CN108442422A - A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices - Google Patents

A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices Download PDF

Info

Publication number
CN108442422A
CN108442422A CN201810400114.3A CN201810400114A CN108442422A CN 108442422 A CN108442422 A CN 108442422A CN 201810400114 A CN201810400114 A CN 201810400114A CN 108442422 A CN108442422 A CN 108442422A
Authority
CN
China
Prior art keywords
anchor rod
rod
float anchor
fiber bar
rod body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810400114.3A
Other languages
Chinese (zh)
Inventor
张明义
白晓宇
匡政
桑松魁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201810400114.3A priority Critical patent/CN108442422A/en
Publication of CN108442422A publication Critical patent/CN108442422A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to ground foundation engineering technical fields, it is related to a kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices, anchor-rod positioner is mounted on fiber bar anti-float anchor rod body of rod shaft, the fiber bar anti-float anchor rod body of rod is vertically installed in grout hole, surface of bedrock is lined with bed course, load box is sleeved on the fiber bar anti-float anchor rod body of rod, oil inlet pipe and flowline are mounted on the upper surface of load box plate and are connect with high-pressure oil pump, base steel pad is symmetrically built up in the both sides of the fiber bar anti-float anchor rod body of rod and is fixedly mounted on the bottom of sole plate, gauge stand is adsorbed on the surface of base steel pad, holding for gauge stand is provided with displacement sensor on table arm, steel lining is pasted onto on the fiber bar anti-float anchor rod body of rod;Displacement sensor is contacted with the fiber bar anti-float anchor rod body of rod;Data collecting instrument is connect with high-pressure oil pump and displacement sensor respectively, simple in structure, and operability is high, and securely and reliably, test performance is superior comprehensively, and measuring accuracy is high, at low cost.

Description

A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices
Technical field:
The invention belongs to ground foundation engineering technical field, be related to a kind of more anchor fiber type muscle anti-float anchor rod system collaborations by Force test device, it is especially a kind of can be to the survey of the common stress of plurality of fibers muscle anti-float anchor rod system in anti-float anchor rod system Trial assembly is set.
Background technology:
GFRP (Glass Fiber Reinforced Polymer) muscle (using glass fibre as reinforcing material, synthetic resin For basis material, the resin glues such as the unsaturated polyester resin containing a variety of auxiliary agents such as curing agent, accelerating agent are impregnated using silvalin After liquid, by pultrusion, winding screw thread, a kind of one-time formed new material of solidification) it is applied to nonmetallic anti-float anchor rod, compared to The muscle material of other types or material its tensile strength height, light weight, anticorrosive, electromagnetism interference have price low, cost performance Height, the advantages that being widely used.Since fiber bar anti-float anchor rod can be applied to that there are underground water is ionized by above-mentioned many merits The environment for learning the stray electrical current electrochemical corrosion of the environment and direct current of corrosion is medium.This can largely improve anti-floating anchor The durability and bearing capacity of bar, solve the Anticorrosion of underground structure to a certain extent, its application is not only in foundation Engineering field even can also be extended to other field, also can all show its more advantages wherein.Nowadays, anti-float anchor rod is in base All it is that more anchor poles cooperate with participation anti-floating in floor in plinth engineering, simultaneously because lacking opposite to anti-float anchor rod and sole plate The correlative study of slippage and anti-pulling capacity, numerous limit studied and concentrate on anti-float anchor rod body of rod in basement rock are anti-in addition Pull out bearing capacity and anchoring body and the body of rod relatively on the amount of pulling out, such as 201720790989.X discloses and a kind of tried for anchor rod drawing The draw-off gear tested, including door frame are respectively fixed with a piece of steel plate at door frame both ends, door frame both ends be separately installed with one group around Rope part is respectively equipped with a drawing mechanism in door frame both sides, and the drawing mechanism includes steel wire rope, fixed branch on the steel plate Frame, the hollow hydraulic jack at rack-mount end, the changed course pulley of mounting bracket lower end and rack-mount percentage Table;One end of steel wire rope is connect after sequentially passing through holder and jack middle cavity from down to up with jack lift side, steel wire Rope other end head is connected on anchor pole, is connected in the middle part of steel wire rope on changed course pulley and wiring part, and dial gauge is for measuring thousand The jacking amount on jin top;201510757696.7 inventions propose a kind of anchor structure pull-out test device, including loading frame, reaction frame With anchor structure model, the loading frame and the reaction frame are slidably connected, the anchor structure model respectively with the load Frame and the reaction frame are detachably connected;The loading frame is fixedly connected with load chassis, and pressure biography is provided on the reaction frame Sensor, advantage are:The laboratory test that anchor structure pulling capacity is used on the basis of pressure testing machine is realized, it can be with The pull-out test of anchor structure model mechanics performance is conveniently realized, and pull-out test load is stable, test effect is fine; 201310343292.4 are related to a kind of anchor pole indoor pull-out test device, and experimental rig is by horizontal addload system, vertical load system System, anchor rod drawing system, babinet, support column, supporting plate composition, the experimental rig can be realized to two horizontal directions of sample and be erected Histogram to load, solve the pull-out test that traditional anchor pole indoor pull-out test device can not carry out under loading environment and ask It inscribes, the acoustic emission sensor being arranged in experimental rig during the experiment of monitored over time anchor rod drawing inside sample, it can be achieved that occur Damage and failure, crack germinating and spread scenarios, overcome in traditional indoor pull-out test inconvenient monitoring anchoring body mechanical response Limitation, can be applied in geotechnical engineering in the research of expansion sleeve bolt and the pull-out test of respective anchors Solid Mechanics behavior, from And the test basis of science is provided for the test of the anchoring property of expansion sleeve bolt, it can also be applied to the pull-out test of sticking failure In research.Therefore, design it is a kind of rationally, effectively, can really reflect that plurality of fibers muscle anti-float anchor rod carries out drawing in the soleplate Test device it is essential, solid foundation will be established for the popularization and application of fiber bar anti-float anchor rod.
Invention content:
Present invention aims to overcome that disadvantage of the existing technology, it is cost-effective, improve test quality under the premise of, It can be embedded to this characteristic in armored concrete using load box and design one kind plurality of fibers muscle anti-float anchor rod in bottom plate and basement rock Cooperate with pull-out test device, synergistic effect of the test fiber bar anti-float anchor rod in basement rock and bottom plate, anchoring-bolt system bearing capacity Change, the relative slippage of anchor rod body and bottom plate, load box is placed on floor and basement rock intersection, ensures that its axial drawing is fine Tie up muscle anchor rod body, then pour it is integral, installation flush type displacement sensor tested.
To achieve the goals above, agent structure of the invention includes the fiber bar anti-float anchor rod body of rod, anchor-rod positioner, filling Starch hole, load box, oil inlet pipe, flowline, pillar, sole plate, base steel pad, gauge stand, displacement sensor, steel lining, bed course, base Rock, high-pressure oil pump and data collecting instrument;Anchor-rod positioner is mounted on fiber bar anti-float anchor rod body of rod shaft, fiber with coupled modes The muscle anti-float anchor rod body of rod is vertically installed in grout hole, and grout hole uses down-the-hole drill pore-forming, aperture to press design drawing in basement rock Paper determines, generally takes 90mm~120mm;Surface of bedrock is lined with bed course, and load box is sleeved on the fiber bar anti-float anchor rod body of rod simultaneously Between bed course and sole plate, oil inlet pipe and flowline are inserted vertically into respectively on the upper surface of load box plate, oil inlet pipe Pillar is cased with the outside of flowline to be protected, tubing deformation when preventing casting concrete;Oil inlet pipe and flowline with High-pressure oil pump connects, and the interface of oil inlet pipe and flowline is sealed, and base is inserted on the top of the fiber bar anti-float anchor rod body of rod On plinth bottom plate, base steel pad is symmetrically built up in the both sides of the fiber bar anti-float anchor rod body of rod and is fixedly mounted on the bottom of sole plate, It is adsorbed on the surface of base steel pad with magnet base and the gauge stand for holding table arm, holding for gauge stand is provided with displacement sensor on table arm, uses In the displacement of automatic collection testee;Steel lining is pasted onto the fiber bar anti-float anchor rod body of rod away from bottom plate about by anchoring adhesive At 0.5cm;Displacement sensor is contacted by steel lining with the fiber bar anti-float anchor rod body of rod;Data collecting instrument respectively with high-pressure oil pump and Displacement sensor connects, and adds unloading, sustained loading and automatic collection displacement and payload values automatically for controlling high-pressure oil pump.
The fiber bar anti-float anchor rod body of rod of the present invention is glass fiber reinforced polymer (GFRP) full thread solid rod-like Structure can enhance the bond stress between anchor rod body and anchoring body;The material of anchor-rod positioner and the fiber bar anti-float anchor rod body of rod Material it is identical, outer diameter slightly smaller than be in the milk bore dia;Load box is the precious bored concrete pile load box (universal) of match (the precious liquid of Nanjing match Press the production of equipment Co., Ltd), it is highly 30cm, a diameter of 40cm;Oil inlet pipe and flowline are all made of internal diameter about 2cm, outer diameter The nylon rubber pipe of about 3cm;Pillar uses internal diameter 3.5cm seamless steel pipes;The range 100mm of displacement sensor;Steel lining is using straight Angle steel, base steel pad are square steel plate, and length of side 25cm, thickness 1cm, circular hole is reserved in base steel pad centre, for expansion bolt It is fixed on bottom plate across by base steel pad.
Sole plate of the present invention is length of side 1.5m equilateral triangle reinforced concrete structures, and thickness is according to works The design requirement of bottom plate determines, while meeting the minimum thickness requirement in specification, generally takes 0.5m~1.0m, when being unsatisfactory for fiber When the anchoring of the muscle anti-float anchor rod body of rod requires, by fiber bar anti-float anchor rod body of rod 90-degree bent~135 °, fiber bar anti-float anchor rod bar The anchorage length of body and sole plate is 0.6m~1.0m, and structural reinforcement is according to bending resistance, shearing resistance, local resistance to compression, shear-carrying capacity The ratio of reinforcement for checking gained (meets《Code for design of concrete structures GB50010-2010》Specified in minimum steel ratio and maximum The requirement of the ratio of reinforcement) carry out arrangement of reinforcement;Bed course is the pea gravel concreten of thickness 10cm, the entire working face of area covering;Basement rock is ground Rock And Soil.
The present invention in bottom plate and basement rock to plurality of fibers muscle anti-float anchor rod system cooperate with pull-out test detailed process be:
(1) anti-float anchor rod and bed course are poured:Three grout holes, grout hole and bottom plate are first formed in basement rock with down-the-hole drill Distance be not less than 10 times of fiber bar anti-float anchor rod shank diameter, installed with tied silk in the shaft of the fiber bar anti-float anchor rod body of rod The quantity of anchor-rod positioner, anchor-rod positioner is determined according to grout hole hole depth, is generally uniformly distributed along hole depth, spacing 200mm Arrangement can be encrypted in~400mm in away from grout hole aperture 600mm depth bounds, and spacing is 150mm~200mm, then will be fine Dimension muscle anti-float anchor rod is put into grout hole, ensures its verticality (± 1mm), eccentric distance (± 1mm) and decentralization depth (away from grouting Hole bottom hole 200mm), finally pour into mortar, the minimum of mortar makes mortar specimen marked as M30 after grouting, by mortar specimen with The M30 mortars that grout hole pours into were conserved under the same conditions to 28 days ages, and the resistance to compression that grout hole pours into M30 mortars is measured Whether intensity reaches the compressive strength standard value of label mortar;After anti-float anchor rod reaches design strength, poured in surface of bedrock The pea gravel concreten of 10cm thickness forms bed course, then is conserved no less than 28 days;
(2) load box is installed:First by mat surface dabbing, dabbing position is the central area of three grout holes, dabbing Area is that each side in load box bottom surface extends out 10cm, and unwrapping wire positions the position of load box, load box be located at sole plate and bed course it Between, and it is located at the position of centre of gravity that three grout holes form equilateral triangle, the centre of form of guarantee load box and grout hole is the same as always On line, load box is then temporarily fixed at bed course upper surface;
(3) bottom plate is poured:The lower surface of the template of branch bottom plate first, bottom plate is 30cm at a distance from bed course upper surface, will Oil inlet pipe and flowline are pierced by from pillar and straight respectively, then pillar is vertically welded in load box upper surface, the top of pillar End is higher by bottom plate about 50cm, and oil inlet pipe and flowline are sealed temporarily, designed reinforcing bar is then bound in the template of bottom plate Cage is later welded together load box and steel reinforcement cage with loudspeaker muscle securely, and by pillar binding in the main reinforcement of steel reinforcement cage; Pour, vibrate C30 concrete, reserves concrete test block, concrete test block and the C30 concrete of bottom plate will be poured in the same terms Under conserved to 28 days ages, pour the compression strength of bottom plate to measure;It is used on the shaft of the fiber bar anti-float anchor rod body of rod Structure glue steel lining conserves 7 days;
(4) it is tested:Place steel base seat, gauge stand, displacement sensor successively first, then by displacement sensor and high pressure oil The conducting wire of pump is connect with its mating data collecting instrument, connection load pump and oil inlet pipe and flowline, pre-applied first order load The 1/2 of (0.1 times that estimates ultimate load) amount, and initial reading is recorded, quickly test error caused by load is rejected, starts to try It tests, 10 grades of loads of total loading capacity point, the load applied per level-one is equal, and real-time data collection, until fiber bar anti-float anchor rod The body of rod destroys, as long as there is a fiber bar anti-float anchor rod body of rod to destroy, is considered as entire anti-floating system and destroys, and tests The criterion that Load-unload and termination loading environment and anchor pole destroy is pressed《Building foundation pit supporting technical regulation》(JGJ120- 2012) it executes.
The present invention is before use, ensure that load box is in the position of form center of sole plate, the fiber bar anti-float anchor rod body of rod is in base There are enough anchorage lengths in plinth bottom plate and basement rock, it is ensured that displacement sensor works normally;Load box is in loading, unloading and transportational process In oil pipe and connector should be avoided injured, influence to use, oil pipe needs banding fixed on steel reinforcement cage, keeps it in relaxed state; Steel reinforcement cage and load box upper and lower plates need to weld together, and loudspeaker muscle is arranged.
Compared with prior art, the present invention its is simple in structure, operability is high, and securely and reliably, test performance is superior comprehensively, Measuring accuracy is high, at low cost, can test the overall mechanical characteristic and deformation behaviour of plurality of fibers muscle anti-float anchor rod system simultaneously, more The working condition of anti-float anchor rod in closing to reality engineering establishes solid foundation for the popularization and application of fiber bar anti-float anchor rod.
Description of the drawings:
Fig. 1 is the agent structure principle schematic of the present invention.
Fig. 2 is the agent structure vertical view of the present invention.
Fig. 3 is the principle schematic diagram of anchor rod body locator of the present invention.
Fig. 4 is the structure top view of steel base seat of the present invention.
Specific implementation mode:
The present invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
The agent structure of the present embodiment includes the fiber bar anti-float anchor rod body of rod 1, anchor-rod positioner 2, grout hole 3, load box 4, oil inlet pipe 5, flowline 6, pillar 7, sole plate 8, base steel pad 9, gauge stand 10, displacement sensor 11, steel lining 12, bed course 13, Basement rock 14, high-pressure oil pump 15 and data collecting instrument 16;Anchor-rod positioner 2 is mounted on the fiber bar anti-float anchor rod body of rod with coupled modes 1 shaft, the fiber bar anti-float anchor rod body of rod 1 are vertically installed in grout hole 3, grout hole 3 in basement rock 14 using down-the-hole drill at Hole, aperture is determined by design drawing, generally takes 90mm~120mm;14 surface of basement rock is lined with bed course 13, and load box 4 is sleeved on fibre It ties up on the muscle anti-float anchor rod body of rod 1 and mounted between bed course 13 and sole plate 8, oil inlet pipe 5 and flowline 6 are inserted vertically into respectively On the upper surface of load box 4 plate, the outside of oil inlet pipe 5 and flowline 6 is cased with pillar 7 and is protected, and prevents casting concrete When tubing deformation;Oil inlet pipe 5 and flowline 6 are connect with high-pressure oil pump, and the interface of oil inlet pipe 5 and flowline 6 carries out close The top of envelope, the fiber bar anti-float anchor rod body of rod 1 is inserted on sole plate 8, and base steel pad 9 is symmetrically built up in fiber bar anti-float anchor rod bar The both sides of body 1 and the bottom for being fixedly mounted on sole plate 8 are adsorbed on base steel pad 9 with magnet base and the gauge stand 10 for holding table arm Surface, holding for gauge stand 10 be provided with displacement sensor 11 on table arm, is used for the displacement of automatic collection testee;Steel lining 12 By anchoring adhesive be pasted onto the fiber bar anti-float anchor rod body of rod 1 away from bottom plate about 0.5cm at;Displacement sensor 11 passes through steel lining 12 and fibre The muscle anti-float anchor rod body of rod 1 is tieed up to contact;Data collecting instrument 16 is connect with high-pressure oil pump 15 and displacement sensor 11 respectively, for controlling High-pressure oil pump 15 adds unloading, sustained loading and automatic collection displacement and payload values automatically.
The fiber bar anti-float anchor rod body of rod 1 described in the present embodiment is glass fiber reinforced polymer (GFRP) full thread solid hopkinson bar Shape structure can enhance the bond stress between anchor rod body and anchoring body;The material of anchor-rod positioner 2 and fiber bar anti-float anchor rod bar The material of body 1 is identical, and outer diameter is slightly smaller than 3 diameter of grout hole;Load box 4 is precious bored concrete pile load box (the universal) (Nanjing of match Sai Bao hydraulic tests Co., Ltd produces), it is highly 30cm, a diameter of 40cm;Oil inlet pipe 5 and flowline 6 are all made of internal diameter about The nylon rubber pipe of 2cm, outer diameter about 3cm;Pillar 7 uses internal diameter 3.5cm seamless steel pipes;The range 100mm of displacement sensor 11; Steel lining 12 uses right angle angle steel, base steel pad 9 to be square steel plate, length of side 25cm, thickness 1cm, the reserved circle in 9 centre of base steel pad Hole passes through for expansion bolt and base steel pad is fixed on bottom plate 8.
Sole plate 8 described in the present embodiment is length of side 1.5m equilateral triangle reinforced concrete structures, and thickness is according to knot The design requirement of structure object bottom plate determines, while meeting the minimum thickness requirement in specification, generally takes 0.5m~1.0m, when being unsatisfactory for When the anchoring of the fiber bar anti-float anchor rod body of rod 1 requires, by 1 90-degree bent~135 ° of the fiber bar anti-float anchor rod body of rod, fiber bar anti-floating The anchorage length of anchor rod body 1 and sole plate 8 is 0.6m~1.0m, and structural reinforcement is according to bending resistance, shearing resistance, local resistance to compression, anti- The ratio of reinforcement obtained by checking of bearing capacity is cut (to meet《Code for design of concrete structures GB50010-2010》Specified in minimum reinforcements The requirement of rate and the maximum ratio of reinforcement) carry out arrangement of reinforcement;Bed course 13 is the pea gravel concreten of thickness 10cm, the entire working face of area covering; Basement rock 14 is ground Rock And Soil.
The present embodiment cooperates with plurality of fibers muscle anti-float anchor rod system in bottom plate and basement rock the detailed process of pull-out test For:
(1) anti-float anchor rod and bed course 13 are poured:Three grout holes 3, grout hole 3 are first formed in basement rock 14 with down-the-hole drill It is not less than 10 times of fiber bar anti-float anchor rod shank diameter apart from 8 side of bottom plate, is pricked in the shaft of the fiber bar anti-float anchor rod body of rod 1 Silk installation anchor-rod positioner 2, the quantity of anchor-rod positioner 2 is determined according to 3 hole depth of grout hole, is generally uniformly distributed along hole depth, Away from for 200mm~400mm, being encrypted arrangement in away from 3 aperture 600mm depth bounds of grout hole, spacing be 150mm~ 200mm, then fiber bar anti-float anchor rod 1 is put into grout hole 3, ensure its verticality (± 1mm), eccentric distance (± 1mm) and Transfer depth (away from 3 bottom hole 200mm of grout hole), finally pour into mortar, mortar it is minimum marked as M30, make mortar after grouting Test block conserves the M30 mortars that all mortar specimens and grout hole 3 pour under the same conditions to 28 days ages, with fixed Whether the compression strength that grout hole 3 pours into M30 mortars reaches the compressive strength standard value of label mortar;Wait for that anti-float anchor rod arrival is set After counting intensity, the pea gravel concreten that 10cm thickness is poured on 14 surface of basement rock forms bed course 13, then is conserved no less than 28 days;
(2) load box 4 is installed:First by 13 surface dabbing of bed course, dabbing position is the central area of three grout holes 3, Dabbing area is that each side in 4 bottom surface of load box extends out 10cm, and unwrapping wire positions the position of load box 4, and load box 4 is located at sole plate 8 Between bed course 13, and the position of centre of gravity of equilateral triangle is formed positioned at three grout holes 3, ensures load box 4 and grout hole 3 Load box 4 on the same line, is then temporarily fixed at 13 upper surface of bed course by the centre of form;
(3) bottom plate 8 is poured:The lower surface of the template of branch bottom plate 8 first, bottom plate 8 is at a distance from 13 upper surface of bed course Oil inlet pipe 5 and flowline 6 are pierced by from pillar 7 and straight, then pillar 7 are vertically welded in 4 upper table of load box by 30cm respectively The top in face, pillar 7 is higher by the about 50cm of bottom plate 8, oil inlet pipe 5 and flowline 6 is sealed temporarily, then in the template of bottom plate 8 Designed steel reinforcement cage is bound, is later welded together load box and steel reinforcement cage securely with loudspeaker muscle, and pillar 7 is bound In the main reinforcement of steel reinforcement cage;Pour, vibrate C30 concrete, reserves concrete test block, concrete test block and bottom plate 8 will be poured C30 concrete was conserved under the same conditions to 28 days ages, to measure the compression strength for pouring bottom plate 8;It is anti-in fiber bar Structure glue steel lining 12 is used on the shaft of drogue club shaft 1, is conserved 7 days;
(4) it is tested:Place steel base seat 9, gauge stand 10, displacement sensor 11 successively first, then by displacement sensor 11 It is connect with its mating data collecting instrument 16 with the conducting wire of high-pressure oil pump 15, connection load pump 15 and oil inlet pipe 5 and flowline 6, The 1/2 of (0.1 times that estimates ultimate load) amount of pre-applied first order load, and initial reading is recorded, it rejects quickly load and causes Test error, start to test, points of 10 grades loads of total loading capacity, the load applied per level-one is equal, and real-time data collection, directly It destroys to the fiber bar anti-float anchor rod body of rod 1, as long as there is a fiber bar anti-float anchor rod body of rod 1 to destroy, is considered as entirely anti- Floating body system destroys, and the criterion that experiment Load-unload and termination loading environment and anchor pole destroy is pressed《Building foundation pit supporting Technical regulation》(JGJ120-2012) it executes.

Claims (4)

1. a kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices, it is characterised in that agent structure includes fiber The muscle anti-float anchor rod body of rod, anchor-rod positioner, grout hole, load box, oil inlet pipe, flowline, pillar, sole plate, base steel pad, table Seat, displacement sensor, steel lining, bed course, basement rock, high-pressure oil pump and data collecting instrument;Anchor-rod positioner is mounted on coupled modes Fiber bar anti-float anchor rod body of rod shaft, the fiber bar anti-float anchor rod body of rod are vertically installed in grout hole, and grout hole is adopted in basement rock With down-the-hole drill pore-forming, aperture is 90mm~120mm;Surface of bedrock is lined with bed course, and load box is sleeved on fiber bar anti-float anchor rod On the body of rod and mounted between bed course and sole plate, oil inlet pipe and flowline are inserted vertically into respectively in the upper surface of load box plate On, the outside of oil inlet pipe and flowline is cased with pillar and is protected, tubing deformation when preventing casting concrete;Oil inlet pipe and go out Oil pipe is connect with high-pressure oil pump, and the interface of oil inlet pipe and flowline is sealed, the top of the fiber bar anti-float anchor rod body of rod End is inserted on sole plate, and base steel pad is symmetrically built up in the both sides of the fiber bar anti-float anchor rod body of rod and is fixedly mounted on sole plate Bottom, be adsorbed on the surface of base steel pad with magnet base and the gauge stand for holding table arm, holding for gauge stand is provided with displacement biography on table arm Sensor is used for the displacement of automatic collection testee;Steel lining is pasted onto the fiber bar anti-float anchor rod body of rod bottom of away from by anchoring adhesive At plate 0.5cm;Displacement sensor is contacted by steel lining with the fiber bar anti-float anchor rod body of rod;Data collecting instrument respectively with high-pressure oil pump It is connected with displacement sensor, adds unloading, sustained loading and automatic collection displacement and payload values automatically for controlling high-pressure oil pump.
2. more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices according to claim 1, it is characterised in that institute It is glass fiber reinforced polymer full thread solid rod-like structure to state the fiber bar anti-float anchor rod body of rod, can enhance anchor rod body and anchor Bond stress between solid;The material of anchor-rod positioner is identical as the material of the fiber bar anti-float anchor rod body of rod, and outer diameter, which is less than, to be filled Starch bore dia;Load box is the precious bored concrete pile load box of commercially available match, is highly 30cm, a diameter of 40cm;Oil inlet pipe and flowline It is all made of the nylon rubber pipe of internal diameter 2cm, outer diameter 3cm;Pillar uses internal diameter 3.5cm seamless steel pipes;The range of displacement sensor 100mm;Steel lining uses right angle angle steel, base steel pad to be square steel plate, length of side 25cm, thickness 1cm, and base steel pad centre is reserved Circular hole passes through for expansion bolt and base steel pad is fixed on bottom plate.
3. more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices according to claim 1, it is characterised in that institute It is length of side 1.5m equilateral triangle reinforced concrete structures to state sole plate, and thickness is 0.5m~1.0m;When sole plate not When meeting the anchoring of the fiber bar anti-float anchor rod body of rod and requiring, by fiber bar anti-float anchor rod body of rod 90-degree bent~135 °, fiber bar is anti- The anchorage length of drogue club shaft and sole plate is 0.6m~1.0m;Bed course is the pea gravel concreten of thickness 10cm, area covering Entire working face;Basement rock is ground Rock And Soil.
4. more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices according to claim 1, it is characterised in that adopt It is to the detailed process of plurality of fibers muscle anti-float anchor rod system collaboration pull-out test in bottom plate and basement rock with the device:
(1) anti-float anchor rod and bed course are poured:First form three grout holes in basement rock with down-the-hole drill, grout hole and bottom plate away from From 10 times not less than fiber bar anti-float anchor rod shank diameter, anchor pole is installed in the shaft tied silk of the fiber bar anti-float anchor rod body of rod Locator, the quantity of anchor-rod positioner is determined according to grout hole hole depth, is generally uniformly distributed along hole depth, spacing be 200mm~ 400mm, can be encrypted arrangement in away from grout hole aperture 600mm depth bounds, and spacing is 150mm~200mm, then by fiber Muscle anti-float anchor rod is put into grout hole, is ensured its verticality, eccentric distance and decentralization depth, is finally poured into mortar, mortar is most Low grade is M30, and mortar specimen is made after grouting, the M30 mortars that mortar specimen and grout hole are poured under the same conditions into Row maintenance measured grout hole and pours into the compression strength of M30 mortars whether reach the pressure resistance scale of label mortar to 28 days ages Quasi- value;After anti-float anchor rod reaches design strength, the pea gravel concreten that 10cm thickness is poured in surface of bedrock forms bed course, then carries out Maintenance no less than 28 days;
(2) load box is installed:First by mat surface dabbing, dabbing position is the central area of three grout holes, dabbing area Extend out 10cm for each side in load box bottom surface, unwrapping wire positions the position of load box, load box between sole plate and bed course, and The position of centre of gravity of equilateral triangle is formed positioned at three grout holes, ensures the centre of form of load box and grout hole on the same line, Then load box is temporarily fixed at bed course upper surface;
(3) bottom plate is poured:The lower surface of the template of branch bottom plate first, bottom plate is 30cm at a distance from bed course upper surface, by oil inlet Pipe and flowline are pierced by from pillar and straight respectively, then pillar is vertically welded in load box upper surface, and the top of pillar is high Go out bottom plate 50cm, oil inlet pipe and flowline are sealed temporarily, designed steel reinforcement cage is then bound in the template of bottom plate, later Load box and steel reinforcement cage are welded together securely with loudspeaker muscle, and by pillar binding in the main reinforcement of steel reinforcement cage;It pours, shake C30 concrete is smash, concrete test block is reserved, concrete test block is carried out under the same conditions with the C30 concrete for pouring bottom plate Maintenance was to 28 days ages, to measure the compression strength for pouring bottom plate;Structure glue is used on the shaft of the fiber bar anti-float anchor rod body of rod Steel lining is pasted, is conserved 7 days;
(4) it is tested:Place steel base seat, gauge stand, displacement sensor successively first, then by displacement sensor and high-pressure oil pump Conducting wire is connect with its mating data collecting instrument, connection load pump and oil inlet pipe and flowline, pre-applied first order capacity value 1/2, and initial reading is recorded, quickly test error caused by load is rejected, starts to test, 10 grades of loads of total loading capacity point, often The load that level-one applies is equal, and real-time data collection, until the fiber bar anti-float anchor rod body of rod destroys, tests Load-unload It is pressed with the criterion for terminating loading environment and anchor pole destruction《Building foundation pit supporting technical regulation》(JGJ120-2012) it holds Row.
CN201810400114.3A 2018-04-28 2018-04-28 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices Pending CN108442422A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810400114.3A CN108442422A (en) 2018-04-28 2018-04-28 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810400114.3A CN108442422A (en) 2018-04-28 2018-04-28 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices

Publications (1)

Publication Number Publication Date
CN108442422A true CN108442422A (en) 2018-08-24

Family

ID=63202233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810400114.3A Pending CN108442422A (en) 2018-04-28 2018-04-28 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices

Country Status (1)

Country Link
CN (1) CN108442422A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409450A (en) * 2018-09-18 2019-03-01 四川西牛矩阵科技有限公司 A kind of storehouse item location system based on RFID

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101539185B1 (en) * 2014-11-06 2015-07-24 장신찬 Method of constructing steel anchor having controlled lifting distance and structure thereof
CN104963368A (en) * 2015-07-09 2015-10-07 安徽省建筑工程质量监督检测站 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof
CN104963355A (en) * 2015-06-24 2015-10-07 同济大学 Classification anchoring type draught fan rock anchor rod assembly
CN204875875U (en) * 2015-07-09 2015-12-16 安徽省建筑工程质量监督检测站 Anti sea anchor pole bearing capacity detecting system of many reinforcing bars of major diameter
CN107558511A (en) * 2017-09-30 2018-01-09 青岛理工大学 A kind of full-automatic test method of nonmetallic anti-float anchor rod TERM DEFORMATION
CN208201955U (en) * 2018-04-28 2018-12-07 青岛理工大学 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices
CN108593446B (en) * 2018-04-28 2020-10-23 青岛理工大学 Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101539185B1 (en) * 2014-11-06 2015-07-24 장신찬 Method of constructing steel anchor having controlled lifting distance and structure thereof
CN104963355A (en) * 2015-06-24 2015-10-07 同济大学 Classification anchoring type draught fan rock anchor rod assembly
CN104963368A (en) * 2015-07-09 2015-10-07 安徽省建筑工程质量监督检测站 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof
CN204875875U (en) * 2015-07-09 2015-12-16 安徽省建筑工程质量监督检测站 Anti sea anchor pole bearing capacity detecting system of many reinforcing bars of major diameter
CN107558511A (en) * 2017-09-30 2018-01-09 青岛理工大学 A kind of full-automatic test method of nonmetallic anti-float anchor rod TERM DEFORMATION
CN208201955U (en) * 2018-04-28 2018-12-07 青岛理工大学 A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices
CN108593446B (en) * 2018-04-28 2020-10-23 青岛理工大学 Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409450A (en) * 2018-09-18 2019-03-01 四川西牛矩阵科技有限公司 A kind of storehouse item location system based on RFID

Similar Documents

Publication Publication Date Title
CN108844807B (en) Indoor simulation test method for stress characteristic of fiber rib anti-floating anchor rod
CN104374648B (en) A kind of experimental rig and method for testing dynamic shear characteristic between pile tube and the slip casting soil body
CN108956285B (en) Drawing test method for single-anchor fiber rib anti-floating anchor rod system
CN104374649B (en) A kind of experimental rig and method for being used to observe shear deformation breaks down feature between pile tube and the slip casting soil body
CN108505550A (en) A kind of list anchored fiber muscle anti-float anchor rod system pull-out test device
CN107817162B (en) Rapid drawing test method for nonmetal anti-floating anchor rod with enlarged head
CN101831925B (en) Detection method for static load of pile foundation
CN107621412B (en) Quick drawing test device for nonmetal anti-floating anchor rod with enlarged head
CN108593446A (en) A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test methods
CN101871353B (en) Method for soft rock roadway grouting and full-length prestress baseboard anchor cable comprehensive support
CN108978734A (en) A kind of fiber bar anti-float anchor rod mechanical characteristic simulation laboratory test device
CN103510552A (en) Creep test loading device for non-metal anti-floating anchor
CN104374650A (en) Testing device and method for testing static force shear property between tubular pile and grouting soil body
RU83517U1 (en) SOIL ANCHOR
CN208329016U (en) A kind of fiber bar anti-float anchor rod mechanical characteristic simulation laboratory test device
CN108106939A (en) A kind of gravity compensation formula anchoring body creep effect pilot system based on lever principle
CN104988884A (en) Concrete faced rock-fill dam void deformation monitoring device and installation method thereof
CN110359506B (en) Simple high-pressure grouting lifting deformation monitoring device and installation method thereof
CN208201955U (en) A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices
CN108661090B (en) Stress testing method for closed prestressed concrete pipe pile
CN108442422A (en) A kind of more anchor fiber type muscle anti-float anchor rod system cooperative bearing test devices
CN208201954U (en) A kind of list anchored fiber muscle anti-float anchor rod system pull-out test device
CN214460568U (en) Bridge steel pipe support foundation on bedding rock face
CN204662373U (en) A kind of deformation monitoring device that comes to nothing for rock
CN207633383U (en) Device for precast hollow uplift pile wadding weft variation pull

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination