CN108505962A - A kind of extra large system of landwaste single-point row and its application method - Google Patents

A kind of extra large system of landwaste single-point row and its application method Download PDF

Info

Publication number
CN108505962A
CN108505962A CN201810160234.0A CN201810160234A CN108505962A CN 108505962 A CN108505962 A CN 108505962A CN 201810160234 A CN201810160234 A CN 201810160234A CN 108505962 A CN108505962 A CN 108505962A
Authority
CN
China
Prior art keywords
landwaste
accumulator tank
pipe
swing pipe
extra large
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810160234.0A
Other languages
Chinese (zh)
Inventor
赵建亭
张宇凡
杨梦婕
祝奎臣
张云峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
708th Research Institute of CSIC
Original Assignee
708th Research Institute of CSIC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 708th Research Institute of CSIC filed Critical 708th Research Institute of CSIC
Priority to CN201810160234.0A priority Critical patent/CN108505962A/en
Publication of CN108505962A publication Critical patent/CN108505962A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/001Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor specially adapted for underwater drilling

Abstract

The present invention relates to landwaste single-points to arrange extra large system, including the first accumulator tank, first accumulator tank are arranged in the inside of cantilever beam, for storing landwaste;Fixing pipe, the fixing pipe run through the side wall of the cantilever beam, and are connect with first accumulator tank, for the landwaste in first accumulator tank to be discharged;Swing pipe, the swing pipe is arranged in the outside of the cantilever beam, is connect with the fixing pipe, for the landwaste in the fixing pipe to be discharged;Second accumulator tank, second accumulator tank are arranged on deck, are connect with the swing pipe, the landwaste for storing the swing pipe discharge;Side of a ship outer tube, the side of a ship outer tube run through main hull, are connect with second accumulator tank, for the landwaste in second accumulator tank to be discharged;Wherein, the swing pipe is to be detachably connected with the fixing pipe.It the advantage is that, can landwaste be subjected to point discharge;The extra large system of landwaste single-point row improves space availability ratio, while occupied space is few using the idle space of existing apparatus.

Description

A kind of extra large system of landwaste single-point row and its application method
Technical field
The present invention relates to marine drilling technical field more particularly to a kind of extra large systems of landwaste single-point row and application method.
Background technology
Self-elevating drilling platform is marine important mobile drilling rig.In order to promote the workability of self-elevating drilling platform Energy and efficiency, current platform are both needed to setting movable suspending arm girder system and unite.Cantilever beam in different well location operations, landwaste floss hole with Cantilever beam changes position, therefore is typically employed in the mode of cantilever beam bottom connection flexible pipe or direct emission, is followed to handle mud Landwaste caused by loop system.Aforesaid way easy tos produce pipeline obstruction since installation space is limited, it is difficult to clear up.
Therefore, there is an urgent need for one kind capable of ensureing cantilever beam operation fluency and safety, reduces pipeline obstruction, improves rock It considers the landwaste exhaust system of discharge efficiency to be worth doing, and is had not been reported at present about this landwaste exhaust system.
Invention content
The purpose of the present invention is being directed to deficiency in the prior art, a kind of extra large system of landwaste single-point row is provided.
To achieve the above object, the technical solution adopted by the present invention is that:
The extra large system of landwaste single-point row, is applied in cantilever beam, and the cantilever beam is removable, including:
First accumulator tank, first accumulator tank are arranged in the inside of cantilever beam, for storing landwaste;
Fixing pipe, the fixing pipe run through the side wall of the cantilever beam, and are connect with first accumulator tank, for being discharged Landwaste in first accumulator tank;
Swing pipe, the swing pipe are arranged in the outside of the cantilever beam, are connect with the fixing pipe, described for being discharged Landwaste in fixing pipe;
Second accumulator tank, second accumulator tank are arranged on deck, are connect with the swing pipe, for storing the swing The landwaste of pipe discharge;
Side of a ship outer tube, the side of a ship outer tube run through hull, are connect with second accumulator tank, for second accumulator tank to be discharged Interior landwaste;
Wherein, the swing pipe is to be detachably connected with the fixing pipe.
Preferably, the swing pipe and the fixing pipe junction are provided with fixing device, for the swing pipe with The fixing pipe is fixed.
Preferably, further include screening plant, the inner wall in the cantilever beam is arranged in the screening plant, with first storage Slot connection is deposited, for landwaste screen and the landwaste after screening being discharged into first accumulator tank.
Preferably, the junction of the swing pipe and second accumulator tank is provided with limiting device, described for limiting Swing pipe.
Preferably, second accumulator tank for no top panel accumulator tank.
Preferably, the swing pipe stretches into second accumulator tank.
Preferably, the upper surface of second accumulator tank is provided with track, and the swing pipe is arranged on the track, institute Swing pipe is stated on the track to move back and forth.
The present invention also provides the application methods that a kind of landwaste single-point arranges extra large system.
The application method of the extra large system of landwaste single-point row, includes the following steps:
Step S1, the landwaste single-point row extra large system is installed;
Step S2, the landwaste that mud circulating system generates, is expelled to the first accumulator tank;
Step S3, the landwaste in described first accumulator tank, is expelled to fixing pipe;
Step S4, the landwaste in the described fixing pipe, is expelled to swing pipe;
Step S5, the landwaste in the described swing pipe, is expelled to the second accumulator tank;
Step S6, the landwaste in described second accumulator tank, is discharged by side of a ship outer tube.
Preferably, in the step S1, include the following steps:
Step S11, swing pipe, mobile cantilever beam to job position are dismantled;
Step S12, the swing pipe is reconnected with fixing pipe, and by the other end of the swing pipe and second Accumulator tank is attached;
Step S13, the swing pipe and the fixing pipe are fixed.
Preferably, in the step S2~S6, landwaste is discharged by way of gravity or bath auxiliary.
The present invention is had the following technical effect that compared with prior art using above technical scheme:
The extra large system of landwaste single-point row of the present invention can still carry out landwaste in the case where cantilever beam position adjusts Point discharge;The extra large system of landwaste single-point row, is transformed on existing cantilever beam system and ocean platform, utilizes existing apparatus Idle space, improve space availability ratio, while occupied space is few;Swing pipe and fixing pipe can fast assembling-disassembling, be convenient for cantilever Beam carries out position adjustment;Swing pipe is provided with fixing device with fixing pipe junction, and swing pipe can be made to carry out jail with fixing pipe Gu it is fixed, avoid occurring swing pipe obscission in landwaste discharge process;By adjusting swing pipe position, make the rock in cantilever beam Bits are emitted into always in the second accumulator tank, are reduced manpower and are cleaned or debug;The extra large system of single-point row, can be quickly to each component It is maintained or replaced.
Description of the drawings
Fig. 1 is the side view of a preferred embodiment of the present invention.
Fig. 2 is the front view of a preferred embodiment of the present invention.
Fig. 3 is the vertical view of a preferred embodiment of the present invention.
Fig. 4 is the flow chart of the application method of a preferred embodiment of the present invention.
Fig. 5 is the flow chart of the step S1 of the application method of a preferred embodiment of the present invention.
Reference numeral therein is:First accumulator tank 1;Fixing pipe 2;Swing pipe 3;Second accumulator tank 4;Side of a ship outer tube 5;It is fixed Device 6;Screening plant 7;Cantilever beam 8;Deck 9.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of not making creative work it is all its His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The invention will be further described in the following with reference to the drawings and specific embodiments, but not as limiting to the invention.
The preferred embodiment of the present invention, as shown in Figures 1 to 3, the extra large system of landwaste single-point row, including the first accumulator tank 1, fixing pipe 2, swing pipe 3, the second holding vessel 4, side of a ship outer tube 5.
First accumulator tank 1 is arranged in the inside of cantilever beam 8, the landwaste for collecting mud circulating system generation.
Fixing pipe 2, one end are connect with the first accumulator tank 1, and the other end runs through the side wall of cantilever beam 8, will be in the first accumulator tank 1 Landwaste discharge cantilever beam 8 outside.
Fixing pipe 2 can be connect with any surface of the first accumulator tank 1.In the present embodiment, fixing pipe 2 and the first accumulator tank 1 bottom connection, is connected by bottom, can utmostly empty the landwaste in the first accumulator tank 1.
Swing pipe 3, one end and the one end for the fixing pipe 2 for stretching out cantilever beam 8 are attached, and the landwaste in fixing pipe 2 is arranged Go out to appointed place.
Swing pipe 3 is to be detachably connected, such as threaded connection, fixture block connect, nested encryptions with fixing pipe 2.
Make cantilever beam 8 at different work position by the way that a swing pipe 3 is arranged using above-mentioned technical proposal, always can It is enough that landwaste is emitted into designated position;Swing pipe 3 is detachably connected with fixing pipe 2, it is ensured that cantilever beam 8 is in moving process In, do not occur the case where outlet of swing pipe 3 moves around.
In the present embodiment, in order to improve stability, swing pipe 3 and 2 junction of fixing pipe are provided with fixing device 6, For carrying out secondary fixation to swing pipe 3 and fixing pipe 2.Preferably, fixing device 6 is quick coupling.
Using above-mentioned technical proposal, using fixing device 6, secondary fixation is carried out to fixing pipe 2 and 3 junction of swing pipe, The stable connection degree for improving swing pipe 3 and fixing pipe 2, prevents in landwaste discharge process, the accident that swing pipe 3 falls off occurs Situation.
Second accumulator tank 4 is arranged on deck 9, and the other end of swing pipe 3 is attached with the second accumulator tank 4, for storing The landwaste that swing pipe 3 is discharged.
Storage cantilever beam 8 is concentrated to be discharged by the way that the second accumulator tank 4 is arranged in fixed location using above-mentioned technical proposal Landwaste, the case where avoiding previous landwaste from trickling down everywhere, need manually to clean, occur.Meanwhile concentration discharge is carried out, it is conducive to scene Ambient conditions fully understand.
In the present embodiment, in order to improve stability, the junction of swing pipe 3 and the second accumulator tank 4 is provided with limit Device (not shown) avoids 3 displacement of swing pipe for limiting swing pipe 3.
Preferably, limiting device includes bolt limiting device, fixture block limiting device.
The outlet of swing pipe 3 is set to be limited to the specific of the second accumulator tank 4 using limiting device using above-mentioned technical proposal Position prevents swing pipe 3 during landwaste is discharged, the fortuitous events such as displacement occurs, and landwaste is avoided to trickle down in the second accumulator tank 4 It is external.
Second accumulator tank 4 can be there are many design method, such as open accumulator tank, closed accumulator tank, semi-enclosed storage Deposit slot etc..
A kind of preferred scheme is, the second accumulator tank 4 is open accumulator tank, upper part without panel, swing pipe 3 it is another End is stretched into the second accumulator tank 4.
It using above-mentioned technical proposal, is designed by open accumulator tank, the landwaste in the second accumulator tank 4 can be understood in time Store situation.
Another preferred scheme is that the second accumulator tank 4 is semi-enclosed accumulator tank, and upper part is with sliding rail Panel, the other end and the sliding rail of swing pipe 3 are attached, and the other end of swing pipe 3 is slided on sliding rail, and Swing pipe 3 is hose.
Using above-mentioned technical proposal, designed by rail mounted, can make swing pipe 3 with fixing pipe 2 without dismounting In the case of, mobile cantilever beam 8.
In order to meet landwaste emission request, the limited length of the second accumulator tank 4 is fixed.The length of second accumulator tank 4 meets pendulum Dynamic pipe 3 is in different location, range that the outlet port of swing pipe 3 is covered.That is there are one minimum length for the second accumulator tank 4 needs Degree, minimum length meet, and swing pipe 3 can be moved to two limit in second 4 liang of limit end positions of accumulator tank with cantilever beam 8 Fixing pipe 2 when end connects.As shown in Figure 2 to 3, length when cantilever beam 8 is moved to two extreme ends is S1, the second accumulator tank 4 length is S2,3 length of S1=S2+2 × swing pipe.
Side of a ship outer tube 5, one end are connect with the second accumulator tank 4, and the other end runs through hull or ocean platform.
Side of a ship outer tube 5 can be connect with any surface of the second accumulator tank 4.In the present embodiment, it is preferred that the one of side of a ship outer tube 5 End is connect with the bottom of the second accumulator tank 4, is connected by bottom, can utmostly be discharged the landwaste in the second accumulator tank 4.
In the present embodiment, it is further preferred that further including screening plant 7, screening plant 7 is arranged in the inside of cantilever beam 8, And connect with the first accumulator tank 1, it is expelled to the first accumulator tank 1 for being screened to mud, and by the mud after screening.
There are many set-up modes for the position of screening plant 7.In the present embodiment, it is preferred that screening plant 7 is arranged first The top of accumulator tank 1, by the way that screening plant 7 is arranged on top, even if being fallen into the first accumulator tank 1 by gravity landwaste, It need not be by external force.
The application method of the extra large system of landwaste single-point row of the present invention, as shown in figure 4, including the following steps:
Step S1, the extra large system of installation landwaste single-point row;
Step S2, the landwaste that mud circulating system generates, is expelled to the first accumulator tank;
Step S3, the landwaste in the first accumulator tank, is expelled to fixing pipe;
Step S4, the landwaste in fixing pipe, is expelled to swing pipe;
Step S5, the landwaste in swing pipe is expelled to the second accumulator tank;
Step S6, the landwaste in the second accumulator tank, is discharged by side of a ship outer tube.
Preferably, in step sl, as shown in figure 5, including the following steps:
Step S11, swing pipe, mobile cantilever beam to job position are dismantled;
Step S12, swing pipe and fixing pipe are reconnected, and by the other end of swing pipe and the second accumulator tank into Row connection;
Step S13, swing pipe and fixing pipe are fixed.
In step S2~S6, when carrying out landwaste discharge, landwaste can be discharged by way of gravity or bath auxiliary.
The foregoing is merely preferred embodiments of the present invention, are not intended to limit embodiments of the present invention and protection model It encloses, to those skilled in the art, should can appreciate that all with made by description of the invention and diagramatic content Equivalent replacement and obviously change obtained scheme, should all be included within the scope of the present invention.

Claims (10)

1. a kind of extra large system of landwaste single-point row, is applied in cantilever beam (8), the cantilever beam (8) is removable, which is characterized in that packet It includes:
First accumulator tank (1), first accumulator tank (1) are arranged in the inside of cantilever beam (8), for storing landwaste;
Fixing pipe (2), the fixing pipe (2) run through the side wall of the cantilever beam (8), and are connect with first accumulator tank (1), For the landwaste in first accumulator tank (1) to be discharged;
Swing pipe (3), the swing pipe (3) are arranged in the outside of the cantilever beam (8), connect, be used for the fixing pipe (2) The landwaste in the fixing pipe (2) is discharged;
Second accumulator tank (4), second accumulator tank (4) are arranged in deck (9), are connect with the swing pipe (3), for storing The landwaste of swing pipe (3) discharge;
Side of a ship outer tube (5), the side of a ship outer tube (5) are run through hull, are connect with second accumulator tank (4), for being discharged described second Landwaste in accumulator tank (4);
Wherein, the swing pipe (3) is to be detachably connected with the fixing pipe (2).
2. the extra large system of landwaste single-point row according to claim 1, which is characterized in that the swing pipe (3) and the fixation Pipe (2) junction is provided with fixing device (6), for the swing pipe (3) and the fixing pipe (2) to be fixed.
3. the extra large system of landwaste single-point row according to claim 1, which is characterized in that further include screening plant (7), the sieve The inner wall in the cantilever beam (8) is arranged in screening device (7), is connect with first accumulator tank (1), for being screened to landwaste And the landwaste after screening is discharged into first accumulator tank (1).
4. the extra large system of landwaste single-point row according to claim 1, which is characterized in that the swing pipe (3) and described second The junction of accumulator tank (4) is provided with limiting device, for limiting the swing pipe (3).
5. the extra large system of landwaste single-point row according to claim 1, which is characterized in that second accumulator tank (4) is supreme The accumulator tank of panel.
6. the extra large system of landwaste single-point according to claim 5 row, which is characterized in that the swing pipe (3) stretches into described the Two accumulator tanks (4).
7. the extra large system of landwaste single-point row according to claim 1, which is characterized in that the upper table of second accumulator tank (4) Face is provided with track, and on the track, the swing pipe (3) moves back and forth on the track for swing pipe (3) setting.
8. a kind of application method of the extra large system of landwaste single-point row, which is characterized in that include the following steps:
Step S1, the landwaste single-point row extra large system is installed;
Step S2, the landwaste that mud circulating system generates, is expelled to the first accumulator tank (1);
Step S3, the landwaste in described first accumulator tank (1), is expelled to fixing pipe (2);
Step S4, the landwaste in the described fixing pipe (2), is expelled to swing pipe (3);
Step S5, the landwaste in the described swing pipe (3), is expelled to the second accumulator tank (4);
Step S6, the landwaste in described second accumulator tank (4) is discharged by side of a ship outer tube (5).
9. the application method of the extra large system of landwaste single-point row according to claim 8, which is characterized in that in the step S1 In, include the following steps:
Step S11, dismounting swing pipe (3), mobile cantilever beam (8) to job position;
Step S12, the swing pipe (3) and fixing pipe (2) are reconnected, and by the other end of the swing pipe (3) It is attached with the second accumulator tank (4);
Step S13, the swing pipe (3) and the fixing pipe (2) are fixed.
10. the application method of the extra large system of landwaste single-point row according to claim 8, which is characterized in that the step S2~ In S6, landwaste is discharged by way of gravity or bath auxiliary.
CN201810160234.0A 2018-02-26 2018-02-26 A kind of extra large system of landwaste single-point row and its application method Pending CN108505962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810160234.0A CN108505962A (en) 2018-02-26 2018-02-26 A kind of extra large system of landwaste single-point row and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810160234.0A CN108505962A (en) 2018-02-26 2018-02-26 A kind of extra large system of landwaste single-point row and its application method

Publications (1)

Publication Number Publication Date
CN108505962A true CN108505962A (en) 2018-09-07

Family

ID=63375122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810160234.0A Pending CN108505962A (en) 2018-02-26 2018-02-26 A kind of extra large system of landwaste single-point row and its application method

Country Status (1)

Country Link
CN (1) CN108505962A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3029264A1 (en) * 2014-12-05 2016-06-08 Sandvik Mining and Construction Oy Separator, rock drilling unit and method for separating drilling waste
CN105883434A (en) * 2016-06-27 2016-08-24 范广潜 Rock fragment pump system
CN205714045U (en) * 2016-04-29 2016-11-23 招商局重工(江苏)有限公司 A kind of system of landwaste discharge
CN206174871U (en) * 2016-11-18 2017-05-17 大连船舶重工集团有限公司 From installing module ization ocean drilling rig

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3029264A1 (en) * 2014-12-05 2016-06-08 Sandvik Mining and Construction Oy Separator, rock drilling unit and method for separating drilling waste
CN205714045U (en) * 2016-04-29 2016-11-23 招商局重工(江苏)有限公司 A kind of system of landwaste discharge
CN105883434A (en) * 2016-06-27 2016-08-24 范广潜 Rock fragment pump system
CN206174871U (en) * 2016-11-18 2017-05-17 大连船舶重工集团有限公司 From installing module ization ocean drilling rig

Similar Documents

Publication Publication Date Title
BG99298A (en) Device for practically vertical positioning of a pipeline
CN105151227B (en) A kind of structure arrangement of cylinder type FPSO hulls
CN106400847B (en) A kind of constructing device for ocean steel-pipe pile cladding corrosion protection system
CN108505962A (en) A kind of extra large system of landwaste single-point row and its application method
US20200063530A1 (en) Apparatus and Method
CN113833908A (en) Auxiliary device for erecting ocean engineering submarine pipeline
CN205976528U (en) Concrete material feeding unit for building portable
CN106935294B (en) A kind of underwater capacity reducing device of spentnuclear fuel associated component suitable for odevity unit
CN101705942A (en) Submerged pump system
CN207960977U (en) A kind of sliding submerged pump system of deep water
CN115714929A (en) Ocean basic station structure
CN103956679B (en) Steel tube tower upkeep operation platform and using method thereof
CN203826847U (en) A steel tube tower unkeep working platform
CN211735482U (en) Single-pile foundation integrated auxiliary structure for integral installation of offshore wind turbine
CN206307253U (en) A kind of liftable fin keel with interior cleaning apparatus
CN201690177U (en) Cable transit for drilling platform
CN215367481U (en) Backfill system for pile foundation erosion pit of ocean platform
CN215999205U (en) Welding equipment capable of adsorbing welding scraps for marine engineering pipeline installation
CN112623134A (en) Novel floating platform and operation method thereof
CN208361606U (en) A kind of semi-submersible type maritime platform filling station
RU2324100C2 (en) Method of underwater pipe laying, realization system and complexes of joining pipes used
CN218107257U (en) Composite treatment device for waste gas treatment
CN205591627U (en) Line tower is failed to multistage formula altitude mixture control
CN217355826U (en) A stinger for installing many heavy-calibre pipelines
CN217260615U (en) Modularization lander

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180907

RJ01 Rejection of invention patent application after publication