CN214828568U - Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame - Google Patents
Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame Download PDFInfo
- Publication number
- CN214828568U CN214828568U CN202121136303.8U CN202121136303U CN214828568U CN 214828568 U CN214828568 U CN 214828568U CN 202121136303 U CN202121136303 U CN 202121136303U CN 214828568 U CN214828568 U CN 214828568U
- Authority
- CN
- China
- Prior art keywords
- frame
- passageway
- tower crane
- tail end
- pull rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a tower crane pedestrian passageway along with climbing frame whole promotion, including passageway frame, footboard, pull rod, railing, the passageway frame is truss structure and head end and climbs the frame articulated or overlap joint, and the pull rod establishes a plurality of through-holes II for rigidity pole and head end and/or tail end interval, and passageway frame tail end extends to nearly tower crane standard festival, and the pull rod both ends can be dismantled with the pole setting of climbing frame and the tail end of passageway frame and be connected and at least one end and pass through-hole II articulated, and the footboard is laid on the passageway frame, and the railing is fixed in passageway frame both sides. The utility model discloses with the passageway frame head end with climb the articulated or overlap joint of frame to with the pull rod that is equipped with a plurality of through-holes II and the pole setting and the passageway frame tail end connection of climbing the frame, form stable and angle-adjustable triangle-shaped rigidity passageway, can not only climb along with climbing the frame, and can be according to climbing position adjustment and standard frame angle of connection, solved current tower crane pedestrian passageway repeated construction and have the problem of potential safety hazard, have simple structure, adjust convenient, safe and reliable, can repeatedly have enough to meet the need characteristics of use.
Description
Technical Field
The utility model belongs to the technical field of construction machinery, concretely relates to tower crane pedestrian passageway along with climbing frame whole promotion.
Background
In the construction of high-rise building engineering, a tower crane is the most common hoisting equipment. The tower crane promotes gradually because can be along with the increasing of construction building, though the high tower department still accessible tower crane standard festival ladder bare-handed climbing gets into the tower crane control chamber on duty when lower, nevertheless along with the building constantly risees, the climbing of tower department will become very consuming time and difficulty, not only influences work efficiency, and the potential safety hazard of high altitude climbing is also more outstanding moreover.
Because the tower crane has certain distance from the structure floor, in order to solve the problem of the tower crane, a temporary pedestrian passageway needs to be erected at a proper height between the tower body of the tower crane and the floor of the building so as to shorten the climbing distance of the tower crane. At present, a tower crane pedestrian passageway is generally erected on floors and tower bodies by adopting steel pipes, wood springboards, fasteners, dense mesh nets and the like, the tower crane pedestrian passageway needs to be repeatedly installed and disassembled along with the rising of the height of the tower bodies and the height of the floors, the higher the height of a building, the more times of disassembly and assembly, a large amount of manpower is consumed, and the operation needs to be carried out in the high altitude during erection and disassembly, so that the potential safety hazard is greater. In order to solve the problem that the pedestrian passageway needs to be repeatedly disassembled and assembled, the pedestrian passageway is also manufactured into a plurality of modules, and the modules are assembled after being respectively hoisted to a preset floor, so that the problem of low disassembling and assembling efficiency is solved, the working time of a tower crane still needs to be occupied, the assembling workload is not small, and potential safety hazards still exist in high-altitude installation. Therefore, in the prior art, one end of the pedestrian passageway is fixed on a climbing frame of the tower crane, so that the pedestrian passageway can be lifted along with the climbing frame, and the problems of large workload of disassembly and assembly and high-altitude installation safety are solved. But the pedestrian passageway fixedly installed on the climbing frame is difficult to ensure to be aligned with the standard knot after climbing along with the pedestrian passageway, so that the inconvenience of climbing the tower crane in and out of the standard knot is caused, and the high-altitude safety risk is increased. In order to solve the problem that a pedestrian passageway climbing along with a climbing frame is not aligned with a standard knot, a hinged extension frame is added at the tail end of the pedestrian passageway, but because the extension frame cannot be too long, if the dislocation between the pedestrian passageway and the standard knot is large, the slope is large, an inlet and an outlet are narrow, and the problems of inconvenience in entering and exiting and high altitude safety risk are difficult to eliminate. Also have with the pedestrian passageway with climb the frame articulated, then set up the capstan winch on the frame of climbing of pedestrian passageway top, through the trailing end connection of capstan winch control hawser and pedestrian passageway to realize the adjustment of pedestrian passageway and standard festival linking angle, in order to solve the aforementioned problem that exists. However, it should also be seen that, because the mooring rope is in flexible connection, and the pedestrian passageway of the tower crane is generally erected at a high altitude, the safety of passing the tower crane is affected by a large wind pendulum at the high altitude, and the structural reliability of the hinged part of the pedestrian passageway and the climbing frame is reduced due to long-time frequent shaking of the pedestrian passageway, so that serious potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a tower crane pedestrian passageway along with climbing the whole promotion of frame that simple structure, dismouting and adjustment are convenient, safe and reliable, can repeatedly have enough to meet the need the use.
The purpose of the utility model is realized like this: including passageway frame, footboard, pull rod, railing, the passageway frame is truss structure and head end and climbs the frame articulated or overlap joint, the pull rod is provided with a plurality of through-holes II for rigidity pole and head end and/or tail end along vertical difference interval, the tail end of passageway frame extends to nearly tower crane standard festival, the both ends of pull rod are connected and are passed through-hole II articulated with the pole setting of climbing the frame and the tail end detachable of passageway frame and at least one end respectively, the footboard is fixed to be laid on the passageway frame, the railing is fixed respectively in the both sides of setting up in the passageway frame.
The utility model has the advantages that:
1. the utility model discloses a passageway frame head end with climb the frame articulated or overlap joint, and the both ends of pull rod are connected with the pole setting of climbing the frame and the tail end detachable of passageway frame respectively to form stable triangle-shaped rigidity passageway, can form stable being connected with climbing the frame, can promote along with climbing the frame is synchronous, solved traditional tower crane pedestrian's passageway and needed the outstanding difficult problem of repeated dismouting and potential safety hazard.
2. The utility model discloses with climb the frame in order being connected of dismantling the mode, make the utility model discloses and the dismouting of climbing between the frame is comparatively easy, the repeated turnover of being convenient for is used.
3. The utility model discloses a pull rod is rigidity pole and head end and/or tail end along vertically being provided with a plurality of through-hole II respectively at the interval, the pull rod passes through-hole II and climbs the pole setting of frame and the tail end detachable of passageway frame is connected and at least one end passes through-hole II articulated, thereby can climb after the frame is climbed according to the dislocation condition or the tower crane between passageway and standard festival and climb the distance between the frame, the angle of selecting nimble adjustment pedestrian passageway through-hole II makes it correspond or shorten with the standard festival or shorten with the distance between the standard festival, dock with the standard festival under the condition of the less slope of pedestrian passageway, the business turn over of the department of being convenient for, with the great inconvenient and great problem of extension frame slope of business turn over that causes of dislocation among the solution prior art, can improve pedestrian passageway's security and enlarge its application scope.
4. The utility model discloses a pull rod adopts rigid rod and the pole setting of climbing the frame and the tail end of passageway frame to carry out rigid connection, and the passageway frame also is rigid support simultaneously and with climb a rigid hinge or overlap joint, consequently can weaken and even avoid high altitude strong wind to cause the pedestrian passageway to rock to can guarantee the security that tower department passes through, also avoided the wearing and tearing of passageway frame and climbing a articulated portion moreover, thereby eliminate the potential safety hazard of current pylon pedestrian passageway.
To sum up, the utility model has the characteristics of simple structure, adjustment are convenient, safe and reliable, can repeatedly have enough to meet the need the use.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a second schematic structural diagram of the present invention;
FIG. 3 is a top view of FIG. 2 (without the creel and standard section);
FIG. 4 is a right side view of FIG. 3;
in the figure: 1-channel frame, 1-1-hinge point, 1-2-hook, 2-pedal, 3-pull rod, 3-1-through hole II, 4-railing, 4-1-upper guardrail, 4-2-safety net, 5-climbing frame, 5-1-upright rod, 6-tower crane standard knot, 7-bolt, 8-hook lock, 9-turning plate and 10-floor surface.
Detailed Description
The present invention is further described with reference to the following drawings and examples, but the present invention is not limited thereto in any way, and any modification or improvement based on the teaching of the present invention is within the protection scope of the present invention.
As shown in fig. 1 to 4, the utility model discloses an access frame 1, footboard 2, pull rod 3, railing 4, access frame 1 is truss structure and head end and climbs 5 articulated or overlap joint, pull rod 3 is that rigid rod and head end and/or tail end are provided with a plurality of through-holes II 3-1 along vertical interval respectively, access frame 1's tail end extends to nearly tower crane standard festival 6, pull rod 3's both ends are connected and at least one end is passed through-hole II 3-1 with pole setting 5-1 of climbing 5 and access frame 1's tail end detachable respectively and articulated, footboard 2 is fixed to be laid on access frame 1, railing 4 is fixed respectively to be set up in access frame 1's both sides.
As shown in fig. 2, a plurality of through holes ii 3-1 are respectively arranged at two ends of the pull rod 3 at intervals along the longitudinal direction, a through hole i or a stud is vertically arranged on at least one side of the tail end of the channel frame 1, the head end of the pull rod 3 is fixedly connected with the upright rod 5-1 through a bolt 7 which runs through the through hole ii 3-1, the tail end of the pull rod 3 passes through the through hole ii 3-1 through the stud at the tail end of the channel frame 1 and is fixedly connected with a nut, or the tail end of the pull rod 3 is fixedly connected with the bolt 7 which runs through the through hole ii 3-1 and the through hole i at the tail end of the channel frame 1.
The guardrail comprises a guardrail body and is characterized in that a through hole I or a stud is vertically arranged at the tail end, close to the upper guardrail 4-1, of at least one side of the guardrail 4, a plurality of through holes II 3-1 are longitudinally arranged at intervals at the section, close to the upper guardrail, of the pull rod 3, the pull rod 3 is fixedly connected with the upper guardrail 4-1 through bolts 7 passing through the through hole I and the through hole II 3-1, or the pull rod 3 penetrates through the through hole II 3-1 through the stud and is fixedly connected with the stud through nuts.
The tail end of the upper guardrail 4-1 or the channel frame 1 is fixedly provided with a hook lock 8 which can hook the tower crane standard knot 6, so that the safety of the pedestrian channel can be improved when the device is used, and accidents can be avoided when the angle of the pedestrian channel is adjusted through the through hole II 3-1 of the pull rod 3.
The hook lock 8 comprises a steel rope or a mountain-climbing rope and a safety catch connected with the steel rope or the mountain-climbing rope, one end of the steel rope or the mountain-climbing rope is fixed with the tail end of the upper guardrail 4-1 or the tail end of the channel frame 1, and the safety catch is detachably connected with a cross beam or a longitudinal beam of the tower crane standard knot 6.
The tail end of the channel frame 1 is hinged with a turning plate 9 which can be lapped on a cross beam of a standard section 6 of the tower crane.
A supporting beam hinged with the tail end of the channel frame 1 is arranged at the bottom of the turning plate 9, a pedal 2 is fixedly laid at the upper part of the turning plate, and the pedal 2 is a patterned steel plate.
The turnover plate 9 can be folded to coincide with the tail end of the upper guardrail 4-1, and at least one side of the top end of the turnover plate 9 and the tail end of the upper guardrail 4-1 are respectively provided with a chain and a lock which are matched with each other, so that the turnover plate can be closed when a pedestrian passageway is not used or lifted along with a climbing frame.
And steel wire meshes or rope meshes serving as safety meshes 4-2 are fixedly arranged on the railings 4 at the two sides of the channel frame 1 respectively.
The pull rods 3 are respectively arranged on two sides of the channel frame 1.
The supporting beam, the pull rod 3 and/or the upper guardrail 4-1 of the channel frame 1 are angle steel, square steel or channel steel.
The interval between the tail end of the channel frame 1 and the tower crane standard section 6 is 100-300 mm.
The utility model discloses processing and use as follows:
as shown in fig. 2, 3 and 4, during processing, the lengths of the channel frame 1, the pedals 2, the railings 4 and the turning plates 9 are determined according to the distance between the outer vertical surface of the field climbing frame 5 and the standard section 6 of the tower crane, the width of the channel frame 1 is designed according to the width of the standard section 6 of the tower crane, the height of the pull rod 3 positioned on the vertical rod 5-1 of the climbing frame 5 is calculated according to the stress, and finally the length of the pull rod 3 is determined. After determining various size data of the pedestrian passageway of the tower crane, preparing materials in a factory or a construction site for manufacturing, and assembling after experiential folding grids. During assembly, a tower crane is used as auxiliary assembly to lift materials to an installation position, the high-strength bolt 7 is firstly adopted to be connected with a support beam of the manufactured channel frame 1, then the pedal 2 is welded or riveted on the channel frame 1, and then the two sides of the channel frame 1 are connected with the railings 4 through the bolts 7; or the parts except the railing 3 are assembled on the ground and then hoisted, and finally the vertical rod 5-1 of the climbing frame and the channel frame 1 are connected by the pull rod 3 by adopting the high-strength bolt 7, and the climbing frame can be used after acceptance check is finished. And the reverse can be realized when the device is disassembled.
Before using, the board 9 is turned over in earlier packing up of pedestrian's passageway, then promote preset position along with climbing frame 5, be connected coupler lock 8 with the crossbeam or the longeron of tower crane standard festival 6 afterwards, according to the 2 faces of footboard and the 6 dislocation condition between crossbeams of tower crane standard festival of passageway, through-hole II 3-1 position that adjustment pull rod 3 and pole setting 5-1 and/or passageway frame 1 are connected, thereby make 2 faces of footboard and 6 crossbeams of tower crane standard festival of passageway correspond basically, fixed pull rod 3, put down afterwards and turn over board 9 and make it overlap joint on 6 crossbeams of tower crane standard festival, the cost is accomplished this moment utility model and the adjustment between 6 of tower crane standard festival, the tower department can pass through safely. When the tower crane is not used temporarily, the turning plate 9 can be folded and locked with the tail end of the upper guardrail 4-1 by using a ring chain and a lock, so that irrelevant persons can be prevented from intruding.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (8)
1. A tower crane pedestrian passageway integrally lifted along with a climbing frame is characterized by comprising a passageway frame (1), pedals (2), pull rods (3) and railings (4), the channel frame (1) is of a truss structure, the head end of the channel frame is hinged or lapped with the climbing frame (5), the pull rod (3) is a rigid rod, the head end and/or the tail end are/is respectively provided with a plurality of through holes II (3-1) at intervals along the longitudinal direction, the tail end of the channel frame (1) extends to a near tower crane standard knot (6), two ends of the pull rod (3) are detachably connected with a vertical rod (5-1) of the climbing frame (5) and the tail end of the channel frame (1) respectively, at least one end of the pull rod is hinged through a through hole II (3-1), the footboard (2) is fixedly laid on the channel frame (1), and the railings (4) are respectively and fixedly arranged on two sides of the channel frame (1).
2. The tower crane pedestrian passageway capable of being integrally lifted along with the climbing frame is characterized in that a plurality of through holes II (3-1) are longitudinally arranged at two ends of the pull rod (3) at intervals respectively, at least one side of the tail end of the passageway frame (1) is vertically provided with a through hole I or a stud, the head end of the pull rod (3) is fixedly connected with the vertical rod (5-1) through a bolt (7) running through the through hole II (3-1), the tail end of the pull rod (3) passes through the through hole II (3-1) through the stud at the tail end of the passageway frame (1) to be fixedly connected with a nut, or the tail end of the pull rod (3) is fixedly connected with the bolt (7) running through the through hole II (3-1) and the through hole I at the tail end of the passageway frame (1).
3. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to claim 2, characterized in that a through hole I or a stud is vertically arranged near the tail end of the upper guardrail (4-1) at least one side of the railing (4), a plurality of through holes II (3-1) are longitudinally arranged at intervals at least near the section of the upper guardrail (4-1) of the pull rod (3), the pull rod (3) is fixedly connected with the upper guardrail (4-1) through a bolt (7) running through the through hole I and the through hole II (3-1), or the pull rod (3) passes through the through hole II (3-1) through the stud and is fixedly connected with the through hole II (3-1) through a nut.
4. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to claim 3, characterized in that the tail end of the upper guardrail (4-1) or the passageway frame (1) is fixedly provided with a hook lock (8) capable of hooking the standard section (6) of the tower crane.
5. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to claim 1, characterized in that the tail end of the passageway frame (1) is hinged with a turning plate (9) capable of being lapped on a cross beam of a tower crane standard knot (6).
6. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to claim 5, characterized in that a supporting beam hinged with the tail end of the passageway frame (1) is arranged at the bottom of the turning plate (9), a pedal (2) is fixedly paved at the upper part of the turning plate, and the pedal (2) is a patterned steel plate.
7. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to claim 5, characterized in that at least one side of the top end of the turning plate (9) and the tail end of the upper guardrail (4-1) are respectively provided with a ring chain and a lock which are matched with each other.
8. The tower crane pedestrian passageway integrally lifted along with the climbing frame according to any one of claims 1 to 7, characterized in that steel wire meshes or rope meshes are respectively and fixedly arranged on the railings (4) at the two sides of the passageway frame (1) as safety nets (4-2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121136303.8U CN214828568U (en) | 2021-05-26 | 2021-05-26 | Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121136303.8U CN214828568U (en) | 2021-05-26 | 2021-05-26 | Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214828568U true CN214828568U (en) | 2021-11-23 |
Family
ID=78775351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121136303.8U Active CN214828568U (en) | 2021-05-26 | 2021-05-26 | Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214828568U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114105008A (en) * | 2021-12-20 | 2022-03-01 | 中国建筑第二工程局有限公司 | Can have enough to meet need formula tower crane passageway of going up people that climbs along with climbing frame |
-
2021
- 2021-05-26 CN CN202121136303.8U patent/CN214828568U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114105008A (en) * | 2021-12-20 | 2022-03-01 | 中国建筑第二工程局有限公司 | Can have enough to meet need formula tower crane passageway of going up people that climbs along with climbing frame |
CN114105008B (en) * | 2021-12-20 | 2023-07-28 | 中国建筑第二工程局有限公司 | Turnover type tower crane manned channel climbing along with climbing frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN104929373B (en) | Large span Square Steel Tubes Truss and its accumulation slippage construction method | |
CN215291318U (en) | Mounting structure of attached lifting scaffold | |
CN103806645B (en) | Light intelligent hydraulic climbing formwork device with good wind-resistant and fireproof performances | |
CN214828568U (en) | Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame | |
CN114412158A (en) | Aluminum alloy-steel combined attached lifting scaffold and mounting method thereof | |
CN202099993U (en) | Lift type external scaffold made of square steel pipes | |
CN102287045B (en) | Square steel tube lifting outside scaffold | |
CN213923828U (en) | Temporary pedestrian passageway for tower crane | |
CN212103679U (en) | A construction platform for installation of assembled tower | |
CN210857952U (en) | Novel attached lifting scaffold | |
CN116607774A (en) | Construction method of variable-section core tube of super high-rise building | |
CN110863641A (en) | Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof | |
CN110817709A (en) | High-rise tower crane driver climbing device | |
CN214652983U (en) | A hoisting structure for assembled stair | |
CN205955164U (en) | Portable steel truss operation platform | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN211644382U (en) | Tower crane attached stay bar walkway platform system | |
CN110241730B (en) | Auxiliary truss construction operation platform for steel truss girder | |
CN217627285U (en) | Tool type tower crane driver channel | |
CN111894252A (en) | Be applied to steel trestle behind dam of power station | |
CN215671309U (en) | Prefabricated temporary stair of going up people | |
CN212954042U (en) | Lattice formula cable saddle hoist and mount portal | |
CN216949441U (en) | Steel ladder stand for assembly type building stairwell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |