CN108691420A - A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate - Google Patents

A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate Download PDF

Info

Publication number
CN108691420A
CN108691420A CN201710228240.0A CN201710228240A CN108691420A CN 108691420 A CN108691420 A CN 108691420A CN 201710228240 A CN201710228240 A CN 201710228240A CN 108691420 A CN108691420 A CN 108691420A
Authority
CN
China
Prior art keywords
installation
sphere
movements
steel
shape frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710228240.0A
Other languages
Chinese (zh)
Inventor
李志红
汪从
梁广远
刘贵斌
董健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710228240.0A priority Critical patent/CN108691420A/en
Publication of CN108691420A publication Critical patent/CN108691420A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate, it is characterised in that include the following steps:A, operating platform is made(1), b, in operating platform(1)On completely spread steel wire(9), c, in operating platform(1)Respectively a motor hoist is fixed in installation on four angles(11), four d, processing lifting clamps(12), when e, mounting purlines hide type profiled sheet composite heat-insulation roof bottom plate, use four motor hoists(11)By operating platform(1)It is promoted to the installation that suitable height carries out bottom plate.The present invention has installation procedure novel design, operability strong, it avoids and carries out high-altitude installation using unstable reinforcing bar cage, installation personnel operates more stable on platform, reduce the security risk of installation personnel, installation personnel operates more stable on platform, the advantages of substantially increasing installation quality, improving installation effectiveness and reduce engineering cost.

Description

A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate
Technical field
The present invention relates to a kind of installation methods of the double-deck roofing profiled sheet bottom plate, specifically, being that a kind of purlin is dark The installation method of concealed bilayer roofing profiled sheet bottom plate.
Background technology
Steel structural plant roof building enclosure generally use profiled sheet composite heat-insulation roof system, construction features:It is applying Work scene after structural framework installs, is fixed in upper layer and lower layer profiled sheet, upper layer profiled sheet and purlin or special stand Between be laid with thermal insulation material, thermal insulation material generally use glass cotton roll felt, vapor barrier layer is arranged in side to glass cotton roll felt indoors;Heat preservation Waterproof ventilative layer is arranged in material top according to actual needs.This system has following two kinds of structures mode:Purlin concealed type structure, bottom Laminated-type Interal fixation makes interior can't see purlin in the lower surface of steel purlin item:Such construction is not easy to tie up because purlin is not exposed It repaiies, preferably uses zinc-plated purlin, to reach corrosion resistant requirement;Purlin reveals Ming Dynasty style structure, and bottom profiled sheet is fixed on steel purlin item Epicuticle, structure purlin is exposed, adds attached purlin or special stand on bottom profiled sheet, is laid with insulating layer simultaneously fixed upper layer Profiled sheet.This construction does not use and wind load larger area.
Purlin concealed type profiled sheet composite heat-insulation roof bottom plate, due to being fixed on roof purline lower surface, when installation, Lower section does not have a foothold, and conventional method is that nacelle construction is hung on purlin, and nacelle construction narrow space, operator's active receiving Limit, installation effectiveness is low, and the suitable unstability of hanging basket, causes safety accident.
Therefore there is above-mentioned various for known purlin concealed type profiled sheet composite heat-insulation roof bottom plate installing engineering Inconvenient and problem.
Invention content
The purpose of the present invention is to propose a kind of safe and efficient purlin concealed type bilayer roofing profiled sheet bottom plate Installation method.
It is another object of the present invention to propose a kind of purlin concealed type bilayer roofing pressure reducing working at height work amount The installation method of shape steel plate bottom plate.
To achieve the above object, technical solution of the invention is:
A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate, it is characterised in that include the following steps:
A, operating platform is made, is included the following steps:
(1)Be welded into sphere of movements for the elephants shape frame with 80X40X2mm rectangular tubes, the length and width of operating platform be according to steel structural roof beam it Between spacing determine, be equal to or more than spacing between roof girder;
(2)3 50X30X2mm rectangular tube secondary beams are equidistantly welded in each grid of sphere of movements for the elephants shape frame, in sphere of movements for the elephants shape 1 section of 80X40X2mm rectangular tube is respectively welded as elevator fixed beam in 4 angles of frame 2;
(3)A 1100mm long, 80X40X2mm rectangles are welded in the vertical sphere of movements for the elephants shape frame plane of sphere of movements for the elephants shape frame center point Tube column;
(4)Using 8 80X40X2mm rectangular tubes as diagonal brace by 5 top of column and four angles of sphere of movements for the elephants shape frame and four Side central point connection;
(5)Perpendicular to sphere of movements for the elephants shape frame plane on the intersection point of projection and beam of each diagonal brace on sphere of movements for the elephants shape frame plane One section of 50X30X2mm rectangular tube is welded as vertical support rod,
(6)The 80X40X2mm rectangular tubes of one section of 1200mm long of vertical welding are as platform branch on four angles of sphere of movements for the elephants shape frame Leg(8), 80X40X2mm rectangular tubes is used in combination to connect supporting leg with the central point on four sides of sphere of movements for the elephants shape frame;
B, steel wire is completely spread on the operational platform, and 12 pieces of wooden springboards are then fixed on steel wire;The 12 wooden springboards are in sphere of movements for the elephants shape Frame surface is arranged in two columns, is mutually arranged with proportional spacing per the wooden springboard in 6 pieces of column;
C, respectively a motor hoist is fixed in installation on four angles of operating platform;
D, four lifting clamps are processed, fixture is equipped with the symmetrically arranged steel clamp plate of two panels, and one end of steel clamp plate is to link up with to hook On the bottom wing listrium of roof girder, the other end of steel clamp plate is connect with steel wire rope;
E, when mounting purlines hide type profiled sheet composite heat-insulation roof bottom plate, four lifting clamps are electronic with four respectively Steel wire rope connection on elevator, then four lifting clamps are stuck on the bottom wing listrium of adjacent two roof girder;Bottom plate is installed When, operating platform, which is promoted to suitable height, carries out bottom on the operational platform, using four motor hoists at installation personnel station The installation of laminate.
The installation method of the purlin concealed type bilayer roofing profiled sheet bottom plate of the present invention can also use skill below Art measure further realizes.
Method above-mentioned, wherein the two panels steel clamp plate of the fixture is 7 Zee bar steel Z clamping plate of two panels, one end of every steel clamp plate Equipped with hook, the other end is equipped with a through-hole, and bolt is arranged in through-holes and is flexibly connected 7 Zee bar steel Z clamping plate of two panels, makes 7 font of two panels The V-shaped connection of steel clamp plate also is provided with a through-hole in the middle part of every steel clamp plate, provides a steel wire rope, one end of steel wire rope is made to penetrate The through-hole at the middle part of a piece of steel clamp plate, then the through-hole at the middle part of another steel clamp plate is penetrated from the other side of another steel clamp plate, It is finally fixedly clamped to form a steel wire hanging ring by aperture in the middle part of 7 Zee bar steel Z clamping plate of two panels with steel wire.
Method above-mentioned, wherein the steel wire hanging ring can make hook activity in its folding range of every steel clamp plate.
After adopting the above technical scheme, the installation method of the purlin concealed type bilayer roofing profiled sheet bottom plate of the present invention It has the following advantages:
1, installation procedure is novel in design, operability is strong;
2, it avoids and carries out high-altitude installation using unstable reinforcing bar cage, installation personnel operates more stable, reduction on platform The security risk of installation personnel, installation personnel operate on platform more stable, substantially increase installation quality;
3, installation effectiveness is improved, engineering cost is reduced.
Description of the drawings
Fig. 1 is the sphere of movements for the elephants shape circuit theory schematic diagram of the embodiment of the present invention;
Fig. 2 is the sphere of movements for the elephants shape frame welding secondary beam and elevator fixed beam schematic diagram of the embodiment of the present invention;
Fig. 3 is that column schematic diagram is welded among the sphere of movements for the elephants shape frame of the embodiment of the present invention;
Fig. 4 is the sphere of movements for the elephants shape frame welding diagonal brace schematic diagram of the embodiment of the present invention;
Fig. 5 is the sphere of movements for the elephants shape frame welding vertical support schematic diagram of the embodiment of the present invention;
Fig. 6 is the operating platform structural schematic diagram of the embodiment of the present invention;
Fig. 7 is the operating platform steel wire of the embodiment of the present invention and the wooden springboard arrangement schematic diagram;
Fig. 8 is the structural schematic diagram of the lifting clamp of the embodiment of the present invention;
Fig. 9 is the hoist installation and bottom plate scheme of installation of the embodiment of the present invention.
Specific implementation mode
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The installation method of the purlin concealed type bilayer roofing profiled sheet bottom plate of the present invention includes the following steps.
It is the sphere of movements for the elephants shape circuit theory schematic diagram of the embodiment of the present invention referring now to Fig. 1, Fig. 1.
1, an operating platform 1 is processed, 1 procedure of processing of operating platform is as follows:First it is welded into " field " with 80X40X2 rectangular tubes Glyph framework 2, the length and width of operating platform are determined according to spacing between steel structural roof beam, be equal to or slightly greater than roof girder it Between spacing.
3 50X30X2mm rectangular tubes secondary beams 3 are equidistantly welded in 2 each grid of sphere of movements for the elephants shape frame again, in sphere of movements for the elephants 1 section of 80X40X2mm rectangular tube is respectively welded as elevator fixed beam 4 in 4 angles of shape frame 2.Fig. 2 is the embodiment of the present invention Sphere of movements for the elephants shape frame welding secondary beam and elevator fixed beam schematic diagram.
Again a 1100mm long, 80X40X2mm squares are welded in the vertical sphere of movements for the elephants shape frame plane of sphere of movements for the elephants shape frame center Shape tube column 5.Fig. 3 is that column schematic diagram is welded among the sphere of movements for the elephants shape frame of the embodiment of the present invention.
Using 8 80X40X2mm rectangular tubes as diagonal brace 6 by four angles and four on 5 top of column and sphere of movements for the elephants shape frame 2 A side center connection.Fig. 4 is the sphere of movements for the elephants shape frame welding diagonal brace schematic diagram of the embodiment of the present invention.
Perpendicular to sphere of movements for the elephants shape frame 2 on the intersection point of projection and beam of each diagonal brace 6 in 2 plane of sphere of movements for the elephants shape frame One section of 50X30X2mm rectangular tube of plane-welding is as vertical support 7.Fig. 5 is the sphere of movements for the elephants shape frame welding of the embodiment of the present invention Vertical support schematic diagram.
The 80X40X2mm rectangular tubes of one section of 1200mm long of vertical welding are as platform on 2 four angles of sphere of movements for the elephants shape frame Supporting leg 8 is used in combination 80X40X2mm rectangular tubes to connect supporting leg 8 with the center on four sides of sphere of movements for the elephants shape frame 2.Fig. 6 is the present invention The operating platform structural schematic diagram of embodiment.
2, steel wire 9 is completely spread on operating platform 1, then the fixed wooden springboard 10.Fig. 7 is that the operation of the embodiment of the present invention is flat Platform steel wire and the wooden springboard arrangement schematic diagram.
3, respectively a motor hoist 11 is fixed in installation on 1 four angles of operating platform.
4, four lifting clamps 12 are processed using 16mm steel plates.Four lifting clamps 12 are stuck in adjacent two roof girder 13 Bottom wing listrium on;When bottom plate is installed, installation personnel station will be operated on operating platform 1 using four motor hoists 11 Platform 1 is promoted to the installation that suitable height carries out bottom plate.The two panels steel clamp plate of fixture 12 is 7 Zee bar steel Z clamping plate of two panels, often One end of piece steel clamp plate is equipped with hook 14, and the other end is equipped with a through-hole, and bolt is arranged in through-holes and is flexibly connected 7 Zee bar steel Z of two panels Clamping plate makes the 7 V-shaped connection of Zee bar steel Z clamping plate of two panels, also is provided with a through-hole in the middle part of every steel clamp plate, provides a steel wire rope, make One end of steel wire rope penetrates the through-hole at the middle part of a piece of steel clamp plate, then penetrates another steel clamp from the other side of another steel clamp plate The through-hole at the middle part of plate, being finally fixedly clamped with steel wire to form a steel wire by aperture in the middle part of 7 Zee bar steel Z clamping plate of two panels and hangs Ring.It is movable in range that the steel wire hanging ring can be such that the hook 14 of every steel clamp plate is opened and closed at it.Fig. 8 is carrying for the embodiment of the present invention Rise the structural schematic diagram of fixture.
5, when mounting purlines hide type profiled sheet composite heat-insulation roof bottom plate, by four lifting clamps 12 respectively with four Steel wire rope on platform motor hoist 11 connects, then four lifting clamps 12 are stuck in the bottom wing listrium of adjacent two roof girder 13 On, when bottom plate is installed, operating platform 1 is promoted to by installation personnel station on operating platform 1, using four motor hoists 11 Suitable height carries out the installation of bottom plate.Fig. 9 is the hoist installation and bottom plate scheme of installation of the embodiment of the present invention.
The present invention has substantive distinguishing features and significant technological progress, purlin concealed type bilayer roofing die mould steel of the invention The installation method of board bottom laminate improves installation quality:It avoids and carries out high-altitude installation using unstable reinforcing bar cage, people is installed Member operates more stable on platform, substantially increases installation quality, reduces security risk, improve installation effectiveness, saves cost.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate, it is characterised in that include the following steps:
A, operating platform is made(1), include the following steps:
(1)It is welded into sphere of movements for the elephants shape frame with 80X40X2mm rectangular tubes(2), the length and width of operating platform are according to steel structural roof Spacing determines between beam, is equal to or more than spacing between roof girder;
(2)In sphere of movements for the elephants shape frame(2)Each grid in equidistantly weld 3 50X30X2mm rectangular tube secondary beams(3), Sphere of movements for the elephants shape frame(2)4 angles respectively welding 1 section of 80X40X2mm rectangular tube as elevator fixed beam(4);
(3)A 1100mm long, 80X40X2mm rectangles are welded in the vertical sphere of movements for the elephants shape frame plane of sphere of movements for the elephants shape frame center point Tube column(5);
(4)Using 8 80X40X2mm rectangular tubes as diagonal brace(6)By 5 top of column and sphere of movements for the elephants shape frame(2)Four angles It is connected with four side central points;
(5)In each diagonal brace(6)In sphere of movements for the elephants shape frame(2)Projection in plane and on the intersection point of beam perpendicular to sphere of movements for the elephants shape frame Frame(2)One section of 50X30X2mm rectangular tube of plane-welding is as vertical support rod(7),
(6)In sphere of movements for the elephants shape frame(2)The 80X40X2mm rectangular tubes of one section of 1200mm long of vertical welding are as platform on four angles Supporting leg(8), it is used in combination 80X40X2mm rectangular tubes by supporting leg(8)With sphere of movements for the elephants shape frame(2)Four sides central point connection;
B, in operating platform(1)On completely spread steel wire(9), 12 pieces of wooden springboards are then fixed on steel wire(10);The 12 wooden springboards In sphere of movements for the elephants shape frame(2)Surface is arranged in two columns, is mutually arranged with proportional spacing per the wooden springboard in 6 pieces of column;
C, in operating platform(1)Respectively a motor hoist is fixed in installation on four angles(11);
D, four lifting clamps are processed(12), for fixture equipped with the symmetrically arranged steel clamp plate of two panels, one end of steel clamp plate is hook (14)To be hooked on roof girder(13)Bottom wing listrium on, the other end of steel clamp plate is connect with steel wire rope;
E, when mounting purlines hide type profiled sheet composite heat-insulation roof bottom plate, by four lifting clamps(12)Respectively with four Motor hoist(11)On steel wire rope connection, then by four lifting clamps(12)It is stuck in adjacent two roof girder(13)Lower flange On plate;When bottom plate is installed, installation personnel station is in operating platform(1)On, use four motor hoists(11)By operating platform (1)It is promoted to the installation that suitable height carries out bottom plate.
2. the method for purlin concealed type bilayer roofing profiled sheet bottom plate as described in claim 1, which is characterized in that described Fixture(12)Two panels steel clamp plate be 7 Zee bar steel Z clamping plate of two panels, one end of every steel clamp plate is equipped with hook(14), the other end is equipped with One through-hole is arranged bolt and is flexibly connected 7 Zee bar steel Z clamping plate of two panels, makes the 7 V-shaped connection of Zee bar steel Z clamping plate of two panels, often in through-holes It also is provided with a through-hole in the middle part of piece steel clamp plate, a steel wire rope is provided, one end of steel wire rope is made to penetrate the middle part of a piece of steel clamp plate Through-hole, then the through-hole at the middle part of another steel clamp plate is penetrated from the other side of another steel clamp plate, finally it is fixedly clamped with steel wire Form a steel wire hanging ring by aperture in the middle part of 7 Zee bar steel Z clamping plate of two panels.
3. the method for purlin concealed type bilayer roofing profiled sheet bottom plate as claimed in claim 2, which is characterized in that described Steel wire hanging ring can make the hook of every steel clamp plate(14)It is movable in range to be opened and closed at it.
CN201710228240.0A 2017-04-10 2017-04-10 A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate Pending CN108691420A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710228240.0A CN108691420A (en) 2017-04-10 2017-04-10 A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710228240.0A CN108691420A (en) 2017-04-10 2017-04-10 A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate

Publications (1)

Publication Number Publication Date
CN108691420A true CN108691420A (en) 2018-10-23

Family

ID=63842269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710228240.0A Pending CN108691420A (en) 2017-04-10 2017-04-10 A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate

Country Status (1)

Country Link
CN (1) CN108691420A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321850A (en) * 2020-03-11 2020-06-23 五冶集团上海有限公司 Construction method of steel structure roof steel wire mesh

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
JP5039374B2 (en) * 2006-12-13 2012-10-03 新明和エンジニアリング株式会社 Working device in mechanical parking device and its working method
CN103741941A (en) * 2014-01-16 2014-04-23 江苏博宇建筑工程设备科技有限公司 Large-span corridor basket
CN204826594U (en) * 2015-03-27 2015-12-02 河北工业大学 High altitude is work platform system for construction robot
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5039374B2 (en) * 2006-12-13 2012-10-03 新明和エンジニアリング株式会社 Working device in mechanical parking device and its working method
CN101672102A (en) * 2009-10-19 2010-03-17 中铁建设集团有限公司 Steel structural overhead ceiling construction platform
CN103741941A (en) * 2014-01-16 2014-04-23 江苏博宇建筑工程设备科技有限公司 Large-span corridor basket
CN204826594U (en) * 2015-03-27 2015-12-02 河北工业大学 High altitude is work platform system for construction robot
CN106437179A (en) * 2016-11-16 2017-02-22 上海通用金属结构工程有限公司 Device for steel structure roof ceiling floor construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王心田等: "《道路结构体系与选型》", 30 September 2003 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111321850A (en) * 2020-03-11 2020-06-23 五冶集团上海有限公司 Construction method of steel structure roof steel wire mesh

Similar Documents

Publication Publication Date Title
CN106337589B (en) Adjustable frustum of a cone class Hold Ceiling lift umbrella shape load steel structure and its construction method
CN201297036Y (en) Discharging platform
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN204163364U (en) A kind of elevator shaft formwork and operation steel platform
CN210084736U (en) A portable lifting hook for installation of people's air defense door
CN206233546U (en) A kind of elevator hoistways workbench
CN108691420A (en) A kind of installation method of purlin concealed type bilayer roofing profiled sheet bottom plate
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN108301630A (en) A kind of turnable assembled protection shed device and its application method
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN107795133B (en) Integral protective frame platform and construction method thereof
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN110778009A (en) Suspended ceiling structure
CN215101546U (en) Chinese ancient architecture pavilion maintenance and roof lifting device
CN201915630U (en) Combined platform of fire control joint gallery form supporting steel beam
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN205063310U (en) Multi -functional operation platform of liftable formula in elevartor shaft
CN215291333U (en) Safe and economical combined hanging basket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181023

RJ01 Rejection of invention patent application after publication