CN105863624A - Visual testing method for simulating permeation of slurry into stratum during slurry shielding - Google Patents
Visual testing method for simulating permeation of slurry into stratum during slurry shielding Download PDFInfo
- Publication number
- CN105863624A CN105863624A CN201610223266.1A CN201610223266A CN105863624A CN 105863624 A CN105863624 A CN 105863624A CN 201610223266 A CN201610223266 A CN 201610223266A CN 105863624 A CN105863624 A CN 105863624A
- Authority
- CN
- China
- Prior art keywords
- mud
- plexiglass
- formation
- test
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 32
- 230000000007 visual effect Effects 0.000 title claims abstract description 5
- 239000002002 slurry Substances 0.000 title 2
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 53
- 238000005755 formation reaction Methods 0.000 claims abstract description 52
- VVQNEPGJFQJSBK-UHFFFAOYSA-N Methyl methacrylate Chemical compound COC(=O)C(C)=C VVQNEPGJFQJSBK-UHFFFAOYSA-N 0.000 claims abstract description 42
- 229920005372 Plexiglas® Polymers 0.000 claims abstract description 42
- 239000002689 soil Substances 0.000 claims abstract description 39
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 32
- 238000010998 test method Methods 0.000 claims abstract description 14
- 239000011521 glass Substances 0.000 claims description 28
- 238000000034 method Methods 0.000 claims description 19
- 238000001764 infiltration Methods 0.000 claims description 17
- 230000008595 infiltration Effects 0.000 claims description 17
- 238000002474 experimental method Methods 0.000 claims description 11
- 239000000243 solution Substances 0.000 claims description 10
- 229910001622 calcium bromide Inorganic materials 0.000 claims description 8
- WGEFECGEFUFIQW-UHFFFAOYSA-L calcium dibromide Chemical compound [Ca+2].[Br-].[Br-] WGEFECGEFUFIQW-UHFFFAOYSA-L 0.000 claims description 8
- 239000004576 sand Substances 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 7
- 238000002347 injection Methods 0.000 claims description 6
- 239000007924 injection Substances 0.000 claims description 6
- 238000009835 boiling Methods 0.000 claims description 3
- 238000005056 compaction Methods 0.000 claims description 3
- 230000000052 comparative effect Effects 0.000 claims description 3
- 230000000087 stabilizing effect Effects 0.000 claims description 3
- 238000012800 visualization Methods 0.000 claims description 3
- 239000011362 coarse particle Substances 0.000 claims description 2
- 238000003825 pressing Methods 0.000 claims description 2
- 239000012466 permeate Substances 0.000 claims 1
- 230000035515 penetration Effects 0.000 abstract description 8
- 238000007794 visualization technique Methods 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 235000006506 Brasenia schreberi Nutrition 0.000 description 2
- 244000267222 Brasenia schreberi Species 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M10/00—Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- General Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开一种模拟泥水盾构泥浆在地层中渗透的可视化的测试方法,包括以下步骤:首先转动转轴,调节刀盘开口率为0,使有机玻璃直角圆筒封闭;然后,在有机玻璃模型箱中装入利用透明土制备的模拟地层,并从下向上饱和地层;接着,在有机玻璃直角圆筒中注入试验泥浆,密封直角圆筒;最后,打开气压源,转动转轴,调节刀盘开口率为某一值(0%‑50%),进行渗透实验。此种泥浆渗透的可视化方法,可以实时观测泥浆在地层中的渗透形态,并精确观测到泥膜的形成类型及各方向渗透距离。
The invention discloses a visual test method for simulating the penetration of mud-water shield mud in formations, which comprises the following steps: firstly, rotating the rotating shaft, adjusting the opening ratio of the cutter head to 0, and closing the plexiglass right-angle cylinder; then, in the plexiglass model Put the simulated formation prepared by transparent soil into the box, and saturate the formation from bottom to top; then, inject test mud into the plexiglass right-angle cylinder to seal the right-angle cylinder; finally, turn on the air pressure source, turn the shaft, and adjust the opening ratio of the cutter head For a certain value (0%‑50%), conduct a penetration test. This visualization method of mud seepage can observe the seepage form of mud in the formation in real time, and accurately observe the formation type of mud film and the seepage distance in each direction.
Description
技术领域technical field
本发明涉及的是一种对泥水盾构掘进过程中压力舱内泥浆向地层渗透过程的可视化的测试方法。该方法能实现可视化地层条件、不同泥浆压力和不同刀盘开口率条件下泥浆渗透过程的模拟,并直观观测泥浆在各个方向的渗透形态。该发明属于地下工程领域。The invention relates to a visual test method for the mud in the pressure cabin to seep into the formation during the excavation process of the mud-water shield. This method can realize the simulation of the mud seepage process under the conditions of visualized formation conditions, different mud pressures and different cutter head opening ratios, and visually observe the mud seepage form in all directions. The invention belongs to the field of underground engineering.
背景技术Background technique
近年来,泥水盾构法以其优越的开挖面控制模式在我国城市过江地铁和越江海隧道的建设中被广泛地采用。在泥水盾构向前掘进过程中,压力舱内的泥浆向地层渗透以平衡地层中水土压力,保持开挖面稳定。同时,由于地质条件复杂多变,盾构机出现刀盘刀具磨损严重、刀盘结饼、刀具与地层不匹配需要更换等情况,而不得不停机进行开舱清理或维修等作业,需要向开挖面注入泥浆形成泥膜保持维修空间稳定,如南京长江隧道工程在江底粉细砂、砾砂地层中进行的维修性带压开舱。不管是正常掘进过程中,还是在带压开舱检修时,都难以观测到泥浆在地层中渗透形成泥膜的情况,更加难以判断开挖面的稳定性和施工方案是否合理。In recent years, the mud-water shield method has been widely used in the construction of urban river-crossing subways and cross-river-sea tunnels because of its superior excavation surface control mode. During the forward excavation of the mud-water shield, the mud in the pressure chamber penetrates into the formation to balance the water and soil pressure in the formation and keep the excavation surface stable. At the same time, due to the complex and changeable geological conditions, the shield machine had to be shut down for operations such as opening the cabin for cleaning or maintenance, etc. due to serious wear on the cutter head, cake formation on the cutter head, and mismatch between the cutter and the stratum. Inject mud on the surface to form a mud film to keep the maintenance space stable, such as the maintenance under pressure opening of the Nanjing Yangtze River Tunnel Project in the fine sand and gravel sand formations at the bottom of the river. No matter during the normal excavation process or during the open cabin maintenance under pressure, it is difficult to observe the mud film seeping through the formation, and it is even more difficult to judge the stability of the excavation surface and whether the construction plan is reasonable.
随着透明土合成技术的发展及透明土三轴试验等物性实验的开展,证明了透明土应用于实验研究的可能性,目前已逐步应用于盾构隧道研究,已有实验采用透明土研究盾构开挖引起的周围土体内部变形规律、盾构隧道壁后同步注浆模型等。With the development of transparent soil synthesis technology and the development of transparent soil triaxial tests and other physical properties experiments, it has been proved that the transparent soil can be applied to experimental research. At present, it has been gradually applied to shield tunnel research. The internal deformation of the surrounding soil caused by the excavation of the structure, the synchronous grouting model behind the shield tunnel wall, etc.
本发明设计了一种用透明土模拟地层,以实现泥浆在不同刀盘开口率条件下向地层中渗透的可视化的观测方法。该方法可直观简便地观测到不同刀盘开口率条件下泥浆在地层各方向渗透形态,对泥水盾构施工和泥浆配制具有指导意义。The present invention designs a transparent soil simulating strata to realize a visualized observation method of mud seeping into the strata under different cutterhead opening ratio conditions. This method can intuitively and easily observe the mud seepage pattern in all directions of the formation under different cutterhead opening ratios, which has guiding significance for mud-water shield construction and mud preparation.
发明内容Contents of the invention
本发明的目的在于提供一种模拟泥水盾构泥浆在地层中渗透的可视化方法,能研究泥浆在不同刀盘开口率条件下各个方向的渗透形态。The purpose of the present invention is to provide a visualization method for simulating the seepage of mud-water shield mud in formations, which can study the seepage forms of mud in various directions under the conditions of different cutterhead opening ratios.
本发明的技术方案如下:Technical scheme of the present invention is as follows:
模拟泥水盾构泥浆在地层中渗透的可视化的测试方法,A visual test method for simulating the penetration of mud-water shield mud in the formation,
所述测试方法采用的可视化装置包括有机玻璃箱、有机玻璃直角圆筒和用于施加压力的气压源;所述有机玻璃箱的底部放置有用于模拟工程地层的中粗粒径透明土,在机玻璃箱的上部设置有泥浆溢流槽,在机玻璃箱的下部设置有注水口,有机玻璃箱的箱体上设有用于量测透明土地层厚度的箱体刻度尺;所述有机玻璃直角圆筒包括用于模拟泥水盾构刀盘向地层注入泥浆的水平玻璃管和用于控制泥浆量和施加气压的竖直玻璃管;有机玻璃圆筒的顶部通过可拆卸的法兰盘进行密封,竖直玻璃管上设有刻度尺,竖直玻璃管的顶部侧壁与气压源相连接,其底部侧壁设置有排泥阀;The visualization device adopted in the test method includes a plexiglass box, a plexiglass right-angle cylinder and an air pressure source for applying pressure; the bottom of the plexiglass box is placed with medium-coarse particle diameter transparent soil for simulating engineering formations, and the machine The upper part of the glass box is provided with a mud overflow tank, and the lower part of the plexiglass box is provided with a water injection port, and the box body of the plexiglass box is provided with a box scale for measuring the thickness of the transparent soil layer; the plexiglass right-angle circle The barrel includes a horizontal glass tube for simulating mud-water shield cutterhead injecting mud into the formation and a vertical glass tube for controlling the amount of mud and applying air pressure; the top of the plexiglass cylinder is sealed by a detachable flange, and the vertical There is a scale on the straight glass tube, the top side wall of the vertical glass tube is connected to the air pressure source, and the bottom side wall is provided with a mud discharge valve;
所述测试方法包括以下步骤:Described test method comprises the following steps:
步骤一,调节模型刀盘开口率:转动转轴,调节模型刀盘开口率为0,将有机玻璃箱和有机玻璃直角圆筒之间进行分隔,用于分隔试验地层和泥浆;Step 1, adjust the opening ratio of the model cutter head: rotate the shaft, adjust the opening ratio of the model cutter head to 0, and separate the plexiglass box and the plexiglass right-angle cylinder to separate the test formation and mud;
步骤二,制备地层:采用透明土模拟中粗砂试验地层;用分层击实的方法向有机玻璃箱中装入透明土并形成实验地层,然后通过箱体下部的注水口自下往上均匀缓慢地注入溴化钙溶液来饱和试验地层,用于防止饱和过程中地层隆起或砂沸;Step 2, prepare the stratum: use transparent soil to simulate the medium-coarse sand test stratum; fill the transparent soil into the plexiglass box by layer compaction method to form the test stratum, and then pass through the water injection port at the bottom of the box from bottom to top. Slowly inject calcium bromide solution to saturate the test formation, which is used to prevent the formation from heaving or sand boiling during the saturation process;
步骤三,形成渗透带:关闭排泥阀和稳压阀,从有机玻璃直角圆筒的顶端注入试验泥浆,泥浆液位位于有机玻璃直角圆筒上部的进气管的下方,通过法兰盘将有机玻璃直角圆筒的顶端进行密封;打开气压源,调节气压源气压,将有机玻璃直角圆筒上部气压值调节至预定值,预定值为有机玻璃箱中的土水压力值;然后,转动转轴,调节模型刀盘开口率至20%,泥浆开始渗入试验地层并形成渗透带;观察渗透全过程,待形成完整渗透带,溢流槽处溴化钙溶液稳定的流出或者不流出时,关闭气压源,渗透结束,观测泥浆在试验地层中各个方向的渗透距离和渗透带形式;Step 3, forming a permeable zone: close the mud discharge valve and the pressure stabilizing valve, inject the test mud from the top of the plexiglass right-angle cylinder, the mud level is located below the air inlet pipe on the upper part of the plexiglass right-angle cylinder, and pass the organic glass through the flange. The top of the glass rectangular cylinder is sealed; open the air pressure source, adjust the air pressure of the air pressure source, adjust the air pressure value on the upper part of the organic glass rectangular cylinder to a predetermined value, and the predetermined value is the soil-water pressure value in the organic glass box; then, rotate the shaft, Adjust the opening ratio of the model cutter head to 20%, and the mud begins to infiltrate into the test formation and form a permeable zone; observe the whole process of infiltration, and when a complete permeable zone is formed, and the calcium bromide solution at the overflow tank flows out stably or does not flow out, turn off the air pressure source , when the infiltration is over, observe the infiltration distance and the infiltration zone form of the mud in all directions in the test formation;
步骤四,对照实验:重复两次上述步骤一、二、三,分别调节步骤三中模型刀盘的开口率为30%和40%,通过三组对比实验,观测在不同的模型刀盘开口率条件下各方向渗透带形态。Step 4, control experiment: repeat the above steps 1, 2, and 3 twice, and adjust the opening ratio of the model cutter head in step 3 to 30% and 40%, respectively. Through three sets of comparative experiments, observe the opening ratio of different model cutter heads Permeable zone morphology in all directions under different conditions.
进一步地,步骤一中,所述泥水盾构模型刀盘由两片内外紧贴的圆形挡土片组成,外侧挡土片固定在水平玻璃管的前端上,所述外侧挡土片上每间隔30°开设一转角为30°的扇形开口;内测挡土片通过转轴与外侧挡土片同轴连接,并固定在转轴上,所述内侧挡土片上每间隔32°开设一转角为28°的扇形开口。Further, in step 1, the muddy water shield model cutter head is composed of two round soil retaining pieces that are closely attached inside and outside, and the outer soil retaining pieces are fixed on the front end of the horizontal glass tube, and each interval on the outer soil retaining pieces is A fan-shaped opening with a rotation angle of 30° is set at 30°; the inner soil retaining sheet is coaxially connected with the outer soil retaining sheet through the rotating shaft and fixed on the rotating shaft, and a rotation angle of 28° is set at every 32° interval on the inner soil retaining sheet fan-shaped opening.
进一步地,步骤二中,所述试验地层高度不低于25cm,并位于泥浆溢流槽位置下方。Further, in step 2, the test formation height is not lower than 25cm, and is located below the position of the mud overflow tank.
进一步地,步骤三中,所述泥浆为实际施工工程中拟使用的泥浆,且用量不超过有机玻璃直角圆筒上端的气压源进气口。Further, in Step 3, the mud is the mud to be used in the actual construction project, and the amount used shall not exceed the air pressure source air inlet at the upper end of the plexiglass rectangular cylinder.
进一步地,步骤三中,所述有机玻璃箱中渗透排出的溴化钙溶液由溢流槽流出。Further, in step 3, the calcium bromide solution permeated and discharged in the plexiglass box flows out from the overflow tank.
进一步地,步骤四中,三组实验应控制试验地层高度、泥浆高度和预定气压值保持相同。本发明的技术效果:Further, in step four, the three groups of experiments should control the test formation height, mud height and predetermined air pressure to remain the same. Technical effect of the present invention:
本发明能观察泥水盾构掘进过程和带压开舱条件下泥浆在地层中各个方向的渗透全过程,通过改变刀盘开口率研究泥浆渗透规律,从而确定泥浆的用量,指导盾构施工。The invention can observe the mud-water shield excavation process and the whole process of mud seepage in various directions in the formation under the condition of opening the cabin under pressure, and study the mud seepage law by changing the opening ratio of the cutter head, thereby determining the amount of mud used and guiding the shield construction.
说明书附图:Attached to the manual:
图1:本发明所用的模拟泥水盾构泥浆在地层中渗透的可视化试验装置示意图;Fig. 1: the schematic diagram of the visualized test device of the simulated mud-water shield mud seepage in the stratum used in the present invention;
图2:本发明所用泥水盾构模型刀盘外侧挡土片示意图;Fig. 2: Schematic diagram of the outer soil retaining piece of the muddy water shield model cutter head used in the present invention;
图3:本发明所用泥水盾构模型刀盘内侧挡土片示意图;Fig. 3: Schematic diagram of the soil retaining piece inside the mud-water shield model cutter head used in the present invention;
其中:1、有机玻璃箱;2、溢流槽;3、有机玻璃直角圆筒;4、法兰盘;5、模型刀盘;6、排泥阀;7、气压源;8、转轴;9、刻度尺;10、箱体刻度尺;11、稳压阀;12、注水口。Among them: 1. Plexiglass box; 2. Overflow tank; 3. Plexiglass right-angle cylinder; 4. Flange; 5. Model cutter head; 6. Mud discharge valve; 7. Air pressure source; 8. Rotating shaft; , scale; 10, box scale; 11, regulator valve; 12, water inlet.
具体实施方式detailed description
为使本发明实施例的目的和技术方案更加清楚,下面将结合本发明实施例的附图,对本发明实施例的技术方案进行清楚、完整地描述。显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于所描述的本发明的实施例,本领域普通技术人员在无需创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose and technical solutions of the embodiments of the present invention more clear, the technical solutions of the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings of the embodiments of the present invention. Apparently, the described embodiments are some, not all, embodiments of the present invention. Based on the described embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
本技术领域技术人员可以理解,除非另外定义,这里使用的所有术语(包括技术术语和科学术语)具有与本发明所属领域中的普通技术人员的一般理解相同的意义。还应该理解的是,诸如通用字典中定义的那些术语应该被理解为具有与现有技术的上下文中的意义一致的意义,并且除非像这里一样定义,不会用理想化或过于正式的含义来解释。Those skilled in the art can understand that, unless otherwise defined, all terms (including technical terms and scientific terms) used herein have the same meaning as commonly understood by those of ordinary skill in the art to which this invention belongs. It should also be understood that terms such as those defined in commonly used dictionaries should be understood to have a meaning consistent with the meaning in the context of the prior art, and will not be interpreted in an idealized or overly formal sense unless defined as herein Explanation.
本发明中所述的“内、外”的含义指的是相对于设备本身而言,指向设备内部的方向为内,反之为外,而非对本发明的装置机构的特定限定。The meanings of "inside and outside" in the present invention refer to that relative to the device itself, the direction pointing to the inside of the device is inward, and vice versa, it is not a specific limitation to the device mechanism of the present invention.
本发明中所述的“连接”的含义可以是部件之间的直接连接也可以是部件间通过其它部件的间接连接。The meaning of "connection" in the present invention may be a direct connection between components or an indirect connection between components through other components.
如图1所示,本发明测试方法采用的可视化装置包括有机玻璃箱1、有机玻璃直角圆筒3和用于施加压力的气压源7;有机玻璃箱1的底部放置有用于模拟工程地层的中粗粒径透明土,在机玻璃箱的上部设置有泥浆溢流槽2,在机玻璃箱的下部设置有注水口12,有机玻璃箱1的箱体上设有用于量测透明土地层厚度的箱体刻度尺10;有机玻璃直角圆筒3包括用于模拟泥水盾构刀盘向地层注入泥浆的水平玻璃管和用于控制泥浆量和施加气压的竖直玻璃管;有机玻璃圆筒的顶部通过可拆卸的法兰盘4进行密封,竖直玻璃管上设有刻度尺9,竖直玻璃管的顶部侧壁与气压源7相连接,其底部侧壁设置有排泥阀6;As shown in Figure 1, the visualization device that test method of the present invention adopts comprises plexiglass box 1, plexiglass rectangular cylinder 3 and the air pressure source 7 that is used to apply pressure; Coarse-grained transparent soil, the upper part of the organic glass box is provided with a mud overflow tank 2, the lower part of the organic glass box is provided with a water injection port 12, and the casing of the organic glass box 1 is provided with a device for measuring the thickness of the transparent soil layer. The box scale 10; the plexiglass right-angle cylinder 3 includes a horizontal glass tube for simulating mud-water shield cutterhead injecting mud into the formation and a vertical glass tube for controlling the amount of mud and applying air pressure; the top of the plexiglass cylinder It is sealed by a detachable flange 4, a scale 9 is provided on the vertical glass tube, the top side wall of the vertical glass tube is connected with the air pressure source 7, and a mud discharge valve 6 is provided on the bottom side wall;
本发明的模拟泥水盾构泥浆在地层中渗透的可视化的装置的测试方法,首先调节刀盘开口率为0,使有机玻璃直角圆筒封闭,然后在有机玻璃模型箱中装入利用透明土制备的模拟地层并饱和,在有机玻璃直角圆筒中注入试验泥浆,最后打开气压源,转动转轴,在不同刀盘开口率下进行渗透实验,此种泥浆渗透的可视化方法,可以实时观测泥浆在地层中的渗透形态,并精确观测到泥膜的形成类型及各方向渗透距离。The testing method of the visualized device for simulating mud-water shield mud penetration in the stratum of the present invention firstly adjusts the opening ratio of the cutter head to 0, makes the plexiglass rectangular cylinder closed, and then puts it into the plexiglass model box and prepares it with transparent soil. The simulated formation is saturated and the test mud is injected into the plexiglass rectangular cylinder. Finally, the air pressure source is turned on, the rotating shaft is turned, and the penetration experiment is carried out under different cutterhead opening ratios. This visualization method of mud penetration can observe the mud in the formation in real time. The seepage form of the mud film and the formation type of the mud film and the seepage distance in each direction were accurately observed.
上述一种研究泥水盾构泥浆在地层中渗透的可视化方法,具体而言包括以下步骤:The above-mentioned visualization method for studying the penetration of mud-water shield mud in formations specifically includes the following steps:
a、调节刀盘开口率:首先转动转轴,调节刀盘开口率为0,使两片刀盘将有机玻璃箱及有机玻璃直角圆筒分隔开,防止装入实验材料时,试验地层与泥浆二者互相掺杂。a. Adjust the opening ratio of the cutter head: firstly turn the rotating shaft and adjust the opening ratio of the cutter head to 0, so that the two cutter heads separate the plexiglass box and the plexiglass right-angle cylinder to prevent the formation and mud from being mixed when the test material is loaded. The two are mixed with each other.
b、制备地层:利用透明土模拟自然砂土,制备满足级配要求的中粗砂试验地层。再用分层击实的方法装入试验土,用刻度尺控制透明土用量,然后通过注水口从下往上注溴化钙溶液饱和地层,饱和过程中,应防止地层隆起或砂沸。b. Formation preparation: use transparent soil to simulate natural sandy soil, and prepare medium-coarse sand test formations that meet the gradation requirements. Then use layered compaction method to load the test soil, use the scale to control the amount of transparent soil, and then inject calcium bromide solution from bottom to top through the water injection port to saturate the formation. During the saturation process, the formation should be prevented from heaving or sand boiling.
c、形成渗透带:关闭排泥口及稳压阀门,注入试验泥浆,用刻度尺控制泥浆用量,采用法兰盘将装置密封。转动转轴,调节刀盘开口率20%,打开气压源阀门,调节气压至预定值,泥浆开始渗入试验透明土土层并形成渗透带,观察渗透全过程,一定时间后关闭气压源阀门,渗透结束,打开排泥阀,排出多余泥浆,观测各方向渗透距离及渗透带形式。c. Formation of permeable zone: close the mud outlet and pressure stabilizing valve, inject test mud, control the amount of mud with a scale, and seal the device with a flange. Turn the rotating shaft, adjust the opening ratio of the cutter head to 20%, open the air pressure source valve, adjust the air pressure to a predetermined value, the mud begins to penetrate into the test transparent soil layer and form a permeable zone, observe the whole process of infiltration, close the air pressure source valve after a certain period of time, and the infiltration is over , open the mud discharge valve, discharge the excess mud, observe the seepage distance in each direction and the form of the seepage zone.
d、对照实验:重复两次上述步骤a、b、c,分别调节步骤c中刀盘开口率为30%、40%,通过三组对比实验,观测在不同刀盘开口率条件下各方向渗透带形态,总结规律。d. Control experiment: Repeat the above steps a, b, and c twice, and adjust the cutterhead opening ratio in step c to 30% and 40%, respectively. Through three sets of comparative experiments, observe the penetration in all directions under different cutterhead opening ratios Take form and summarize the rules.
步骤a中,所述模型刀盘由两片紧贴圆形挡土片组成,外侧挡土片固定,每隔30°具有转角为30°的扇形开口;内测挡土片通过转轴与外侧挡土片相连,每隔32°具有转角为28°的扇形开口,转动转轴可以调节开口率,开口率范围0%-50%。In step a, the model cutter head is composed of two circular soil retaining pieces close to each other, the outer soil retaining pieces are fixed, and have fan-shaped openings with a rotation angle of 30° every 30°; The soil slices are connected, and there are fan-shaped openings with a rotation angle of 28° every 32°. The opening ratio can be adjusted by rotating the shaft, and the opening ratio ranges from 0% to 50%.
步骤b中,所述透明土地层高度不低于25cm且位于排水口以下,试验时可制备不同级配的透明土土层,研究渗透规律。In step b, the height of the transparent soil layer is not less than 25 cm and is located below the outfall. During the test, transparent soil layers with different gradations can be prepared to study the law of infiltration.
步骤c中,所述的泥浆为实际施工工程中拟使用的泥浆,且用量不得超过气压源进气口。In step c, the mud is the mud to be used in the actual construction project, and the amount used must not exceed the air inlet of the air pressure source.
步骤c中,所述有机玻璃箱中由渗透排出的溴化钙溶液由溢流槽流出。In step c, the calcium bromide solution discharged by permeation in the plexiglass box flows out from the overflow tank.
步骤d中,三组实验应控制试验地层高度、泥浆高度、预定气压值等除刀盘开口率以外的各基本量相同,以便观察刀盘开口率对各方向渗透带形态的影响。In step d, the three groups of experiments should control the test formation height, mud height, predetermined air pressure and other basic quantities except the cutterhead opening ratio to be the same, so as to observe the influence of the cutterhead opening ratio on the shape of the permeable zone in each direction.
以上仅为本发明的实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些均属于本发明的保护范围。The above is only the embodiment of the present invention, and its description is relatively specific and detailed, but it should not be construed as limiting the patent scope of the present invention. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610223266.1A CN105863624B (en) | 2016-04-12 | 2016-04-12 | The visual test method that simulation slurry shield slurry permeates in the earth formation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610223266.1A CN105863624B (en) | 2016-04-12 | 2016-04-12 | The visual test method that simulation slurry shield slurry permeates in the earth formation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105863624A true CN105863624A (en) | 2016-08-17 |
CN105863624B CN105863624B (en) | 2018-12-28 |
Family
ID=56636665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610223266.1A Active CN105863624B (en) | 2016-04-12 | 2016-04-12 | The visual test method that simulation slurry shield slurry permeates in the earth formation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105863624B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106353224A (en) * | 2016-09-08 | 2017-01-25 | 上海工程技术大学 | Slurry shielding mud permeation film forming simulation test apparatus |
CN106841578A (en) * | 2017-04-13 | 2017-06-13 | 中国科学院武汉岩土力学研究所 | A kind of slurry shield face mud hydraulic pressure experiment test device and method of testing |
CN108072749A (en) * | 2017-07-05 | 2018-05-25 | 同济大学 | A kind of tunneling shield excavates high-precision seepage flow simulation by tracing experimental rig |
CN108489892A (en) * | 2018-03-29 | 2018-09-04 | 华东交通大学 | Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow |
CN109162730A (en) * | 2018-07-21 | 2019-01-08 | 中铁十八局集团有限公司 | A kind of slurry balance shield slurries parameter management system based on BIM |
CN109826652A (en) * | 2019-02-01 | 2019-05-31 | 上海工程技术大学 | Simulation test device and method for slurry loss in shield synchronous grouting |
CN111208047A (en) * | 2020-01-10 | 2020-05-29 | 中国矿业大学 | Test method capable of simulating permeability of fractured rock mass under complex disturbance condition |
CN111485906A (en) * | 2020-04-09 | 2020-08-04 | 中铁第六勘察设计院集团有限公司 | Sandwich tunnel structure and construction method thereof |
CN111795917A (en) * | 2020-08-14 | 2020-10-20 | 盾构及掘进技术国家重点实验室 | Dynamic slurry permeability test device and method |
CN115200833A (en) * | 2022-07-01 | 2022-10-18 | 中铁隧道局集团有限公司 | Multipurpose test device and test method for shield operation slurry |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000265794A (en) * | 1999-03-15 | 2000-09-26 | Ohbayashi Corp | Segment assembly training device |
CN102191939A (en) * | 2010-03-05 | 2011-09-21 | 上海盾构设计试验研究中心有限公司 | Test method for forming mud membrane by using slurry shield under high pressure |
CN102226729A (en) * | 2011-06-02 | 2011-10-26 | 广厦建设集团有限责任公司 | Earth pressure balance shield muck soil pressure control model test device |
KR101529098B1 (en) * | 2014-02-19 | 2015-06-16 | 한국건설기술연구원 | Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same |
CN104897527A (en) * | 2015-06-11 | 2015-09-09 | 同济大学 | Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application |
CN104914008A (en) * | 2015-06-11 | 2015-09-16 | 同济大学 | Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method |
-
2016
- 2016-04-12 CN CN201610223266.1A patent/CN105863624B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000265794A (en) * | 1999-03-15 | 2000-09-26 | Ohbayashi Corp | Segment assembly training device |
CN102191939A (en) * | 2010-03-05 | 2011-09-21 | 上海盾构设计试验研究中心有限公司 | Test method for forming mud membrane by using slurry shield under high pressure |
CN102226729A (en) * | 2011-06-02 | 2011-10-26 | 广厦建设集团有限责任公司 | Earth pressure balance shield muck soil pressure control model test device |
KR101529098B1 (en) * | 2014-02-19 | 2015-06-16 | 한국건설기술연구원 | Test apparatus for shield tunnel mock-up considering both underground earth pressure and pore water pressure according to draining condition, and method for the same |
CN104897527A (en) * | 2015-06-11 | 2015-09-09 | 同济大学 | Visual quasi-rectangular shield synchronous grouting slurry diffusion mode research platform and application |
CN104914008A (en) * | 2015-06-11 | 2015-09-16 | 同济大学 | Quasi-rectangular shield soil chamber residue soil flow characteristic visualization observation test system and method |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106353224B (en) * | 2016-09-08 | 2023-08-18 | 上海工程技术大学 | A mud-water shield mud penetration film formation simulation test device |
CN106353224A (en) * | 2016-09-08 | 2017-01-25 | 上海工程技术大学 | Slurry shielding mud permeation film forming simulation test apparatus |
CN106841578A (en) * | 2017-04-13 | 2017-06-13 | 中国科学院武汉岩土力学研究所 | A kind of slurry shield face mud hydraulic pressure experiment test device and method of testing |
CN108072749A (en) * | 2017-07-05 | 2018-05-25 | 同济大学 | A kind of tunneling shield excavates high-precision seepage flow simulation by tracing experimental rig |
CN108489892A (en) * | 2018-03-29 | 2018-09-04 | 华东交通大学 | Seabed Shield Tunneling experimental rig and method under the conditions of a kind of seepage flow |
CN108489892B (en) * | 2018-03-29 | 2020-06-05 | 华东交通大学 | A test device and method for excavation of a submarine shield tunnel under seepage conditions |
CN109162730A (en) * | 2018-07-21 | 2019-01-08 | 中铁十八局集团有限公司 | A kind of slurry balance shield slurries parameter management system based on BIM |
CN109162730B (en) * | 2018-07-21 | 2020-08-11 | 中铁十八局集团有限公司 | Slurry parameter management system of slurry balance shield based on BIM |
CN109826652A (en) * | 2019-02-01 | 2019-05-31 | 上海工程技术大学 | Simulation test device and method for slurry loss in shield synchronous grouting |
CN109826652B (en) * | 2019-02-01 | 2023-10-13 | 上海工程技术大学 | Simulation test device and method for slurry loss during shield synchronous grouting |
CN111208047A (en) * | 2020-01-10 | 2020-05-29 | 中国矿业大学 | Test method capable of simulating permeability of fractured rock mass under complex disturbance condition |
CN111485906A (en) * | 2020-04-09 | 2020-08-04 | 中铁第六勘察设计院集团有限公司 | Sandwich tunnel structure and construction method thereof |
CN111485906B (en) * | 2020-04-09 | 2022-02-22 | 中铁第六勘察设计院集团有限公司 | Sandwich tunnel structure and construction method thereof |
CN111795917A (en) * | 2020-08-14 | 2020-10-20 | 盾构及掘进技术国家重点实验室 | Dynamic slurry permeability test device and method |
CN115200833A (en) * | 2022-07-01 | 2022-10-18 | 中铁隧道局集团有限公司 | Multipurpose test device and test method for shield operation slurry |
CN115200833B (en) * | 2022-07-01 | 2023-06-23 | 中铁隧道局集团有限公司 | Multipurpose test device and test method for shield operation slurry |
Also Published As
Publication number | Publication date |
---|---|
CN105863624B (en) | 2018-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863624A (en) | Visual testing method for simulating permeation of slurry into stratum during slurry shielding | |
CN106437644B (en) | Outsole water sandstone oil reservoir develops physical simulation experiment device and its working method | |
CN112627795B (en) | Sandstone uranium ore horizontal well in-situ leaching mining simulation test system and test method | |
CN105136641B (en) | A kind of mould unit simulating osmotic grouting diffusion test under river channels | |
CN110018291A (en) | A kind of filling mining fluid structurecoupling physical simulation experiment test system | |
CN107389898A (en) | Dynamic current Flooding in Borehole consolidation grouting Diffusion Law visual Simulation experimental provision and method | |
CN107167411A (en) | Piping infiltration visible model testing device and test method in a kind of seepage liquefaction | |
CN106885759B (en) | A device and method for visualizing saturated dynamic water-bearing sand layer seepage grouting test | |
CN110031369A (en) | The underwater slurry shield mud film of bad ground forms simulator and analogy method | |
CN106168550A (en) | Microorganism solidification Extra-fine sand is used to form the Experimental Method in Laboratory of artificial crust layer | |
CN105043938A (en) | Reusable saturated sand layer permeation grouting test model and applications thereof | |
CN109839491A (en) | A kind of recharge ground water analogue experiment method | |
CN108828188A (en) | A kind of simulated groundwater induces the physical model of soil slope instability | |
CN107941544B (en) | A test device and method for simulating the principle of oil storage in a groundwater sealed oil depot | |
CN108680340A (en) | A kind of analogue experiment installation and method accelerating the formation of reclaimed land fresh groundwater | |
CN109164211A (en) | A kind of seawater invasion simulation test sandbox | |
CN205477604U (en) | Visual device that simulation slurry shield mud permeates in stratum | |
CN109060602A (en) | The experimental rig and its method of islands and reefs fresh groundwater boundary variation when studying rainfall | |
CN102419298A (en) | Seepage device for slurry of coarse grained soil | |
CN108426706B (en) | Shield type TBM tunnel segment design test bench for high water pressure area | |
CN107152038A (en) | A kind of geotechnical centrifugal model test equipment and Excavation simulation method | |
CN207470190U (en) | It simulates slurry shield excavation face mud film forming and measures the device of mud film infiltration coefficient | |
CN105957441B (en) | The drafting of plane drift net and seepage principle teaching testing device and test method | |
CN109212163A (en) | It is a kind of to study disturbance to the experimental provision and method of grouting for water blocking influential effect | |
CN209742911U (en) | simulation test device for slurry loss amount in shield synchronous grouting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |