CN108560947A - Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced - Google Patents

Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced Download PDF

Info

Publication number
CN108560947A
CN108560947A CN201810523681.8A CN201810523681A CN108560947A CN 108560947 A CN108560947 A CN 108560947A CN 201810523681 A CN201810523681 A CN 201810523681A CN 108560947 A CN108560947 A CN 108560947A
Authority
CN
China
Prior art keywords
separation trough
stress separation
ceramic tile
stress
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810523681.8A
Other languages
Chinese (zh)
Inventor
杨雨奕
缪德忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai State Mstar Technology Ltd
Original Assignee
Shanghai State Mstar Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai State Mstar Technology Ltd filed Critical Shanghai State Mstar Technology Ltd
Priority to CN201810523681.8A priority Critical patent/CN108560947A/en
Publication of CN108560947A publication Critical patent/CN108560947A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

Force construction method is answered in the fluting release that a kind of ceramic tile disclosed by the invention, stone material inner-outer wall are reinforced, which is characterized in that is included the following steps:(1) stress release separation trough step is opened;(2) stress separation trough interface processing step;(3) stress separation trough pointing fluid sealant step.The present invention on ceramic tile exterior wall by being arranged vertical stress separation trough and lateral stress separation trough, it is used in combination fluid sealant to fill up vertical stress separation trough and lateral stress separation trough and seals vertical stress separation trough and lateral stress separation trough, the temperature stress for releasing ceramic tile exterior wall slows down metope temperature deformation.

Description

Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced
Technical field
The present invention relates to building inside and outside wall ceramic tile, stone material reinforcement technique field, more particularly to what a kind of ceramic tile exterior wall was reinforced Force construction method is answered in fluting release.
Background technology
Inside and outside wall facing pastes the materials category rigid materials such as ceramic tile, stone material, mosaic, the material of two kinds of different attributes it is swollen The technical performance indexs difference such as swollen coefficient is larger.Especially traditional handicraft pastes the ceramic tile brickwork joint of cement element ash, summer temperature When reaching 35 DEG C, insulating layer of external wall temperature may be up to 70 DEG C -- and 80 DEG C, prominent rainfall moment temperature of meeting can be reduced to 10 DEG C -- and 20 DEG C, temperature Poor 50 DEG C -- 60 DEG C.Two kinds of larger materials of two kinds of coefficient of expansion difference are bonded together, when and long be bound to cause cement element The ceramic tile seam cracking of ash.Winter ceramic tile hollowing will certainly just occur, fall off, cause in rainwater infiltration crack when snowing after freeze thawing The safety accident for killing people, injuring people by a crashing object.The serious safety for threatening living environment.
Invention content
Technical problem to be solved by the present invention lies in cause ceramic tile sloughing of exterior wall institute for ceramic tile, stone material inner-outer wall stress There are the problem of and the fluting release that a kind of ceramic tile exterior wall is reinforced is provided and answers force construction method.
The technical problems to be solved by the invention can be achieved through the following technical solutions:
Force construction method is answered in the fluting release that a kind of ceramic tile, stone material inner-outer wall are reinforced, and is included the following steps:
(1) stress release separation trough step is opened
In the step, it vertically is cut into one of vertical stress separation trough with cutting machine every 3-5m in ceramic tile exterior wall first, In every layer of ceramic tile of ceramic tile exterior wall horizontal direction one of lateral stress separation trough, vertical stress separation trough and cross are cut into cutting machine It is 10mm~20mm, depth 10-15mm to the width of stress separation trough;
(2) stress separation trough interface processing step
Brushing reinforcement interfacial agents reinforce outer plinth course in the vertical stress separation trough and lateral stress separation trough being cut into;
(3) stress separation trough pointing fluid sealant step
Vertical stress separation trough and lateral stress separation trough are filled up with fluid sealant and seal vertical stress separation trough and transverse direction Stress separation trough.
As a result of technical solution as above, the present invention on ceramic tile exterior wall by being arranged vertical stress separation trough and cross To stress separation trough, it is used in combination fluid sealant to fill up vertical stress separation trough and lateral stress separation trough and seals vertical stress separation trough With lateral stress separation trough, the temperature stress of ceramic tile exterior wall is released, slows down metope temperature deformation.
Specific implementation mode
Force construction method is answered in the fluting release that a kind of ceramic tile exterior wall is reinforced, and is included the following steps:
(1) stress release separation trough step is opened
In the step, it vertically is cut into one of vertical stress separation trough with cutting machine every 3-5m in ceramic tile exterior wall first, In every layer of ceramic tile of ceramic tile exterior wall horizontal direction one of lateral stress separation trough, vertical stress separation trough and cross are cut into cutting machine It is 10mm~20mm, depth 10-15mm to the width of stress separation trough;
(2) stress separation trough interface processing step
Brushing reinforcement interfacial agents reinforce outer plinth course in the vertical stress separation trough and lateral stress separation trough being cut into;
(3) stress separation trough pointing fluid sealant step
Vertical stress separation trough and lateral stress separation trough are filled up with fluid sealant and seal vertical stress separation trough and transverse direction Stress separation trough.

Claims (1)

1. force construction method is answered in the fluting release that a kind of ceramic tile, stone material inner-outer wall are reinforced, which is characterized in that include the following steps:
(1) stress release separation trough step is opened
In the step, it vertically is cut into one of vertical stress separation trough with cutting machine every 3-5m in ceramic tile exterior wall first, in porcelain Every layer of ceramic tile of brick exterior wall horizontal direction is cut into one of lateral stress separation trough with cutting machine, and vertical stress separation trough is answered with lateral The width of power separation trough is 10mm~20mm, depth 10-15mm;
(2) stress separation trough interface processing step
Brushing reinforcement interfacial agents reinforce outer plinth course in the vertical stress separation trough and lateral stress separation trough being cut into;
(3) stress separation trough pointing fluid sealant step
Vertical stress separation trough and lateral stress separation trough are filled up with fluid sealant and seal vertical stress separation trough and lateral stress Separation trough.
CN201810523681.8A 2018-05-28 2018-05-28 Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced Pending CN108560947A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810523681.8A CN108560947A (en) 2018-05-28 2018-05-28 Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810523681.8A CN108560947A (en) 2018-05-28 2018-05-28 Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced

Publications (1)

Publication Number Publication Date
CN108560947A true CN108560947A (en) 2018-09-21

Family

ID=63540289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810523681.8A Pending CN108560947A (en) 2018-05-28 2018-05-28 Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced

Country Status (1)

Country Link
CN (1) CN108560947A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734163A (en) * 2020-07-08 2020-10-02 海南红杉科创实业有限公司 Leakage maintenance method for light partition board for assembled building outer wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2249120B (en) * 1991-01-26 1993-04-07 Executive Insulation Structural repair process
CN1381659A (en) * 2001-04-14 2002-11-27 廖石泉 Technology for treating water leakage of external wall with facing bricks
CN1436908A (en) * 2003-01-26 2003-08-20 卢桂才 Reinforcing material for preventing and treating leakage and falling of decorating outer wall tile
CN107859282A (en) * 2017-11-17 2018-03-30 苏州闪电防水科技有限公司 Hotel toilet specific complex marine glue, infiltration rapid-maintenance technique

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2249120B (en) * 1991-01-26 1993-04-07 Executive Insulation Structural repair process
CN1381659A (en) * 2001-04-14 2002-11-27 廖石泉 Technology for treating water leakage of external wall with facing bricks
CN1436908A (en) * 2003-01-26 2003-08-20 卢桂才 Reinforcing material for preventing and treating leakage and falling of decorating outer wall tile
CN107859282A (en) * 2017-11-17 2018-03-30 苏州闪电防水科技有限公司 Hotel toilet specific complex marine glue, infiltration rapid-maintenance technique

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111734163A (en) * 2020-07-08 2020-10-02 海南红杉科创实业有限公司 Leakage maintenance method for light partition board for assembled building outer wall

Similar Documents

Publication Publication Date Title
CN201635308U (en) Multi-channel exhausting-prevention waterproof structure of prefabricated external wallboards
CN101403218B (en) Processing method for basement water-proof concrete construction joint
CN103967386B (en) External window of building first closing in antiseep Node Processing Method
CN109025343A (en) A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN102758509A (en) Horizontal seam waterproof plate of prefabricated exterior wall cladding
CN104847130B (en) A kind of ruggedized construction and its construction method of existing structure beam
CN104153401A (en) Waterproof construction method for anti-floating anchor rods
CN102225872A (en) Micropore sealant of aerated concrete blocks and preparation method thereof
CN109057385A (en) Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN106812219A (en) Filling wall top stuff up a crack construction method
US20230098072A1 (en) Waterproofing method using acrylic material
CN108560947A (en) Force construction method is answered in the fluting release that a kind of ceramic tile stone material inner-outer wall is reinforced
CN106013470B (en) Prevent the node and construction method that assembled Timberwork wall hole is seeped water
CN106760080B (en) Postposition concrete heat-insulating Curtainwall connector and construction method
CN209837324U (en) Tooth-groove type waterproof connecting structure for prefabricated wallboard of prefabricated building by vertical joint grouting method
CN103669746B (en) The construction method of inverted roof heat-insulation system
CN109707058A (en) A kind of cast-in-place concrete fireproof heat insulating compound external mold plate and its application method
CN205242457U (en) Basement bottom plate and outer wall waterproof construction
CN103590508A (en) Composite thermal insulating wall structure and construction method thereof
CN108708563A (en) It is a kind of to keep the ceramic tile of ceramic tile original state, stone facing point face to reinforce repairing engineering method
CN208534084U (en) A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs
CN205917889U (en) Building is bullet strip that rises for subsiding crack
CN208534936U (en) A kind of tile decorative surface point face reinforcing repairerment engineering method modified anchor studs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921