CN108589459A - Sponge city sectional polyurethane eco-landscape road and construction method - Google Patents

Sponge city sectional polyurethane eco-landscape road and construction method Download PDF

Info

Publication number
CN108589459A
CN108589459A CN201810379784.1A CN201810379784A CN108589459A CN 108589459 A CN108589459 A CN 108589459A CN 201810379784 A CN201810379784 A CN 201810379784A CN 108589459 A CN108589459 A CN 108589459A
Authority
CN
China
Prior art keywords
brick
road
polyurethane
kerbstone
blind way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810379784.1A
Other languages
Chinese (zh)
Other versions
CN108589459B (en
Inventor
李冰
肖理中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Sponge City Construction Co Ltd
Original Assignee
Henan Sponge City Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Sponge City Construction Co Ltd filed Critical Henan Sponge City Construction Co Ltd
Priority to CN201810379784.1A priority Critical patent/CN108589459B/en
Publication of CN108589459A publication Critical patent/CN108589459A/en
Application granted granted Critical
Publication of CN108589459B publication Critical patent/CN108589459B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H3/00Applying liquids to roads or like surfaces, e.g. for dust control; Stationary flushing devices
    • E01H3/04Fixed devices, e.g. permanently- installed flushing means

Abstract

Include road assembled rigid unit and layer of polyurethane the invention discloses a kind of sponge city sectional polyurethane eco-landscape road and construction method, the assembled rigid unit includes being located at blind way brick in the middle part of road, positioned at the road brick of blind way brick both sides, the supporting brick for being used to support blind way brick and road brick, kerbstone and railing positioned at road brick both sides;Osculum is offered on the road brick and blind way brick, supporting brick and kerbstone upper side offer gutter.Sponge city sectional polyurethane eco-landscape road and construction method assembly road of the present invention solve the problems, such as that urban road construction is complicated, subsequent maintenance is inconvenient, the design of water seepage hole and rhone is collected to surface water and reuse, saves water resource.

Description

Sponge city sectional polyurethane eco-landscape road and construction method
Technical field
The invention belongs to sponge urban construction equipment technical fields, and in particular to a kind of sponge city sectional polyurethane Eco-landscape road and construction method.
Background technology
With the continuous development in city, sponge city has become the target of urban construction.Specifically with road, city The infrastructure such as city's building, park are carrier, to the rainwater and waste water of building surface collection or generation ooze, purify, stagnant It stores and reuse plans as a whole the systematicness of precipitation, surface water and groundwater, reach saving to repair city Ecology, self-restraint water resource The purpose of groundwater resources.The hardening of urban road at present prevents surface water from collecting or permeating the ground, and causes a large amount of recyclable Water resource waste, thus in the construction in sponge city, the transformation and upgrade of road are a directions of sponge urban construction.
Invention content
To solve the above problems, the present invention devises sponge city sectional polyurethane eco-landscape road and construction party Method, assembled road solve the problems, such as that urban road construction is complicated, subsequent maintenance is inconvenient, the design pair of water seepage hole and rhone Surface water is collected and reuse, saves water resource.
To achieve the above object, present invention employs following technical schemes:Sponge city sectional polyurethane ecological landscape See road, including road assembled rigid unit and layer of polyurethane, the assembled rigid unit include be located at blind way brick in the middle part of road, be located at it is blind The road brick of road brick both sides, the supporting brick for being used to support blind way brick and road brick, kerbstone and railing positioned at road brick both sides;The road Osculum is offered on brick and blind way brick, supporting brick and kerbstone upper side offer gutter.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:The road brick with it is blind The upper and lower side of road brick is provided through osculum, and the side of road brick is provided with the splicing protrusion spliced with adjacent road brick and splicing Slot, road brick end face are provided with the splicing protrusion with blind way brick and kerbstone splicing, blind way brick side setting splicing slot, blind way brick end Face is respectively arranged with splicing protrusion and splicing slot.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:The kerbstone side Face is provided with the splicing slot for installing splicing protrusion, and kerbstone upper surface is provided with gutter and installs the guardrail slot of guardrail, Kerbstone lower surface is equipped with fixing groove;The railing is internally provided with aqueduct, and railing upper surface, which is uniformly arranged, is connected to diversion The fountain head of pipe.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:The splicing slot and Splicing protrusion is close to the setting of brick body downside.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:On the supporting brick It is provided with a plurality of gutter, the gutter positioned at supporting brick upper side centre position is arranged in the underface of blind way brick osculum, Gutter positioned at supporting brick upper side both sides is arranged between the underface of road brick osculum, adjacent two gutters Support portion supports blind way brick and road brick, supporting brick lower surface to be equipped with fixing groove.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:On the kerbstone For surface tool there are two step plane, first step plane is provided with guardrail slot, and second step plane is arranged gutter, and described first The thickness of step plane and the roads second step level Cha Wei brick.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:The blind way brick is long Degree is identical as kerbstone length, and blind way brick length is two times of road brick width.
As being further improved for sponge city sectional polyurethane eco-landscape road of the present invention:The layer of polyurethane Using polyurethane material as adhesive, sandstone and polyurethane particles are mixed.
The construction method of sponge city sectional polyurethane eco-landscape road, includes the following steps:
1)Determine original road elevation and gradient;
2)Remove the kerb of original path both sides;
3)Prolong intermediate region and two side areas of the original path extending direction on original path and bores water seepage hole;
4)The pre-buried foundation pile in water seepage hole, foundation pile upper surface is higher than original path surface, with polyurethane between foundation pile and water seepage hole Grain filling;
5)Kerbstone and supporting brick are placed in by the fixing groove of its downside on foundation pile, and by the upper of kerbstone and supporting brick Gutter on side is set up;
6)Rubble stabilized zone is laid between kerbstone and supporting brick;
7)It is laid with blind way brick on supporting brick, road brick is laid between blind way brick and kerbstone;
8)Road brick is laid with layer of polyurethane with blind way brick upper surface;
9)Guardrail is installed, and water pipeline is installed;
The construction method of sponge city sectional polyurethane eco-landscape road, includes the following steps:
1)Rammed earth;
2)It is laid with kerbstone and supporting brick;
3)Rubble stabilized zone is filled between kerbstone and supporting brick;
4)It is laid with blind way brick on supporting brick, road brick is laid between supporting brick and kerbstone;
5)Road brick is laid with layer of polyurethane with blind way brick upper surface;
6)Guardrail is installed, and water pipeline is installed;
Advantageous effect
Compared with prior art, the invention has the advantages that:
First, sectional polyurethane eco-landscape road in sponge city of the present invention is simply tied by single structure Structure unit spliced forms, and by splicing protrusion and splices slot simple concatenation inside structural unit and between structural unit, and structure It is supported by support construction inside unit, not only makes overall structure firm, but also be easy to the carrying and installation of road raw material, greatly Save manpower greatly;Splicing structure can carry out specific aim replacement in road maintenance, improve maintenance efficiency.
Second, sectional polyurethane eco-landscape road in sponge city of the present invention is equipped on road permeable Type polyurethane material, polyurethane material make road surface water carry out crossing current effect, i.e. water is quick under the action of polyurethane material Transverse distribution, and the osculum stream through setting in road main body is leaked to road main body, makes road surface not water.
Third, sectional polyurethane eco-landscape road in sponge city of the present invention, the setting of supporting brick is not only Blind way brick and road brick are supported, and the water to leak down in osculum is carried out drainage receipts by the rhone of supporting brick upper surface Collection, and secondary use;Blind way brick and road brick are fixed by foundation pile, prevent assembled road from being slided on original path.
4th, sectional polyurethane eco-landscape road in sponge city of the present invention is set on two kerbstone of road Guardrail is set, guardrail is internally provided with jet pipe and fountain head, and fountain head is timed sprinkling to road, ensures road cleaning and air It is pure and fresh;Jet pipe can quote the water collected by gutter, realize the recycling of water resource.
5th, there are two types of sponge city sectional polyurethane eco-landscape road construction method tools of the present invention, Transformation and new construction road on original road are corresponded respectively to, i.e. assembled road of the invention is suitable for all kinds of construction environments.
Description of the drawings
Fig. 1 is the structural schematic diagram of sectional polyurethane eco-landscape road of the present invention;
Fig. 2 is the overlooking structure diagram of Ecological Road of the present invention;
Fig. 3 is the structural schematic diagram of Ecological Road end face of the present invention;
Fig. 4 is the structural schematic diagram of Road brick of the present invention;
Fig. 5 is the structural schematic diagram of blind way brick in the present invention;
Fig. 6 is the structural schematic diagram of kerbstone in the present invention;
It is marked in figure:1, road brick, 101, osculum, 102, splicing protrusion, 103, splicing slot, 2, blind way brick, 3, supporting brick, 301, Gutter, 4, kerbstone, 401, guardrail slot, 402, guardrail, 403, fountain head, 5, layer of polyurethane.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments, and the present embodiment is with technical solution of the present invention Premised on, give detailed embodiment.
As shown in the figure the present invention sponge city sectional polyurethane eco-landscape road, including road assembled rigid unit and Layer of polyurethane 5, the assembled rigid unit include be located at road in the middle part of blind way brick 2, positioned at 2 both sides of blind way brick road brick 1, for branch Support supporting brick 3, the kerbstone 4 and railing positioned at 1 both sides of road brick of blind way brick 2 and road brick 1;The road brick 1 is opened on blind way brick 2 Equipped with osculum 101, supporting brick 3 and 4 upper side of kerbstone offer gutter 301.
The upper and lower side of road brick 1 and blind way brick 2 is provided through osculum 101, the side of road brick 1 be provided with it is adjacent The splicing protrusion 102 and splicing slot 103 that road brick 1 splices, 1 end face of road brick be provided with the splicing raised 102 splice with sidewalk for visually impaired people and with The splicing slot 103 that kerbstone 4 splices, 2 side of blind way brick setting splicing slot 103,2 end face of blind way brick is respectively arranged with splicing protrusion 102 are close to brick body downside and are arranged with splicing slot 103, the splicing slot 103 and splicing protrusion 102, not only brick body are made to splice Simply, and splicing construction is arranged below and realizes the smooth of upper road surface.
A plurality of gutter 301 is provided on supporting brick 3, the gutter 301 for being located at 3 upper side centre position of supporting brick is arranged In the underface of 2 osculum 101 of blind way brick, the gutter 301 for being located at 3 upper side both sides of supporting brick is arranged in 1 osculum of road brick 101 underface, the support portion support blind way brick 2 between adjacent two gutters 301 and road brick 1.3 He of the supporting brick The water to leak down from osculum 101 is drained and is collected to pond by the gutter 301 of 1 upper surface of road brick setting, to realize link table It the collection of face flow and utilizes again, 3 lower surface of supporting brick is equipped with fixing groove, to be fixed by fixing groove and original path; The lower section of osculum 101 does not set gutter on road brick 1, directly leaks the flow that osculum 101 leaks down on roadbed and cross occurring Stream, to disperse water, final flow infiltrates into downwards soil layer.
2 length of the blind way brick is identical as 4 length of kerbstone, and the length of blind way brick 2 is twice of road brick width, this design The relative size specification of road brick 1, blind way brick 2 and kerbstone 4 is determined, production and installation are facilitated, improves the laying effect of road Rate.
4 side of kerbstone is provided with the splicing slot 103 for installing splicing protrusion 102, and 4 upper surface of kerbstone, which is provided with, draws The guardrail slot 401 of sink 301 and installation guardrail 402;The railing is internally provided with aqueduct, and railing upper surface is uniformly arranged company It is connected to the fountain head 403 of aqueduct, fountain head 403 is connect by pipeline with aqueduct, and the water inlet end of aqueduct is arranged in pond Interior, water pool inner water is realized by diversion tube pump to fountain head 403 and being sprayed at around road to the cleaning of road and to air Wash away.For 4 upper surface of kerbstone tool there are two step plane, first step plane is provided with guardrail slot 401, second step plane Gutter 301 is set, and second step plane is used to support road brick 1, and the first step plane and second step level are poor For the thickness of road brick 1;4 lower surface of kerbstone is equipped with fixing groove, to assembled road when convenient for being laid on the basis of original path It is fixed.
The construction method of sectional polyurethane eco-landscape road in sponge city of the present invention is right in embodiment 1 In the construction method for being directly laid with sectional polyurethane eco-landscape road of the present invention on original road include with Lower step:
1)It determines original road elevation and gradient, and simple construction is carried out to ensure construction surface superelevation angle to road surface Degree is 0-5 °;
2)Remove the kerb of original path both sides;
3)Prolong intermediate region and two side areas of the original path extending direction on original path and is uniformly drilled with water seepage hole, the water seepage hole It is drilled with to soil layer downwards, is convenient for the downward infiltration of flow;
4)The pre-buried foundation pile in water seepage hole makes foundation pile upper surface be higher than original path surface, with polyurethane between water seepage hole and foundation pile Material filling, foundation pile and polyurethane material ensure that the stability on road basis, and the filling of polyurethane material can guarantee flow It is permeated to soil layer;
5)Kerbstone 4 is placed on the foundation pile positioned at original path basis both sides, fixing groove and the foundation pile of 4 lower surface of kerbstone coordinate It is fixed, by the fixing groove placement positioned at 3 lower surface of supporting brick on the foundation pile positioned at original path medium position, prevent kerbstone 4 and supporting brick 3 slided on original path, and the gutter 301 on the upper side of kerbstone 4 and supporting brick 3 is set upwards It sets;
6)Between kerbstone 4 and supporting brick 3 be laid with rubble stabilized zone, rubble stabilized zone compacting after with supporting brick upper surface phase It is flat;
7)It is laid with blind way brick 2 on supporting brick 3, road brick 1 is laid between blind way brick 2 and kerbstone 4, road brick 1 passes through its both sides Splicing protrusion 102 and splicing slot 103 and adjacent road brick 1 splice, the splicing protrusion 102 at 1 both ends of road brick and the spelling on kerbstone 4 Access slot 103 docks;Osculum 101 thereon is located at the surface of 3 gutter 301 of supporting brick, road brick 1 by the laying of blind way brick 2 Upper surface be located at both sides osculum 101 be located at kerbstone 4 gutter 301 surface, on supporting brick 3 and kerbstone 4 The water to leak down from osculum 101 is led in pond and is collected by gutter 301;The water to leak down from the osculum 101 at 1 middle part of road brick Stream leakage is in rubble stabilized zone, and runoff and crossing current in rubble stabilized zone, finally leaks into soil layer along water seepage hole and permeates downwards;
8)On road, brick 1 and the upper surface of blind way brick 2 are laid with layer of polyurethane 5;
9)Guardrail 402 is installed, and fountain head is installed, fountain head 403 is connected in the aqueduct inside guardrail 402, diversion The water inlet end of pipe is arranged in pond.
The construction method of sectional polyurethane eco-landscape road in sponge city of the present invention is right in embodiment 2 The construction method that sectional polyurethane eco-landscape road of the present invention is laid in new construction section includes the following steps:
1)Rammed earth, and ensure that the sideways pitch of roadbed is 0-5 °;
2)It is laid with kerbstone 4 in both sides of the road, portion is laid with supporting brick 3,3 upper surface of supporting brick and 4 upper table of kerbstone in the road Face is equal;
3)In kerbstone(4)With supporting brick(3)Between fill rubble stabilized zone, rubble stabilized zone compacting after with 3 upper table of supporting brick Face is equal with 4 upper surface of kerbstone;
4)It is laid with blind way brick 2 on supporting brick 3, road brick 1 is laid between blind way brick 2 and kerbstone 4, road brick 1 passes through its both sides Splicing protrusion 102 and splicing slot 103 and adjacent road brick 1 splice, the splicing protrusion 102 at 1 both ends of road brick and the spelling on kerbstone 4 Access slot 103 docks;Osculum 101 thereon is located at the surface of 3 gutter 301 of supporting brick, road brick 1 by the laying of blind way brick 2 Upper surface be located at both sides osculum 101 be located at kerbstone 4 gutter 301 surface, on supporting brick 3 and kerbstone 4 The water to leak down from osculum 101 is led in pond and is collected by gutter 301, the water to leak down from the osculum 101 at 1 middle part of road brick Stream leakage is in rubble stabilized zone, and runoff and crossing current in rubble stabilized zone, finally leaks into soil layer, and permeate downwards;
5)On road, brick 1 is laid with layer of polyurethane 5 with 2 upper surface of blind way brick;
6)Guardrail 402 is installed, and fountain head is installed, fountain head 403 is connected in the aqueduct inside guardrail 402, diversion The water inlet end of pipe is arranged in pond
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, although this Invention is disclosed above with preferred embodiment, and however, it is not intended to limit the invention, any person skilled in the art, It does not depart within the scope of technical solution of the present invention, when the technology contents using the disclosure above make a little change or are modified to equivalent The equivalent embodiment of variation, as long as being without departing from technical solution of the present invention content, according to the technical essence of the invention to above real Any simple modification, equivalent change and modification made by example are applied, in the range of still falling within technical solution of the present invention.

Claims (10)

1. sponge city sectional polyurethane eco-landscape road, it is characterised in that:Including road assembled rigid unit and polyurethane Layer(5), the assembled rigid unit includes the blind way brick being located in the middle part of road(2), be located at blind way brick(2)The road brick of both sides(1), be used for Support blind way brick(2)With road brick(1)Supporting brick(3), be located at road brick(1)The kerbstone of both sides(4)And railing;The road brick (1)With blind way brick(2)On offer osculum(101), supporting brick(3)And kerbstone(4)Upper side offers gutter (301).
2. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The road brick (1)With blind way brick(2)Upper and lower side be provided through osculum(101), road brick(1)Side be provided with and adjacent road brick (1)The splicing protrusion of splicing(102)With splicing slot(103), road brick(1)End face is provided with and blind way brick(2)And kerbstone(4)It spells The splicing protrusion connect(102), blind way brick(2)End face is respectively arranged with splicing protrusion(102)With splicing slot(103), blind way brick(2) Side is provided with splicing slot(103).
3. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The curb Stone(4)Side is provided with for installing splicing protrusion(102)Splicing slot(103), kerbstone(4)Upper surface is provided with gutter (301)With installation guardrail(402)Guardrail slot(401), kerbstone(4)Lower surface is equipped with fixing groove;Setting inside the railing There are aqueduct, railing upper surface to be uniformly arranged the fountain head for being connected to aqueduct(403).
4. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The splicing Slot(103)With splicing protrusion(102)It is close to the setting of brick body downside.
5. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The support Brick(3)On be provided with a plurality of gutter(301), it is located at supporting brick(3)The gutter in upper side centre position(301)It is arranged blind Road brick(2)Osculum(101)Underface, be located at supporting brick(3)The gutter of upper side both sides(301)It is arranged in road brick(1) Osculum(101)Underface, adjacent two gutters(301)Between support portion support blind way brick(2)With road brick (1), supporting brick(3)Lower surface is equipped with fixing groove.
6. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The curb Stone(4)For upper surface tool there are two step plane, first step plane is provided with guardrail slot(401), second step plane, which is arranged, draws Sink(301), the first step plane and the roads second step level Cha Wei brick(1)Thickness.
7. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The sidewalk for visually impaired people Brick(2)Length and kerbstone(4)Length is identical, blind way brick(2)Length is road brick(1)Two times of width.
8. sectional polyurethane eco-landscape road in sponge city as described in claim 1, it is characterised in that:The poly- ammonia Ester layer(5)Using polyurethane material as adhesive, sandstone and polyurethane particles are mixed.
9. the construction method of sectional polyurethane eco-landscape road in sponge city as described in claim 1, feature exist In:
1)Determine original road elevation and gradient;
2)Remove the kerb of original path both sides;
3)Prolong intermediate region and two side areas of the original path extending direction on original path and bores water seepage hole;
4)The pre-buried foundation pile in water seepage hole, foundation pile upper surface is higher than original path surface, with polyurethane between foundation pile and water seepage hole Grain filling;
5)By kerbstone(4)And supporting brick(3)It is placed on foundation pile by the fixing groove of its downside, and by kerbstone(4)With Supporting brick(3)Upper side on gutter(301)It sets up;
6)In kerbstone(4)With supporting brick(3)Between be laid with rubble stabilized zone;
7)In supporting brick(3)Upper laying blind way brick(2), in blind way brick(2)With kerbstone(4)Between be laid with road brick(1);
8)Road brick(1)With blind way brick(2)Upper surface is laid with layer of polyurethane(5);
9)Guardrail is installed(402), and water pipeline is installed.
10. the construction method of sectional polyurethane eco-landscape road in sponge city as described in claim 1, feature exist In:
1)Rammed earth;
2)It is laid with kerbstone(4)And supporting brick(3);
3)Kerbstone(4)With supporting brick(3)Between fill rubble stabilized zone;
4)In supporting brick(3)Upper laying blind way brick(2), in supporting brick(3)With kerbstone(4)Between be laid with road brick(1);
5)Road brick(1)With blind way brick(2)Upper surface is laid with layer of polyurethane(5);
6)Guardrail is installed(402), and water pipeline is installed.
CN201810379784.1A 2018-04-25 2018-04-25 Sponge city assembled polyurethane ecological landscape road and construction method Active CN108589459B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810379784.1A CN108589459B (en) 2018-04-25 2018-04-25 Sponge city assembled polyurethane ecological landscape road and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810379784.1A CN108589459B (en) 2018-04-25 2018-04-25 Sponge city assembled polyurethane ecological landscape road and construction method

Publications (2)

Publication Number Publication Date
CN108589459A true CN108589459A (en) 2018-09-28
CN108589459B CN108589459B (en) 2021-04-23

Family

ID=63609246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810379784.1A Active CN108589459B (en) 2018-04-25 2018-04-25 Sponge city assembled polyurethane ecological landscape road and construction method

Country Status (1)

Country Link
CN (1) CN108589459B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853322A (en) * 2018-12-28 2019-06-07 无锡市城归设计有限责任公司 Sponge city sectional polyurethane eco-landscape road
CN110453559A (en) * 2019-08-14 2019-11-15 郑州暖树实业有限公司 Roads plate, assembled road and its construction method
WO2020084417A1 (en) * 2018-10-25 2020-04-30 Revo S.R.L. Modular section for tracks, in particular cycle tracks

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1379158A (en) * 2002-01-30 2002-11-13 G·K株式会社 Spreading method of elastic ground material
CN1651654A (en) * 2004-02-06 2005-08-10 姜成顺 Elastic draining road surface containing waste broken polyurethane for existing road and its paving method
CN106676997A (en) * 2017-02-23 2017-05-17 湖南品智工程技术有限公司 Intelligent parking lot floor tile
CN206266968U (en) * 2016-12-02 2017-06-20 安徽仁创生态环保科技股份有限公司 Carriageway paving structure
CN106988184A (en) * 2017-03-27 2017-07-28 葛威延 Porous pavement
CN207047630U (en) * 2017-06-15 2018-02-27 深圳市奥德斯景观及建筑规划设计院有限公司 A kind of water-permeable brick
CN207159890U (en) * 2017-09-15 2018-03-30 黄佳生 A kind of urban construction greenbelt isolation guardrail

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1379158A (en) * 2002-01-30 2002-11-13 G·K株式会社 Spreading method of elastic ground material
CN1651654A (en) * 2004-02-06 2005-08-10 姜成顺 Elastic draining road surface containing waste broken polyurethane for existing road and its paving method
CN206266968U (en) * 2016-12-02 2017-06-20 安徽仁创生态环保科技股份有限公司 Carriageway paving structure
CN106676997A (en) * 2017-02-23 2017-05-17 湖南品智工程技术有限公司 Intelligent parking lot floor tile
CN106988184A (en) * 2017-03-27 2017-07-28 葛威延 Porous pavement
CN207047630U (en) * 2017-06-15 2018-02-27 深圳市奥德斯景观及建筑规划设计院有限公司 A kind of water-permeable brick
CN207159890U (en) * 2017-09-15 2018-03-30 黄佳生 A kind of urban construction greenbelt isolation guardrail

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020084417A1 (en) * 2018-10-25 2020-04-30 Revo S.R.L. Modular section for tracks, in particular cycle tracks
US11746477B2 (en) 2018-10-25 2023-09-05 Revo S.R.L. Modular section for tracks, in particular cycle tracks
CN109853322A (en) * 2018-12-28 2019-06-07 无锡市城归设计有限责任公司 Sponge city sectional polyurethane eco-landscape road
CN110453559A (en) * 2019-08-14 2019-11-15 郑州暖树实业有限公司 Roads plate, assembled road and its construction method

Also Published As

Publication number Publication date
CN108589459B (en) 2021-04-23

Similar Documents

Publication Publication Date Title
CN111560812B (en) Sponge urban permeable road and construction process thereof
CN108589459A (en) Sponge city sectional polyurethane eco-landscape road and construction method
CN104652214A (en) Paving method of water-permeable pavement
CN106088684B (en) The sunk type square and its construction method that a kind of rainwater-collecting recycles
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN109972475A (en) A kind of ecological permeable paving structure
CN207633496U (en) A kind of super large square sponge city Integral rain recycling system
CN211498343U (en) Urban road structure of mating formation that permeates water
CN205741809U (en) The permeable road structure of a kind of footpath and water-permeable brick
CN104594155A (en) Permeable pavement laying method
CN216474335U (en) A foundation structure for installing night light ceramic tile that permeates water
CN206916893U (en) One kind circulation infiltration water storage sponge integral system
CN111980131A (en) Construction method for combining wooden plank road with sunken green land
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
TWI833115B (en) High-strength path for water resources adaptation system in response to climate change
CN216947714U (en) Sidewalk structure for improving water permeability
CN213203670U (en) Municipal works road laying structure
CN216919869U (en) Bay type bus stop with sponge city function
CN214460950U (en) Town road structure of permeating water
CN211815261U (en) Town road paves road surface structure that permeates water
KR102200910B1 (en) Smart assembly type water circulation drainage system and drive method of the Same
WO2023035644A1 (en) High-strength road for water resource regulation system in response to climate change
CN219059637U (en) Permeable pavement
CN219604077U (en) Modularized curb structure and composite pavement
CN217419174U (en) A road surface structure for sponge city

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant