CN214460568U - Bridge steel pipe support foundation on bedding rock face - Google Patents

Bridge steel pipe support foundation on bedding rock face Download PDF

Info

Publication number
CN214460568U
CN214460568U CN202120398276.5U CN202120398276U CN214460568U CN 214460568 U CN214460568 U CN 214460568U CN 202120398276 U CN202120398276 U CN 202120398276U CN 214460568 U CN214460568 U CN 214460568U
Authority
CN
China
Prior art keywords
steel pipe
pile
cushion cap
micro
rock face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120398276.5U
Other languages
Chinese (zh)
Inventor
王冬恒
危志豪
严少发
魏刚
毛志刚
翟海彬
南维州
姬东东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Application granted granted Critical
Publication of CN214460568U publication Critical patent/CN214460568U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a bridge steel pipe support basis on bedding rock face relates to support basis technical field. This bridge steel pipe support basis includes the cushion cap on the bedding rock face, the top pin joint of cushion cap has miniature stake, the bottom fixed mounting of cushion cap has the steel pipe, the bottom fixed mounting of cushion cap has the cable, the concrete has been pour to the inside of miniature stake, there is branch inside of concrete through connector fixed mounting. The method is characterized in that the top of a main reinforcement is pre-bent in advance before binding of a bearing platform reinforcement so as to enhance the reinforcement anchoring capability and the bearing platform anti-cutting capability, tension force is applied to steel strands by using a jack according to the principle of an anchor cable frame beam, whether the stress condition of a micro-pile is consistent with the calculation or not is verified, and micro-pile drilling construction is performed by adopting seamless steel tube follow-up, so that the micro-pile is not inclined on the bedding rock face and is formed into a complete pile without hole collapse, a good effect is obtained on a complex marble stratum, the applicability of the micro-pile of the complex marble stratum is verified, and the method is simple, economical and convenient.

Description

Bridge steel pipe support foundation on bedding rock face
Technical Field
The utility model relates to a support foundation technical field, very much be a bridge steel pipe support basis on bedding rock face.
Background
And (3) generating a slide-resistant pile foundation: the load is transferred to a stable rock stratum through the bearing capacity of the pile, and the pile forming mode comprises two modes of manual hole digging and mechanical hole drilling.
1. The manual hole digging is high in safety risk and low in pile forming efficiency, and rock face loosening is easily caused by blasting excavation of initiating explosive devices.
2. The construction period of mechanical hole forming is long, large-scale equipment is required to be matched for construction, the requirement on the site is strict, the construction cost is high, and the construction is not economical.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a bridge steel pipe support basis on consequent layer rock face should solve the problem among the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a bridge steel pipe support basis on consequent layer rock face, includes the cushion cap, the top pin joint of cushion cap has miniature stake, the bottom fixed mounting of cushion cap has the steel pipe, the bottom fixed mounting of cushion cap has the cable, the inside of miniature stake is pour has the concrete, there is branch inside of concrete through connector fixed mounting.
The utility model provides a bridge steel pipe support basis on bedding rock face. The method has the following beneficial effects:
the bridge steel pipe support foundation on the bedding rock surface has the advantages that the bearing platform has good steel bar anchoring capability and anti-cutting capability; the steel pipe can follow up to carry out micro-pile drilling construction, so that the micro-pile is not inclined on the bedding rock surface and the pile is formed completely without hole collapse; the guy cable is used for stabilizing the whole bracket foundation; the mini-pile has the characteristics of less material consumption of a single pile, convenience in construction and the like, the concrete and the supporting rod are arranged inside the mini-pile, a good effect can be achieved on a complex compound marble stratum, the applicability on the compound marble stratum is strong, and the mini-pile is simple, economical and convenient. The utility model discloses simple and convenient, it is convenient to use, has economic value and social value well.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic diagram of the operation steps of S2 of the present invention;
fig. 3 is a schematic diagram of the operation steps of S3 according to the present invention;
fig. 4 is a schematic diagram of the operation of S4 of the present invention;
fig. 5 is a schematic diagram of the operation steps of S5 according to the present invention.
In the figure: 1. a steel pipe; 2. a bearing platform; 3. micro-piles; 4. a cable; 5. concrete; 6. a strut; 7. a connecting head.
Detailed Description
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a bridge steel pipe support basis on consequent layer rock face, includes cushion cap 2, the top pin joint of cushion cap 2 has miniature stake 3, the bottom fixed mounting of cushion cap 2 has steel pipe 1, the bottom fixed mounting of cushion cap 2 has cable 4, the inside of miniature stake 3 is pour and has concrete 5, there is branch 6 inside of concrete 5 through connector 7 fixed mounting.
A bridge foundation treatment method on bedding rock surface comprises the steps that the load of stand columns on the upper portion of a support is distributed to micro piles through a bearing platform 2, then the micro piles are transmitted to a stable foundation rock through the micro piles 3, on the other hand, the micro piles 3 are in pin connection and series connection, the effect of soil retaining and skid resisting reinforcement on an unstable slope can be achieved, and the method comprises the following operation steps:
s1, operation before hole forming: and (4) measuring and lofting, building a platform according to the size of the bearing platform, and draining water around.
S2, anchor cable hole drilling: the down-the-hole drill is adopted to operate according to a designed position, the hole diameter of the drilled holes is 10cm-20cm, the distance is 1-2m, the holes are arranged in a quincuncial shape, specific parameters are determined according to calculation, in the implementation process, the holes are drilled in a batch and jump drilling method, the influence of the drilled holes on the overall stability of a rock stratum is avoided, the length of the steel pipe is +10cm, the diameter of the steel pipe is generally smaller than the hole diameter of 1-2cm, grout outlet holes with the diameter of 2cm are reserved at the bottom, and the holes are drilled in a seamless steel pipe follow-up mode to ensure the hole forming effect.
S3, lowering an anchor cable, and grouting: the steel reinforcement cage owner muscle, splice bar are that the back field is processed into wholly, adopt to lift by crane equipment and once only transfer to in the seamless steel pipe, during the slip casting, the slip casting pipe stretches into the hole bottom, and the thick liquid ratio should be slow with prestressing tendons pipeline thick liquid, and the slip casting is gone on in grades, guarantees downthehole and rock crack slurry is abundant.
S4, installing a tension reaction beam and an anchorage device: and (3) carrying out bearing platform construction, wherein the construction is carried out on a conventional reinforced concrete structure, the top of the main reinforcement is pre-bent in advance before reinforcing steel bars are bound, so that the anchoring capability of the reinforcing steel bars and the punching resistance of the bearing platform are enhanced, and related embedded parts are embedded according to the design position before concrete pouring.
S5, load application: and (3) applying a tensile force F to the steel strand by using a jack, transmitting the tensile force F to the bearing platform through the tension counter-force beam, and anchoring the anchor cable on the bearing layer under the micro-pile so as to simulate the stress.
S6, hold load, observe data: and observing foundation settlement, foundation deformation and slope slippage.
And S7, unloading.
The method of the examples was performed for detection analysis and compared to the prior art to yield the following data:
Figure DEST_PATH_IMAGE002
according to above-mentioned table data can derive, when the embodiment, through the utility model discloses bridge steel pipe support basis and processing method acquisition parameter are reinforcing bar anchoring ability and the anti die-cut ability of cushion cap on the bedding rock face: and (3) the state of the micro pile on the bedding rock face is strong: no inclination, no hole collapse, economy: is simple, economical and convenient.
The utility model provides a, bridge steel pipe support basis on bedding rock face, including cushion cap 2, cushion cap 2's top pin joint has miniature stake 3, cushion cap 2's bottom fixed mounting has steel pipe 1, a bridge foundation treatment method on bedding rock face, including support upper portion stand load, distribute to miniature stake 3 through cushion cap 2, then transmit to on stabilizing the basement rock by miniature stake, on the other hand, miniature stake pin joint series effect can play the anti-skidding reinforcing action of fender soil to unstable slope, and its operating procedure has following step: s1, operation before hole forming: and (4) measuring and lofting, building a platform according to the size of the bearing platform, and draining water around. S2, anchor cable hole drilling: the method is characterized in that a down-the-hole drill is adopted to operate according to a designed position, the hole diameter of the drilled holes is 10cm-20cm, the distance is 1-2m, the holes are arranged in a quincuncial shape, specific parameters are determined according to calculation, in the implementation process, the drilling method is carried out in batches and in a jump drilling mode, the influence of the drilling on the overall stability of a rock stratum is avoided, the length of a steel pipe is +10cm, the diameter is generally smaller than the hole diameter of 1-2cm, a grout outlet hole with the diameter of 2cm is reserved at the bottom, in order to guarantee the hole forming effect, the holes are drilled in a seamless steel pipe follow-up mode, micro-pile drilling construction is carried out in the seamless steel pipe follow-up mode, and the micro-piles are guaranteed not to incline along the rock surface and not to collapse completely. S3, lowering an anchor cable, and grouting: the steel reinforcement cage owner muscle, splice bar are that the back field is processed into wholly, adopt to lift by crane equipment and once only transfer to in the seamless steel pipe, during the slip casting, the slip casting pipe stretches into the hole bottom, and the thick liquid ratio should be slow with prestressing tendons pipeline thick liquid, and the slip casting is gone on in grades, guarantees downthehole and rock crack slurry is abundant. S4, installing a tension reaction beam and an anchorage device: the cushion cap construction is with conventional reinforced concrete structure thing construction, carries out the preflex to main muscle top before the reinforcement to reinforcing bar anchoring ability and cushion cap die-cut resistance ability, before the concreting, according to the pre-buried relevant built-in fitting of design position, carries out the preflex to main muscle top before the cushion cap reinforcement in advance before the cushion cap reinforcement, so that reinforcing bar anchoring ability and cushion cap die-cut resistance ability. S5, load application: the tensioning force F is applied to the steel strand by the jack and transmitted to the bearing platform through the tensioning reaction beam, the anchor cable is anchored on the bearing layer under the micro-pile, so that the effect of simulating stress is achieved, and according to the principle of the anchor cable frame beam, the tensioning force is applied to the steel strand by the jack, and whether the stress condition of the micro-pile is consistent with the calculation or not is verified. S6, hold load, observe data: and observing foundation settlement, foundation deformation and slope slippage. S7, unloading, adopting the micro-pile foundation treatment on the complex compound marble stratum for the first time, obtaining good effect on the complex compound marble stratum, verifying the applicability of the micro-pile of the compound marble stratum, and being simple, economical and convenient.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, many modifications and improvements can be made without departing from the inventive concept, and all of them belong to the protection scope of the present invention.

Claims (1)

1. The utility model provides a bridge steel pipe support basis on bedding rock face, includes cushion cap (2), its characterized in that: the top pin joint of cushion cap (2) has miniature stake (3), the bottom fixed mounting of cushion cap (2) has steel pipe (1), the bottom fixed mounting of cushion cap (2) has cable (4), the internally cast of miniature stake (3) has concrete (5), the inside of concrete (5) has branch (6) through connector (7) fixed mounting.
CN202120398276.5U 2020-04-03 2021-02-23 Bridge steel pipe support foundation on bedding rock face Active CN214460568U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN2020204776811 2020-04-03
CN202020477681 2020-04-03

Publications (1)

Publication Number Publication Date
CN214460568U true CN214460568U (en) 2021-10-22

Family

ID=78144835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120398276.5U Active CN214460568U (en) 2020-04-03 2021-02-23 Bridge steel pipe support foundation on bedding rock face

Country Status (1)

Country Link
CN (1) CN214460568U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456064A (en) * 2020-04-03 2020-07-28 中交一公局集团有限公司 Bridge steel pipe support foundation on bedding rock surface and processing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111456064A (en) * 2020-04-03 2020-07-28 中交一公局集团有限公司 Bridge steel pipe support foundation on bedding rock surface and processing method thereof

Similar Documents

Publication Publication Date Title
CN204266121U (en) Button anchor system combinations formula pile foundation support table anchorage
CN104018490B (en) A kind of Z-shaped square-section friction pile and construction method thereof
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN110629671A (en) Suspension bridge anchorage and construction method thereof
CN103572701A (en) Buckling anchor system combined rock anchor
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN106638655A (en) Conical-head tendon body post-tensioning pile foundation and construction process thereof
CN214460568U (en) Bridge steel pipe support foundation on bedding rock face
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN209211459U (en) Skirt piles are gone along with sb. to guard him in a kind of buried subway station PBA
CN111456064A (en) Bridge steel pipe support foundation on bedding rock surface and processing method thereof
CN205822206U (en) A kind of vertical side slope bracing means
CN107059872B (en) Inclined cable pile pulling method and inclined cable pile pulling system
CN104018496B (en) A kind of pile body arranges circular cross-section friction pile and the construction method thereof of Horizontal hunche beam
CN208328968U (en) A kind of upper stake suitable for large-scale cyclic load is casted anchor novel foundation
CN203846399U (en) Combined type rock anchor with buckling anchor system
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
EP1283307A2 (en) Method of forming enlarged pile heads
CN204715196U (en) A kind of cantilever casting beam abutment pier prestressed reinforcement device
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
CN210555475U (en) Floating type drilling platform
CN102444131B (en) Foundation pit support method
CN202194144U (en) Ground pit inclined tension pile
CN206554106U (en) Conehead muscle body posttension pile foundation
CN217027038U (en) Pile anchor structure capable of adapting to soil filling, consolidation and settlement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant