CN108506019A - 盾构隧道管片嵌缝防脱落装置 - Google Patents

盾构隧道管片嵌缝防脱落装置 Download PDF

Info

Publication number
CN108506019A
CN108506019A CN201810530231.1A CN201810530231A CN108506019A CN 108506019 A CN108506019 A CN 108506019A CN 201810530231 A CN201810530231 A CN 201810530231A CN 108506019 A CN108506019 A CN 108506019A
Authority
CN
China
Prior art keywords
filleting
section
slot
jurisdiction
shield tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810530231.1A
Other languages
English (en)
Inventor
陈昂
张慧玲
陈峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201810530231.1A priority Critical patent/CN108506019A/zh
Publication of CN108506019A publication Critical patent/CN108506019A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

盾构隧道管片嵌缝防脱落装置,以有效避免嵌缝材料脱落对隧道的影响,确保列车运行安全。包括:滑槽构件,预埋设置于嵌缝两侧的管片内,具有沿长度方向延伸的T型槽,T型槽的开口端位于与管片内表面平齐的滑槽构件外表面上;螺栓,沿滑槽构件纵向间隔设置,其头部位于T型槽内且受其竖向约束,螺栓尾部螺杆段向外伸出T型槽,其上套装螺母和压板;弧形橡胶带,横跨嵌缝,其横向两侧通过螺栓、螺母、压板和垫块压紧紧贴管片内表面。

Description

盾构隧道管片嵌缝防脱落装置
技术领域
本发明涉及盾构隧道工程,特别涉及一种盾构隧道管片嵌缝防脱落装置。
背景技术
近年来,盾构隧道以其非开挖、施工速度快、劳动强度低等特点,在地铁、铁路、公路等行业得到了快速的发展。
盾构隧道衬砌以预制混凝土管片为主,为避免管片拼装时角部混凝土点接触应力过大、混凝土脱落,通常在管片内侧接缝处内退几毫米,管片拼装后形成嵌缝槽。考虑接缝防水要求,管片拼装结束后通常采用橡胶条或嵌缝胶进行嵌缝处理。
从实际应用情况来看,管片嵌缝有效避免了管片角部接触应力带来的混凝土脱落问题,同时对接缝防水也有一定帮助。但隧道内车辆运行反复震动影响、隧道纵向不均匀沉降等因素影响下,嵌缝材料容易错开,甚至脱落。对于设置接触网的地铁隧道、铁路隧道,嵌缝材料脱落后,经常挂在接触网上,造成接触网短路损坏,甚至造成列车停运事故。
因此,有必要对现有设计进行改进,在保留接缝嵌缝的情况下,增加防止嵌缝脱落的措施,保证隧道的正常运营。
发明内容
本发明所要解决的技术问题是提供一种盾构隧道管片嵌缝防脱落装置,以有效避免嵌缝材料脱落对隧道的影响,确保列车运行安全。
本发明解决其技术问题所采用的技术方案如下:
本发明的盾构隧道管片嵌缝防脱落装置,其特征是包括:滑槽构件,预埋设置于嵌缝两侧的管片内,具有沿长度方向延伸的T型槽,T型槽的开口端位于与管片内表面平齐的滑槽构件外表面上;螺栓,沿滑槽构件纵向间隔设置,其头部位于T型槽内且受其竖向约束,螺栓尾部螺杆段向外伸出T型槽,其上套装螺母和压板;弧形橡胶带,横跨嵌缝,其横向两侧由螺栓、螺母、压板和垫块压紧紧贴管片内表面。
本发明的有益效果是,可实现对纵向接缝、环向接缝的完全密封,有效避免嵌缝材料脱落对隧道运营的影响,确保列车运行安全;弧形橡胶带能适应车辆震动、隧道纵向不均匀沉降变形,达到设计使用寿命后能方便地进行拆卸更换。
附图说明
本说明书包括如下七幅附图:
图1是本发明盾构隧道管片嵌缝防脱落装置的结构示意图;
图2是图1中A局部的放大图;
图3是本发明盾构隧道管片嵌缝防脱落装置的平面示意图;
图4是本发明盾构隧道管片嵌缝防脱落装置中滑槽构件的断面图;
图5是本发明盾构隧道管片嵌缝防脱落装置中滑槽构件的主视图;
图6是本发明盾构隧道管片嵌缝防脱落装置中弧形橡胶带的断面图;
图7是本发明盾构隧道管片嵌缝防脱落装置中垫块的断面图;
图中示出构件和对应的标记:管片1、弹性密封垫2、嵌缝3、弧形橡胶带4、弧形段4a、翼缘4b、凹槽4c、滑槽构件5、T型槽5a、、压板6、螺栓7、螺母8、垫块9、通孔9a、限位槽9b、顶压凸台9c、管片接缝11。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
参照图1至图5,本发明的盾构隧道管片嵌缝防脱落装置包括:滑槽构件5,预埋设置于嵌缝3两侧的管片1内,具有沿长度方向延伸的T型槽5a,T型槽5a的开口端位于与管片1内表面平齐的滑槽构件5外表面上;螺栓7,沿滑槽构件5纵向间隔设置,其头部位于T型槽5a内且受其竖向约束,螺栓7尾部螺杆段向外伸出T型槽5a,其上套装螺母8和压板6;弧形橡胶带4,横跨嵌缝3,其横向两侧通过螺栓7、螺母8、压板6和垫块9压紧紧贴管片1内表面。
参照图5,所述滑槽构件5上沿T型槽5a延伸方向间隔设置供螺栓7头部进入的扩大孔5b。
滑槽构件5有两种结构形式,当用于纵向拼接缝的嵌缝3时,滑槽构件5预埋于管片1纵向拼接缝的内侧,其轴线为直线。当用于环向拼接缝的嵌缝3时,滑槽构件5预埋于管片1环向拼接缝的内侧,其轴线为半径与管片1内表面相一致的圆弧。
参照图6,所述弧形橡胶带4横断面的中部为弧形段4a,两侧具有翼缘4b,翼缘4b外边缘向上凸起,在翼缘4b上形成凹槽4c。参照图2,所述垫块包括外侧垫块9、内侧垫块10,外侧垫块9设置于管片1内表面与压板6底面之间,内侧垫块10设置于凹槽4c底面与压板6底面之间。参照图7,所述垫块9具有供螺栓7穿过的通孔9a,横截面呈台阶状,内侧为顶压凸台9c,顶压凸台9c与通孔9a之间为容纳翼缘4b外边缘向上凸起部位的限位槽9b。
参照图3和图2,预制生产管片1时,将滑槽构件5按设计位置安装到管片模具中,再浇筑混凝土并养护至设计强度。脱模后,管片1的外侧安装弹性密封垫2后再拼装,待隧道稳定后施做嵌缝3。然后将弧形橡胶带4沿管片接缝11形状进行弯折,同时将螺栓7从扩大孔5b放入T型槽5a内,并沿T型槽5a滑动至安装位置。将压板6套装入螺栓7,压板6以下放置外侧垫块9,将螺母8安装至螺栓7上部并拧紧。在拧紧螺栓7的过程中,注意调整垫块9的位置,使得垫块9的顶压凸台9c始终与弧形橡胶带4接触密贴。
隧道运营后,若需对嵌缝3进行检查,或发现弧形橡胶带4有破损或达到设计使用寿命时,可将螺母8和弧形橡胶带4拆下,对嵌缝3检查,弧形橡胶带4更换后再重复上述过程进行安装固定。
本发明可实现对纵向接缝、环向接缝的完全密封,有效避免嵌缝材料脱落对隧道运营的影响,确保列车运行安全。弧形橡胶带4能适应车辆震动、隧道纵向不均匀沉降变形,达到设计使用寿命后能方便地进行拆卸更换。
以上所述只是用图解说明本发明盾构隧道管片嵌缝防脱落装置的一些原理,并非是要将本发明局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。

Claims (7)

1.盾构隧道管片嵌缝防脱落装置,其特征是包括:滑槽构件(5),预埋设置于嵌缝(3)两侧的管片(1)内,具有沿长度方向延伸的T型槽(5a),T型槽(5a)的开口端位于与管片(1)内表面平齐的滑槽构件(5)外表面上;螺栓(7),沿滑槽构件(5)纵向间隔设置,其头部位于T型槽(5a)内且受其竖向约束,螺栓(7)尾部螺杆段向外伸出T型槽(5a),其上套装螺母(8)和压板(6);弧形橡胶带(4),横跨嵌缝(3),其横向两侧通过螺栓(7)、螺母(8)、压板(6)和垫块(9)压紧紧贴管片(1)内表面。
2.如权利要求1所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述滑槽构件(5)上沿T型槽(5a)延伸方向间隔设置供螺栓(7)头部进入的扩大孔(5b)。
3.如权利要求1所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述滑槽构件(5)预埋于管片(1)纵向拼接缝的内侧,其轴线为直线。
4.如权利要求1所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述滑槽构件(5)预埋于管片(1)环向拼接缝的内侧,其轴线为半径与管片(1)内表面相一致的圆弧。
5.如权利要求1所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述弧形橡胶带(4)横断面的中部为弧形段(4a),两侧具有翼缘(4b),翼缘(4b)外边缘向上凸起,在翼缘(4b)上形成凹槽(4c)。
6.如权利要求5所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述垫块(9)具有供螺栓(7)穿过的通孔(9a),横截面呈台阶状,内侧为顶压凸台(9c),顶压凸台(9c)与通孔(9a)之间为容纳翼缘(4b)外边缘向上凸起部位的限位槽(9b)。
7.如权利要求6所述的盾构隧道管片嵌缝防脱落装置,其特征是:所述垫块(9)由易压缩橡胶材料制成。
CN201810530231.1A 2018-05-29 2018-05-29 盾构隧道管片嵌缝防脱落装置 Pending CN108506019A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810530231.1A CN108506019A (zh) 2018-05-29 2018-05-29 盾构隧道管片嵌缝防脱落装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810530231.1A CN108506019A (zh) 2018-05-29 2018-05-29 盾构隧道管片嵌缝防脱落装置

Publications (1)

Publication Number Publication Date
CN108506019A true CN108506019A (zh) 2018-09-07

Family

ID=63401760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810530231.1A Pending CN108506019A (zh) 2018-05-29 2018-05-29 盾构隧道管片嵌缝防脱落装置

Country Status (1)

Country Link
CN (1) CN108506019A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899086A (zh) * 2019-03-15 2019-06-18 广州大学 一种隧道隔减震体系
CN110307007A (zh) * 2019-06-24 2019-10-08 中铁二院工程集团有限责任公司 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具
CN112832814A (zh) * 2021-03-18 2021-05-25 天津城建大学 一种预紧力自复位管片接头组件

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107692A (ja) * 1997-10-01 1999-04-20 Ohbayashi Corp 防食被覆コンクリート構造部材の目地部構造
JP2005232819A (ja) * 2004-02-20 2005-09-02 C I Kasei Co Ltd 剥落防止部材
CN1916364A (zh) * 2006-08-07 2007-02-21 上海市隧道工程轨道交通设计研究院 适应大量值地层不均匀沉降或错动的隧道处理方法
JP2011099233A (ja) * 2009-11-05 2011-05-19 Seibu Polymer Corp コンクリート構造物用伸縮継手の固定構造およびその固定方法
CN203230048U (zh) * 2013-03-24 2013-10-09 中铁二院工程集团有限责任公司 不同截面复杂结构防水构造
CN203403892U (zh) * 2013-06-24 2014-01-22 中铁第一勘察设计院集团有限公司 一种高压富水地层盾构法隧道衬砌接缝防水结构
CN203856484U (zh) * 2014-05-23 2014-10-01 常州工程职业技术学院 一种隧道管片的密封结构
JP2015148044A (ja) * 2014-02-04 2015-08-20 株式会社 プロテクノ 可撓継手構造
CN105587326A (zh) * 2016-01-29 2016-05-18 中铁第一勘察设计院集团有限公司 盾构或tbm法隧道的多道防水管片结构
CN107435548A (zh) * 2017-07-17 2017-12-05 中铁隧道勘测设计院有限公司 一种盾构隧道管片接缝防水结构及其施工方法
CN208310797U (zh) * 2018-05-29 2019-01-01 中铁二院工程集团有限责任公司 盾构隧道管片嵌缝防脱落装置

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107692A (ja) * 1997-10-01 1999-04-20 Ohbayashi Corp 防食被覆コンクリート構造部材の目地部構造
JP2005232819A (ja) * 2004-02-20 2005-09-02 C I Kasei Co Ltd 剥落防止部材
CN1916364A (zh) * 2006-08-07 2007-02-21 上海市隧道工程轨道交通设计研究院 适应大量值地层不均匀沉降或错动的隧道处理方法
JP2011099233A (ja) * 2009-11-05 2011-05-19 Seibu Polymer Corp コンクリート構造物用伸縮継手の固定構造およびその固定方法
CN203230048U (zh) * 2013-03-24 2013-10-09 中铁二院工程集团有限责任公司 不同截面复杂结构防水构造
CN203403892U (zh) * 2013-06-24 2014-01-22 中铁第一勘察设计院集团有限公司 一种高压富水地层盾构法隧道衬砌接缝防水结构
JP2015148044A (ja) * 2014-02-04 2015-08-20 株式会社 プロテクノ 可撓継手構造
CN203856484U (zh) * 2014-05-23 2014-10-01 常州工程职业技术学院 一种隧道管片的密封结构
CN105587326A (zh) * 2016-01-29 2016-05-18 中铁第一勘察设计院集团有限公司 盾构或tbm法隧道的多道防水管片结构
CN107435548A (zh) * 2017-07-17 2017-12-05 中铁隧道勘测设计院有限公司 一种盾构隧道管片接缝防水结构及其施工方法
CN208310797U (zh) * 2018-05-29 2019-01-01 中铁二院工程集团有限责任公司 盾构隧道管片嵌缝防脱落装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙国强;: "盾构区间隧道结构防水及耐久性问题探讨", 现代城市轨道交通 *
高墅;: "某过江地铁盾构隧道管片渗漏水原因分析及治理技术", 中国建筑防水 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109899086A (zh) * 2019-03-15 2019-06-18 广州大学 一种隧道隔减震体系
CN110307007A (zh) * 2019-06-24 2019-10-08 中铁二院工程集团有限责任公司 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具
CN110307007B (zh) * 2019-06-24 2024-03-22 中铁二院工程集团有限责任公司 掘进机法隧道预制管片衬砌仰拱支撑构件快速安装工具
CN112832814A (zh) * 2021-03-18 2021-05-25 天津城建大学 一种预紧力自复位管片接头组件
CN112832814B (zh) * 2021-03-18 2022-06-21 天津城建大学 一种预紧力自复位管片接头组件

Similar Documents

Publication Publication Date Title
CN108506019A (zh) 盾构隧道管片嵌缝防脱落装置
CN104843022A (zh) 设备舱底板的安装结构
CN207727423U (zh) 一种可更换的浅埋模数式桥梁伸缩装置
CN208310797U (zh) 盾构隧道管片嵌缝防脱落装置
CN101625061B (zh) 预应力钢筒混凝土管管线应急抢修方法
CN113309146A (zh) 一种最终接头止水装置及安装方法
CN103912288A (zh) 高承载力管片接头结构
CN108442951A (zh) 一种用于盾构隧道接缝的导水密封装置
CN204605804U (zh) 设备舱底板的安装结构
CN105040743B (zh) 地下结构后浇带可拆卸式换撑方法及结构
CN112324456A (zh) 一种盾构隧道复合衬砌结构及方法
CN104404871B (zh) 桥梁伸缩缝处治方法
CN207878270U (zh) 一种降噪型伸缩缝
CN212985234U (zh) 一种隧道衬砌软搭接装置
CN201462321U (zh) 预应力钢筒混凝土管管线应急抢修结构
CN210178375U (zh) 一种隧道衬砌纵向施工缝的楔块式密封装置
CN211223834U (zh) 一种飞机雷达舱防水密封结构
CN209556368U (zh) 扣件一体化双矩管搭接背楞
CN208881808U (zh) 一种120型集成式空气制动系统
CN206072243U (zh) 管线快速安装拖链
CN208479060U (zh) 悬挂式单轨交通漏缆夹具
WO2016119509A1 (zh) 动车组的电缆过桥安装结构
CN207377583U (zh) 一种隧道固定环向止水带二衬封端钢模板装置
CN221682984U (zh) 施工缝v型槽安装结构
CN209010966U (zh) 一种桥梁伸缩装置用免维护降噪橡胶止水带

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180907