CN108442205A - A kind of prefabricated built-in water drainage curb - Google Patents
A kind of prefabricated built-in water drainage curb Download PDFInfo
- Publication number
- CN108442205A CN108442205A CN201810370263.XA CN201810370263A CN108442205A CN 108442205 A CN108442205 A CN 108442205A CN 201810370263 A CN201810370263 A CN 201810370263A CN 108442205 A CN108442205 A CN 108442205A
- Authority
- CN
- China
- Prior art keywords
- kerbstone
- osculum
- drainage
- water drainage
- diving
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 17
- 230000009189 diving Effects 0.000 claims abstract description 15
- 239000004575 stone Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 230000007547 defect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 239000011384 asphalt concrete Substances 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000002932 luster Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/221—Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
- E01C11/223—Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Abstract
The present invention provides a kind of prefabricated built-in water drainage curb, including kerbstone ontology, the kerbstone body interior is equipped with a drainage cavity, and the drainage cavity is through the left and right ends of kerbstone ontology;The top of the kerbstone ontology is equipped with a plurality of osculums and at least one diving hole, and the osculum is connected to diving Kong Junyu drainage cavities, and the least significant end of the osculum is less than road surface, and the diving hole is located at the lower section of osculum.The present invention integrates conventional kerbstone and gutter function, saves gutter operating expenses, small, light-weight, speed of application is fast, reduces project cost;Rainwater can be made quickly to infiltrate, prevent road ponding.
Description
【Technical field】
Present invention relates particularly to a kind of prefabricated built-in water drainage curbs.
【Background technology】
Kerbstone is laid on road edge to demarcate road surface boundary and guiding road surface drainage, currently, traditional kerbstone one
As be lithotome kerbstone, be to exploit mountain stones by cutting down a large amount of forests, formed by machinery, artificial, cause nature
The destruction of ecological environment is unfavorable for environmental requirement, and weight transports inconvenience again, and transportation cost is high;Outside lithotome kerbstone
Viewing is beautiful, but stone material is easy mound unfilled corner, while exploiting processing and compare feed consumption and taking a lot of work, and exhaustive exploitation is easily destroyed ecology
Environment.Another kind is precast concrete kerbstone, be using ready-mixed concrete by the prefabricated profiled kerbstone of simple mould, though
It does not so form mountain stone and largely exploits, but existing precast concrete kerbstone is unfavorable for road surface drainage, road surface when rainfall
Rainwater is will be by rainwater on road surface well central drainage, and usual catch-basin distance arrangement is larger, and drainage effect is undesirable;Although having
Gutter is directly arranged in town road both sides, and sedimentation, edge cracky, rain are had differences between gutter and road structure layer
Leaf grating for down pipe is fragile, influences whole perception.
【Invention content】
To overcome defect existing for existing equipment, the invention reside in provide a kind of prefabricated built-in water drainage curb.
The invention is realized in this way:A kind of prefabricated built-in water drainage curb, including kerbstone ontology, the kerbstone sheet
Body is internally provided with a drainage cavity, and the drainage cavity is through the left and right ends of kerbstone ontology;The top of the kerbstone ontology
Equipped with a plurality of osculums and at least one diving hole, the osculum is connected to diving Kong Junyu drainage cavities, and the osculum
Least significant end be less than road surface, the diving hole is located at the lower section of osculum.
Preferably, there is the medial surface of the kerbstone ontology slope and a straight wall, the osculum to be set to described oblique
On slope, and the lower part of the osculum extends in the straight wall, and the diving hole is set in straight wall.
Preferably, the kerbstone body width is 200mm.
The advantage of the invention is that:Integrate conventional kerbstone and gutter function, save gutter operating expenses,
Small, light-weight, speed of application is fast, saves construction time and cost, reduces project cost;Efficiently solve road surface drainage
Problem can be such that rainwater quickly infiltrates, and prevent road ponding from improving safety and comfort to the influence of pedestrian, vehicle.
【Description of the drawings】
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
A kind of structural schematic diagram of prefabricated built-in water drainage curb of Fig. 1 present invention.
A kind of usage state diagram of prefabricated built-in water drainage curb of Fig. 2 present invention.
【Specific implementation mode】
Referring to Fig. 1, a kind of prefabricated built-in water drainage curb 100, including kerbstone ontology 1, in the kerbstone ontology 1
Portion is equipped with a drainage cavity 11, and the drainage cavity 11 is through the left and right ends of kerbstone ontology 1;The kerbstone ontology 1 it is upper
Portion is equipped with a plurality of osculums 12 and at least one diving hole 13, and the osculum 12 and diving hole 13 are connected to drainage cavity 11,
And the least significant end a of the osculum 12 is less than road surface, the diving hole 13 is located at the lower section of osculum 12.The kerbstone ontology
There is 1 medial surface a slope 14 and a straight wall 15, the osculum 12 to be set on the slope 14, and under the osculum 12
Portion extends in the straight wall 15, and the diving hole 13 is set in straight wall 15.1 width of kerbstone ontology is 200mm, height
By design height.
Referring again to Fig. 2, when application present invention work, smooth location removes fertile soil, the building waste on original place surface
Deng after roadbed filling uses the press mechanical pressing grinding compacting that shakes after filling, to kerbstone position progress construction layout, repetition measurement plan-position
And elevation;By the absolute altitude and cross fall of design requirement, the coefficient that is determined according to the pretest section cement stabilizing that pave is broken
Stone, and rolled using regulation road roller;Pressure is rolled by vibration, the sequence from lower to eminence, fast after elder generation is slow after first static pressure
It is real;Prefabricated built-in water drainage curb 100 is checked again, intensity is unqualified, color and luster is inconsistent, apparent size error 5mm
Above, the prefabricated built-in water drainage curb 100 the problems such as visual defects (falling side, unfilled corner, honeycomb, pitted skin) must not use;Cement
One layer of mortar bed is set on stabilization gravel layer, it is then that prefabricated built-in water drainage curb 100 is placed on it, first controlled with cotton rope
The straight cis degree and absolute altitude of prefabricated built-in water drainage curb 100, then checked with horizon rule, it is hooked using mortar after qualified
Seam.Mark 2,3,4 and 5 is respectively asphalt concrete layer, cement stabilized macadam layer, roadbed, mortar bed in Fig. 2.
Water drainage curb 100 integrates conventional kerbstone and gutter function built in the present invention is prefabricated, saves draining
Ditch operating expenses, small, light-weight, prefabricated assembled to construct, speed of application is fast, saves construction time and cost, drop
Low the 3~5% of project cost have significant economic benefit;It efficiently solves the problems, such as road surface drainage simultaneously, rainwater can be made fast
Speed is infiltrated, and prevents road ponding from improving safety and comfort to the influence of pedestrian, vehicle, has significant social benefit.
Although specific embodiments of the present invention have been described above, those familiar with the art should manage
Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this
The technical staff in field modification and variation equivalent made by the spirit according to the present invention, should all cover the present invention's
In scope of the claimed protection.
Claims (3)
1. a kind of prefabricated built-in water drainage curb, it is characterised in that:Including kerbstone ontology, the kerbstone body interior is equipped with
One drainage cavity, the drainage cavity is through the left and right ends of kerbstone ontology;The top of the kerbstone ontology is equipped with a plurality of
Osculum and at least one diving hole, the osculum is connected to diving Kong Junyu drainage cavities, and the least significant end of the osculum is low
In road surface, the diving hole is located at the lower section of osculum.
2. a kind of prefabricated built-in water drainage curb as described in claim 1, it is characterised in that:The inside of the kerbstone ontology
Face has a slope and a straight wall, and the osculum is set on the slope, and the lower part of the osculum extends to the straight wall
On, the diving hole is set in straight wall.
3. a kind of prefabricated built-in water drainage curb as described in claim 1, it is characterised in that:The kerbstone body width is
200mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810370263.XA CN108442205A (en) | 2018-04-24 | 2018-04-24 | A kind of prefabricated built-in water drainage curb |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810370263.XA CN108442205A (en) | 2018-04-24 | 2018-04-24 | A kind of prefabricated built-in water drainage curb |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108442205A true CN108442205A (en) | 2018-08-24 |
Family
ID=63200863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810370263.XA Pending CN108442205A (en) | 2018-04-24 | 2018-04-24 | A kind of prefabricated built-in water drainage curb |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108442205A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797626A (en) * | 2019-01-14 | 2019-05-24 | 广东省怡合高速公路工程有限公司 | Quick drainage town road |
CN110130179A (en) * | 2019-05-24 | 2019-08-16 | 杭州悦为科技有限公司 | Porous pavement greenbelt drainage kerbstone rain dirt separates system construction method of regulating and storing |
CN110640873A (en) * | 2019-09-27 | 2020-01-03 | 西安建筑科技大学 | But reverse mould of pouring of drainage concrete curb |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10183729A (en) * | 1996-12-26 | 1998-07-14 | Daikure:Kk | Drainage channel for draining pavement |
KR19990011951U (en) * | 1998-12-24 | 1999-03-25 | 박용운 | Road boundary stone forming a drainage hole |
CN205741822U (en) * | 2016-05-24 | 2016-11-30 | 沈阳建筑大学 | A kind of monoblock type water drainage curb |
CN205934646U (en) * | 2016-08-04 | 2017-02-08 | 贵州三阁园林生态股份有限公司 | Water conservancy system |
CN206800111U (en) * | 2017-05-22 | 2017-12-26 | 江苏普利匡聚合物材料有限公司 | Collect water route dental calculus |
CN208440938U (en) * | 2018-04-24 | 2019-01-29 | 福建建工集团有限责任公司 | A kind of prefabricated built-in water drainage curb |
-
2018
- 2018-04-24 CN CN201810370263.XA patent/CN108442205A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10183729A (en) * | 1996-12-26 | 1998-07-14 | Daikure:Kk | Drainage channel for draining pavement |
KR19990011951U (en) * | 1998-12-24 | 1999-03-25 | 박용운 | Road boundary stone forming a drainage hole |
CN205741822U (en) * | 2016-05-24 | 2016-11-30 | 沈阳建筑大学 | A kind of monoblock type water drainage curb |
CN205934646U (en) * | 2016-08-04 | 2017-02-08 | 贵州三阁园林生态股份有限公司 | Water conservancy system |
CN206800111U (en) * | 2017-05-22 | 2017-12-26 | 江苏普利匡聚合物材料有限公司 | Collect water route dental calculus |
CN208440938U (en) * | 2018-04-24 | 2019-01-29 | 福建建工集团有限责任公司 | A kind of prefabricated built-in water drainage curb |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797626A (en) * | 2019-01-14 | 2019-05-24 | 广东省怡合高速公路工程有限公司 | Quick drainage town road |
CN110130179A (en) * | 2019-05-24 | 2019-08-16 | 杭州悦为科技有限公司 | Porous pavement greenbelt drainage kerbstone rain dirt separates system construction method of regulating and storing |
CN110640873A (en) * | 2019-09-27 | 2020-01-03 | 西安建筑科技大学 | But reverse mould of pouring of drainage concrete curb |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203295913U (en) | Novel ecological permeable road structure | |
CN108442205A (en) | A kind of prefabricated built-in water drainage curb | |
CN104060631A (en) | Road well lid opening elevation dynamic control structure and construction method thereof | |
CN110629629A (en) | Recycled aggregate permeable pavement structure and method | |
CN207362616U (en) | A kind of paving structure of water-permeable brick | |
CN104846712A (en) | Hard road construction method by naturally recharging underground water | |
CN104404857B (en) | A kind of permeable tile work ground and construction method | |
CN105484132B (en) | A kind of construction method that novel water permeable pavement is mated formation | |
CN202220319U (en) | Unidirectional water permeable sidewalk base course | |
CN208440938U (en) | A kind of prefabricated built-in water drainage curb | |
CN105507104A (en) | Novel water-permeable sidewalk pavement | |
CN207376761U (en) | concrete prefabricated rainwater seepage well | |
CN2893020Y (en) | Road sewage apparatus | |
CN209338948U (en) | A kind of water-permeable pavement structure | |
CN202500072U (en) | Permeable pavement structure | |
CN111648383A (en) | Internal drainage method for loess high-fill side slope | |
CN204780521U (en) | Compound row water environmental protection ground of holding | |
CN207793792U (en) | A kind of road surface permeable pavement structure | |
CN105019329A (en) | Water storage type road structure | |
CN105332328A (en) | Collapsible loess road structure capable of preventing water seepage and construction method of road with structure | |
CN211547155U (en) | Water permeable flat curb for road | |
CN208136656U (en) | A kind of whole-permeable asphalt pavement structure | |
CN212199899U (en) | Combined type roadbed structure | |
CN208136657U (en) | A kind of pavement structure for sponge urban construction | |
KR20140114711A (en) | Improvement Method for Base Ground of Pavement Block using Light-Weighted Foam Soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |