CN104963368A - Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof - Google Patents

Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof Download PDF

Info

Publication number
CN104963368A
CN104963368A CN201510405594.9A CN201510405594A CN104963368A CN 104963368 A CN104963368 A CN 104963368A CN 201510405594 A CN201510405594 A CN 201510405594A CN 104963368 A CN104963368 A CN 104963368A
Authority
CN
China
Prior art keywords
steel strand
anchor rod
float anchor
hole
grip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510405594.9A
Other languages
Chinese (zh)
Inventor
吴大国
王春林
束兵
姚运昌
彭建和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Construction Engineering Quality Supervision and Testing Station Co Ltd
Original Assignee
Anhui Construction Engineering Quality Supervision and Testing Station Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Construction Engineering Quality Supervision and Testing Station Co Ltd filed Critical Anhui Construction Engineering Quality Supervision and Testing Station Co Ltd
Priority to CN201510405594.9A priority Critical patent/CN104963368A/en
Publication of CN104963368A publication Critical patent/CN104963368A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system. The large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system comprises a steel strand, a steel bar clamp, a box girder, a lifting equipment and displacement testing equipment, wherein the steel strand is vertically arranged, the lower end of the steel strand is used for being fixedly connected with an anti-floating anchor, and the upper end of the steel strand is used for bearing lifting acting force; the steel bar clamp comprises a circular-pipe-shaped clamping pipe and a clamping block arranged on the inner side of the top of the clamping pipe, the clamping pipe is used for being connected with the lower end of the steel strand, the clamping pipe is provided with two rows of radial screw holes arrayed in the axial direction, in addition, the two rows of radial screw holes are symmetrically distributed on the two sides of the axis of the clamping pipe, and a clamping bolt is arranged in each radial screw hole; the box girder is provided with a through hole allowing the steel strand to penetrate through; the lifting equipment is used for supplying the lifting acting force to the upper end of the steel strand; the displacement testing equipment is used for measuring the displacement quantity of the upper end of the steel strand. The large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system is convenient to machine and fast and convenient to assemble.

Description

Major diameter many reinforcing bar anti-float anchor rod loading test systems and mounting method thereof
Technical field
The present invention relates to a kind of major diameter many reinforcing bar anti-float anchor rod loading test systems, belong to construction work facility stress performance testing equipment technical field.
Background technology
Along with in recent years, the continuous increase of building foundation buried depth objective demand, anti-float anchor rod testing arrangement and method for improving the firm and safety of building have been waited until and have been developed quickly.In order to improve accuracy and the detection efficiency of anti-float anchor rod loading test, this area proposes a lot of schemes, disclose a kind of raft plate anti-float anchor rod resistance to plucking detection experiment collapsible tool as Chinese patent literature CN 102839692 A and apply the method that this instrument carries out testing, scheme disclosed in the document has certain contribution for the cost savings of anti-float anchor rod loading test.In addition, in order to have more simple structure relatively, thus be conducive to the test efficiency improving anti-float anchor rod loading test, and ensure the accuracy of experimental result, Chinese patent literature CN 203949781 U discloses anti-float anchor rod loading test device, not only structure is simple for it, assembling rapidly, detection experiment efficiency is high, and optimize box-beam structure, thus can ensure that connecting rod is vertical on guard box beam horizontal base, to ensure the accuracy of test result, reduce the error because the horizontal component of connecting rod inclination generation and the frictional force of increase cause result of the test.
Above-mentioned prior art still has the space of improving further: the loading test test of anti-float anchor rod all utilizes punching jack to carry out on-the-spot pull-out test, in traditional pull-out test, will punching jack through whole group of dowel, then at dowel upper weld one section of reinforcement bar, thus jack power is upwards delivered on dowel, this kind mode operating efficiency is low, labour intensity is large, experimentation cost is high.For this reason, Chinese patent literature CN 104674858 A discloses a kind of anti-floats request anchor rod drawing test instrument, which provide a kind of anchor pole locked assembly, anchor pole and lengthening anchor pole can be linked together fast, centre-hole jack applies pulling capacity to lengthening anchor pole, and be passed on anchor pole, thus carry out pull-out test.But its deficiency existed is: anchor pole locked assembly complex structure, not only processing difficulties, working (machining) efficiency low, easily damage, and when using, efficiency of assembling is low, and assembly manipulation is easily made a fault or deviation, thus causes the accuracy affected of result of the test.
Summary of the invention
The present invention for the deficiency that prior art exists, provides a kind of major diameter many reinforcing bar anti-float anchor rod loading test systems just, can overcome the deficiency that prior art exists, meet actual tests instructions for use.
For solving the problem, the technical solution used in the present invention is as follows:
A kind of major diameter many reinforcing bar anti-float anchor rod loading test systems, comprising:
One steel strand, described steel strand are vertically arrange, and lower end is used for being fixedly connected with anti-float anchor rod, and upper end is used for bearing lifting active force;
One rebar clips, described rebar clips comprises the grip tube of tubular and is arranged at the grip block of described grip tube inside top, described grip block is for connecting the lower end of described steel strand, described grip tube is provided with the radial screw that two rows arrange vertically, and the described radial screw of two rows is symmetrically distributed in the both sides of described grip tube axis, is provided with a grip bolt in each described radial screw;
One case beam, described case beam is provided with the through hole passed for described steel strand;
One lifting equipment, described lifting equipment is used for providing lifting active force to described steel strand upper end;
One displacement measurement equipment, described displacement measurement equipment is for measuring the displacement of described steel strand upper end.
As the improvement of technique scheme, grip block comprises retaining sleeve and holding piece, described holding piece is two and is semicircular platforms shape, described retaining sleeve is provided with the through hole of taper, the lower end of described steel strand is between two described holding pieces, two described holding pieces are arranged in the conical through-hole of described retaining sleeve, and described retaining sleeve and described grip tube inside top are threaded connection.
As the improvement of technique scheme, described grip bolt comprise towards the bare terminal end of described grip tube axis and dorsad described grip tube axis screw end, described grip bolt also comprises the movable sleeve being arranged at described bare terminal end, described bare terminal end is provided with the suit post that diameter is less than described grip bolt diameter, described movable sleeve one end is provided with cylindrical radial groove, the described movable sleeve other end is provided with the blind hole for being sleeved on described suit post, and the external diameter of described movable sleeve is less than or equal to the diameter of described grip bolt.
As the improvement of technique scheme, also comprise buttress and porous anchor, described case beam is arranged at ground by described buttress, described steel strand are through the through hole of described case beam, and described steel strand lower end connects anti-float anchor rod and upper end connects described porous anchor, described lifting equipment to be arranged on described case beam and to be positioned at bottom described porous anchor for porous anchor described in lifting.
As the improvement of technique scheme, also comprise upper padding plate and be positioned at the lower bolster below described upper padding plate, described upper padding plate and described lower bolster are provided with the backing plate hole passed for described steel strand, described lifting equipment comprise centre-hole jack and described centre-hole jack between described upper padding plate and described lower bolster, described porous anchor is positioned at above described upper padding plate.
As the improvement of technique scheme, also comprise and automatically add unloading controller; Described displacement measurement equipment is displacement transducer, and described lifting equipment also comprises for the electric oil pump to described centre-hole jack conveying high-pressure fluid; The described unloading controller that automatically adds is electrically connected with institute's displacement sensors and described electric oil pump, and for controlling described electric oil pump operation.
The mounting method of above-mentioned major diameter many reinforcing bar anti-float anchor rod loading test systems, comprises the following steps:
Step one, leveling test site, and do cure process;
Step 2, set up described buttress, the spacing of described buttress is not less than 3 meters, not little relative to the height of ground line 0.5 meter;
Step 3, be enclosed within anti-float anchor rod by the described grip tube being connected to described steel strand, anchoring is respectively tightened by ten described grip bolts in both sides, and larger than anti-float anchor rod diameter 5 millimeters of the internal diameter of described grip tube;
Step 4, set up described case beam, make the center of the through-hole alignment anti-float anchor rod of described case beam, be positioned at anti-float anchor rod center place described lower bolster in described case back portion, and described lower bolster thickness is 30 millimeters, described lower bolster center drilling diameter 150 millimeters;
Step 5, place described centre-hole jack, described centre-hole jack is consistent with anti-float anchor rod center;
Step 6, by described steel strand, anti-float anchor rod is drawn length, through described centre-hole jack, and with described porous anchor anchoring;
Step 7, set up datum line beam outward in test platform influence basin, and displacement meter is installed;
Step 8, described electric oil pump is installed and describedly automatically adds unloading controller.
Compared with prior art, implementation result of the present invention is as follows in the present invention:
Major diameter of the present invention many reinforcing bar anti-float anchor rod loading test systems, first rebar clips structure is simple, easy to process, assembling is quick, is easy to operating operation test; Secondly rebar clips is reliable to the firm grip of anti-float anchor rod, is optimally provided with movable sleeve further, adds the contact area with anti-float anchor rod, further enhancing blessing effect by cylindrical radial groove; Again by arrange automatically add unloading controller make anti-float anchor rod loading test test can automatically carry out, without the need to personnel monitor and reverse cyclic loadings, unloading hydraulic coupling, for loading force load time control more accurate.
Accompanying drawing explanation
Fig. 1 is major diameter of the present invention many reinforcing bar anti-float anchor rod loading test system architecture schematic diagrames;
Fig. 2 is major diameter of the present invention many reinforcing bar anti-float anchor rod loading test system side sectional structure schematic diagrames;
Fig. 3 is the cross-sectional view of rebar clips of the present invention;
Fig. 4 is the structural representation of grip bolt of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiments content of the present invention is described.
As shown in Figures 1 to 4, be major diameter of the present invention many reinforcing bar anti-float anchor rod loading test system architecture schematic diagrames.Major diameter of the present invention many reinforcing bar anti-float anchor rod loading test systems, comprising:
One steel strand 1, described steel strand 1 are vertically arrange, and lower end is used for being fixedly connected with anti-float anchor rod 2, and upper end is used for bearing lifting active force; One rebar clips 3, described rebar clips 3 comprises the grip tube 31 of tubular and is arranged at the grip block of described grip tube 31 inside top, described grip block is for connecting the lower end of described steel strand 1, described grip tube 31 is provided with the radial screw that two rows arrange vertically, and the described radial screw of two rows is symmetrically distributed in the both sides of described grip tube 31 axis, is provided with a grip bolt 33 in each described radial screw; As shown in Figure 3, described grip block is cylindrical, described grip tube 31 inside top is the cylindrical hole matched with described grip block, and described grip block comprises retaining sleeve 321 and holding piece 322, described holding piece 322 is two and is semicircular platforms shape, described retaining sleeve 321 is provided with the through hole of taper, the lower end of described steel strand 1 is between two described holding pieces 322, two described holding pieces 322 are arranged in the conical through-hole of described retaining sleeve 321, and described retaining sleeve 321 is threaded connection with described grip tube 31 inside top.
Further preferably, as shown in Figure 4, described grip bolt 33 comprise towards the bare terminal end 332 of described grip tube 31 axis and dorsad described grip tube 31 axis screw end 331, described grip bolt 33 also comprises the movable sleeve 333 being arranged at described bare terminal end 332, described bare terminal end 332 is provided with the suit post 334 that diameter is less than described grip bolt 33 diameter, described movable sleeve 333 one end is provided with cylindrical radial groove 3331, described movable sleeve 333 other end is provided with the blind hole for being sleeved on described suit post 334, and the external diameter of described movable sleeve 333 is less than or equal to the diameter of described grip bolt 33.
One case beam 4, described case beam 4 is provided with the through hole passed for described steel strand 1; One lifting equipment 5, described lifting equipment 5 is for providing lifting active force to described steel strand 1 upper end; One displacement measurement equipment 6, described displacement measurement equipment 6 is for measuring the displacement of described steel strand 1 upper end.Described displacement measurement equipment 6 can be dial gauge, dial gage or displacement transducer particularly, the position relationship of described steel strand 1, case beam 4, lifting equipment 5 and displacement measurement equipment 6 is not limited to the mode that the utility model specific embodiment provides, also can be other structures, such as: displacement measurement equipment 6 is positioned at described steel strand 1 lower end---known described steel strand 1 should be rigid body, and namely the change in displacement therefore surveying lower end also surveys the displacement of upper end; Steel strand 1 upper end is fixed on case beam 4, and described lifting equipment 5 is for case beam 4 described in lifting.
Preferably, also comprise and automatically add unloading controller 11; Described displacement measurement equipment 6 is displacement transducer, and described lifting equipment 5 also comprises for the electric oil pump 12 to described centre-hole jack conveying high-pressure fluid; The described unloading controller 11 that automatically adds is electrically connected with institute's displacement sensors and described electric oil pump 12, and for controlling the operation of described electric oil pump 12.Usually when carrying out the test of anti-float anchor rod loading test, stairstepping is needed to load force pulling, and stopping the different time, manual operation not only needs to take staff and loads hydraulic coupling and unloading hydraulic coupling repeatedly routinely, and is difficult to accurately perform for the load time.
Particularly, also comprise buttress 7 and porous anchor 8, described case beam 4 is arranged at ground by described buttress 7, described steel strand 1 are through the through hole of described case beam 4, and described steel strand 1 lower end connects anti-float anchor rod 2 and upper end connects described porous anchor 8, described lifting equipment 5 to be arranged on described case beam 4 and to be positioned at bottom described porous anchor 8 for porous anchor described in lifting 8.The lower bolster 10 also comprising upper padding plate 9 and be positioned at below described upper padding plate 9, described upper padding plate 9 and described lower bolster 10 are provided with the backing plate hole passed for described steel strand 1, described lifting equipment 5 comprise centre-hole jack and described centre-hole jack between described upper padding plate 9 and described lower bolster 10, described porous anchor 8 is positioned at above described upper padding plate 9.
The mounting method of above-mentioned major diameter many reinforcing bar anti-float anchor rod loading test systems, comprises the following steps:
Step one, leveling test site, and do cure process;
Step 2, set up described buttress 7, the spacing of described buttress 7 is not less than 3 meters, not little relative to the height of ground line 0.5 meter;
Step 3, be enclosed within anti-float anchor rod 2 by the described grip tube 31 being connected to described steel strand 1, anchoring is respectively tightened by ten described grip bolts 33 in both sides, and larger than anti-float anchor rod 2 diameter 5 millimeters of the internal diameter of described grip tube 31; Which solving major diameter many reinforcing bar anti-float anchor rods cannot the difficult problem of anchoring, and is convenient to dismounting;
Step 4, set up described case beam 4, make the center of the through-hole alignment anti-float anchor rod 2 of described case beam 4, be positioned at anti-float anchor rod 2 center place described lower bolster 10 at described case beam 4 top, and described lower bolster 10 thickness is 30 millimeters, described lower bolster 10 center drilling diameter 150 millimeters;
Step 5, place described centre-hole jack, described centre-hole jack is consistent with anti-float anchor rod 2 center;
Step 6, by described steel strand 1, anti-float anchor rod 2 is drawn length, through described centre-hole jack, and with the anchoring of described porous anchor 8; Overcome the shortcomings such as traditional reinforcing bar weld anchor is admittedly consuming time, waste material;
Step 7, set up datum line beam 13 outward in test platform influence basin, and displacement meter is installed;
Step 8, described electric oil pump 12 is installed, and describedly automatically adds unloading controller 11; Avoid the error manually adding unloading.
Above content is detailed description made for the present invention in conjunction with specific embodiments, can not assert that the present invention specifically implements to be only limitted to these explanations.For those skilled in the art, without departing from the inventive concept of the premise, some simple deduction or replace can also be made, all should be considered as belonging to the scope of protection of the invention.

Claims (7)

1. major diameter many reinforcing bar anti-float anchor rod loading test systems, is characterized in that, comprising:
One steel strand (1), described steel strand (1) are vertically arrange, and lower end is used for being fixedly connected with anti-float anchor rod (2), and upper end is used for bearing lifting active force;
One rebar clips (3), described rebar clips (3) comprises the grip tube (31) of tubular and is arranged at the grip block of described grip tube (31) inside top, described grip block is for connecting the lower end of described steel strand (1), described grip tube (31) is provided with the radial screw that two rows arrange vertically, and the described radial screw of two rows is symmetrically distributed in the both sides of described grip tube (31) axis, is provided with a grip bolt (33) in each described radial screw;
One case beam (4), described case beam (4) is provided with the through hole passed for described steel strand (1);
One lifting equipment (5), described lifting equipment (5) is for providing lifting active force to described steel strand (1) upper end;
One displacement measurement equipment (6), described displacement measurement equipment (6) is for measuring the displacement of described steel strand (1) upper end.
2. major diameter many reinforcing bar anti-float anchor rod loading test systems as claimed in claim 1, it is characterized in that, described grip block comprises retaining sleeve (321) and holding piece (322), described holding piece (322) is two and is semicircular platforms shape, described retaining sleeve (321) is provided with the through hole of taper, the lower end of described steel strand (1) is positioned between two described holding pieces (322), two described holding pieces (322) are arranged in the conical through-hole of described retaining sleeve (321), described retaining sleeve (321) and described grip tube (31) inside top are threaded connection.
3. major diameter many reinforcing bar anti-float anchor rod loading test systems as claimed in claim 1, it is characterized in that, described grip bolt (33) comprise towards the bare terminal end (332) of described grip tube (31) axis and dorsad described grip tube (31) axis screw end (331), described grip bolt (33) also comprises the movable sleeve (333) being arranged at described bare terminal end (332), described bare terminal end (332) is provided with the suit post (334) that diameter is less than described grip bolt (33) diameter, described movable sleeve (333) one end is provided with cylindrical radial groove (3331), described movable sleeve (333) other end is provided with the blind hole for being sleeved on described suit post (334), and the external diameter of described movable sleeve (333) is less than or equal to the diameter of described grip bolt (33).
4. as the major diameter many reinforcing bar anti-float anchor rod loading test systems as described in arbitrary in claims 1 to 3, it is characterized in that, also comprise buttress (7) and porous anchor (8), described case beam (4) is arranged at ground by described buttress (7), described steel strand (1) are through the through hole of described case beam (4), and described steel strand (1) lower end connects anti-float anchor rod (2) and upper end connects described porous anchor (8), it is upper and be positioned at described porous anchor (8) bottom and be used for porous anchor (8) described in lifting that described lifting equipment (5) is arranged at described case beam (4).
5. major diameter many reinforcing bar anti-float anchor rod loading test systems as claimed in claim 4, it is characterized in that, also comprise upper padding plate (9) and be positioned at the lower bolster (10) below described upper padding plate (9), described upper padding plate (9) and described lower bolster (10) are provided with the backing plate hole passed for described steel strand (1), described lifting equipment (5) comprises centre-hole jack and described centre-hole jack is positioned between described upper padding plate (9) and described lower bolster (10), and described porous anchor (8) is positioned at described upper padding plate (9) top.
6. major diameter many reinforcing bar anti-float anchor rod loading test systems as claimed in claim 5, is characterized in that, also comprise and automatically add unloading controller (11); Described displacement measurement equipment (6) is displacement transducer, and described lifting equipment (5) also comprises for the electric oil pump (12) to described centre-hole jack conveying high-pressure fluid; The described unloading controller (11) that automatically adds is electrically connected with institute's displacement sensors and described electric oil pump (12), and for controlling described electric oil pump (12) operation.
7. the mounting method of major diameter many reinforcing bar anti-float anchor rod loading test systems as claimed in claim 6, is characterized in that, comprise the following steps:
Step one, leveling test site, and do cure process;
Step 2, set up described buttress (7), the spacing of described buttress (7) is not less than 3 meters, not little relative to the height of ground line 0.5 meter;
Step 3, the described grip tube (31) being connected to described steel strand (1) is enclosed within anti-float anchor rod (2), anchoring is respectively tightened by ten described grip bolts (33) in both sides, and larger than anti-float anchor rod (2) diameter 5 millimeters of the internal diameter of described grip tube (31);
Step 4, set up described case beam (4), make the center of the through-hole alignment anti-float anchor rod (2) of described case beam (4), be positioned at anti-float anchor rod (2) center place described lower bolster (10) at described case beam (4) top, and described lower bolster (10) thickness is 30 millimeters, described lower bolster (10) center drilling diameter 150 millimeters;
Step 5, place described centre-hole jack, described centre-hole jack is consistent with anti-float anchor rod (2) center;
Step 6, by described steel strand (1), anti-float anchor rod (2) is drawn length, through described centre-hole jack, and with described porous anchor (8) anchoring; Step 7, set up datum line beam (13) outward in test platform influence basin, and displacement meter is installed;
Step 8, described electric oil pump (12) is installed, and describedly automatically adds unloading controller (11).
CN201510405594.9A 2015-07-09 2015-07-09 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof Pending CN104963368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510405594.9A CN104963368A (en) 2015-07-09 2015-07-09 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510405594.9A CN104963368A (en) 2015-07-09 2015-07-09 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof

Publications (1)

Publication Number Publication Date
CN104963368A true CN104963368A (en) 2015-10-07

Family

ID=54217440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510405594.9A Pending CN104963368A (en) 2015-07-09 2015-07-09 Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof

Country Status (1)

Country Link
CN (1) CN104963368A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108018890A (en) * 2018-01-23 2018-05-11 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) A kind of anchor pole pullout tests system
CN108412052A (en) * 2018-03-30 2018-08-17 德清县荣昌冷轧带钢有限公司 A kind of anti-float anchor rod loading test cold rolling girder steel
CN108442422A (en) * 2018-04-28 2018-08-24 青岛理工大学 Many anchor type fibre muscle anti-floating anchor rod system is atress testing arrangement in coordination
CN108593446A (en) * 2018-04-28 2018-09-28 青岛理工大学 Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method
CN110374151A (en) * 2019-08-26 2019-10-25 关喜才 A kind of full-automatic vertical load detection method and device of anti-floating pile
CN110374150A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating pile vertical load experiment detection method and device equipped with pre-tightening apparatus
CN110374149A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating pile vertical load detection method and disk knot detection device
CN110374148A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating engineering pile vertical load experiment detection method and device
CN110424478A (en) * 2019-08-26 2019-11-08 关喜才 A kind of anti-floating pile variable diameters vertical load detection method and device
CN111945717A (en) * 2020-06-27 2020-11-17 中国铁道科学研究院集团有限公司铁道建筑研究所 Slope in-service anchor cable bearing capacity detection device and detection method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002005789A (en) * 2000-06-16 2002-01-09 Nsk Ltd Forced deterioration device and forced deterioration method for seatbelt device
CN203949781U (en) * 2014-06-20 2014-11-19 安徽省建筑工程质量监督检测站 Anti-float anchor rod loading test device
CN204151781U (en) * 2014-09-23 2015-02-11 张百全 A kind of end carrying anti-float anchor rod assembly
CN104674858A (en) * 2015-02-12 2015-06-03 广州市市政工程设计研究院 Foundation pit anti-floating anchor rod pull-out test tool
CN204875875U (en) * 2015-07-09 2015-12-16 安徽省建筑工程质量监督检测站 Anti sea anchor pole bearing capacity detecting system of many reinforcing bars of major diameter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002005789A (en) * 2000-06-16 2002-01-09 Nsk Ltd Forced deterioration device and forced deterioration method for seatbelt device
CN203949781U (en) * 2014-06-20 2014-11-19 安徽省建筑工程质量监督检测站 Anti-float anchor rod loading test device
CN204151781U (en) * 2014-09-23 2015-02-11 张百全 A kind of end carrying anti-float anchor rod assembly
CN104674858A (en) * 2015-02-12 2015-06-03 广州市市政工程设计研究院 Foundation pit anti-floating anchor rod pull-out test tool
CN204875875U (en) * 2015-07-09 2015-12-16 安徽省建筑工程质量监督检测站 Anti sea anchor pole bearing capacity detecting system of many reinforcing bars of major diameter

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108018890A (en) * 2018-01-23 2018-05-11 安徽省(水利部淮河水利委员会)水利科学研究院(安徽省水利工程质量检测中心站) A kind of anchor pole pullout tests system
CN108412052A (en) * 2018-03-30 2018-08-17 德清县荣昌冷轧带钢有限公司 A kind of anti-float anchor rod loading test cold rolling girder steel
CN108593446B (en) * 2018-04-28 2020-10-23 青岛理工大学 Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method
CN108593446A (en) * 2018-04-28 2018-09-28 青岛理工大学 Multi-anchor fiber rib anti-floating anchor rod system collaborative stress testing method
CN108442422A (en) * 2018-04-28 2018-08-24 青岛理工大学 Many anchor type fibre muscle anti-floating anchor rod system is atress testing arrangement in coordination
CN108442422B (en) * 2018-04-28 2024-07-30 青岛理工大学 Cooperative stress testing device for multi-anchor type fiber reinforcement anti-floating anchor system
CN110374151A (en) * 2019-08-26 2019-10-25 关喜才 A kind of full-automatic vertical load detection method and device of anti-floating pile
CN110374150A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating pile vertical load experiment detection method and device equipped with pre-tightening apparatus
CN110374149A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating pile vertical load detection method and disk knot detection device
CN110374148A (en) * 2019-08-26 2019-10-25 关喜才 A kind of anti-floating engineering pile vertical load experiment detection method and device
CN110424478A (en) * 2019-08-26 2019-11-08 关喜才 A kind of anti-floating pile variable diameters vertical load detection method and device
CN111945717A (en) * 2020-06-27 2020-11-17 中国铁道科学研究院集团有限公司铁道建筑研究所 Slope in-service anchor cable bearing capacity detection device and detection method
CN111945717B (en) * 2020-06-27 2022-02-15 中国铁道科学研究院集团有限公司铁道建筑研究所 Slope in-service anchor cable bearing capacity detection device and detection method

Similar Documents

Publication Publication Date Title
CN104963368A (en) Large-diameter multiple steel bar anti-floating anchor bearing capacity detecting system and installation method thereof
CN209636806U (en) A kind of steel support structure
CN204875875U (en) Anti sea anchor pole bearing capacity detecting system of many reinforcing bars of major diameter
CN206512764U (en) A kind of horizontally loading test system for applying vertical load in stake top
CN101831925B (en) Detection method for static load of pile foundation
CN204255832U (en) Crab-bolt pullout tests charger
CN101892812B (en) Reciprocating drill or electric drill support
CN104328810B (en) Prefabricated tubular pile single pile foundation bearing capacity detection improvement method
CN101260676A (en) Pipe pile and reaction frame connecting method and single tube pile pressure-resistant static load test method
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN107817162A (en) Rapid drawing test method for nonmetal anti-floating anchor rod with enlarged head
CN108487340A (en) The anchor connection method anti-pulling device of unit for single-pile vertical anti-pulling static test
CN111236327B (en) Load box for self-balancing detection, pile foundation bearing capacity detection device and method
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN208043562U (en) One kind can move freely formula beams of concrete counter-force loading frame
CN105509683B (en) Displacement measuring device for self-balancing pile testing method
CN106351246A (en) Installing method of the integral sleeve of a kind of T -bolt (diameter <= 48mm)
CN111965033A (en) Anti-floating anchor rod nondestructive testing equipment and construction method
CN108755788B (en) Drawing test loading device
CN111351725A (en) A mold box system for bridge foundation and soil interaction pseudo-static test
CN212001319U (en) Foundation anchor rod static load test device
CN206583692U (en) A kind of Portable reinforcing steel bar tensile strength detection means
CN203855991U (en) Device for conducting anti-pulling frictional resistance test on bed rock
CN103982048A (en) Overhead correction adjuster for box-shaped steel columns in ultrahigh layer steel structure
CN210775046U (en) Loading device for bonding and drawing multi-bar planting bar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151007

WD01 Invention patent application deemed withdrawn after publication