CN105863624A - Visual testing method for simulating permeation of slurry into stratum during slurry shielding - Google Patents

Visual testing method for simulating permeation of slurry into stratum during slurry shielding Download PDF

Info

Publication number
CN105863624A
CN105863624A CN201610223266.1A CN201610223266A CN105863624A CN 105863624 A CN105863624 A CN 105863624A CN 201610223266 A CN201610223266 A CN 201610223266A CN 105863624 A CN105863624 A CN 105863624A
Authority
CN
China
Prior art keywords
slurry
mud
stratum
lucite
testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610223266.1A
Other languages
Chinese (zh)
Other versions
CN105863624B (en
Inventor
杜佳芮
闵凡路
王媛
徐静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201610223266.1A priority Critical patent/CN105863624B/en
Publication of CN105863624A publication Critical patent/CN105863624A/en
Application granted granted Critical
Publication of CN105863624B publication Critical patent/CN105863624B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Fluid Mechanics (AREA)
  • Civil Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a visual testing method for simulating permeation of slurry into a stratum during slurry shielding. The method comprises the following steps that firstly, a rotary shaft is rotated, and the aperture ratio of a cutterhead is regulated to zero to enable an organic glass right-angle cylinder to be closed; secondly, a simulated stratum prepared from transparent soil is put into an organic glass model box, and the stratum is saturated from bottom to top; thirdly, testing slurry is injected into the organic glass right-angle cylinder, and the right-angle cylinder is sealed; and finally, a pneumatic supply is opened, the rotary shaft is rotated, the aperture ratio of the cutterhead is regulated to some value (0%-50%), and a permeation test is performed. By means of the visual testing method for slurry permeation, the permeation form of the slurry in the stratum can be observed in real time, the forming type of a slurry film and the distances of the slurry permeating to all the directions can be observed accurately.

Description

The visual method of testing that simulation slurry shield slurry permeates in the earth formation
Technical field
The present invention relates to a kind of to mud in barochamber in slurry shield tunneling process to stratum process of osmosis can Depending on the method for testing changed.Under the conditions of the method can realize visualizing formation condition, different mud pressure and different cutterhead aperture opening ratio The simulation of slurry penetration process, and intuitively observe the mud infiltration form in all directions.This invention belongs to underground engineering field.
Background technology
In recent years, slurry shield method crosses river subway and more sea, river tunnel with its superior excavation face control model in China city The construction in road is widely adopted.In slurry shield forward tunneling process, the mud in barochamber permeates to stratum with flat Water And Earth Pressures in weighing apparatus stratum, keeps excavation face stable.Simultaneously as complex geologic conditions is changeable, there is knife disc tool in shield machine Serious wear, cutterhead molding, cutter do not mate situations such as needing replacing with stratum, and shutdown of having to carries out open the cabin cleaning or dimension The operation such as repair, need to inject mud to excavation face and form mud film and keep service clearance stable, if yangtze river in nanjing Tunnel Engineering is in river The maintainability that carries out in end Extra-fine sand, gravelly sand stratum is with pressure opens the cabin.No matter it is in normal tunneling process, or in inspection of opening the cabin with pressure When repairing, be all difficult to observe that mud permeates the situation forming mud film in the earth formation, be more difficult to the stability judging excavation face with Arrangement and method for construction is the most reasonable.
Along with the development of transparent soil synthetic technology and carrying out of the transparent soil physical property experiment such as triaxial test, it was demonstrated that transparent soil It is applied to the probability of experimentation, is the most progressively applied to shield tunnel research, test employing transparent soil research shield Structure excavates surrounding soil internal modification rule, the shield tunnel back synchronous injection model etc. caused.
The present invention devises a kind of transparent soil simulated formation, to realize mud under the conditions of different cutterhead aperture opening ratios to ground The visual observation procedure of infiltration in Ceng.Under the conditions of the method can observe different cutterhead aperture opening ratio the most easily, mud exists Stratum all directions infiltration form, has directive significance to slurry shield construction and Slurry confection.
Summary of the invention
It is an object of the invention to provide and a kind of simulate the method for visualizing that slurry shield slurry permeates in the earth formation, can grind Study carefully mud infiltration form of all directions under the conditions of different cutterhead aperture opening ratios.
Technical scheme is as follows:
The visual method of testing that simulation slurry shield slurry permeates in the earth formation,
The visualization device that described method of testing uses includes organic glass box, lucite right angle cylinder and for applying pressure Pneumatic supply;The bottom of described lucite case is placed with the transparent soil in middle coarse grain footpath for model engineering stratum, at machine glass The top of case is provided with mud overflow launder, is provided with water filling port in the bottom of machine glass box, and the casing of lucite case is provided with For measuring the casing rule of transparent soil layer thickness;Described lucite right angle cylinder includes for simulating slurry shield cutter Dish injects the level vial of mud and for controlling mud amount and applying the vertical glass tubing of air pressure to stratum;Lucite circle The top of cylinder is sealed by dismountable ring flange, and vertical glass tubing is provided with rule, the top side of vertical glass tubing Wall is connected with pneumatic supply, and bottom it, sidewall is provided with mud valve;
Described method of testing comprises the following steps:
Step one, regulates model cutterhead aperture opening ratio: rotating shaft, regulation model cutterhead aperture opening ratio is 0, by lucite case and having It is separated, for compartment test stratum and mud between machine glass right angle cylinder;
Step 2, prepares stratum: use transparent clay model to intend medium coarse sand test stratum;Real method is hit to lucite case with layering The transparent soil of middle loading also forms experiment stratum, then uniformly injects bromination lentamente from bottom to top by the water filling port of lower box Calcium solution comes saturation testing stratum, is used for preventing stratum protuberance or sand boiling in saturation history;
Step 3, forms permeable belt: close mud valve and pressure maintaining valve, from the top injection testing mud of lucite right angle cylinder Slurry, mud level is positioned at the lower section of the air inlet pipe on cylinder top, lucite right angle, by ring flange by lucite right angle circle The top of cylinder seals;Open pneumatic supply, regulate pneumatic supply air pressure, cylinder top, lucite right angle atmospheric pressure value is regulated extremely Predetermined value, predetermined value is the soil water pressure value in lucite case;Then, rotating shaft, regulation model cutterhead aperture opening ratio is extremely 20%, mud starts infiltration test stratum and forms permeable belt;Observing infiltration overall process, complete permeable belt to be formed, at overflow launder Outflow that calcium bromide solution is stable or when not flowing out, closes pneumatic supply, and infiltration terminates, observation mud in test stratum each The seepage distance in direction and permeable belt form;
Step 4, control experiment: be repeated twice above-mentioned steps one, two, three, the respectively aperture opening ratio of model cutterhead in regulating step three It is 30% and 40%, by three groups of contrast experiments, observation all directions permeable belt form under the conditions of different model cutterhead aperture opening ratios.
Further, in step one, described slurry shield model cutterhead is made up of the circular gear soil sheet being close to inside and outside two panels, Outer side block soil sheet is fixed on the front end of level vial, and it is 30 ° that described outer side block soil sheet offers a corner at interval of 30 ° Sector open;Interior survey gear soil sheet is coaxially connected with outer side block soil sheet by rotating shaft, and is fixed in rotating shaft, described interior side block soil sheet On offer, at interval of 32 °, the sector open that a corner is 28 °.
Further, in step 2, described experimental field layer height is not less than 25cm, and is positioned under mud overflow launder position Side.
Further, in step 3, described mud is the mud being intended that in practice of construction engineering, and consumption is less than having The pneumatic supply air inlet of cylinder upper end, machine glass right angle.
Further, in step 3, the calcium bromide solution permeating discharge in described lucite case is flowed out by overflow launder.
Further, in step 4, three groups of experiments answer Control experiment ground layer height, mud height and preset air pressure value to keep Identical.The technique effect of the present invention:
The present invention can observe slurry shield tunneling process and with pressure open the cabin under the conditions of the infiltration of mud all directions in the earth formation complete Process, by changing cutterhead aperture opening ratio research slurry penetration rule, so that it is determined that the consumption of mud, instructs shield-tunneling construction.
Figure of description:
Fig. 1: the visual test device schematic diagram that the simulation slurry shield slurry used by the present invention permeates in the earth formation;
The outer side block soil sheet schematic diagram of Fig. 2: slurry shield model cutterhead used by the present invention;
Fig. 3: side block soil sheet schematic diagram in slurry shield model cutterhead used by the present invention;
Wherein: 1, lucite case;2, overflow launder;3, lucite right angle cylinder;4, ring flange;5, model cutterhead;6, spoil disposal Valve;7, pneumatic supply;8, rotating shaft;9, rule;10, casing rule;11, pressure maintaining valve;12, water filling port.
Detailed description of the invention
Purpose and technical scheme for making the embodiment of the present invention are clearer, attached below in conjunction with the embodiment of the present invention Figure, is clearly and completely described the technical scheme of the embodiment of the present invention.Obviously, described embodiment is the present invention A part of embodiment rather than whole embodiments.Based on described embodiments of the invention, those of ordinary skill in the art The every other embodiment obtained on the premise of without creative work, broadly falls into the scope of protection of the invention.
Those skilled in the art of the present technique are appreciated that unless otherwise defined, and all terms used herein (include technology art Language and scientific terminology) have with the those of ordinary skill in art of the present invention be commonly understood by identical meaning.Also should Being understood by, those terms defined in such as general dictionary should be understood that the meaning having with the context of prior art The meaning that justice is consistent, and unless defined as here, will not explain by idealization or the most formal implication.
The implication of heretofore described " inside and outside " refers to relative to equipment itself, the side within sensing equipment To for interior, otherwise it is outward, rather than the specific restriction to assembly of the invention mechanism.
The implication of heretofore described " connection " can be being directly connected between parts can also be to pass through between parts Being indirectly connected with of other parts.
As it is shown in figure 1, the visualization device that method of testing of the present invention uses includes organic glass box 1, lucite right angle Cylinder 3 and be used for executing stressed pneumatic supply 7;The bottom of lucite case 1 is placed with the middle coarse grain for model engineering stratum The transparent soil in footpath, is provided with mud overflow launder 2 on the top of machine glass box, the bottom of machine glass box is provided with water filling port 12, has The casing of machine glass box 1 is provided with the casing rule 10 for measuring transparent soil layer thickness;Lucite right angle cylinder 3 wraps Include for simulating slurry shield cutterhead to the level vial of stratum injection mud with for controlling mud amount and applying air pressure Vertically glass tubing;The top of plexiglass cylinder is sealed by dismountable ring flange 4, and vertical glass tubing is provided with scale Chi 9, the top sidewall of vertical glass tubing is connected with pneumatic supply 7, and bottom it, sidewall is provided with mud valve 6;
The method of testing of the visible apparatus that the simulation slurry shield slurry of the present invention permeates in the earth formation, first regulates cutterhead Aperture opening ratio is 0, makes lucite right angle cylinder enclosed, then loads the mould utilizing transparent soil preparation in organic glass model case Plan stratum is the most saturated, and injection testing mud in lucite right angle cylinder finally opens pneumatic supply, and rotating shaft, in difference Permeability test is carried out under cutterhead aperture opening ratio, the method for visualizing of this kind of slurry penetration, can with real-time monitored mud in the earth formation Infiltration form, and accurate surveying is to the internus of mud film and all directions seepage distance.
Above-mentioned a kind of study the method for visualizing that slurry shield slurry permeates in the earth formation, specifically comprise the following steps:
A, regulation cutterhead aperture opening ratio: first rotating shaft, regulation cutterhead aperture opening ratio is 0, make two panels cutterhead by lucite case and Lucite right angle cylinder separates, and when preventing from loading experiment material, adulterate mutually with both mud in test stratum.
B, preparation stratum: utilize transparent clay model to intend nature sand, preparation meets the medium coarse sand test stratum that grating requires.Again Hit real method with layering and load test soil, control transparent soil consumption with rule, then note bromine from the bottom up by water filling port Change the saturated stratum of calcium solution, in saturation history, stratum protuberance or sand boiling should be prevented.
C, formation permeable belt: close mud discharging mouth and controlling valve, injection testing mud, control slurry consumption with rule, Ring flange is used to be sealed by device.Rotating shaft, regulates cutterhead aperture opening ratio 20%, opens pneumatic supply valve, and regulation air pressure is to predetermined Value, mud starts infiltration test transparent soil soil layer and forms permeable belt, observes infiltration overall process, closes pneumatic supply after certain time Valve, infiltration terminates, and opens mud valve, discharges unnecessary mud, observation all directions seepage distance and permeable belt form.
D, control experiment: being repeated twice above-mentioned steps a, b, c, in regulating step c, cutterhead aperture opening ratio is 30%, 40% respectively, By three groups of contrast experiments, observe all directions permeable belt form under the conditions of different cutterhead aperture opening ratios, Rule Summary.
In step a, described model cutterhead is close to circular gear soil sheet by two panels and is formed, and outer side block soil sheet is fixed, every 30 ° of tools The sector open having corner to be 30 °;Interior gear soil sheet of surveying is connected with outer side block soil sheet by rotating shaft, and having corner every 32 ° is 28 ° Sector open, rotating shaft can regulate aperture opening ratio, aperture opening ratio scope 0%-50%.
In step b, described transparent soil layer height is not less than 25cm and is positioned at below discharge outlet, can prepare difference during test The transparent soil soil layer of grating, studies Percolation Law.
In step c, described mud is the mud being intended that in practice of construction engineering, and consumption must not exceed pneumatic supply and enters QI KOU.
In step c, the calcium bromide solution discharged by infiltration in described lucite case is flowed out by overflow launder.
In step d, three groups of experiments answer Control experiment ground layer height, mud height, preset air pressure value etc. except cutterhead aperture opening ratio Each fundamental quantity in addition is identical, in order to observe the impact on all directions permeable belt form of the cutterhead aperture opening ratio.
These are only embodiments of the present invention, it describes more concrete and in detail, but can not therefore and be interpreted as right The restriction of the scope of the claims of the present invention.It should be pointed out that, for the person of ordinary skill of the art, without departing from the present invention On the premise of design, it is also possible to make some deformation and improvement, these belong to protection scope of the present invention.

Claims (6)

1. the visual method of testing that simulation slurry shield slurry permeates in the earth formation, it is characterised in that
The visualization device that described method of testing uses includes organic glass box, lucite right angle cylinder and for applying pressure Pneumatic supply;The bottom of described lucite case is placed with the transparent soil in middle coarse grain footpath for model engineering stratum, at machine glass The top of case is provided with mud overflow launder, is provided with water filling port in the bottom of machine glass box, and the casing of lucite case is provided with For measuring the casing rule of transparent soil layer thickness;Described lucite right angle cylinder includes for simulating slurry shield cutter Dish injects the level vial of mud and for controlling mud amount and applying the vertical glass tubing of air pressure to stratum;Lucite circle The top of cylinder is sealed by dismountable ring flange, and vertical glass tubing is provided with rule, the top side of vertical glass tubing Wall is connected with pneumatic supply, and bottom it, sidewall is provided with mud valve;
Described method of testing comprises the following steps:
Step one, regulates model cutterhead aperture opening ratio: rotating shaft, regulation model cutterhead aperture opening ratio is 0, by lucite case and having It is separated, for compartment test stratum and mud between machine glass right angle cylinder;
Step 2, prepares stratum: use transparent clay model to intend medium coarse sand test stratum;Real method is hit to lucite case with layering The transparent soil of middle loading also forms experiment stratum, then uniformly injects bromination lentamente from bottom to top by the water filling port of lower box Calcium solution comes saturation testing stratum, is used for preventing stratum protuberance or sand boiling in saturation history;
Step 3, forms permeable belt: close mud valve and pressure maintaining valve, from the top injection testing mud of lucite right angle cylinder Slurry, mud level is positioned at the lower section of the air inlet pipe on cylinder top, lucite right angle, by ring flange by lucite right angle circle The top of cylinder seals;Open pneumatic supply, regulate pneumatic supply air pressure, cylinder top, lucite right angle atmospheric pressure value is regulated extremely Predetermined value, predetermined value is the soil water pressure value in lucite case;Then, rotating shaft, regulation model cutterhead aperture opening ratio is extremely 20%, mud starts infiltration test stratum and forms permeable belt;Observing infiltration overall process, complete permeable belt to be formed, at overflow launder Outflow that calcium bromide solution is stable or when not flowing out, closes pneumatic supply, and infiltration terminates, observation mud in test stratum each The seepage distance in direction and permeable belt form;
Step 4, control experiment: be repeated twice above-mentioned steps one, two, three, the respectively aperture opening ratio of model cutterhead in regulating step three It is 30% and 40%, by three groups of contrast experiments, observation all directions permeable belt form under the conditions of different model cutterhead aperture opening ratios.
The visual method of testing that simulation slurry shield slurry the most according to claim 1 permeates in the earth formation, it is special Levying and be, in step one, described slurry shield model cutterhead is made up of the circular gear soil sheet being close to inside and outside two panels, outer side block soil Sheet is fixed on the front end of level vial, described outer side block soil sheet offers, at interval of 30 °, the sector that a corner is 30 ° and opens Mouthful;Interior to survey gear soil sheet coaxially connected with outer side block soil sheet by rotating shaft, and is fixed in rotating shaft, on described interior side block soil sheet every The sector open that a corner is 28 ° is offered every 32 °.
The visual method of testing that simulation slurry shield slurry the most according to claim 1 permeates in the earth formation, it is special Levying and be, in step 2, described experimental field layer height is not less than 25cm, and is positioned at below mud overflow launder position.
The visual method of testing that simulation slurry shield slurry the most according to claim 1 permeates in the earth formation, it is special Levying and be, in step 3, described mud is the mud being intended that in practice of construction engineering, and consumption is less than lucite right angle The pneumatic supply air inlet of cylinder upper end.
The visual method of testing that simulation slurry shield slurry the most according to claim 1 permeates in the earth formation, it is special Levying and be, in step 3, the calcium bromide solution permeating discharge in described lucite case is flowed out by overflow launder.
The visual method of testing that simulation slurry shield slurry the most according to claim 6 permeates in the earth formation, it is special Levying and be, in step 4, three groups of experiments answer Control experiment ground layer height, mud height to keep identical with preset air pressure value.
CN201610223266.1A 2016-04-12 2016-04-12 The visual test method that simulation slurry shield slurry permeates in the earth formation Active CN105863624B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610223266.1A CN105863624B (en) 2016-04-12 2016-04-12 The visual test method that simulation slurry shield slurry permeates in the earth formation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610223266.1A CN105863624B (en) 2016-04-12 2016-04-12 The visual test method that simulation slurry shield slurry permeates in the earth formation

Publications (2)

Publication Number Publication Date
CN105863624A true CN105863624A (en) 2016-08-17
CN105863624B CN105863624B (en) 2018-12-28

Family

ID=56636665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610223266.1A Active CN105863624B (en) 2016-04-12 2016-04-12 The visual test method that simulation slurry shield slurry permeates in the earth formation

Country Status (1)

Country Link
CN (1) CN105863624B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106353224A (en) * 2016-09-08 2017-01-25 上海工程技术大学 Slurry shielding mud permeation film forming simulation test apparatus
CN106841578A (en) * 2017-04-13 2017-06-13 中国科学院武汉岩土力学研究所 A kind of slurry shield face mud hydraulic pressure experiment test device and method of testing
CN108072749A (en) * 2017-07-05 2018-05-25 同济大学 A kind of tunneling shield excavates high-precision seepage flow simulation by tracing experimental rig
CN108489892A (en) * 2018-03-29 2018-09-04 华东交通大学 Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow
CN109162730A (en) * 2018-07-21 2019-01-08 中铁十八局集团有限公司 A kind of slurry balance shield slurries parameter management system based on BIM
CN109826652A (en) * 2019-02-01 2019-05-31 上海工程技术大学 The simulation test device and method of slurries loss amount in shield synchronization slip casting
CN111208047A (en) * 2020-01-10 2020-05-29 中国矿业大学 Test method capable of simulating permeability of fractured rock mass under complex disturbance condition
CN111485906A (en) * 2020-04-09 2020-08-04 中铁第六勘察设计院集团有限公司 Sandwich tunnel structure and construction method thereof
CN111795917A (en) * 2020-08-14 2020-10-20 盾构及掘进技术国家重点实验室 Dynamic slurry permeability test device and method
CN115200833A (en) * 2022-07-01 2022-10-18 中铁隧道局集团有限公司 Multipurpose test device and test method for shield operation slurry

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265794A (en) * 1999-03-15 2000-09-26 Ohbayashi Corp Training device for assembling segment
CN102191939A (en) * 2010-03-05 2011-09-21 上海盾构设计试验研究中心有限公司 Test method for forming mud membrane by using slurry shield under high pressure
CN102226729A (en) * 2011-06-02 2011-10-26 广厦建设集团有限责任公司 Earth pressure balance (EPB) shield residual soil pressure control model test apparatus
KR101529098B1 (en) * 2014-02-19 2015-06-16 한국건설기술연구원 Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same
CN104897527A (en) * 2015-06-11 2015-09-09 同济大学 Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application
CN104914008A (en) * 2015-06-11 2015-09-16 同济大学 Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265794A (en) * 1999-03-15 2000-09-26 Ohbayashi Corp Training device for assembling segment
CN102191939A (en) * 2010-03-05 2011-09-21 上海盾构设计试验研究中心有限公司 Test method for forming mud membrane by using slurry shield under high pressure
CN102226729A (en) * 2011-06-02 2011-10-26 广厦建设集团有限责任公司 Earth pressure balance (EPB) shield residual soil pressure control model test apparatus
KR101529098B1 (en) * 2014-02-19 2015-06-16 한국건설기술연구원 Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same
CN104897527A (en) * 2015-06-11 2015-09-09 同济大学 Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application
CN104914008A (en) * 2015-06-11 2015-09-16 同济大学 Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106353224B (en) * 2016-09-08 2023-08-18 上海工程技术大学 Slurry shield mud permeation film-forming simulation test device
CN106353224A (en) * 2016-09-08 2017-01-25 上海工程技术大学 Slurry shielding mud permeation film forming simulation test apparatus
CN106841578A (en) * 2017-04-13 2017-06-13 中国科学院武汉岩土力学研究所 A kind of slurry shield face mud hydraulic pressure experiment test device and method of testing
CN108072749A (en) * 2017-07-05 2018-05-25 同济大学 A kind of tunneling shield excavates high-precision seepage flow simulation by tracing experimental rig
CN108489892A (en) * 2018-03-29 2018-09-04 华东交通大学 Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow
CN108489892B (en) * 2018-03-29 2020-06-05 华东交通大学 Submarine shield tunnel excavation test device and method under seepage condition
CN109162730A (en) * 2018-07-21 2019-01-08 中铁十八局集团有限公司 A kind of slurry balance shield slurries parameter management system based on BIM
CN109162730B (en) * 2018-07-21 2020-08-11 中铁十八局集团有限公司 Slurry parameter management system of slurry balance shield based on BIM
CN109826652A (en) * 2019-02-01 2019-05-31 上海工程技术大学 The simulation test device and method of slurries loss amount in shield synchronization slip casting
CN109826652B (en) * 2019-02-01 2023-10-13 上海工程技术大学 Simulation test device and method for slurry loss in shield synchronous grouting
CN111208047A (en) * 2020-01-10 2020-05-29 中国矿业大学 Test method capable of simulating permeability of fractured rock mass under complex disturbance condition
CN111485906A (en) * 2020-04-09 2020-08-04 中铁第六勘察设计院集团有限公司 Sandwich tunnel structure and construction method thereof
CN111485906B (en) * 2020-04-09 2022-02-22 中铁第六勘察设计院集团有限公司 Sandwich tunnel structure and construction method thereof
CN111795917A (en) * 2020-08-14 2020-10-20 盾构及掘进技术国家重点实验室 Dynamic slurry permeability test device and method
CN115200833A (en) * 2022-07-01 2022-10-18 中铁隧道局集团有限公司 Multipurpose test device and test method for shield operation slurry
CN115200833B (en) * 2022-07-01 2023-06-23 中铁隧道局集团有限公司 Multipurpose test device and test method for shield operation slurry

Also Published As

Publication number Publication date
CN105863624B (en) 2018-12-28

Similar Documents

Publication Publication Date Title
CN105863624A (en) Visual testing method for simulating permeation of slurry into stratum during slurry shielding
CN106197944B (en) Simulate the testing system apparatus and method of complex condition deep tunnel inrush through faults
CN205808669U (en) The testing system apparatus of simulation complex condition deep tunnel inrush through faults
CN104462654B (en) Shallow embedding hides seam mining earth's surface insertion fractured zones and the feature decision method that leaks out
CN105736004B (en) Shield is opened a position pressurize panelling construction method with weighing apparatus shield mud air pressure
CN105021418B (en) Suitable for the shield tunneling surface model and analogy method of geotechnical centrifugal model test
CN108318396B (en) Test method of tailing dam seepage field similarity simulation test system
CN205483943U (en) Experimental device for mud dipes stratum formation sludge -biofilm among simulation slurry shield
CN105891084B (en) Dismountable mud film forming and mud film tightness test device and method
CN103967498B (en) A kind of method of opening the cabin with pressure of shield machine in coarse-grained soil stratum
CN105334142B (en) A kind of experimental provision formed for simulating shield mud film
CN108037267A (en) A kind of pipe leakage water eroding and flooding of simulating induces the experimental rig that road caves in
CN113186924A (en) Subway foundation pit deep-buried karst cave treatment method
CN108195723A (en) A kind of osmotic grouting pilot system and method for reinforcing loose gravelly soil
CN203132854U (en) Test device used for simulating stratum deformation triggered by subway shield tunnel construction
CN103614984B (en) For the ecological treatment method of the geological environmental disaster that goaf, river course is brought
CN108205057B (en) Simulation test device for urban stratum collapse caused by water cut-off circulation path of underground engineering
CN106198890A (en) A kind of indoor grouting simulation test device and using method thereof
CN110671119A (en) High-performance bentonite for shield construction and preparation process of mud film of high-performance bentonite
CN103821554A (en) Coal pillar-free exploitation Y-shaped venting goaf drilling hole location method
CN107905777A (en) One kind visualization stagnant sand experimental evaluation device of horizontal well pit shaft
CN205477604U (en) Visual device that simulation slurry shield mud permeates in stratum
CN103176220A (en) Tunnel water pressure model test method
CN111239370A (en) Experimental method for simulating karst collapse caused by underground water
CN111441761A (en) Simulation device and simulation method for preventing slurry loss during formation drilling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant