CN108526803A - 一种钢结构全方位锁定安装系统及该系统的安装施工工艺 - Google Patents
一种钢结构全方位锁定安装系统及该系统的安装施工工艺 Download PDFInfo
- Publication number
- CN108526803A CN108526803A CN201810695576.2A CN201810695576A CN108526803A CN 108526803 A CN108526803 A CN 108526803A CN 201810695576 A CN201810695576 A CN 201810695576A CN 108526803 A CN108526803 A CN 108526803A
- Authority
- CN
- China
- Prior art keywords
- playback
- lifting
- plate
- limit
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 263
- 239000010959 steel Substances 0.000 title claims abstract description 263
- 238000010276 construction Methods 0.000 title claims abstract description 42
- 238000009434 installation Methods 0.000 title claims abstract description 15
- 238000000034 method Methods 0.000 title abstract description 8
- 230000007246 mechanism Effects 0.000 claims abstract description 54
- 244000309464 bull Species 0.000 claims description 20
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 19
- 240000007643 Phytolacca americana Species 0.000 claims description 14
- 230000004807 localization Effects 0.000 claims description 14
- 239000011111 cardboard Substances 0.000 claims description 13
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 239000000837 restrainer Substances 0.000 claims 1
- 238000003466 welding Methods 0.000 abstract description 34
- 230000005540 biological transmission Effects 0.000 abstract description 21
- 230000009471 action Effects 0.000 description 15
- 238000005192 partition Methods 0.000 description 12
- 230000000694 effects Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 6
- 230000008859 change Effects 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000003756 stirring Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009527 percussion Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/047—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810695576.2A CN108526803B (zh) | 2018-06-29 | 2018-06-29 | 一种钢结构全方位锁定安装系统及该系统的安装施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810695576.2A CN108526803B (zh) | 2018-06-29 | 2018-06-29 | 一种钢结构全方位锁定安装系统及该系统的安装施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108526803A true CN108526803A (zh) | 2018-09-14 |
CN108526803B CN108526803B (zh) | 2020-08-11 |
Family
ID=63487336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810695576.2A Active CN108526803B (zh) | 2018-06-29 | 2018-06-29 | 一种钢结构全方位锁定安装系统及该系统的安装施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108526803B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109159190A (zh) * | 2018-09-25 | 2019-01-08 | 缪心怡 | 一种聚苯颗粒隔墙板自动切割生产线及隔墙板切割工艺 |
CN110449710A (zh) * | 2019-07-15 | 2019-11-15 | 泉州职业技术大学 | 一种等离子相贯线切割装置 |
CN111558789A (zh) * | 2020-04-28 | 2020-08-21 | 青岛鳌福机械有限公司 | 一种举升机立柱的焊接方法及焊接系统 |
CN112605594A (zh) * | 2020-12-16 | 2021-04-06 | 南通伯林环保科技有限公司 | 一种机构箱生产用的焊接装置 |
CN113856989A (zh) * | 2021-09-28 | 2021-12-31 | 深圳市普天达智能装备有限公司 | 一种显示屏的ic和fpc绑定后智能点胶设备 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19990077676A (ko) * | 1998-03-31 | 1999-10-25 | 후지야마 겐지 | 본딩장치용 가이드레일 기구 |
CN103231198A (zh) * | 2013-04-26 | 2013-08-07 | 四川东方能源科技股份有限公司 | 自动升降型焊接辅助装置 |
CN203282125U (zh) * | 2013-05-29 | 2013-11-13 | 天津市万尔特钢结构有限公司 | 一种h型钢组立焊接设备 |
CN204197105U (zh) * | 2014-09-26 | 2015-03-11 | 华晨汽车集团控股有限公司 | 随动举升工装移动车 |
CN205309635U (zh) * | 2015-12-01 | 2016-06-15 | 重庆大东汽车配件有限公司 | 车用d柱焊接工装气缸控制按钮分区结构 |
CN106736141A (zh) * | 2016-11-30 | 2017-05-31 | 中车青岛四方机车车辆股份有限公司 | 机器人焊接承载台 |
-
2018
- 2018-06-29 CN CN201810695576.2A patent/CN108526803B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR19990077676A (ko) * | 1998-03-31 | 1999-10-25 | 후지야마 겐지 | 본딩장치용 가이드레일 기구 |
CN103231198A (zh) * | 2013-04-26 | 2013-08-07 | 四川东方能源科技股份有限公司 | 自动升降型焊接辅助装置 |
CN203282125U (zh) * | 2013-05-29 | 2013-11-13 | 天津市万尔特钢结构有限公司 | 一种h型钢组立焊接设备 |
CN204197105U (zh) * | 2014-09-26 | 2015-03-11 | 华晨汽车集团控股有限公司 | 随动举升工装移动车 |
CN205309635U (zh) * | 2015-12-01 | 2016-06-15 | 重庆大东汽车配件有限公司 | 车用d柱焊接工装气缸控制按钮分区结构 |
CN106736141A (zh) * | 2016-11-30 | 2017-05-31 | 中车青岛四方机车车辆股份有限公司 | 机器人焊接承载台 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109159190A (zh) * | 2018-09-25 | 2019-01-08 | 缪心怡 | 一种聚苯颗粒隔墙板自动切割生产线及隔墙板切割工艺 |
CN109159190B (zh) * | 2018-09-25 | 2020-06-02 | 深圳市至合实业有限公司 | 一种聚苯颗粒隔墙板自动切割生产线及隔墙板切割工艺 |
CN110449710A (zh) * | 2019-07-15 | 2019-11-15 | 泉州职业技术大学 | 一种等离子相贯线切割装置 |
CN111558789A (zh) * | 2020-04-28 | 2020-08-21 | 青岛鳌福机械有限公司 | 一种举升机立柱的焊接方法及焊接系统 |
CN111558789B (zh) * | 2020-04-28 | 2021-07-20 | 青岛鳌福机械有限公司 | 一种举升机立柱的焊接方法及焊接系统 |
CN112605594A (zh) * | 2020-12-16 | 2021-04-06 | 南通伯林环保科技有限公司 | 一种机构箱生产用的焊接装置 |
CN113856989A (zh) * | 2021-09-28 | 2021-12-31 | 深圳市普天达智能装备有限公司 | 一种显示屏的ic和fpc绑定后智能点胶设备 |
CN113856989B (zh) * | 2021-09-28 | 2022-06-10 | 深圳市普天达智能装备有限公司 | 一种显示屏的ic和fpc绑定后智能点胶设备 |
Also Published As
Publication number | Publication date |
---|---|
CN108526803B (zh) | 2020-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108526803A (zh) | 一种钢结构全方位锁定安装系统及该系统的安装施工工艺 | |
CN108750994A (zh) | 一种钢结构自动安装设备及其自动安装施工方法 | |
CN100539066C (zh) | 对准装置 | |
CN207997179U (zh) | 一种化工热能交换钢管加工处理自动化打磨矫正拼接设备 | |
CN207447407U (zh) | 一种销轴自动夹紧和顶出的钻孔设备 | |
CN206169521U (zh) | 一种接管内壁半自动堆焊装置 | |
CN108857211A (zh) | 一种钢结构定位放置机器人 | |
CN110142438A (zh) | 一种用于现场安装的孔位防偏离的钻孔装置及其使用方法 | |
CN207151137U (zh) | 具有清土结构的框架式挖坑机 | |
CN110345822A (zh) | 隧道周边眼炮孔定位装置和方法 | |
CN101321658B (zh) | 在车辆用门上安装门玻璃的方法及其装置 | |
CN206652915U (zh) | 一种简易的工地钢筋弯曲机 | |
CN219241404U (zh) | 一种玻璃幕墙安装定位装置 | |
CN206556910U (zh) | 一种用于检测工程表面的精确导向混凝土取芯机 | |
CN115815942A (zh) | 一种内衬不锈钢复合管内壁强化工艺及强化设备 | |
CN108397137A (zh) | 一种造斜工具及其制造方法 | |
IT201900003035A1 (it) | Supporto articolato di dispositivo mast per una perforatrice e relativa perforatrice | |
CN108067653B (zh) | 一种适用于不同直径的钢管的打孔装置 | |
CN203236556U (zh) | 加工吉他琴颈与琴箱上端部对接处的切削装置 | |
CN113638610B (zh) | 一种装配式建筑基础柱筋精准定位工具 | |
CN216045790U (zh) | 一种管道安装接驳辅助装置 | |
WO2010071412A1 (en) | Vessel and method for laying a pipeline | |
CN209256235U (zh) | 一种生产汽车管道的装配机 | |
CN106730799B (zh) | 一种打靶装置 | |
CN206936219U (zh) | 钢筋折弯机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200716 Address after: No.8 Kaiyuan Road, Haojia Town, Kenli District, Dongying City, Shandong Province Applicant after: Shandong Hongji Petroleum Machinery Equipment Co.,Ltd. Address before: 231602 Room 116, 103 Block A, North East China International Building Materials Center, Hedian Road, Qizhen Town, Feidong County, Hefei City, Anhui Province Applicant before: HEFEI MIHONG INTELLIGENT TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An omnidirectional locking installation system for steel structure and its installation construction technology Effective date of registration: 20200903 Granted publication date: 20200811 Pledgee: Small business exclusive center of Dongying Bank Co.,Ltd. Pledgor: Shandong Hongji Petroleum Machinery Equipment Co.,Ltd. Registration number: Y2020980005688 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220907 Granted publication date: 20200811 Pledgee: Small business exclusive center of Dongying Bank Co.,Ltd. Pledgor: Shandong Hongji Petroleum Machinery Equipment Co.,Ltd. Registration number: Y2020980005688 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A steel structure all-round locking installation system and its installation construction process Effective date of registration: 20230904 Granted publication date: 20200811 Pledgee: Kenli sub branch of Dongying Bank Co.,Ltd. Pledgor: Shandong Hongji Petroleum Machinery Equipment Co.,Ltd. Registration number: Y2023980055183 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |