CN108497291A - Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method - Google Patents

Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method Download PDF

Info

Publication number
CN108497291A
CN108497291A CN201810222996.9A CN201810222996A CN108497291A CN 108497291 A CN108497291 A CN 108497291A CN 201810222996 A CN201810222996 A CN 201810222996A CN 108497291 A CN108497291 A CN 108497291A
Authority
CN
China
Prior art keywords
curing
raw material
cooling
round roller
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810222996.9A
Other languages
Chinese (zh)
Inventor
于姗彤
于剑睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hulun Buir Golden Food And Food Co Ltd
Original Assignee
Hulun Buir Golden Food And Food Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hulun Buir Golden Food And Food Co Ltd filed Critical Hulun Buir Golden Food And Food Co Ltd
Priority to CN201810222996.9A priority Critical patent/CN108497291A/en
Publication of CN108497291A publication Critical patent/CN108497291A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A23FOODS OR FOODSTUFFS; TREATMENT THEREOF, NOT COVERED BY OTHER CLASSES
    • A23LFOODS, FOODSTUFFS, OR NON-ALCOHOLIC BEVERAGES, NOT COVERED BY SUBCLASSES A21D OR A23B-A23J; THEIR PREPARATION OR TREATMENT, e.g. COOKING, MODIFICATION OF NUTRITIVE QUALITIES, PHYSICAL TREATMENT; PRESERVATION OF FOODS OR FOODSTUFFS, IN GENERAL
    • A23L7/00Cereal-derived products; Malt products; Preparation or treatment thereof
    • A23L7/10Cereal-derived products

Landscapes

  • Health & Medical Sciences (AREA)
  • Nutrition Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Polymers & Plastics (AREA)
  • Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)

Abstract

A kind of Artemisia integrifolia various grains gruel production line raw material curing cooling device and its application method, it is related to production equipment technology, it includes device frame, curing box, cooler bin and material storing box, device top of the trellis is equipped with curing box, crossbearer cooler bin among device frame, material storing box is equipped with below cooler bin, curing box top is equipped with feed inlet, is equipped with the first curing round roller and the second curing round roller below feed inlet successively;It is equipped with discharge bucket below second curing round roller discharge end, discharge bucket bottom end is connect with pants pipe, cooler bin is equipped with below pants pipe, feed hopper there are two being set at the top of cooler bin, two feed hoppers are connected to cooling chamber respectively, are cased with backwater cavity outside two cooling chambers, material transferring band is equipped in two cooling chambers, it is equipped with dump skip below material transferring band discharge end, dump skip is connect by cooling pipe with material storing box.It is simple in structure, it is easy to use, reach good curing effect, improves cooling velocity.

Description

Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method
Technical field:
The present invention relates to production equipment technologies, and in particular to Artemisia integrifolia various grains gruel production line raw material cure cooling device and its Application method.
Background technology:
The diet of science is most important to the health of human body, as using rice as in the country of staple food, the diet of rice served with meat and vegetables on top is must not Can be less, the type of rice served with meat and vegetables on top is various, mainly adds the different and all difference of food materials according to it, with people's work, life The continuous quickening of rhythm, instant convenient food increasingly have been favored by people, and especially instant facilitates rice served with meat and vegetables on top.Mesh Before, in the rice served with meat and vegetables on top production line of instant, particle after molding needs, by curing twice, after curing twice to cool down cold But, existing amount of cure is deep, so that material moisture is lost more, and then affect eating mouth feel, and cooling after curing The long period is needed, production efficiency is reduced.
Invention content:
In place of overcoming above-mentioned the shortcomings of the prior art, and provide a kind of Artemisia integrifolia various grains gruel life Producing line raw material cures cooling device and its application method, it is simple in structure, easy to use, has reached good curing effect, has carried High cooling velocity.
In order to solve the problems existing in background technology, the present invention is to adopt the following technical scheme that:Including device frame, curing Case, cooler bin and material storing box, device top of the trellis are equipped with curing box, and device frame centre crossbearer cooler bin, cooler bin lower section is equipped with storage Hopper, curing box top are equipped with feed inlet, several the first curing round rollers are equipped with below feed inlet, are led between the first curing round roller The first material transfer band connection is crossed, several the second curing round rollers are equipped with below the first curing round roller, are passed through between the second curing round roller Thermovent, the second curing round roller are equipped on second material transfer band connection, the second curing round roller and the first curing round roller outer circumference surface It is connect respectively with the second hollow connecting shaft and the first hollow connecting shaft with the first curing round roller both ends, the second hollow connection of one end Axis and the first hollow connecting shaft are connect by bearing with the second curing round roller and the first curing round roller respectively, and hollow connecting shaft point It does not accumulate a pipeline to connect with the second air-heater and the first air-heater respectively, the second hollow connecting shaft of the other end and first Hollow connecting shaft is separately connected second driving wheel and the first driving wheel, and the second driving wheel and the first driving wheel pass through respectively Two driving chains and the connection of the first driving chain, one of them second driving wheel and the first driving wheel respectively with the second motor and the The output axis connection of one motor;It is equipped with discharge bucket below second curing round roller discharge end, discharge bucket bottom end connect with pants pipe, goes out Hopper is equipped with material rotating plate with pants pipe junction, and material rotating plate bottom end is connect with swing arm, and swing arm one end is hinged with push rod, the trousers It is equipped with cooler bin below vent in the sides of a garment pipe, is set at the top of cooler bin there are two feed hopper, two feed hoppers tops are respectively aligned to the two of pants pipe A discharge port, two feed hoppers are connected to cooling chamber respectively, and two cooling chamber mirror images are arranged in cooler bin, outside two cooling chambers Be cased with backwater cavity, backwater cavity bottom is equipped with water inlet pipe and return pipe, water inlet pipe and return pipe respectively with the water inlet below cooler bin Case is connected to recovery tank, and material transferring band is equipped in two cooling chambers, and material transferring band discharge end stretches out cooler bin, and material passes Dump skip is equipped with below defeated band discharge end, dump skip is connect by cooling pipe with material storing box.
Application method is as follows:
1)Raw material is entered by feed inlet in curing box, and raw material, which is scattered to the first material transfer, to be taken, and starts first motor;
2)First motor starts, and after the first material transfer band moves a distance, stops first motor, so that the first material transfer is taken and be paved with original Material starts the first air-heater;
3)First air-heater blows into hot wind in the first curing round roller by pipeline and the first hollow connecting shaft, and hot wind simultaneously passes through The thermovent heat dissipation on one curing round roller surface carries out depth curing for the raw material that the first material transfer takes, and the curing time is 5~20 points Clock;
4)After the completion of depth curing, starting first motor, raw material drops down onto the second material transfer by the discharge end of the first material transfer band and takes, Start the second motor;
5)Second electric motor starting after the second material transfer band moves a distance, stops the second motor, is that the second material transfer takes and is paved with original Material starts the second air-heater;
6)Second air-heater blows into hot wind in the second curing round roller by pipeline and the second hollow connecting shaft, and hot wind simultaneously passes through The thermovent heat dissipation on two curing round roller surfaces, the raw material progress taken for the second material transfer is light cured, and the curing time is 5~20 points Clock;
7)After the completion of light cured, start the second motor, raw material is dropped down onto by the discharge end of the second material transfer band in discharge bucket, is discharged Bucket is connect with pants pipe, and discharge bucket is equipped with material rotating plate with pants pipe junction;
8)Raw material stirs material rotating plate after dropping down onto discharge bucket, and raw material enters one in cooler bin by a discharge nozzle of pants pipe In cooling chamber;
9)Raw material drops down onto on the material transferring band in cooling chamber, starts conveying transmission belt, after material transferring band moves a distance Stop, making to be paved with raw material on material transferring band;
10)After being paved with raw material on material transferring band, start inlet tank, the cold water being equipped in inlet tank enters cooling by water inlet pipe It is that the raw material on material transferring band carries out cooling down work, cooling time is 10~30 minutes in the backwater cavity being cased with outside chamber;
11)After cooling, start material transferring band, material transferring band will be in feedstock transportation to dump skip;
12)After raw material in dump skip carries out one section of natural cooling by cooling pipe, slide to material storing box;
13)When having raw material after curing to enter in discharge bucket again, material rotating plate is stirred by push rod, raw material by pants pipe another Discharge nozzle enters into another cooling chamber in cooler bin;
14)Raw material drops down onto on the material transferring band in another cooling chamber, starts conveying transmission belt, and material transferring band moves one section Stop after distance, makes to be paved with raw material on material transferring band;
15)After material transferring band is paved with raw material, start inlet tank, the cold water being equipped in inlet tank enters cooling chamber by water inlet pipe It is that the raw material on material transferring band carries out cooling down work, cooling time is 10~20 minutes in the backwater cavity being cased with outside;
16)After cooling, start material transferring band, material transferring band will be in feedstock transportation to dump skip;
17)After raw material in dump skip carries out one section of natural cooling by another cooling pipe, slide to material storing box;
18)Raw material in material storing box waits for next station to use.
The described second curing round roller and the first curing round roller are the identical curing round roller of size, and second, which cures round roller, is equipped with Number one more than the first number for being equipped with of curing round roller.
The first material transfer band is opposite with the material transfer direction of the second material transfer band.
The thermovent number is several, and thermovent equal distribution is outside the second curing round roller and the first curing round roller On periphery.
Cooling water is housed in the inlet tank.
The material transfer direction of material transferring band in two cooling chambers is opposite.
The temperature value of the first air-heater setting is higher than the temperature value of the second air-heater setting.
The step 10)With step 15)Middle cold water enters recovery tank after backwater cavity carries out cold exchange by return pipe It is interior.
The beneficial effects of the invention are as follows reasonable designs, securely and reliably:
1)Using the first curing round roller and the second curing round roller, depth curing and light cured work are completed, ensure that object The moisture content and saturation degree of material, ensure that eating mouth feel;
2)Using two cooling chambers, cooling speed is accelerated, production efficiency is improved;
3)Using backwater cavity, cooling effect not only ensure that, but also will not destroy the moisture content and saturation degree of material after curing;
4)Using cooling pipe, achieve the purpose that convey material natural cooling.
Description of the drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is curing box vertical view of the present invention;
Fig. 3 is discharge bucket enlarged drawing of the present invention.
Specific implementation mode:
With reference to each figure, the present invention specifically uses and mode is implemented as follows:Including device frame 25, curing box 1, cooler bin 16 and material storing box 24,25 top of device frame is equipped with curing box 1,25 intermediate crossbearer cooler bin 16 of device frame, and 16 lower section of cooler bin is equipped with material storing box 24, 1 top of curing box is equipped with feed inlet 7, and 7 lower section of feed inlet is equipped with several the first curing round rollers 2, leads between the first curing round roller 2 Cross the connection of the first material transfer band 5, the first curing round roller 2 lower section is equipped with several the second curing round rollers 8, between the second curing round roller 8 It being connected by the second material transfer band 6, the second curing round roller 2 and first, which cures, is equipped with thermovent 3 on 2 outer circumference surface of round roller, and second Curing round roller 8 and first cures 2 both ends of round roller and is connect respectively with the second hollow connecting shaft 9 and the first hollow connecting shaft 4, one end Second hollow connecting shaft 9 and the first hollow connecting shaft 4 are cured round roller 2 and are connected by bearing and the second curing round roller 8 and first respectively It connects, and hollow connecting shaft accumulates a pipeline and connect respectively with the second air-heater 26 and the first air-heater 27 respectively, the other end The second hollow connecting shaft 9 and the first hollow connecting shaft 4 be separately connected second driving wheel 28 and the first driving wheel 32, second Driving wheel 28 and the first driving wheel 32 are connected by the second driving chain 30 and the first driving chain 31 respectively, one of them second Driving wheel 28 and the first driving wheel 32 the output axis connection with the second motor 29 and first motor 33 respectively;Second curing round roller 8 Discharge bucket 10 is equipped with below discharge end, 10 bottom end of discharge bucket is connect with pants pipe 15, and discharge bucket 10 is set with 15 junction of pants pipe There are material rotating plate 12,12 bottom end of material rotating plate to be connect with swing arm 14,14 one end of swing arm is hinged with push rod 13,15 lower section of pants pipe Equipped with cooler bin 16,16 top of cooler bin is set there are two feed hopper 11, and two 11 tops of feed hopper are respectively aligned to pants pipe 15 Two discharge ports, two feed hoppers 11 are connected to cooling chamber 17 respectively, and two 17 mirror images of cooling chamber are arranged in cooler bin 16, and two Be cased with backwater cavity 18 outside a cooling chamber 17,18 bottom of backwater cavity is equipped with water inlet pipe and return pipe, water inlet pipe and return pipe respectively with The inlet tank 23 of 16 lower section of cooler bin is connected to recovery tank 22, and material transferring band 19 is equipped in two cooling chambers 17, and material passes 19 discharge end of defeated band stretches out cooler bin 16, is equipped with dump skip 20 below 19 discharge end of material transferring band, dump skip 20 passes through cooling Pipeline 21 is connect with material storing box 24.
Application method is as follows:
1)Raw material is entered by feed inlet 7 in curing box 1, and raw material is scattered to the first material transfer band 5, starts first motor 33;
2)First motor 33 starts, and after the first material transfer band 5 moves a distance, stopping first motor 33 makes on the first material transfer band 5 It is paved with raw material, starts the first air-heater 27;
3)First air-heater 27 blows into hot wind in the first curing round roller 2 by pipeline and the first hollow connecting shaft 4, and hot wind simultaneously leads to The thermovent 3 for crossing the first 2 surface of curing round roller radiates, and for the raw material progress depth curing on the first material transfer band 5, the curing time is 5~20 minutes;
4)After the completion of depth curing, start first motor 33, raw material drops down onto the second material transfer band by the discharge end of the first material transfer band 5 On 6, start the second motor 29;
5)Second motor 29 starts, and after the second material transfer band 6 moves a distance, stops the second motor 29, is on the second material transfer band 6 It is paved with raw material, starts the second air-heater 26;
6)Second air-heater 26 blows into hot wind in the second curing round roller 8 by pipeline and the second hollow connecting shaft 9, and hot wind simultaneously leads to The thermovent 3 for crossing the second 8 surface of curing round roller radiates, light cured for the raw material progress on the second material transfer band 6, and the curing time is 5~20 minutes;
7)After the completion of light cured, start the second motor 29, raw material drops down onto discharge bucket 10 by the discharge end of the second material transfer band 6 Interior, discharge bucket 10 is connect with pants pipe 15, and discharge bucket 10 is equipped with material rotating plate 12 with 15 junction of pants pipe;
8)Raw material stirs material rotating plate 12 after dropping down onto discharge bucket 10, and raw material enters cooler bin 16 by a discharge nozzle of pants pipe 15 In a cooling chamber 17 in;
9)Raw material drops down onto on the material transferring band 19 in cooling chamber 17, starts conveying transmission belt 19, the movement of material transferring band 19 one Stop after segment distance, makes to be paved with raw material on material transferring band 19;
10)After being paved with raw material on material transferring band 19, start inlet tank 23, the cold water being equipped in inlet tank 23 by water inlet pipe into Enter in the backwater cavity 18 being cased with outside cooling chamber 17, is that the raw material on material transferring band 19 carries out cooling down work, cooling time It is 10~30 minutes;
11)After cooling, start material transferring band 19, material transferring band 19 will be in feedstock transportation to dump skip 20;
12)After raw material in dump skip 20 carries out one section of natural cooling by cooling pipe 21, slide to material storing box 24;
13)When thering is raw material after curing to enter in discharge bucket 10 again, material rotating plate 12 is stirred by push rod 13, raw material passes through pants pipe 15 another discharge nozzle enter into another cooling chamber 17 in cooler bin 16;
14)Raw material drops down onto on the material transferring band 19 in another cooling chamber 17, starts conveying transmission belt 19, material transferring band 19 Stop after mobile a distance, makes to be paved with raw material on material transferring band 19;
15)After being paved with raw material on material transferring band 19, start inlet tank 23, the cold water being equipped in inlet tank 23 by water inlet pipe into Enter in the backwater cavity 18 being cased with outside cooling chamber 17, is that the raw material on material transferring band 19 carries out cooling down work, cooling time It is 10~20 minutes;
16)After cooling, start material transferring band 19, material transferring band 19 will be in feedstock transportation to dump skip 20;
17)After raw material in dump skip 20 carries out one section of natural cooling by another cooling pipe 21, slide to material storing box 24 It is interior;
18)Raw material in material storing box 24 waits for next station to use.
The described second curing round roller 8 and the first curing round roller 2 are the identical curing round roller of size, and second cures round roller 8 One more than the number that the number being equipped with is equipped with than the first curing round roller 2.The biography of the first material transfer band 5 and the second material transfer band 6 Expect that direction is opposite.Described 3 numbers of thermovent are several, and 3 equal distribution of thermovent is cured in the second curing round roller 8 and first On 2 outer circumference surface of round roller.Cooling water is housed in the inlet tank 23.Material transferring band 19 in two cooling chambers 17 Material transfer direction it is opposite.The temperature value of first air-heater 27 setting is higher than the temperature value of the second air-heater 26 setting.Institute The step 10 stated)With step 15)Middle cold water is entered by return pipe in recovery tank 22 after backwater cavity 18 carries out cold exchange.
When Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method and works, material from feed inlet 7 into Enter to be scattered on the first material transfer band 5, open the first air-heater 27, the first air-heater 27 hot wind is passed through into pipeline and side first Hollow connecting shaft 4 is conveyed into the first curing round roller 2, and the first curing round roller 2 is set in curing box 1, and the first curing round roller 2 Number is at least six, according to the size of curing box 1, can increase the number of the first curing round roller 2, the first curing 2 excircle of round roller The thermovent 3 that face is equipped with, and then the hot wind of the first air-heater 27 conveying sheds eventually by thermovent 2 as the first material transfer band 5 Heating cures purpose with the material being reached on the first material transfer band 5.Material is completed to cure for the first time on the first material transfer band 5, and It is cured for depth, the temperature of the first air-heater 27 is higher.
After material completes depth curing on the first material transfer band 5, start first motor 33, connects with 33 output shaft of first motor First driving wheel 32 rotation connect, and then turned therewith by other first driving wheels 32 that the first driving chain 31 is connected Dynamic, the first driving wheel 32 is fixedly connected by the first hollow connecting shaft 4 of the other side with the first curing round roller 2, the first curing Round roller 2 is rotated, and the rotation of the first curing round roller 2 drives the first material transfer band 5 to carry out mobile conveying, has reached material conveying Purpose, material are fallen on by the discharge end of the first material transfer band 5 on the second material transfer band 6.Start the second motor 29, with the second motor 29 Export second driving wheel 28 rotation of axis connection, and then other second driving wheels being connected by the second driving chain 30 28 rotate therewith, and the second driving wheel 28 is fixedly connected by the second hollow connecting shaft 9 of the other side with the second curing round roller 8, Second curing round roller 8 is rotated, and the rotation of the second curing round roller 8 drives the second material transfer band 6 to carry out mobile conveying.
The second air-heater 26 is opened, the first air-heater 26 is defeated by the second hollow connecting shaft 9 of pipeline and side by hot wind It being sent into the second curing round roller 8, the second curing round roller 8 is set in curing box 1, and second curing 8 numbers of round roller are at least seven, According to the size of curing box 1, the number of the second curing round roller 8 can be increased, still, the number of the second curing round roller 8 is always than the The number of one curing round roller 2 is one more, and the transmission direction of the second material transfer band 6 and the first material transfer band 5 is on the contrary, and the second material transfer band 6 Than the distance that the first material transfer band 5 grows a curing round roller, to ensure that the raw material on the first material transfer band 5 can successfully be fallen second On material transfer band 6, the thermovent 3 also being provided on the second curing 8 outer circumference surface of round roller is connected to the second curing round roller 8, and then second The hot wind that air-heater 26 conveys sheds eventually by thermovent 3 and is heated for the second material transfer band 6, to be reached on the second material transfer band 6 Material curing purpose.Material is completed second on the second material transfer band 6 and is cured, and is light cured, the second air-heater 26 Temperature be less than the temperature of the first air-heater 27, slightly cure using depth and twice, that is, accelerate curing speed, in turn ensure The moisture content and saturation degree of material.
Enter in discharge bucket 10 by discharge end after being cured on the second material transfer band 6, is equipped in discharge bucket 10 for controlling The material rotating plate 12 of discharging direction processed connects the swing arm 14 of right control 12 reverses direction of material rotating plate on material rotating plate 12, is cut with scissors in swing arm 14 Push rod 13 is connect, pushes push rod 13 that can rotate material rotating plate 12 by swing arm 14, and then adjust discharging direction.Push rod 13 is pushed, is made Material is entered by a discharge nozzle of pants pipe 15 in cooler bin 16 in one of cooling chamber 17, and material spilling is passed in material On defeated band 19,17 outer wall of cooling chamber is cased with backwater cavity 18, the water inlet pipe and return pipe of 18 bottom of backwater cavity, can complete it is independent into The cold water being equipped in inlet tank 23 is entered by water inlet pipe in backwater cavity 18, and then makes temperature in cooling chamber 17 by water and return water It reduces, plays to material cooling effect, the cold water after use is entered by return pipe in recovery tank 22, and material passes through cooling chamber After 17 carry out cooling, discharge end is transported to by material transferring band 19 and enters dump skip 20, then one section is carried out certainly by cooling tube 21 So after cooling, finally drops into material storing box 24, that is, complete cooling work.
When a cooling chamber 17 in cooler bin 16 is cooling down material, and the not completion of the material in the cooling chamber 17 It is that the material in discharge port 10 enters another at this time by pushing push rod 13 to overturn material rotating plate 12 when being cooled to required temperature In cooling chamber 17, the operation principle of two cooling chambers 17 in cooler bin 16 is identical, and 17 material after cooling of each cooling chamber is equal Enter in material storing box 24 after carrying out one section of natural cooling by cooling pipe 21.
It using two cooling chambers 17, can not only work at the same time, but also can separate and work, and thus cleverly avoid cooling The contradiction that the speed difference generated between speed and curing speed is brought, meanwhile, cooling speed is improved, and then improve production Efficiency.
According to actual needs, the number that the first curing round roller 2 and second in curing box 1 cures round roller 8 can be increased, so as to Curing area is increased, the inventory that can be cured is increased, improves curing efficiency.
Using a pants pipe 15 and a material rotating plate 12, you can complete the cooling work of both sides charging, saved cost.
In conclusion this Artemisia integrifolia various grains gruel production line raw material curing cooling device and its application method reasonable design, peace It is complete reliable, round roller 8 is cured using the first curing round roller 2 and second, depth curing and light cured work is completed, ensure that The moisture content and saturation degree of material, ensure that eating mouth feel;Using two cooling chambers 17, cooling speed is accelerated, is improved Production efficiency;Using backwater cavity 18, cooling effect not only ensure that, but also will not destroy the moisture content and saturation degree of material after curing; Using cooling pipe 21, achieve the purpose that convey material natural cooling.

Claims (9)

1. a kind of Artemisia integrifolia various grains gruel production line raw material curing cooling device and its application method, it is characterised in that:Curing cooling Device includes device frame(25), curing box(1), cooler bin(16)And material storing box(24), device frame(25)Top is equipped with curing box (1), device frame(25)Intermediate crossbearer cooler bin(16), cooler bin(16)Lower section is equipped with material storing box(24), curing box(1)Top is set There is feed inlet(7), feed inlet(7)Lower section is equipped with several the first curing round rollers(2), the first curing round roller(2)Between pass through One material transfer band(5)Connection, the first curing round roller(2)Lower section is equipped with several the second curing round rollers(8), the second curing round roller(8) Between pass through the second material transfer band(6)Connection, the second curing round roller(2)With the first curing round roller(2)It is equipped on outer circumference surface scattered Hot mouth(3), the second curing round roller(8)With the first curing round roller(2)Both ends respectively with the second hollow connecting shaft(9)It is hollow with first Connecting shaft(4)Connection, second hollow connecting shaft of one end(9)With the first hollow connecting shaft(4)It is ripe with second by bearing respectively Change round roller(8)With the first curing round roller(2)Connection, and hollow connecting shaft accumulate respectively a pipeline respectively with the second air-heater (26)With the first air-heater(27)Connection, the second hollow connecting shaft of the other end(9)With the first hollow connecting shaft(4)It is separately connected One the second driving wheel(28)With the first driving wheel(32), the second driving wheel(28)With the first driving wheel(32)Pass through second respectively Driving chain(30)With the first driving chain(31)Connection, one of them second driving wheel(28)With the first driving wheel(32)Respectively With the second motor(29)And first motor(33)Output axis connection;Second curing round roller(8)Discharge bucket is equipped with below discharge end (10), discharge bucket(10)Bottom end and pants pipe(15)Connection, discharge bucket(10)With pants pipe(15)Junction is equipped with material rotating plate (12), material rotating plate(12)Bottom end and swing arm(14)Connection, swing arm(14)One end and push rod(13)Hinged, described pants pipe(15) Lower section is equipped with cooler bin(16), cooler bin(16)Top is set there are two feed hopper(11), two feed hoppers(11)Top is right respectively Quasi- pants pipe(15)Two discharge ports, two feed hoppers(11)Respectively with cooling chamber(17)Connection, two cooling chambers(17)Mirror As being arranged in cooler bin(16)It is interior, two cooling chambers(17)It is cased with backwater cavity outside(18), backwater cavity(18)Bottom is equipped with water inlet pipe And return pipe, water inlet pipe and return pipe respectively with cooler bin(16)The inlet tank of lower section(23)And recovery tank(22)Connection, two Cooling chamber(17)Inside it is equipped with material transferring band(19), material transferring band(19)Discharge end stretches out cooler bin(16), material transferring Band(19)Dump skip is equipped with below discharge end(20), dump skip(20)Pass through cooling pipe(21)With material storing box(24)Connection.
2. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:Application method is as follows:
Raw material passes through feed inlet(7)Into curing box(1)Interior, raw material is scattered to the first material transfer band(5)On, start first motor (33);
First motor(33)Start, the first material transfer band(5)After mobile a distance, stop first motor(33), make the first material transfer Band(5)On be paved with raw material, start the first air-heater(27);
First air-heater(27)Hot wind is passed through into pipeline and the first hollow connecting shaft(4)Blow into the first curing round roller(2)It is interior, hot wind And pass through the first curing round roller(2)The thermovent on surface(3)Heat dissipation is the first material transfer band(5)On raw material carry out depth curing, Curing time is 5~20 minutes;
After the completion of depth curing, start first motor(33), raw material passes through the first material transfer band(5)Discharge end drop down onto the second material transfer Band(6)On, start the second motor(29);
Second motor(29)Start, the second material transfer band(6)After mobile a distance, stop the second motor(29), it is the second material transfer Band(6)On be paved with raw material, start the second air-heater(26);
Second air-heater(26)Hot wind is passed through into pipeline and the second hollow connecting shaft(9)Blow into the second curing round roller(8)It is interior, hot wind And pass through the second curing round roller(8)The thermovent on surface(3)Heat dissipation is the second material transfer band(6)On raw material carry out it is light cured, Curing time is 5~20 minutes;
After the completion of light cured, start the second motor(29), raw material passes through the second material transfer band(6)Discharge end drop down onto discharge bucket (10)It is interior, discharge bucket(10)With pants pipe(15)Connection, discharge bucket(10)With pants pipe(15)Junction is equipped with material rotating plate(12);
Raw material drops down onto discharge bucket(10)After stir material rotating plate(12), raw material passes through pants pipe(15)A discharge nozzle enter cooling Case(16)In a cooling chamber(17)It is interior;
Raw material drops down onto cooling chamber(17)Interior material transferring band(19)On, start conveying transmission belt(19), material transferring band(19) Stop after mobile a distance, makes material transferring band(19)On be paved with raw material;
Material transferring band(19)On be paved with raw material after, start inlet tank(23), inlet tank(23)The cold water being inside equipped with passes through water inlet Pipe enters cooling chamber(17)The backwater cavity being cased with outside(18)It is interior, it is material transferring band(19)On raw material carry out cooling down work Make, cooling time is 10~30 minutes;
After cooling, start material transferring band(19), material transferring band(19)By feedstock transportation to dump skip(20)It is interior;
Dump skip(20)Interior raw material passes through cooling pipe(21)After carrying out one section of natural cooling, slide to material storing box(24)It is interior;
There is raw material after curing to enter discharge bucket again(10)When interior, pass through push rod(13)Stir material rotating plate(12), raw material passes through trousers Vent in the sides of a garment pipe(15)Another discharge nozzle enters into cooler bin(16)In another cooling chamber(17)It is interior;
Raw material drops down onto another cooling chamber(17)Interior material transferring band(19)On, start conveying transmission belt(19), material transferring Band(19)Stop after mobile a distance, makes material transferring band(19)On be paved with raw material;
Material transferring band(19)On be paved with raw material after, start inlet tank(23), inlet tank(23)The cold water being inside equipped with passes through water inlet Pipe enters cooling chamber(17)The backwater cavity being cased with outside(18)It is interior, it is material transferring band(19)On raw material carry out cooling down work Make, cooling time is 10~20 minutes;
After cooling, start material transferring band(19), material transferring band(19)By feedstock transportation to dump skip(20)It is interior;
Dump skip(20)Interior raw material passes through another cooling pipe(21)After carrying out one section of natural cooling, slide to material storing box (24)It is interior;
Material storing box(24)Interior raw material waits for next station to use.
3. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:The second curing round roller(8)With the first curing round roller(2)For the identical curing round roller of size, the second curing circle Roller(8)The number being equipped with is than the first curing round roller(2)The number being equipped with is one more.
4. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:The first material transfer band(5)With the second material transfer band(6)Material transfer direction it is opposite.
5. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:The thermovent(3)Number be several, thermovent(3)Equal distribution cures round roller second(8)It is ripe with first Change round roller(2)On outer circumference surface.
6. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:The inlet tank(23)It is interior that cooling water is housed.
7. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:Two cooling chambers(17)Interior material transferring band(19)Material transfer direction it is opposite.
8. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 1 and its application method, special Sign is:First air-heater(27)The temperature value of setting is higher than the second air-heater(26)The temperature value of setting.
9. Artemisia integrifolia various grains gruel production line raw material curing cooling device according to claim 2 and its application method, special Sign is:The step 10)With step 15)Middle cold water is in backwater cavity(18)It carries out entering return water by return pipe after cold exchange Case(22)It is interior.
CN201810222996.9A 2018-03-19 2018-03-19 Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method Pending CN108497291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810222996.9A CN108497291A (en) 2018-03-19 2018-03-19 Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810222996.9A CN108497291A (en) 2018-03-19 2018-03-19 Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method

Publications (1)

Publication Number Publication Date
CN108497291A true CN108497291A (en) 2018-09-07

Family

ID=63376637

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810222996.9A Pending CN108497291A (en) 2018-03-19 2018-03-19 Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method

Country Status (1)

Country Link
CN (1) CN108497291A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101548740A (en) * 2008-03-31 2009-10-07 王兆国 Minor cereal rice and production process thereof
CN101803700A (en) * 2010-04-22 2010-08-18 吉林红嘴曙光农牧有限公司 Corn instant porridge
CN204907722U (en) * 2015-07-06 2015-12-30 江西省鑫纬业环保设备制造有限公司 Grain cooling bin
CN205412919U (en) * 2016-03-02 2016-08-03 大庆粥家庄食品有限公司 Curing cereal powder forming granulation equipment
CN205431935U (en) * 2016-03-02 2016-08-10 大庆粥家庄食品有限公司 Food grains other than rice and wheat high temperature curing cooling device
CN206330828U (en) * 2017-01-09 2017-07-14 刘中国 Well logging landwaste drying unit
CN206403180U (en) * 2016-11-17 2017-08-15 黄惠英 A kind of five flour curing process equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101548740A (en) * 2008-03-31 2009-10-07 王兆国 Minor cereal rice and production process thereof
CN101803700A (en) * 2010-04-22 2010-08-18 吉林红嘴曙光农牧有限公司 Corn instant porridge
CN204907722U (en) * 2015-07-06 2015-12-30 江西省鑫纬业环保设备制造有限公司 Grain cooling bin
CN205412919U (en) * 2016-03-02 2016-08-03 大庆粥家庄食品有限公司 Curing cereal powder forming granulation equipment
CN205431935U (en) * 2016-03-02 2016-08-10 大庆粥家庄食品有限公司 Food grains other than rice and wheat high temperature curing cooling device
CN206403180U (en) * 2016-11-17 2017-08-15 黄惠英 A kind of five flour curing process equipment
CN206330828U (en) * 2017-01-09 2017-07-14 刘中国 Well logging landwaste drying unit

Similar Documents

Publication Publication Date Title
CN107455416B (en) Forming process and production system of baked food and baked food
CN206403031U (en) A kind of shortbread type biscuit production line
CN203874871U (en) Processing device for plant powder
CN103639029A (en) Plant powder processing device
CN103090654A (en) Drying device and drying method for pills
CN207269743U (en) A kind of production system of baked goods
CN203762180U (en) Multifunctional complete device for automatically processing Maofeng tea
CN108497291A (en) Artemisia integrifolia various grains gruel production line raw material cures cooling device and its application method
CN207927714U (en) Rice served with meat and vegetables on top raw materials for production cure cooling device
CN206518029U (en) Production line for making biscuit with automatic discharging function
CN211544816U (en) Refining device of green tea conveyor
CN101167485B (en) Fully-automatic convenient vermicelli production line and production technology
CN202083191U (en) Rotary oven
CN209173989U (en) A kind of quartz sand circulation crusher
CN207361148U (en) A kind of fabric conveying box
CN212388084U (en) Device for producing pellets by using dry dedusting ash
CN210988139U (en) Chinese yam baking device
CN106864013A (en) Transfer apparatus and material transfer production line
CN209085258U (en) A kind of novel Gluten drying system
CN209257210U (en) A kind of curing kilns with heat-proof device
CN206073571U (en) A kind of drying machine suitable for high viscosity fermented feed
CN206519353U (en) Shortbread type biscuit production line
CN205940038U (en) Energy -conserving drying -machine of three -dimensional whirlwind
CN203638741U (en) Temperature control conveyor
CN210150337U (en) Conveying equipment used in bean paste mixing process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180907