CN201495786U - Lifting thermal insulation protection device - Google Patents

Lifting thermal insulation protection device Download PDF

Info

Publication number
CN201495786U
CN201495786U CN200920304749XU CN200920304749U CN201495786U CN 201495786 U CN201495786 U CN 201495786U CN 200920304749X U CN200920304749X U CN 200920304749XU CN 200920304749 U CN200920304749 U CN 200920304749U CN 201495786 U CN201495786 U CN 201495786U
Authority
CN
China
Prior art keywords
thermal insulation
steel
frame body
insulation covering
covering fabric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920304749XU
Other languages
Chinese (zh)
Inventor
李洪海
徐巍
任庆新
赵向前
杨波
黄勇
王江
孙兆荣
韩宝生
吴月华
薛刚
欧亚明
冯世伟
高俊峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction First Group Construction and Development Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN200920304749XU priority Critical patent/CN201495786U/en
Application granted granted Critical
Publication of CN201495786U publication Critical patent/CN201495786U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

一种提升式保温防护装置,包括架体和附着于架体的安全网,架体为钢木结构,竖向主龙骨为顶部开有吊孔的H型钢,且兼作竖向导轨,H型钢的一侧与下附墙挂件和上附墙挂件抱合可滑动连接,其中下附墙挂件由螺纹连接在H型钢上的翻转式钢舌楔紧,两根竖向主龙骨之间连接有剪刀撑;横向次龙骨由钢横梁和木横梁间隔分布,架体的内侧面还覆盖连接有保温覆盖织物,保温覆盖织物通过压条钉压在木横梁的内侧,保温覆盖织物的外边缘内侧压有压条,压条与木横梁钉牢,边缘外侧连有粘扣,相邻的保温覆盖织物之间通过粘扣粘接。本装置是一种既能够起到周边安全防护作用,又带有封闭、保温作用的体系,每次上移用塔吊提升,方便、快捷,施工效率极高。

Figure 200920304749

A lifting heat preservation protection device, including a frame body and a safety net attached to the frame body. One side can be slidably connected with the lower wall hanger and the upper wall hanger, wherein the lower wall hanger is tightened by a flip-type steel tongue screwed on the H-shaped steel, and there are scissors braces connected between the two vertical main keels; The horizontal sub-keel is distributed at intervals between steel beams and wooden beams, and the inner side of the frame body is also covered and connected with thermal insulation covering fabric, which is pressed on the inner side of the wooden beam by beading nails, and beading is pressed on the inner side of the outer edge of the thermal insulation covering fabric. It is nailed to the wooden beam, and the outside of the edge is connected with gluing buttons, and the adjacent insulation covering fabrics are bonded by gluing and gluing. This device is a system that can not only play the role of peripheral safety protection, but also has the function of sealing and heat preservation. It is lifted by a tower crane every time it is moved up, which is convenient and fast, and the construction efficiency is extremely high.

Figure 200920304749

Description

Lift-type insulation protector
Technical field
The utility model relates to a kind of attached to the outer insulation protector on the building peripheral structure.
Background technology
In the cold district construction of super highrise building, because temperature is low and through snowing a great deal, concrete structure construction need adopt the way of setting up brooder, heated die plate and reinforcing bar, finishes concrete construction.After building structure construction has arrived certain altitude, bad weather, wind are big, flooring accumulated snow and sliding again, be very difficult and dangerous with in the past the sort of every layer of way of manually setting up outer protection shelf, manually removing to hang outer heat-preservation cotton quilt in this case, so, now need to adopt and a kind ofly can either play the perimeter security protective action, the system that has sealing, insulation effect again, on the building peripheral structure, and do not need manually-operated just can rise to the system that next construction layer gets on smoothly.
The utility model content
In order to overcome the deficiencies in the prior art, the utility model provides a kind of lift-type insulation protector, solve the too difficult and dangerous technical problem of way that tradition is manually set up outer protection shelf and manually removed to hang outer heat-preservation cotton quilt.
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of lift-type insulation protector, comprise support body and the safety net that is attached to support body, described support body is formed by vertical main joist and horizontal secondary joist interconnection, the right and left of support body is connected with vertical limit portion steel pipe, vertical main joist is connected with building floor by the attached wall suspension member, it is characterized in that: described support body is a steel-wood structure, vertical main joist is the H shaped steel that the top has lifting hole(eyelet), and double as vertical guide, obvolvent slidably is connected one side of H shaped steel with last attached wall suspension member with following attached wall suspension member, wherein descend the attached wall suspension member by the convertible steel tongue wedging that is threaded on the H shaped steel, be connected with bridging between two vertical main joists; Laterally secondary joist is distributed by gooseneck and wooden girder space, the medial surface of support body also covers and is connected with the insulation covering fabric, the insulation covering fabric is pressed in the inboard of wooden crossbeam by the press strip nail, in the both sides near vertical main joist, the edge roll of insulation covering fabric is crossed a press strip, press strip and wooden crossbeam stickfast, the outward flange inboard of insulation covering fabric is pressed with press strip, press strip and wooden crossbeam stickfast, the outside, edge is connected with thread gluing, and is bonding by thread gluing between the adjacent insulation covering fabric.
Described down attached wall suspension member and last attached wall suspension member all are made up of two shaped steel and the fixed head, clamp, the clamping plate that are connected between these two shaped steel, wherein between two shaped steel, be connected and fixed plate between one end connection clamp and clamping plate, the other end, and have connecting hole on the fixed head.
Described convertible steel tongue comprises that a box junction plate and that is threaded with H shaped steel is hinged on the steel tongue on the box junction plate, is fixedly connected with a postive stop baffle on the afterbody lower position of steel tongue, box junction plate.
Described insulation covering fabric can be heat-preservation cotton quilt or insulation tarpaulin.
Described safety net can be dense mesh or nylon wire.
Described support body gabarite height can be 10m~14m, and width can be 4m~6m.
The beneficial effects of the utility model are as follows:
The utility model is a kind ofly can either play the perimeter security protective action, the system that has sealing, insulation effect again, it is attached on the building peripheral structure, not needing manually-operated just can rise to next construction layer smoothly gets on, it adopts H shaped steel as the double main joist of doing of the track of support body, wooden H-beam is done secondary joist, the wire gauze conduct of outside installation 25mm mesh is net fully, the rough ground inboard nails on the heat-preservation cotton quilt, the thread gluing adhesion of making on edge heat-preservation cotton quilt of slit between two blocks, sealing performance is fabulous.During structure construction on the edge space of a whole page pre-embedded bolt, be connected with track with the bolt suspension member, the track main joist of holding concurrently inserts that suspension member is inner to be blocked hanger by reversible steel tongue and fix.Divert from one use to another tower crane on each and promote, convenient, fast, efficiency of construction is high.
The utility model compliance is strong, not only can be used for the building of outer facade rule, also be applicable to the outside vertical surface of building angle changing 10 the degree with interior structure; It is simple in structure, uses conventional material to make, from heavy and light, and making, easy to operate; System structure of the present utility model is ingenious, constructing operation is oversimplified, and speed of application is fast, the efficient height, accelerated the construction period, reduced the equipment leasing time, it is obvious to reduce engineering cost, and its hoisting velocity is fast, border record factually, generally about 6-10 minute, general 15 of each construction section then can promote at 2 hours and finish the lifting time of every support body.
Main economy of the utility model and social benefit height and climb support body relatively certainly, have reduced expensively from climbing system, greatly reduce engineering cost, have saved funds; It has directly reduced the hoisting mechanism of outer climbing frame system, and an engineering construction is got off, and can reduce and drop into about 500,000 yuan; Its support body is from heavy and light, and materials are few, reduces general approximately materials than common outrigger, reduces about 200,000 yuan of engineering cost.And the material of all constructions of the utility model can be on a plurality of engineerings, repeatedly recycling, do not have wasting phenomenon substantially, greatly reduce construction costs.
The utility model constructing operation condition is good, safe and reliable, because support body all is to rise in the limited field of suspension member forever, can not produce big swing, even if lifting also is safe under the situation of wind having, after installing first, if operating personnel stand in can be light, safe on the floor of having finished finish lifting, steady job; It need not edge region set up the major safety risks that protective frame is brought, and has guaranteed the overall security of construction, has avoided the security incident of construction period fully, has created strong condition at a high speed, efficiently constructing.
The utility model is applied widely, high level or super highrise building that its suitable form of structure is monolithic reinforced concrete structure; Be fit to the construction of cold district and extremely frigid zones cast-in-place concrete structure, and the engineering of construction period anxiety; Also be fit to indeclinable engineering of outside vertical surface of building and outer facade interlayer angle changing engineering less than 10 degree; In addition, when not needing to be incubated, be suitable for all cast-in-place concrete structure engineerings and use.
This totally enclosed outer frame system construction period no-sundries that the utility model adopts falls, and no dust exposes, environmental protection more, and outer facade overall appearance is effective, and can directly hang corporate advertising, and corporate image is good.The utility model only need be changed suspension member length can have the operating space, uses in the Structural Engineering of side bar is arranged, and can use in any Structural Engineering substantially, and versatility is extremely strong, is worth wideling popularize from now on, and the builing industry technological progress is more stepped to a new level.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is that the utility model is connected the schematic diagram on the floor of building.
Fig. 2 is the schematic diagram that connects between the adjacent insulation covering fabric.
Fig. 3 is a side schematic view of the present utility model.
Fig. 4 is that schematic diagram is looked on the right side of Fig. 3.
Fig. 5 is that schematic diagram is looked on the left side of Fig. 3.
Fig. 6 is the schematic perspective view of convertible steel tongue.
Fig. 7 is the structural representation of convertible steel tongue.
Fig. 8 is the schematic perspective view of following attached wall suspension member.
Fig. 9 is the schematic diagram that following attached wall suspension member matches with convertible steel tongue.
Attached wall suspension member, the last attached wall suspension member of 9-, 10-shore steel pipe, 11-bridging, 12-limit portion steel pipe, 13-gooseneck, the convertible steel tongue of 14-, 15-steel tongue, 16-box junction plate, 17-postive stop baffle, 18-shaped steel, 19-fixed head, 20-clamp, 21-clamping plate, 22-connecting hole, 23-thread gluing under the vertical main joist of Reference numeral: 1-, 2-wood crossbeam, 3-safety net, 4-insulation covering fabric, 5-press strip, 6-sealing brooder, 7-firing equipment, the 8-.
The specific embodiment
Embodiment is referring to shown in Fig. 1-5, kind lift-type insulation protector, comprise support body and the safety net 3 that is attached to support body, described support body is formed by vertical main joist 1 and horizontal secondary joist interconnection, the right and left of support body is connected with vertical limit portion steel pipe 12, vertical main joist 1 is connected with building floor by the attached wall suspension member, described support body is a steel-wood structure, vertical main joist 1 has the H shaped steel of lifting hole(eyelet) for the top, and double as vertical guide, one side of H shaped steel slidably is connected with last attached wall suspension member 9 obvolvents with following attached wall suspension member 8, wherein descend attached wall suspension member 8 by convertible steel tongue 14 wedgings that are threaded on the H shaped steel, be connected with bridging 11 between two vertical main joists 1; Laterally secondary joist is spaced apart by gooseneck 13 and wooden crossbeam 2, the medial surface of support body also covers and is connected with insulation covering fabric 4, insulation covering fabric 4 is pressed in the inboard of wooden crossbeam 2 by press strip 5 nails, in both sides near vertical main joist 1, the edge roll of insulation covering fabric 4 is crossed a press strip 5, press strip and 2 stickfast of wooden crossbeam, the outward flange inboard of insulation covering fabric 4 is pressed with press strip 5, press strip and 2 stickfast of wooden crossbeam, the outside, edge is connected with thread gluing 23, and is bonding by thread gluing between the adjacent insulation covering fabric 4.
Described insulation covering fabric 4 is heat-preservation cotton quilt or insulation tarpaulin.Described safety net is dense mesh or nylon wire.Described support body gabarite height 10m~14m, width 4m~6m.
Referring to Fig. 6-9, described down attached wall suspension member 8 and last attached wall suspension member 9 all are made up of two shaped steel 18 and the fixed head 19, clamp 20, the clamping plate 21 that are connected between these two shaped steel, wherein between two shaped steel 18, be connected and fixed plate 19 between one end connection clamp 20 and clamping plate 21, the other end, and have connecting hole 22 on the fixed head 19.Described convertible steel tongue comprises that a box junction plate 16 and that is threaded with H shaped steel is hinged on the steel tongue 15 on the box junction plate, is fixedly connected with a postive stop baffle 17 on the afterbody lower position of steel tongue 15, box junction plate 16.
The utility model adopts external hanging type, and every standard support body gabarite height 11.7m in the present embodiment, width then determine according to the maximum wind load design, the calculating that make land used, generally at 4-6m, along building outer edge arranged, use the lifting of tower crane burst.Every support body and building are adhered to two points, and the most following adhering to together born vertical and horizontal loading, and horizontal loading is only born on top together.Support body adopts steel-wood structure, and main orbit and main crossbeam, scissors support and can use shaped steel.Less important crossbeam can use the high wooden H-beam of 200mm, and the outside hangs the safety net of 25mm mesh.During winter construction, inboard nail insulation covering fabric 4.
Adopt the suspension member of shaped steel welding to be connected between the utility model and the fabric structure, when promoting, the eyelet tying up tool on vertical main joist 1 directly rises to the last layer suspension member, blocks suspension member by convertible steel tongue and fixes at every turn.Inboard insulation covering fabric 4 usefulness press strips nail is pressed on the wooden frame, and the outside, 200mm slit between two support bodys connects with safety net, and the 4 usefulness thread gluings of inboard insulation covering fabric cement, seal.
Construction technology of the present utility model:
1, set bolt is pre-buried
On the surface of peripheral structure floor or beam, the pre-buried 25mm bolt in structural edge 250mm position is 2 in the office, wants the defence line accurate positioning when bolt is pre-buried, and fixes with the reinforcing bar of floor or beam.
2, support body assembling:
On-the-spot assembling earlier vertical main joist, bridging and horizontal secondary joist are installed safety net then.
3, hoisted in position:
The support body assembling back that finishes lifts into the position with tower crane, needs colligation cable rope on vertical main joist in advance, lifts to flooring to realize in the mounted connection suspension member.
The first installation of structure attachment answered accurate positioning, the notch of following attached wall suspension member and last attached wall suspension member should be concentric, support body lifts into the every vertical main joist in position and is controlled by two people, vertical main joist is aimed at attached wall suspension member and last attached wall suspension member notch down, guide vertical main joist to fall into down attached wall suspension member and last attached wall suspension member, operating personnel at last attached wall suspension member, in the support body dropping process, also should be responsible for steel tongue upset, make down attached wall suspension member and last attached wall suspension member can pass through the convertible steel tongue on upper strata the convertible steel tongue on the vertical main joist.Deng can fall by back, support body in place to following attached wall suspension member.
4, support body promotes:
Lifting order as figure below: the lifting personnel stand on the floor of having finished, and suspension centre hangs over apart from 4 meters hole place on the support body, rise to height after, operating personnel stand in and remove hook on the floor, need not go to climbing to the top.
Each piece support body is fixed fall arrest safety rope and pre-buried ring after promoting and finishing immediately with flower basket bolt.
The another limit of each construction section promotes to the another side block-by-block, whenever finishes one lifting, finishes seam immediately and connects.At first connect the safety net of outside when constructing cold season, and the back connects inboard insulation covering fabric 4.
When support body when non-standard layers is used, adjust the suspension member position on the vertical main joist, make it can adapt to different floor heights, guarantee that support body keeps the upper end to exceed constructing operation face 1.7m height.
When non-standard layers exceeds typical floor when excessive,, in support body office, pass through steel pipe in the cavity, 4m position, upper end, with fastener and the interim support fixation of structural slab for preventing vertical main joist excessive the waving of bringing of length of encorbelmenting.

Claims (5)

1.一种提升式保温防护装置,包括架体和附着于架体的安全网(3),所述架体由竖向主龙骨(1)和横向次龙骨交叉连接而成,架体的左右两边连接有竖向的边部钢管(12),竖向主龙骨(1)通过附墙挂件与建筑物楼板连接,其特征在于:所述架体为钢木结构,竖向主龙骨(1)为顶部开有吊孔的H型钢,且兼作竖向导轨,H型钢的一侧与下附墙挂件(8)和上附墙挂件(9)抱合可滑动连接,其中下附墙挂件(8)由螺纹连接在H型钢上的翻转式钢舌(14)楔紧,两根竖向主龙骨(1)之间连接有剪刀撑(11);横向次龙骨由钢横梁(13)和木横梁(2)间隔分布,架体的内侧面还覆盖连接有保温覆盖织物(4),保温覆盖织物(4)通过压条(5)钉压在木横梁(2)的内侧,在靠近竖向主龙骨(1)的两侧,保温覆盖织物(4)的边缘卷过一压条(5),压条与木横梁(2)钉牢,保温覆盖织物(4)的外边缘内侧压有压条(5),压条与木横梁(2)钉牢,边缘外侧连有粘扣,相邻的保温覆盖织物(4)之间通过粘扣(23)粘接。1. A lifting type heat preservation protection device, comprising a frame body and a safety net (3) attached to the frame body, the frame body is formed by cross-connecting the vertical main keel (1) and the transverse secondary keel, the left and right sides of the frame body Both sides are connected with vertical side steel pipes (12), and the vertical main keel (1) is connected with the building floor through a wall-mounted pendant. It is characterized in that: the frame body is a steel-wood structure, and the vertical main keel (1) It is an H-shaped steel with a hanging hole on the top, and also serves as a vertical guide rail. One side of the H-shaped steel is slidably connected to the lower wall hanger (8) and the upper wall hanger (9). Among them, the lower wall hanger (8) The overturned steel tongue (14) that is screwed on the H-shaped steel is wedged tightly, and the scissors brace (11) is connected between the two vertical main keels (1); the horizontal secondary keel is composed of a steel beam (13) and a wooden beam ( 2) Distributed at intervals, the inner surface of the frame body is also covered and connected with thermal insulation covering fabric (4), and the thermal insulation covering fabric (4) is nailed to the inner side of the wooden beam (2) through beading (5), near the vertical main keel ( On both sides of 1), the edge of the thermal insulation covering fabric (4) is rolled over a bead (5), the bead is nailed to the wooden beam (2), and the outer edge of the thermal insulation covering fabric (4) is pressed on the inner side with a bead (5), the bead It is firmly nailed to the wooden beam (2), and the outside of the edge is connected with a glue button, and the adjacent thermal insulation covering fabrics (4) are bonded by the glue button (23). 2.根据权利要求1所述的提升式保温防护装置,其特征在于:所述下附墙挂件(8)和上附墙挂件(9)均是由两根型钢(18)和连接在这两根型钢之间的固定板(19)、卡板(20)、夹板(21)组成,其中两根型钢(18)之间,一端连接卡板(20)和夹板(21)、另一端之间连接固定板(19),且固定板(19)上开有连接孔(22)。2. The lifting type thermal insulation protection device according to claim 1, characterized in that: the lower attached wall hanger (8) and the upper attached wall hanger (9) are both made of two section steels (18) and connected between the two The fixed plate (19), clamping plate (20) and splint (21) between the root shaped steels are composed of two shaped steels (18), one end is connected with the clamped plate (20) and the splint (21), and the other end is The fixed plate (19) is connected, and the fixed plate (19) is provided with a connecting hole (22). 3.根据权利要求1所述的提升式保温防护装置,其特征在于:所述翻转式钢舌(14)包括一与H型钢螺纹连接的箱型连接板(16)和一铰接在箱型连接板上的钢舌(15),在钢舌(15)的尾部下方位置、箱型连接板(16)上固定连接有一块限位挡板(17)。3. The lifting type heat preservation protection device according to claim 1, characterized in that: the flip-type steel tongue (14) comprises a box-shaped connecting plate (16) connected with H-shaped steel threads and a hinged box-shaped connecting plate (16) The steel tongue (15) on the plate is fixedly connected with a limit baffle (17) at the position below the afterbody of the steel tongue (15) and on the box-type connecting plate (16). 4.根据权利要求1所述的提升式保温防护装置,其特征在于:所述保温覆盖织物(4)为保温棉被或保温苫布。4. The lifting type thermal insulation protection device according to claim 1, characterized in that: the thermal insulation covering fabric (4) is thermal insulation quilt or thermal insulation tarpaulin. 5.根据权利要求1所述的提升式保温防护装置,其特征在于:所述安全网是密目钢丝网或尼龙网。5. The lifting type thermal insulation protection device according to claim 1, characterized in that: the safety net is dense mesh steel wire mesh or nylon mesh.
CN200920304749XU 2009-06-19 2009-06-19 Lifting thermal insulation protection device Expired - Fee Related CN201495786U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920304749XU CN201495786U (en) 2009-06-19 2009-06-19 Lifting thermal insulation protection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920304749XU CN201495786U (en) 2009-06-19 2009-06-19 Lifting thermal insulation protection device

Publications (1)

Publication Number Publication Date
CN201495786U true CN201495786U (en) 2010-06-02

Family

ID=42438994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920304749XU Expired - Fee Related CN201495786U (en) 2009-06-19 2009-06-19 Lifting thermal insulation protection device

Country Status (1)

Country Link
CN (1) CN201495786U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162301A (en) * 2011-03-04 2011-08-24 葛洲坝集团第五工程有限公司 Method and device for preserving temperature and humidity and protecting during concrete construction in winter
CN106907012A (en) * 2017-04-27 2017-06-30 中冶建工集团有限公司 A kind of girder steel high-altitude Windproof thermal insulation welding method
CN117386119A (en) * 2023-09-21 2024-01-12 中国建筑第八工程局有限公司 A flip-type wall attachment device with adjustable fulcrum height

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162301A (en) * 2011-03-04 2011-08-24 葛洲坝集团第五工程有限公司 Method and device for preserving temperature and humidity and protecting during concrete construction in winter
CN106907012A (en) * 2017-04-27 2017-06-30 中冶建工集团有限公司 A kind of girder steel high-altitude Windproof thermal insulation welding method
CN106907012B (en) * 2017-04-27 2019-01-01 中冶建工集团有限公司 A kind of girder steel high-altitude Windproof thermal insulation welding method
CN117386119A (en) * 2023-09-21 2024-01-12 中国建筑第八工程局有限公司 A flip-type wall attachment device with adjustable fulcrum height

Similar Documents

Publication Publication Date Title
US9016025B2 (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN104453197A (en) High-altitude large-cantilever concrete structure structural steel supporting platform
CN202324571U (en) Overhanging type double-row scaffold
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN101892736A (en) High altitude moving hanging basket construction method
CN207079828U (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever
CN109989348A (en) Cantilever formwork for concrete construction and construction method thereof
CN107905536A (en) Glass curtain wall construction method
CN201495786U (en) Lifting thermal insulation protection device
CN108756241A (en) Overhanging slab form installs device on the outside of a kind of shear wall
CN202214974U (en) 5.8 m ultrahigh external climbing frame
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN203924662U (en) A kind of attaching integral lifting scaffold
CN115306137B (en) Operation platform structure for installing suspended ceiling at bottom of high-altitude corridor and construction method thereof
CN209353770U (en) High-altitude suspension formwork protective shed
CN101503910A (en) Security protection method and device for elevator hoistway in house building course
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN208220165U (en) High-altitude soft operating platform
CN110578338A (en) An integrally movable aluminum alloy formwork system and operation method
CN214090903U (en) Tower crane pedestrian passageway capable of climbing synchronously with climbing frame
CN208564047U (en) A kind of people's Cargo Lift overhanging aisle platform
CN202788017U (en) Horizontally-overhung rigid hermetic section steel protective shed for high-rise buildings
CN211597658U (en) Movable overhanging scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20130619