CN108489892A - Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow - Google Patents

Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow Download PDF

Info

Publication number
CN108489892A
CN108489892A CN201810267877.5A CN201810267877A CN108489892A CN 108489892 A CN108489892 A CN 108489892A CN 201810267877 A CN201810267877 A CN 201810267877A CN 108489892 A CN108489892 A CN 108489892A
Authority
CN
China
Prior art keywords
water level
water
experiment
case
height
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810267877.5A
Other languages
Chinese (zh)
Other versions
CN108489892B (en
Inventor
徐长节
陈江
武思宇
刘兴旺
陈锦剑
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN201810267877.5A priority Critical patent/CN108489892B/en
Publication of CN108489892A publication Critical patent/CN108489892A/en
Application granted granted Critical
Publication of CN108489892B publication Critical patent/CN108489892B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N19/00Investigating materials by mechanical methods
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Abstract

Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow, described device includes model babinet, lifting gear and experiment auxiliary device.The model babinet includes the case that bankets(1), steel bracket(2), excavate module(3).The case that bankets is mounted on above steel bracket, excavates the middle position that module is placed in steel bracket.The lifting gear includes decelerating motor(12), screw rod(13), gear set(14).Experiment auxiliary device includes the first external water tank(15), the second external water tank(17), the first crane(16)With the second elevator(18);Excavate module(3)By flapper(31)And fixed sleeving(32)It constitutes.The method includes:Smooth location, equipment arrangement, the preparation of soil sample, soil body saturation, water level regulation, form seepage flow, experiment and record data, cleaning case retrial of laying equal stress on of banketing are tested.

Description

Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow
Technical field
The present invention relates to seabed Shield Tunneling experimental rig and methods under the conditions of a kind of seepage flow, belong to seabed shield tunnel Excavation technology field.
Background technology
Soil arching effect is widely present in the every field of geotechnical engineering, always as a classical problem in soil mechanics Since be all people research hot spot.And in shield tunnel project, caused by shield machine driving in work progress The overlying soil body loosens, and stresses re-distribution will occur for the relaxation zone soil body, and the soil body that part soil pressure is transferred to shield both sides is worked as In, due to the presence of this soil arching effect, the soil pressure for acting on section of jurisdiction top will be substantially less that full earthing pressure.Therefore, to Rationally determine that the cladding earth pressure of shield tunnel, soil arching effect be can not ignore.
Particularly, for the excavation of seabed shield tunnel, strong seepage flow caused by high hydraulic pressure will generate in soil body skeleton Seepage flow force will further weaken the integrality of soil body inter-particulate forces chain and the performance of soil arching effect, to which increase acts on Water And Earth Pressures on the overlying Water And Earth Pressures and excavation face on tunnel top.Currently, the research about soil arching effect is based on doing more It is carried out under the conditions of soil, system research there is no for the coupling between seepage flow and soil arching effect.Under this background, it is necessary to carry For a kind of test method, the indoor model examination of Shield Tunneling process under the conditions of different seepage flow may be implemented by this method It tests, to study seabed shield tunnel water and soil load action mechanism, more accurately to seabed shield tunnel cladding earth pressure and opens Digging face soil pressure is assessed.
Invention content
The object of the present invention is in order to realize the indoor model test of Shield Tunneling process under the conditions of different seepage flow, Seabed shield tunnel water and soil load action mechanism is studied, accurately to seabed shield tunnel cladding earth pressure and excavation face soil pressure It is assessed, seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow of present invention proposition.
The technical solution that the present invention realizes is as follows, seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow, including Model babinet, lifting gear and experiment auxiliary device.The model babinet is connected with the lifting gear, passes through the lifting The mobile simulated sea bottom Shield Tunneling of module activities baffle is excavated in device control.
The model babinet is made of the case that bankets, steel bracket, excavation module;The case that bankets is mounted on above steel bracket, is excavated Module is placed in the medium position of steel bracket;
The lifting gear includes decelerating motor, screw rod, gear set;The decelerating motor is fixed on steel bracket, the screw rod Including two, one vertical to place, and is connected with flapper, and another is horizontally arranged, and is connected with decelerating motor, two screw rods it Between be driven by gear set;
The experiment auxiliary device includes external water tank, crane and digital camera;The external water tank includes the first outer water receiving Case and the second external water tank, crane include the first crane and the second crane;First external water tank and the second external water tank It is separately mounted on first crane and the second crane on model babinet both sides;By control crane rising or under Drop, external water tank are moved up and down with crane.
The case that bankets is cube, and the maximum side of two area is observation panel, and bottom surface is by positioned at both sides Fixed bottom plate and the excavation module composition at middle part, fixed bottom plate both sides corner have inlet opening;Fixed bottom plate and inspection surface Two row water level holes are provided in same position respectively on the adjacent two side of plate, open up position and water level phase one needed for testing program It causes, to the height of water level during Control experiment, the model wall box and bottom plate are that thickness is stainless not less than 10mm Steel plate, observation panel are that thickness is not less than 10mm armorplate glasses.
Module is excavated to be made of flapper and fixed sleeving;The flapper is an arc-shaped stainless steel plate, side On post a circle waterproof washer, to prevent the leakage during experiment, corner is opened there are four osculum, in experiment process Middle generation seepage flow, middle part is provided with pressure tap, and connects pressure-measuring pipe, for measuring corresponding position pore water pressure during the test Power, pressure tap side is provided with circular trough, for placing soil pressure cell;The fixes sleeve is a stainless cube shaped set of steel Cylinder, wall thickness are not less than 10mm, and inner wall is zinc-plated, and inside dimension is identical as flapper outer profile size, and outer edge bankets with described Bottom plate mutually welds, and the flapper is connected with the lifting gear, and vertical direction is in fixation under the action of lifting gear It is freely moved up and down in sleeve.
The equal trepanning in bottom of the first external water tank and the second external water tank, by plastic flexible pipe can respectively with the case that bankets Bottom inlet opening is connected;The crane height is freely adjustable, and the digital camera setting is used for immediately ahead of observation panel Land movement during record experiment.
The experimental rig bankets on the inside of case and flapper upper surface is in the inlet opening, water level hole, osculum and survey The position in pressure hole covers layer of non-woven fabric;The inlet opening, water level hole, osculum and pressure tap are circumscribed with valve.
Seabed Shield Tunneling test method under the conditions of a kind of seepage flow of the present invention, includes the following steps:
(1)Place is flattened, experimental rig is placed and clears up experimental rig and banket case, chamber interior wall is lubricated to banketing, and is being banketed One layer of Teflon film is pasted on case both sides rustless steel inner wall and fixed bottom plate, tempered glass is observed in panel before and after the case that bankets Smear one layer of vaseline in side.
(2)Dial gauge, pressure-measuring pipe and soil pressure cell are installed, by soil pressure cell conducting wire connection data collecting instrument and balance and clearly Except zero;The soil pressure cell is mounted in experimental rig flapper circular trough.
(3)Soil sample is tested to testing desired height using sand rain method placement in layers;The experiment soil sample is sand, is filled every When layer soil sample, distance of the sand rain device bell mouth away from soil sample top surface is identical.
(4)Inlet opening is connected with the first external water tank by plastic flexible pipe, by the first external water tank into model casing It is filled to water level needed for experiment.
(5)Inlet opening valve is closed, the first external tank height is reduced to ground, outside second by the first crane The water filling into model casing of water receiving case, and flapper bottom drain holes valve is opened, it is formed inside case experiment soil sample of banketing steady Determine seepage flow;
(6)Opening is banketed equivalent water level hole valve at tank test water level, Control experiment height of water level;
(7)Simulated sea bottom tunnel excavation, and shield tunnel overlying gross pressure, hole are monitored by soil pressure cell, pressure-measuring pipe respectively Water pressure changes, and experiment soil sample displacement field is recorded by digital camera, to obtain tunnel overlying total stress, hole in digging process The regularity of distribution and damage of soil body pattern of gap water pressure.
(8)Soil sample is replaced, the depth of fill and height of water level are changed, step (2) to (6) is repeated, probes into different seepage flow operating modes Influence to seabed shield tunnel overlying soil body soil arching effect and geostatic shield.
First external water tank water filling into model casing before water filling, is lifted the first external water tank by the first crane Its floor height is risen to higher than height of water level needed for experiment;Be filled to water level in the case that bankets reach experiment water level after, pass through first Crane adjusts the first external tank height so that its height of water level is identical as model tank test height of water level, and stands extremely Height of water level reaches model tank test height of water level in pressure-measuring pipe.
Second external water tank water filling into model casing adjusts simultaneously Control experiment height of water level, reduces the first outer water receiving After case height to ground, inlet opening valve is closed, the second external water tank is raised to by its floor height height by the second crane In experiment height of water level flapper bottom row is opened simultaneously by plastic flexible pipe from box top slow water filling into case of banketing Water hole valve further opens equivalent water level hole valve at the tank test water level that bankets, and pass through the water outlet of the second external water tank Valve regulated waterflood injection rate so that the part water higher than experiment water level is overflowed from water level hole, to water level in the case that ensures to banket Stablize during the test at experiment water level.
The simulated sea bottom tunnel excavation controls flapper by decelerating motor and at the uniform velocity falls, simulated sea bottom shield tunnel The excavation in road;When flapper displacement reaches preset displacement, decelerating motor and water level hole, osculum valve are closed, is stopped simultaneously Only water supply of the second external water tank to the case that bankets continues to record soil pressure cell data and piezometric head situation of change, and comparison is true Recognize influence of the seepage flow to seabed Shield Tunneling Water And Earth Pressures.
The invention has the advantages that first passage of the present invention is to seabed Shield Tunneling mistake under the conditions of saturation and seepage flow The simulation of journey discloses influence of the seepage flow to Shield Tunneling overlying resistance to shear of soil redistribution, enriches seabed shield tunnel The research of water and soil load etc., the related fields theory for the effect that intercouples supplemented with seepage flow and soil arching effect.
Description of the drawings
Fig. 1 is seabed Shield Tunneling experimental rig structural schematic diagram;
Fig. 2 is seabed Shield Tunneling experimental rig model casing body-side view;
Fig. 3 is seabed Shield Tunneling experimental rig model babinet vertical view;
Fig. 4 is seabed Shield Tunneling experimental rig flapper structural schematic diagram;
Fig. 5 is seabed Shield Tunneling experimental rig operating method schematic diagram;
In figure, 1 is the case that bankets, and 2 be steel bracket, and 3 is excavate module, and 4 be observation panel, and 5 be inlet opening, and 6 be water level hole, and 7 are Waterproof washer, 8 be osculum, and 9 be pressure tap, and 10 be pressure-measuring pipe, and 11 be circular trough, and 12 be decelerating motor, and 13 be screw rod, and 14 are Gear set, 15 be the first external water tank, and 16 be the first crane, and 17 be the second external water tank, and 18 be the second crane, and 19 be number Code camera, 31 be flapper, and 32 be fixes sleeve.
Specific implementation mode
As shown in Figure 1, seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow of the present embodiment, including model casing Body, lifting gear and experiment auxiliary device.The model babinet is connected with the lifting gear, passes through the lifting gear control The mobile simulated sea bottom Shield Tunneling of flapper processed.
As shown in Figures 2 and 3, model babinet includes the case 1 that bankets, steel bracket 2 and excavation module 3.The case 1 that bankets is cube Body is erected on steel bracket 2, and the maximum side of two area is that panel 4 is observed made of tempered glass, and observation panel is logical Hot melt adhesive is crossed to fix with two side box bodies.3 bottom surface of case of banketing is fixed the excavation module 3 at bottom plate and middle part by both sides and is constituted.Fixed bottom Plate quadrangle is driveed there are four inlet opening 5, and test water is injected from this four inlet openings bankets in case 3.Excavate module width be B on two side box bodies, away from the position that case 3 bottom plate distance is 2B, 3B and 4B of banketing, has two row water level holes 6, for controlling Different initial water levels are to simulate different seepage flow operating modes.Model wall box and bottom plate are that thickness is not less than 10mm stainless steels Plate, observation panel are that thickness is not less than 10mm armorplate glasses.
Module 3 is excavated to be made of flapper 31 and fixed sleeving 32.The flapper 31 is an arc-shaped stainless steel Plate posts a circle waterproof washer 7 on side, and to prevent the leakage during experiment, corner is opened there are four osculum 8, to Seepage flow is generated during the test, and middle part is provided with pressure tap 9, and connects pressure-measuring pipe 10, corresponding for measuring during the test Position pore water pressure, pressure tap side is provided with circular trough 11, for placing soil pressure cell;The fixes sleeve 32 is one stainless The cube shaped sleeve of steel, wall thickness are not less than 10mm, and inner wall is zinc-plated, and inside dimension is identical as flapper outer profile size, outside Edge is mutually welded with the bottom plate that bankets, and the flapper 31 is connected with the lifting gear, in the effect of lifting gear Lower vertical direction freely moves up and down in fixes sleeve 32.Flapper 31 is as shown in Figure 4.
Lifting gear includes decelerating motor 12, screw rod 13 and gear set 14.Decelerating motor 12 is fixed on steel bracket 2, Velocity of rotation and rotation direction can be adjusted, to meet different tests demand.Screw rod 13 includes two, a horizontal direction It places, is connected with decelerating motor 12, in addition a vertical placement, be connected with module 3 is excavated.It includes flapper to excavate module 3 31 and top edge be welded on the fixes sleeve 32 banketed on 1 bottom plate of case.Flapper 31 is a semicircular arc plate, for simulating shield Structure tunnel.It is connected with screw rod 13, is driven by gear set 14 between two screw rods, so that decelerating motor 12 can be controlled Flapper 31 processed moves up and down in fixes sleeve 32 at different rates, to realize the mould of Shield Tunneling off-load It is quasi-.
Experiment auxiliary device includes external water tank, crane and digital camera;The external water tank includes the first outer water receiving Case 15 and the second external water tank 17, crane include the first crane 16 and the second crane 18;First external water tank 15 and Two external water tanks 17 are separately mounted on first crane 16 and the second crane 18 on model babinet both sides;Pass through control Crane rises or falls, and external water tank is moved up and down with crane.
The equal trepanning in bottom of first external water tank 15 and the second external water tank 17, by plastic flexible pipe respectively with bottom of banketing Two, portion inlet opening 5 is connected;The crane height is freely adjustable, and the setting of the digital camera 19 is before observing panel just Side, for land movement during record experiment.
As shown in figure 5, seabed Shield Tunneling test method under the conditions of a kind of seepage flow of the present embodiment, including following step Suddenly:
(1) place is flattened, experimental rig is placed and clears up the case 1 that bankets, chamber interior wall pastes one layer of spy in addition to observing panel banketing Fluorine dragon film applies last layer vaseline, to reduce the friction banketed between chamber interior wall and experiment soil sample in 4 inside of observation panel Power, one layer of the position stickup of inlet opening 5, osculum 8, water level hole 6 and pressure tap 9 above banket chamber interior wall and flapper 31 Two external water tanks are filled water by non-woven fabrics by running water pipe.
(2) sensor arrangement places soil pressure cell according to the specific requirement of experiment in 31 circular trough 11 of flapper, Soil pressure cell conducting wire is fixed on hot melt adhesive on flapper, to avoid there is the case where conducting wire cutting soil during experiment. Wire end connects data collecting instrument and balances and remove zero.Dial gauge is installed in flapper bottom, in inlet opening 5, row Water hole 8 and corresponding experiment water level correspond to and connect plastic flexible pipe in water level hole 6, pressure-measuring pipe 10 are connected on pressure tap 9, and ensure institute There is valve to be closed.
(3) experiment is poured into normal sand in sand rain drain bucket, is carried it to the case 1 that bankets by crane by the preparation of soil sample Top, by sand rain method, with 50mm for one layer, placement in layers tests buried depth at the top of the soil body to flapper and is equal to arc-shaped activity Baffle diameter, and ensure that sand rain is fallen away from identical when filling every time, the compactness and apparent severe to control every layer of soil sample are identical.
(4) soil body is saturated, and is respectively the first external water tank 15 and the second external water tank 17 to two external water tanks.It will water inlet Hole 5 is connected by plastic flexible pipe with the opening of two external water tank bottoms;The first external water tank is adjusted by the first crane 16 15 floor heights open 5 valve of inlet opening and 15 bottom valve of the first external water tank, pass through first to higher than experiment height of water level It is straight equal to twice of flapper away from 31 distance from top of flapper that external water tank 15 is slowly filled to the water surface into the case 1 that bankets Diameter;The height of the first external water tank is then adjusted by the first crane 16 so that its height of water level and model tank test water Position height is identical;And standing is equal with height of water level in model casing to height of water level in pressure-measuring pipe, is reached with guarantee test soil sample Saturation.
(5) seepage flow is formed, 5 valve of inlet opening is closed, 15 height of the first external water tank is reduced extremely by the first crane 16 31 bottom drain holes of flapper, 8 valve is opened on ground, and the second external water tank 17 is lifted to its bottom surface by the second crane 18 Height opens its bottom flowing water Valve higher than experiment height of water level, slow into the case that bankets from case top surface of banketing by plastic flexible pipe Slow water filling, while being drained into the test water of discharge in the first external water tank 15 by 8 plastic flexible pipe of osculum.
(6) water level control, opens the valve in the equivalent water level hole 6 at case closed test water level of banketing, while by outside second 17 bottom outlet valve regulated waterflood injection rate of water receiving case increases flow of inlet water so that higher than the experiment of experiment water level part It is flowed out from water level hole 6 always with water, to make stable level in experimental design height of water level, and will be from water by plastic flexible pipe The test water overflowed in the hole 6 of position drains into the first external water tank 15.
(7) data are tested and recorded, digital camera 19 is set up in the position of 4 front about 2m of observation panel.Read percentage The primary data of table and pressure-measuring pipe 9, starts decelerating motor 12, and adjustment motor speed to 1mm/min keeps flapper 31 slowly even Speed falls, and simulates Shield Tunneling process;Led to simultaneously with the frequency record soil pressure force data of 1 time/s by data collecting instrument Digital camera is crossed with land movement photo during frequency shooting record experiment primary 15s;When 12 displacement of flapper reaches When 1/10th flapper diameter, second of reading 9 data of pressure-measuring pipe closes decelerating motor 12 and water level hole 6, row 8 valve of water hole is simultaneously stopped water supply of the second external water tank to the case that bankets, and continues to record soil pressure cell data and third time is read Pressure-measuring pipe data compare the data obtained and the data in the case of seepage flow before, to confirm seepage flow to seabed shield tunnel Excavate the influence of Water And Earth Pressures in road.
(8) case that bankets is cleared up in off-test, is read dial gauge final reading and is simultaneously removed dial gauge, reduces the second outer water receiving 17 height of case opens 8 valve of osculum to ground, by 8 hose of osculum will banket tank test with water be expelled to two it is outer In water receiving case, soil sample and sensor in the case that bankets are taken out, clears up the case that bankets, and flapper is risen to by examination by decelerating motor Front position is tested, the depth of fill and height of water level are converted, repeats step (3)-(8).
By the change depth of fill and height of water level, measure under the different depths of fill, different water levels, different seepage flow operating modes, The distribution of seabed Shield Tunneling overlying gross pressure, pore water pressure, and then pore water pressure is subtracted by gross pressure, it obtains Seabed Shield Tunneling overlying effective soil pressure distribution.The variation of different location effective soil pressure during being tested by drafting Figure, compares the relationship of itself and rest effective soil pressure straight line, it can be determined that each point position soil arching effect play situation with And influence of the seepage flow to soil arching effect and geostatic shield:Effective soil pressure change curve is close with rest soil pressure straight line It overlaps, illustrates to occur without soil arching effect herein;Effective soil pressure change curve is fallen below rest soil pressure straight line, explanation There is soil arching effect herein, between the two away from bigger, illustrates that soil arching effect is more apparent.In addition, by assisting software to digital phase Soil body photo compares and analyzes during the captured experiment of machine, can draw out (shield tunnel in flapper dropping process Excavate), top soil displacement field, strain field situation of change, to obtain damage of soil body mechanism under the conditions of seepage flow.
In conclusion the present embodiment first passage, which simulates Shield Tunneling under a variety of seepage flow working conditions, causes actively soil The evolution of arch discloses seepage flow to the affecting laws of damage of soil body pattern and soil arch relaxation zone geostatic shield, enriches sea Research in terms of suffered water and soil load during the Shield Tunneling of bottom.

Claims (9)

1. Shield Tunneling experimental rig in seabed under the conditions of a kind of seepage flow, which is characterized in that described device include model babinet, Lifting gear and experiment auxiliary device;The model babinet is connected with the lifting gear, is controlled by the lifting gear The mobile simulated sea bottom Shield Tunneling of flapper;
The model babinet is made of the case that bankets, steel bracket, excavation module;The case that bankets is mounted on above steel bracket, excavates module It is placed in the medium position of steel bracket;
The lifting gear includes decelerating motor, screw rod, gear set;The decelerating motor is fixed on steel bracket, the screw rod Including two, one vertical to place, and is connected with flapper, and another is horizontally arranged, and is connected with decelerating motor, two screw rods it Between be driven by gear set;
The experiment auxiliary device includes external water tank, crane and digital camera;The external water tank includes the first outer water receiving Case and the second external water tank, the crane include the first crane and the second crane;First external water tank and second external Water tank is separately mounted on first crane and the second crane on model babinet both sides;By the rising for controlling crane Or decline, external water tank is moved up and down with crane.
2. seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow according to claim 1, which is characterized in that institute State banket case be cube, the maximum side of two area be observation panel, bottom surface by positioned at both sides fixation bottom plate and The excavation module at middle part forms, and fixed bottom plate both sides corner has inlet opening;Fixed bottom plate it is adjacent with observation panel two Two row water level holes are provided in same position respectively on side wall, it is consistent with water level needed for testing program to open up position, to control Height of water level during system experiment, the model wall box and bottom plate are that thickness is not less than 10mm stainless steel plates, observation Panel is that thickness is not less than 10mm armorplate glasses.
3. seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow according to claim 1, which is characterized in that institute Excavation module is stated to be made of flapper and fixed sleeving;The flapper is an arc-shaped stainless steel plate, is posted on side One circle waterproof washer, to prevent the leakage during experiment, corner is opened there are four osculum, to generate during the test Seepage flow, middle part is provided with pressure tap, and connects pressure-measuring pipe, for measuring corresponding position pore water pressure, pressure measurement during the test Hole side is provided with circular trough, for placing soil pressure cell;The fixes sleeve is a stainless cube shaped sleeve of steel, wall thickness Not less than 10mm, inner wall is zinc-plated, and inside dimension is identical as flapper outer profile size, and outer edge is mutually welded with the bottom plate that bankets It connects, the flapper is connected with the lifting gear, and vertical direction is free in fixes sleeve under the action of lifting gear It moves up and down.
4. seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow according to claim 1, which is characterized in that institute State the equal trepanning in bottom of the first external water tank and the second external water tank and be equipped with valve, can by plastic flexible pipe respectively with the case that bankets Bottom inlet opening is connected;The crane height is freely adjustable, and the digital camera setting is used for immediately ahead of observation panel Land movement during record experiment.
5. seabed Shield Tunneling experimental rig under the conditions of a kind of seepage flow according to claim 1, which is characterized in that institute State that experimental rig bankets on the inside of case and flapper upper surface is in the position of the inlet opening, water level hole, osculum and pressure tap Cover layer of non-woven fabric;The inlet opening, water level hole, osculum and pressure tap are circumscribed with valve.
6. Shield Tunneling test method in seabed under the conditions of a kind of seepage flow, which is characterized in that the described method comprises the following steps:
(1)Place is flattened, experimental rig is placed and clears up experimental rig and banket case, chamber interior wall is lubricated to banketing, and is being banketed One layer of Teflon film is pasted on case both sides rustless steel inner wall and fixed bottom plate, tempered glass is observed in panel before and after the case that bankets Smear one layer of vaseline in side;
(2)Dial gauge, pressure-measuring pipe and soil pressure cell are installed, soil pressure cell conducting wire is connected into data collecting instrument and balance and remove zero Point;The soil pressure cell is mounted in experimental rig flapper circular trough;
(3)Soil sample is tested to testing desired height using sand rain method placement in layers;The experiment soil sample is sand, fills every layer of soil When sample, distance of the sand rain device bell mouth away from soil sample top surface is identical;
(4)Inlet opening is connected with the first external water tank bottom by plastic flexible pipe, by the first external water tank into model casing It is filled to water level needed for experiment;
(5)Inlet opening valve is closed, the first external tank height is reduced to ground by the first crane, passes through the second outer water receiving Case water filling into model casing, and flapper bottom drain holes valve is opened, forming stabilization inside case experiment soil sample of banketing oozes Stream;
(6)Opening is banketed equivalent water level hole valve at tank test water level, Control experiment height of water level;
(7)Simulated sea bottom tunnel excavation, and shield tunnel overlying gross pressure, hole are monitored by soil pressure cell, pressure-measuring pipe respectively Water pressure changes, and experiment soil sample displacement field is recorded by digital camera, to obtain tunnel overlying total stress, hole in digging process The regularity of distribution and damage of soil body pattern of gap water pressure;
(8)Soil sample is replaced, the depth of fill and height of water level are changed, step (2) to (6) is repeated, probes into different seepage flow operating modes to sea The influence of bottom shield tunnel overlying soil body soil arching effect and geostatic shield.
7. seabed Shield Tunneling test method under the conditions of a kind of seepage flow according to claim 6, which is characterized in that institute First external water tank water filling into model casing is stated, before water filling, the first external water tank is raised to by its bottom surface by the first crane Height is higher than height of water level needed for experiment;Be filled to water level in the case that bankets reach experiment water level after, pass through the first crane adjust First external tank height so that its height of water level is identical as model tank test height of water level, and stands to water in pressure-measuring pipe Position height reaches model tank test height of water level.
8. seabed Shield Tunneling test method under the conditions of a kind of seepage flow according to claim 6, which is characterized in that institute Second external water tank water filling into model casing is stated, simultaneously Control experiment height of water level is adjusted, reduces the first external tank height to ground Behind face, inlet opening valve is closed, the second external water tank is raised to higher than experiment water level by its floor height by the second crane Highly, flapper bottom drain holes valve is opened simultaneously from box top slow water filling into case of banketing by plastic flexible pipe, into One step opens equivalent water level hole valve at the tank test water level that bankets, and passes through the flowing water Valve of the second external water tank and adjust note Water speed so that the part water higher than experiment water level is overflowed from water level hole, to which the water level that ensures to banket in case is in experiment process Middle stabilization is at experiment water level.
9. seabed Shield Tunneling test method under the conditions of a kind of seepage flow according to claim 6, which is characterized in that institute Simulated sea bottom tunnel excavation is stated, controlling flapper by decelerating motor at the uniform velocity falls, the excavation of simulated sea bottom shield tunnel;When When flapper displacement reaches preset displacement, decelerating motor and water level hole, osculum valve are closed, the second outer water receiving is simultaneously stopped Water supply of the case to the case that bankets continues to record soil pressure cell data and piezometric head situation of change, and comparison confirms seepage flow to seabed The influence of Shield Tunneling Water And Earth Pressures.
CN201810267877.5A 2018-03-29 2018-03-29 Submarine shield tunnel excavation test device and method under seepage condition Active CN108489892B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810267877.5A CN108489892B (en) 2018-03-29 2018-03-29 Submarine shield tunnel excavation test device and method under seepage condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810267877.5A CN108489892B (en) 2018-03-29 2018-03-29 Submarine shield tunnel excavation test device and method under seepage condition

Publications (2)

Publication Number Publication Date
CN108489892A true CN108489892A (en) 2018-09-04
CN108489892B CN108489892B (en) 2020-06-05

Family

ID=63317156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810267877.5A Active CN108489892B (en) 2018-03-29 2018-03-29 Submarine shield tunnel excavation test device and method under seepage condition

Country Status (1)

Country Link
CN (1) CN108489892B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109632606A (en) * 2019-01-09 2019-04-16 浙江大学 A kind of excavation face seepage tests system that river tunnel is constructed under Tidal Load effect
CN110221042A (en) * 2019-06-27 2019-09-10 合肥工业大学 A kind of device of simulating excavation stress field and Analysis of Ground-water Seepage Field coupling effect
CN110554165A (en) * 2019-07-31 2019-12-10 浙江杭海城际铁路有限公司 Device and method for testing influence of shield underpass construction on existing subway tunnel
CN110702883A (en) * 2019-10-31 2020-01-17 同济大学 Shield tunnel leakage erosion simulation test device and method
CN111175475A (en) * 2020-02-20 2020-05-19 同济大学 Self-sinking circular foundation pit excavation simulation device
CN113567317A (en) * 2021-06-22 2021-10-29 济南轨道交通集团有限公司 Testing device and system for underground water seepage simulation of subway structure

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009037315A1 (en) * 2007-09-18 2009-03-26 Bouygues Travaux Publics Process for determining additives used in tunnel boring machines and device
CN103278376A (en) * 2013-05-29 2013-09-04 浙江大学 Test device of stability control model of earth pressure balance shield excavation surface
CN203287239U (en) * 2013-05-29 2013-11-13 浙江大学 Earth pressure balance shield excavation face stability control model test device
JP2013256842A (en) * 2012-06-14 2013-12-26 Kajima Corp Boring condition setting method and control method of shield machine
CN104897527A (en) * 2015-06-11 2015-09-09 同济大学 Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN205262912U (en) * 2015-12-16 2016-05-25 北京交通大学 Experimental device for it constructs sludge -biofilm formation to be used for simulating shield
CN105863624A (en) * 2016-04-12 2016-08-17 河海大学 Visual testing method for simulating permeation of slurry into stratum during slurry shielding
CN105866337A (en) * 2016-04-21 2016-08-17 河海大学 Device and method for testing slurry shield excavation surface mud film formation and mud film air tightness under high pressure
CN106198921A (en) * 2016-06-15 2016-12-07 浙江大学 A kind of subway shield tunnel construction Disturbance Model assay device and test method thereof
CN106442941A (en) * 2016-11-11 2017-02-22 浙江科技学院(浙江中德科技促进中心) Testing apparatus and method for shield crossing liquefiable top and hard bottom stratum
CN107045044A (en) * 2017-06-06 2017-08-15 福州大学 A kind of pullout type model test apparatus and method for simulating Shield Tunneling mortar depositing construction
CN107489426A (en) * 2017-09-29 2017-12-19 中铁隧道局集团有限公司 A kind of slurry shield lab simulation mole and its analogy method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009037315A1 (en) * 2007-09-18 2009-03-26 Bouygues Travaux Publics Process for determining additives used in tunnel boring machines and device
JP2013256842A (en) * 2012-06-14 2013-12-26 Kajima Corp Boring condition setting method and control method of shield machine
CN103278376A (en) * 2013-05-29 2013-09-04 浙江大学 Test device of stability control model of earth pressure balance shield excavation surface
CN203287239U (en) * 2013-05-29 2013-11-13 浙江大学 Earth pressure balance shield excavation face stability control model test device
CN104897527A (en) * 2015-06-11 2015-09-09 同济大学 Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application
CN105137048A (en) * 2015-09-28 2015-12-09 北京建筑大学 Stratum grouting simulation system
CN205262912U (en) * 2015-12-16 2016-05-25 北京交通大学 Experimental device for it constructs sludge -biofilm formation to be used for simulating shield
CN105863624A (en) * 2016-04-12 2016-08-17 河海大学 Visual testing method for simulating permeation of slurry into stratum during slurry shielding
CN105866337A (en) * 2016-04-21 2016-08-17 河海大学 Device and method for testing slurry shield excavation surface mud film formation and mud film air tightness under high pressure
CN106198921A (en) * 2016-06-15 2016-12-07 浙江大学 A kind of subway shield tunnel construction Disturbance Model assay device and test method thereof
CN106442941A (en) * 2016-11-11 2017-02-22 浙江科技学院(浙江中德科技促进中心) Testing apparatus and method for shield crossing liquefiable top and hard bottom stratum
CN107045044A (en) * 2017-06-06 2017-08-15 福州大学 A kind of pullout type model test apparatus and method for simulating Shield Tunneling mortar depositing construction
CN107489426A (en) * 2017-09-29 2017-12-19 中铁隧道局集团有限公司 A kind of slurry shield lab simulation mole and its analogy method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
IN-MO LEE ET AL.: "Effect of seepage forces on tunnel face stability", 《CAN. GEOTECH. J.》 *
乔金丽等: "考虑渗流的多层土盾构隧道开挖面稳定性分析", 《岩土力学》 *
房倩等: "基于连续介质模型的海底隧道渗流问题分析", 《岩石力学与工程学报》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109632606A (en) * 2019-01-09 2019-04-16 浙江大学 A kind of excavation face seepage tests system that river tunnel is constructed under Tidal Load effect
CN110221042A (en) * 2019-06-27 2019-09-10 合肥工业大学 A kind of device of simulating excavation stress field and Analysis of Ground-water Seepage Field coupling effect
CN110554165A (en) * 2019-07-31 2019-12-10 浙江杭海城际铁路有限公司 Device and method for testing influence of shield underpass construction on existing subway tunnel
CN110702883A (en) * 2019-10-31 2020-01-17 同济大学 Shield tunnel leakage erosion simulation test device and method
CN111175475A (en) * 2020-02-20 2020-05-19 同济大学 Self-sinking circular foundation pit excavation simulation device
CN111175475B (en) * 2020-02-20 2021-09-03 同济大学 Self-sinking circular foundation pit excavation simulation device
CN113567317A (en) * 2021-06-22 2021-10-29 济南轨道交通集团有限公司 Testing device and system for underground water seepage simulation of subway structure

Also Published As

Publication number Publication date
CN108489892B (en) 2020-06-05

Similar Documents

Publication Publication Date Title
CN108489892A (en) Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow
CN102409688B (en) A kind of construction method of steel sheet-pile cofferdam
CN107505196B (en) It is a kind of can flexible operating three-dimensional soil arching effect development test device and operating method
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN107587516B (en) A kind of efficient sealing resistance sand precipitation composite system of Follow-up type and its construction method
CN103278376B (en) Test device of stability control model of earth pressure balance shield excavation surface
CN105862874A (en) Protection method for controlling deformation of building structure close to foundation pit
CN205643336U (en) Survey physical model device based on water of aeration zone partite transport shift variant pionization under settlement condition
CN112067788B (en) Model test device and method for drainage law of water-bearing stratum at bottom of thick surface soil and thin bedrock
CN110044710A (en) Soil cave collapse experiment simulator under a kind of precipitation funnel
CN110387896B (en) Foundation pit dewatering well design method
CN105716959B (en) It is a kind of can simulated groundwater position dynamic change excavation models experimental rig
CN203287239U (en) Earth pressure balance shield excavation face stability control model test device
CN105696636B (en) Can in Simulation of Excavation Process WATER LEVEL CHANGES excavation models experimental rig
CN109916719A (en) The immersion of loess subway tunnel surrounding and dynamic load simulation system and test method
JP7236781B2 (en) Test equipment and test method for simulating the effect on bearing performance of pile foundation due to the presence of cavities at pile ends
CN107152038B (en) Geotechnical centrifugal model test equipment and excavation simulation method
CN206470116U (en) A kind of experimental rig for simulating the lower basement bottom board stress of artesian water effect
CN217820364U (en) Model test device for inducing ground surface deformation in underground water seepage tunnel construction
CN110660306A (en) Experimental device capable of simulating influence of hammering vibration and flowing water on karst collapse
CN109975117A (en) Push pipe experimental box and experimental method
CN106680127A (en) Homogeneous earth dam and trans-dam culvert pipe contact scour model testing device and method thereof
CN109632606B (en) Excavation surface seepage test system for river bottom shield tunnel construction under tidal load effect
CN114942199A (en) Simulation test device and test method for overtopping erosion/scouring process of dam
CN105200994A (en) Construction method for reserved shield crossing composite foundation pit support device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant