CN108590227A - A kind of Core Walls Structure express passway that people's goods is dual-purpose - Google Patents

A kind of Core Walls Structure express passway that people's goods is dual-purpose Download PDF

Info

Publication number
CN108590227A
CN108590227A CN201810731139.1A CN201810731139A CN108590227A CN 108590227 A CN108590227 A CN 108590227A CN 201810731139 A CN201810731139 A CN 201810731139A CN 108590227 A CN108590227 A CN 108590227A
Authority
CN
China
Prior art keywords
people
core walls
walls structure
dual
aisle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810731139.1A
Other languages
Chinese (zh)
Inventor
黄瑶鑫
邹乐
吴昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201810731139.1A priority Critical patent/CN108590227A/en
Publication of CN108590227A publication Critical patent/CN108590227A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G27/00Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down

Abstract

The present invention proposes a kind of Core Walls Structure express passway that people's goods is dual-purpose, including:Aisle platform, it is disposed in proximity in the Core Walls Structure coupling beam of people's Cargo Lift side, the horizontal girder steel of aisle platform one end is anchored in Core Walls Structure coupling beam, the horizontal girder steel of the other end overhangs to people's Cargo Lift ladder cage doorway, the overhanging is that the horizontal girder steel of the aisle platform is connected and fixed on by steel wire rope in upper track coupling beam, wherein, foot guard plate, guardrail and edge protection are provided on the aisle platform.The dual-purpose Core Walls Structure express passway of people's goods proposed by the present invention, it is about 300Kg that people's Cargo Lift, which overhangs aisle platform weight, simple and light easy for construction.The time required to greatly reducing personnel's lower work face in actual use, the safety of construction equipment is carried when greatly improving worker or more vertical channel.Aisle platform safety is firm in actual use, and is additionally arranged at the bottom limit measure in aisle while also playing the measure of protection finished product.

Description

A kind of Core Walls Structure express passway that people's goods is dual-purpose
Technical field
The invention belongs to architectural engineering construction technique fields, relate generally to the technical measures in Super High work progress, tool Body is a kind of Core Walls Structure express passway that people's goods is dual-purpose.
Background technology
Outline border Construction of Steel Structure vertical channel mainly has the plug-in steel of outline border to climb in existing Construction Technology of Super Tall Buildingin measure Ladder, Core Walls Structure lateral crus hand or shaping operation platform vertical channel.Its main working measure is:Plug-in steel cat ladder mainly uses side Pipe or reinforcement fabrication molding, generally in place with steel column lifting installation, disadvantage is single cat ladder limited height, because it is dangerous high Degree may be only configured in outline border story height or 5 meters, the outer operating platform vertical channel of Core Walls Structure mainly set up using scaffold tubes or Square tube make molding, generally set up after the completion of outline border steel girder erection or this turned over, disadvantage be because material utilization amount is larger can not Every layer of setting of energy, it is relatively time-consuming laborious above and below personnel in the case of height difference is excessively high.
Invention content
Because pioneer Construction of Steel Structure of the steel construction in construction of super highrise building need to surpass civil construction multilayer, and because of superelevation People's Cargo Lift is only to steel platform operating surface at the top of Core Walls Structure in layer core wall structure diversity Core Walls Structure, to solve Construction of Steel Structure Personnel in the safety of outline border working face vertical channel, reliability and economy by means of people's Cargo Lift in Core Walls Structure, in steel construction Construction working face setting people's Cargo Lift overhangs aisle platform and facilitates worker or more.
In order to achieve the above object, the present invention proposes a kind of Core Walls Structure express passway that people's goods is dual-purpose, including:
Aisle platform is disposed in proximity in the Core Walls Structure coupling beam of people's Cargo Lift side, the level of aisle platform one end Girder steel is anchored in Core Walls Structure coupling beam, and the horizontal girder steel of the other end overhangs to people's Cargo Lift ladder cage doorway, and the overhanging is walked for described in The horizontal girder steel of road platform is connected and fixed on by steel wire rope in upper track coupling beam,
Wherein, foot guard plate, guardrail and edge protection are provided on the aisle platform.
Further, the horizontal girder steel of the aisle platform is fixedly connected by embedded part with Core Walls Structure coupling beam.
Further, the girder of the aisle platform and secondary beam are made using No. 14 channel steels.
Further, the guardrail and edge protection are made of 25mm square tubes.
Further, the edge protection is provided with protective door.
Further, the edge protection and the height of protective door are 1.8 meters.
Further, the height of the guardrail is 1.2 meters.
Further, the cantilever span of the horizontal girder steel of the aisle platform is 1.76m, and the anchoring in Core Walls Structure coupling beam is grown Degree is 0.76m, and it is 0.70m to overhang the horizontal girder steel spacing i.e. width of aisle platform.
Further, the overhanging of the aisle platform is to be connected in upper track coupling beam by unloading first, flower basket bolt and steel wire rope Anchor point, then under tower crane hook conversion suspension centre, aisle platform is pushed into installation site, is welded and fixed after dropping place, gets rid of the tight gaily decorated basket Bolt.
Further, steel mesh piece is completely spread on the aisle platform.
The dual-purpose Core Walls Structure express passway of people's goods proposed by the present invention, it is about 300Kg that people's Cargo Lift, which overhangs aisle platform weight, It is simple and light easy for construction.The time required to greatly reducing personnel's lower work face in actual use, it is greatly improved Worker up and down vertical channel when carry the safety of construction equipment.Aisle platform safety is firm in actual use, and It is additionally arranged at the bottom limit measure in aisle while also playing the measure of protection finished product.
Description of the drawings
Fig. 1 show the dual-purpose Core Walls Structure express passway structural schematic diagram of people's goods of present pre-ferred embodiments.
It is the dual-purpose Core Walls Structure express passway floor plan of people's goods shown in Fig. 2.
It is the dual-purpose Core Walls Structure express passway edge protection elevation of people's goods shown in Fig. 3.
Specific implementation mode
The specific implementation mode of the present invention is provided below in conjunction with attached drawing, but the present invention is not limited to the following embodiments and the accompanying drawings.Root According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing be all made of it is very simple The form of change and use non-accurate ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
It please refers to Fig.1 and Fig. 2, Fig. 1 show the dual-purpose Core Walls Structure express passway knots of people's goods of present pre-ferred embodiments Structure schematic diagram.It is the dual-purpose Core Walls Structure express passway floor plan of people's goods shown in Fig. 2.The present invention proposes that a kind of people's goods is dual-purpose Core Walls Structure express passway, including:
Aisle platform 10 is disposed in proximity in people's Cargo Lift side Core Walls Structure coupling beam 100, described 10 one end of aisle platform Horizontal girder steel 20 be anchored in Core Walls Structure coupling beam 100, the horizontal girder steel 20 of the other end overhangs to people's Cargo Lift ladder cage doorway, described Overhanging is that the horizontal girder steel 20 of the aisle platform is connected and fixed on by steel wire rope 200 in upper track coupling beam 300, wherein described Foot guard plate 400, guardrail 500 and edge protection 600 are provided on aisle platform 10.
Main installation steps are that people's Cargo Lift aisle platform is hung to the required work surface installed, installation insurance using tower crane Rope, is welded and fixed, and is listed and comes into operation after acceptance(check).
According to present pre-ferred embodiments, the horizontal girder steel 20 of the aisle platform 10 is connected by embedded part 700 and Core Walls Structure Beam 100 is fixedly connected.
The girder and secondary beam of the aisle platform 10 are made using No. 14 channel steels.The guardrail 500 and edge protection 600 are adopted It is made of 25mm square tubes.Safety rope uses Φ 16mm 6x37+FC-1670MPa steel wire ropes, 2t bow shackles, 1.6t OO type spiral shells Spinner.
Referring to FIG. 3, being the dual-purpose Core Walls Structure express passway edge protection elevation of people's goods shown in Fig. 3.The aisle is flat Completely spread steel mesh piece on platform, the edge protection 600 is provided with protective door 700, and the height of the edge protection and protective door is 1.8 The height of rice, the guardrail is 1.2 meters.
The cantilever span of the horizontal girder steel of the aisle platform is 1.76m, and the anchorage length in Core Walls Structure coupling beam is 0.76m, it is 0.70m to overhang the horizontal girder steel spacing i.e. width of aisle platform.Allowable bearing evenly load 1.50kN/m2, most Raft putting material load 0.50kN.Through design checking, people's Cargo Lift overhanging aisle platform meets stability requirement, safety rope and embedded part Meet requirement for bearing capacity.
Main installation steps are that people's Cargo Lift aisle platform is hung to the required work surface installed using tower crane, and the aisle is flat The overhanging of platform is by unloading the anchor point in first, flower basket bolt and steel wire rope connection upper track coupling beam, then hooking conversion under tower crane and hang Aisle platform is pushed into installation site, is welded and fixed after dropping place, gets rid of tight flower basket bolt by point.When turning over again, first connected using tower crane Suspension centre is connect, subsequent gas cutting cuts off aisle platform and embedded part tie point, and loose flower basket bolt and steel wire rope tower crane are hooked up and turned over.
In actual use, people's Cargo Lift overhangs aisle platform significant increase construction efficiency.Site operation personnel indicate This measure brings great convenience for upper and lower work surface, and personnel need not use in carrying tool climbing composite steel cat ladder Work surface only needs 5 minutes up and down after this aisle platform, while it is hidden to decrease the safety such as falling object from high altitude and personnel's high falling Suffer from.
In conclusion the Core Walls Structure express passway that people's goods proposed by the present invention is dual-purpose, people's Cargo Lift overhangs aisle platform weight About 300Kg, it is simple and light easy for construction.Personnel's lower work face is greatly reduced in actual use to be taken Between, the safety of construction equipment is carried when greatly improving worker or more vertical channel.Aisle platform in actual use Safety and firmness, and be additionally arranged at the bottom limit measure in aisle while also playing the measure of protection finished product.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause This, the scope of protection of the present invention is defined by those of the claims.

Claims (10)

1. a kind of Core Walls Structure express passway that people's goods is dual-purpose, which is characterized in that including:
Aisle platform is disposed in proximity in the Core Walls Structure coupling beam of people's Cargo Lift side, the horizontal girder steel of aisle platform one end It is anchored in Core Walls Structure coupling beam, the horizontal girder steel of the other end overhangs to people's Cargo Lift ladder cage doorway, and the overhanging is that the aisle is flat The horizontal girder steel of platform is connected and fixed on by steel wire rope in upper track coupling beam,
Wherein, foot guard plate, guardrail and edge protection are provided on the aisle platform.
2. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the water of the aisle platform Flat girder steel is fixedly connected by embedded part with Core Walls Structure coupling beam.
3. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the master of the aisle platform Beam and secondary beam are made using No. 14 channel steels.
4. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the guardrail and face frontier defense Shield is made of 25mm square tubes.
5. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the edge protection setting There is protective door.
6. the dual-purpose Core Walls Structure express passway of people's goods according to claim 5, which is characterized in that the edge protection and anti- The height for protecting door is 1.8 meters.
7. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the height of the guardrail is 1.2 rice.
8. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the water of the aisle platform The cantilever span of flat girder steel is 1.76m, and the anchorage length in Core Walls Structure coupling beam is 0.76m, overhangs horizontal girder steel spacing i.e. aisle The width of platform is 0.70m.
9. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that the aisle platform hangs It chooses by unloading the anchor point in first, flower basket bolt and steel wire rope connection upper track coupling beam, conversion suspension centre then to be hooked under tower crane, will be walked Road platform is pushed into installation site, is welded and fixed after dropping place, gets rid of tight flower basket bolt.
10. the dual-purpose Core Walls Structure express passway of people's goods according to claim 1, which is characterized in that on the aisle platform Completely spread steel mesh piece.
CN201810731139.1A 2018-07-05 2018-07-05 A kind of Core Walls Structure express passway that people's goods is dual-purpose Pending CN108590227A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810731139.1A CN108590227A (en) 2018-07-05 2018-07-05 A kind of Core Walls Structure express passway that people's goods is dual-purpose

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810731139.1A CN108590227A (en) 2018-07-05 2018-07-05 A kind of Core Walls Structure express passway that people's goods is dual-purpose

Publications (1)

Publication Number Publication Date
CN108590227A true CN108590227A (en) 2018-09-28

Family

ID=63614958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810731139.1A Pending CN108590227A (en) 2018-07-05 2018-07-05 A kind of Core Walls Structure express passway that people's goods is dual-purpose

Country Status (1)

Country Link
CN (1) CN108590227A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965808A (en) * 2019-11-26 2020-04-07 上海二十冶建设有限公司 Construction method of externally hung stair and packway of fabricated building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671575A1 (en) * 1991-01-10 1992-07-17 Roussel Daniel Guard rail for shuttering boards (wall forms)
CN202125079U (en) * 2011-06-01 2012-01-25 山东宁建建设集团有限公司 Construction-elevator overhanging type discharging platform device
CN103174303A (en) * 2011-12-23 2013-06-26 五冶集团上海有限公司 Movable overhung unloading platform and manufacture and installation method thereof
CN204001751U (en) * 2014-06-11 2014-12-10 中建钢构有限公司 Super high steel structure construction overhanging unloading platform
CN105401733A (en) * 2015-12-03 2016-03-16 上海建工一建集团有限公司 Channel connecting core barrel with peripheral steel structure and construction method for channel
CN208564047U (en) * 2018-07-05 2019-03-01 上海市机械施工集团有限公司 A kind of people's Cargo Lift overhanging aisle platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2671575A1 (en) * 1991-01-10 1992-07-17 Roussel Daniel Guard rail for shuttering boards (wall forms)
CN202125079U (en) * 2011-06-01 2012-01-25 山东宁建建设集团有限公司 Construction-elevator overhanging type discharging platform device
CN103174303A (en) * 2011-12-23 2013-06-26 五冶集团上海有限公司 Movable overhung unloading platform and manufacture and installation method thereof
CN204001751U (en) * 2014-06-11 2014-12-10 中建钢构有限公司 Super high steel structure construction overhanging unloading platform
CN105401733A (en) * 2015-12-03 2016-03-16 上海建工一建集团有限公司 Channel connecting core barrel with peripheral steel structure and construction method for channel
CN208564047U (en) * 2018-07-05 2019-03-01 上海市机械施工集团有限公司 A kind of people's Cargo Lift overhanging aisle platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965808A (en) * 2019-11-26 2020-04-07 上海二十冶建设有限公司 Construction method of externally hung stair and packway of fabricated building

Similar Documents

Publication Publication Date Title
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN207144449U (en) A kind of hoistway operation platform
CN102535845A (en) Construction method of bearing frame of corridor structure
CN105908960B (en) Scaffold for large space construction
CN205955237U (en) Plug -type platform of unloading of encorbelmenting
CN107700719A (en) A kind of hanging method of high-rise building glass curtain wall
CN203487803U (en) Safety protection structure for elevator shaft construction
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN201826542U (en) Self-climbing protective screening
CN208564047U (en) A kind of people's Cargo Lift overhanging aisle platform
CN209723438U (en) A kind of novel coagulation body precast stair plate
CN202990427U (en) Climbing discharging platform
CN106150057A (en) A kind of split blade type hydraulic pressure lift climbing frame
CN108590227A (en) A kind of Core Walls Structure express passway that people's goods is dual-purpose
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN113062584A (en) Multipoint elevator shaft construction lifting platform and construction method
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN106193621A (en) Fabricated construction superimposed sheet string hangs construction method
CN216810895U (en) Elevator shaft operation platform
CN203654754U (en) Double-layered overhanging type discharging platform
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN214828568U (en) Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame
CN205894715U (en) Light steel structure is semi -automatic under enclosed construction constructs from hoisting machine that climbs
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN201495786U (en) Lifting type insulation and protective device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180928