CN202220319U - Unidirectional water permeable sidewalk base course - Google Patents
Unidirectional water permeable sidewalk base course Download PDFInfo
- Publication number
- CN202220319U CN202220319U CN2011202125840U CN201120212584U CN202220319U CN 202220319 U CN202220319 U CN 202220319U CN 2011202125840 U CN2011202125840 U CN 2011202125840U CN 201120212584 U CN201120212584 U CN 201120212584U CN 202220319 U CN202220319 U CN 202220319U
- Authority
- CN
- China
- Prior art keywords
- sidewalk
- basic unit
- unidirectional
- base course
- water permeable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a unidirectional water permeable sidewalk base course which comprises a unidirectional water permeable sidewalk base course board. Unidirectional water permeable holes (7) running through the unidirectional water permeable sidewalk base course are uniformly distributed on the unidirectional water permeable sidewalk base course board. In the utility model, the capillary ascent phenomenon of water is eliminated by utilizing the water permeability of the unidirectional water permeable holes of the base course to the underground and the compactness of a base course material (such as a cement stabilizing material, an industrial solid waste stabilizing material and a lime stabilizing material), so that water can only enter without going out. As time passes, the underground water level of a corresponding area in which a sidewalk is constructed rises year by year, so that the unidirectional water permeable sidewalk base course is beneficial for locally regulating microclimate and greening cities and towns, improving the human settlement environment and bringing benefits to descendants. The base course does not have water storage effect, so that the integral anti-freeze capacity of the sidewalk is improved. Under the condition of the same bearing capacity with that of the existing water permeable sidewalk, the thickness and the base course and other layers are reduced. Moreover, the base courses are arranged in blocks, so that the unidirectional water permeable sidewalk base course is convenient for maintenance and modification of the town construction, and the maintenance engineering quantity and the engineering cost of the sidewalk can be reduced.
Description
Technical field
The utility model belongs to urban road People's Bank of China, pavement base layer structure technical field, and what relate generally to is a kind of unidirectional permeable sidewalk basic unit.Adaptable across the sidewalk, cities and towns, the construction of road such as pedestrian street, modern country road, factory road, square, open car park, residential community road, park, nonmotorized vehicle lane.
Background technology
At present; In the town road construction; The basic structure of permeable sidewalk, pavement is surface layer, leveling layer, basic unit, bed course, soil matrix from top to bottom, or surface layer, leveling layer, basic unit, soil matrix, or surface layer, leveling layer, basic unit, subbase, bed course, soil matrix.Surface material is permeable brick or permeable cement concrete; The leveling layer material is medium sand or dry cement mortar; Base material is permeable cement concrete or permeable cement stabilization gravel or permeable graded broken stone, and major function is bearing load, permeable, water storage; Subbase course material is permeable graded broken stone; Course is natural gravel; Soil matrix is the suitable various soil of building permeable sidewalk.Existing full impregnated water structure of sidewalk all is to design with the requirement of satisfying permeable and water storage; Its water storage function can cause the general frost resistance in sidewalk poor; Compressive strength, non-deformability are poor, and coming into operation promptly occurs surface layer brick gross distortion, sinking, cracked soon, influences the city appearance of the city; Increase maintenance cost, influence people's go off daily; Pervious function be through the effective drainage porosity that increases structure and select for use as far as possible water permeability preferably road materials realize increasing coefficient of permeability, underground water constantly evaporates in atmosphere because of capillarity rises, and makes loss of underground water serious.What basic unit adopted is materials such as permeable cement concrete or permeable cement stabilization gravel, and thickness is corresponding bigger, and As time goes on, its active porosity can reduce very soon, reduces basic unit's permeability rate greatly, and the capillary climbing of its moisture content does not reduce.
Because the particularity of existing full impregnated water structure of sidewalk effective drainage porosity, during practice of construction, unit in charge of construction is difficult for accurately getting hold of the construction quality that permeable sidewalk reaches effective drainage porosity, and whether difficult check reaches desired effective drainage porosity.
The utility model content
The purpose of the utility model produces thus, proposes a kind of unidirectional permeable sidewalk basic unit, when strengthening the sidewalk working strength; Can effectively strengthen the sidewalk water permeable ability; Avoid underground water to evaporate in a large number, reduce difficulty of construction and construction cost, practice thrift sidewalk, cities and towns maintenance cost in a large number.
For reaching the foregoing invention purpose; The utility model adopts following technical scheme: a kind of unidirectional permeable sidewalk basic unit; Comprise unidirectional permeable sidewalk basal plate, on the basal plate of unidirectional permeable sidewalk, be uniformly distributed with and be provided with the unidirectional permeable hole that runs through unidirectional permeable sidewalk basic unit.
Above-mentioned basic unit is combined by the polylith basal plate, stays 2~10 millimeters shrinkage joint between every.
The reinforcing bar stratum reticulare is set in above-mentioned basic unit, or in base material, mixes steel fibre or synthetic fibers.
Above-mentioned base material is stable type of cement stabilized type, industrial residue, lime stabilization class material.
Steel mesh reinforcement employing bar diameter is 4~12 millimeters in the above-mentioned basic unit, 100~400 millimeters of size of mesh opening.
The above-mentioned content that in base material, mixes steel fibre or synthetic fibers is 1~5% of mixture quality.
The unidirectional permeable hole that is provided with in the above-mentioned basic unit is rectangular opening or circular port; The circular port diameter is 3~12 centimetres; The aperture, top of permeable hole equates with the aperture, bottom or the aperture, top is slightly larger than the aperture, bottom; Pitch of holes is 15~40 centimetres, and the horizontal gross area of permeable hole is 2~10% of the horizontal gross area of basic unit.
Above-mentioned basic unit is rectangle, triangle, arc, polygon, 60~300 millimeters of thickness.
The utility model utilizes the unidirectional permeable hole of basic unit to eliminate the capillary rising phenomenon of water to underground water-permeable, base material (cement stabilized type, stable type of industrial residue, lime stabilization class material) tight ness rating; Thereby moisture content can only be advanced can not be gone out; If things go on like this, the groundwater table of building the corresponding area on sidewalk rises year by year, is beneficial to local microclimate and regulates and urban greening; Improve the human settlement, the offspring benefits future generations.Because basic unit is as the water storage effect, thereby improved the integral anti-freezing ability on sidewalk.With reduced basic unit and other layer thickness under the condition of the equal supporting capacity in existing permeable sidewalk, basic unit's piecemeal is arranged in addition, has made things convenient for the maintenance of city-building from now on, transformation, can reduce sidewalk maintenance works amount and engineering cost.Standardized designs and standardized construction be can realize, design efficiency and efficiency of construction improved.
Description of drawings
Fig. 1 is the utility model embodiment 1 structural representation;
Fig. 2 is the utility model embodiment 2, embodiment 3 structural representations;
Fig. 3 is the utility model embodiment 4 structural representations;
Fig. 4 overlooks basic unit's horizontal plane sketch map for Fig. 1 or Fig. 3 A-A;
Fig. 5 makes up a structural representation for Fig. 4 basic unit horizontal plane;
Fig. 6 makes up two structural representations for Fig. 4 basic unit horizontal plane;
Fig. 7 overlooks basic unit's horizontal plane sketch map for Fig. 2 A-A
Among the figure: 1, surface layer, 2, leveling layer, 3, basic unit, 4, bed course, 5, soil matrix, 6, steel mesh reinforcement, 7, unidirectional permeable hole.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is done further detailed description through the mode of embodiment.
Like Fig. 1, Fig. 4, shown in Figure 5: the described unidirectional permeable sidewalk of present embodiment basic unit 3 horizontal planes are combined as the ordinary reinforced concrete of rectangle.Unidirectional permeable sidewalk basal plate is combined by the polylith basal plate, 3 * 4 meters of monolithic horizontal plane sizes.On the basal plate of unidirectional permeable sidewalk, be uniformly distributed with and be provided with the unidirectional permeable hole 7 that runs through unidirectional permeable sidewalk basic unit.Unidirectional permeable hole 7 is a circular port, and average diameter is 6 centimetres, and 6.2 centimetres of its back cut diameters, lower port diameter are 5.8 centimetres, and pitch of holes is 20 centimetres, fills out medium sand in the hole.Because unidirectional permeable hole can not be empty, material general and its upper layer is same seepy material, and the material of the upper strata leveling layer in the present embodiment is a medium sand, so fill out medium sand.In basic unit 3, be provided with size of mesh opening and be 200 millimeters steel mesh reinforcement 6, bar diameter is 6 millimeters.Being the medium sand leveling layer 2 of 2.5 cm thicks on it, is that the joint gap between concrete road pavement brick surface layer 1, the two adjacent concrete pavior brick of 6 cm thicks is 3 millimeters on again, fills out medium sand in the seam.Basic unit is for 3 times a soil matrix 5.
Like Fig. 2, shown in Figure 7: the described unidirectional permeable sidewalk of present embodiment basic unit 3 horizontal planes are rectangle and arc
The lime stabilized soil of shape is once tamped moulding.On the basal plate of unidirectional permeable sidewalk, be uniformly distributed with and be provided with the unidirectional permeable hole 7 that runs through unidirectional permeable sidewalk basic unit (bore pass through basal plate with rig).Unidirectional permeable hole 7 circular ports, diameter is 6 centimetres, pitch of holes is 25 centimetres, fills out medium sand in the hole.Being the medium sand leveling layer 2 of three cm thicks on it, is that the joint gap between concrete road pavement brick surface layer 1, the two adjacent concrete pavior brick of eight cm thicks is two millimeters on again, fills out medium sand in the seam.Basic unit is for 3 times 15 cm thick hardcore beds 4, is soil matrix 5 down.
Like Fig. 2, shown in Figure 7: the described unidirectional permeable sidewalk of present embodiment basic unit 3 horizontal planes are eight cm thick steel fibrous concretes of rectangle and arc, and content of steel fiber is 2% of a mixture quality, and the moulding of template one-time-concreting is set all around.On the basal plate of unidirectional permeable sidewalk, be uniformly distributed with and be provided with the unidirectional permeable hole 7 that runs through unidirectional permeable sidewalk basic unit, unidirectional permeable hole 7 is a circular port, and average diameter is 8 centimetres; 8.2 centimetres of its back cut diameters; Lower port diameter is 7.8 centimetres, and pitch of holes is 30 centimetres, fills out medium sand in the hole.Being the dry cement mortar screeding layer 2 of three cm thicks in the basic unit 3, is that the joint gap between granite tile surface layer 1, the two adjacent granite tile of eight cm thicks is 1 millimeter on again.Under be the natural gravel bed courses 4 of eight cm thicks, be down soil matrix 5 again.
Like Fig. 3, Fig. 4, shown in Figure 6: the described unidirectional permeable sidewalk of present embodiment basic unit 3 horizontal planes are combined as the steel concrete of rectangle and arc, and unidirectional permeable sidewalk basal plate is combined by the polylith basal plate, 4 * 5.5 meters of monolithic horizontal plane sizes; Template is set all around; Spray is built at twice, and it is 4 centimetres that thickness is built in spray for the first time, arranges in the above that then size of mesh opening is 400 millimeters a steel mesh reinforcement 6; Bar diameter is 8 millimeters, and then carries out the spray second time and build to design elevation.On the basal plate of unidirectional permeable sidewalk, be uniformly distributed with and be provided with the unidirectional permeable hole 7 that runs through unidirectional permeable sidewalk basic unit, unidirectional permeable hole 7 is a circular port, and average diameter is 10 centimetres; 10.2 centimetres of its back cut diameters; Lower port diameter is 9.8 centimetres, and pitch of holes is 35 centimetres, fills out medium sand in the hole.Being the medium sand leveling layer 2 of 2.5 cm thicks in the basic unit 3, is that the joint gap between concrete road pavement brick surface layer 1, the two adjacent concrete pavior brick of 6 cm thicks is 3 millimeters on again, fills out medium sand in the seam.Basic unit is for 3 times 15 cm thick graded broken stone bed courses 4, is soil matrix 5 down.
The above; It only is preferred embodiment of the present invention; Be not that the present invention is done any restriction, every technical spirit changes any simple modification, change and the equivalent structure that above embodiment did according to the present invention, all still belongs in the protection domain of technical scheme of the present invention.
Claims (6)
1. unidirectional permeable sidewalk basic unit, it is characterized in that: said unidirectional permeable sidewalk basic unit (3) comprises unidirectional permeable sidewalk basal plate, on the basal plate of unidirectional permeable sidewalk, is uniformly distributed with to be provided with the unidirectional permeable hole (7) that runs through unidirectional permeable sidewalk basic unit.
2. unidirectional permeable sidewalk according to claim 1 basic unit, it is characterized in that: said basic unit (3) is combined by the polylith basal plate.
3. unidirectional permeable sidewalk according to claim 1 basic unit is characterized in that: reinforcing bar stratum reticulare (6) is set in the said basic unit (3).
4. unidirectional permeable sidewalk according to claim 1 basic unit; It is characterized in that: the unidirectional permeable hole that (3) are provided with in the said basic unit is a circular port; The circular port diameter is 3~12 centimetres; The aperture, top is greater than the aperture, bottom, and pitch of holes is 15~40 centimetres, and the horizontal gross area of permeable hole is 2~10% of the horizontal gross area of basic unit.
5. unidirectional permeable sidewalk according to claim 1 basic unit, it is characterized in that: said basic unit (3) is rectangle, triangle, arc, polygon, 60~300 millimeters of thickness.
6. unidirectional permeable sidewalk according to claim 1 basic unit, it is characterized in that: said basic unit (3) material is stable type of cement stabilized type, industrial residue, lime stabilization class material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202125840U CN202220319U (en) | 2011-06-22 | 2011-06-22 | Unidirectional water permeable sidewalk base course |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202125840U CN202220319U (en) | 2011-06-22 | 2011-06-22 | Unidirectional water permeable sidewalk base course |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202220319U true CN202220319U (en) | 2012-05-16 |
Family
ID=46042347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202125840U Expired - Lifetime CN202220319U (en) | 2011-06-22 | 2011-06-22 | Unidirectional water permeable sidewalk base course |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202220319U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103444293A (en) * | 2013-09-09 | 2013-12-18 | 天津泰达园林建设有限公司 | Improvement method for underground soil of urban street trees on coastal saline and alkaline land region |
CN105484132A (en) * | 2016-01-04 | 2016-04-13 | 上海市政工程设计研究总院(集团)有限公司 | Novel construction method of permeable pavement paving |
CN109183547A (en) * | 2018-09-29 | 2019-01-11 | 苏州同尚工程设计咨询有限公司 | A kind of pavement structure and its implementation method of suitable water country and town style and features |
CN109400090A (en) * | 2018-11-19 | 2019-03-01 | 深圳市绿建环保工程有限公司 | Environment friendly road paves block, preparation method and building waste processing method |
CN109554973A (en) * | 2018-11-19 | 2019-04-02 | 深圳市绿建环保工程有限公司 | Environment friendly road and environment friendly road pave the preparation method of block |
-
2011
- 2011-06-22 CN CN2011202125840U patent/CN202220319U/en not_active Expired - Lifetime
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103444293A (en) * | 2013-09-09 | 2013-12-18 | 天津泰达园林建设有限公司 | Improvement method for underground soil of urban street trees on coastal saline and alkaline land region |
CN103444293B (en) * | 2013-09-09 | 2016-02-24 | 天津泰达绿化集团有限公司 | The improvement method of beach saline land Regional City street tree underground |
CN105484132A (en) * | 2016-01-04 | 2016-04-13 | 上海市政工程设计研究总院(集团)有限公司 | Novel construction method of permeable pavement paving |
CN105484132B (en) * | 2016-01-04 | 2019-01-15 | 上海市政工程设计研究总院(集团)有限公司 | A kind of construction method that novel water permeable pavement is mated formation |
CN109183547A (en) * | 2018-09-29 | 2019-01-11 | 苏州同尚工程设计咨询有限公司 | A kind of pavement structure and its implementation method of suitable water country and town style and features |
CN109400090A (en) * | 2018-11-19 | 2019-03-01 | 深圳市绿建环保工程有限公司 | Environment friendly road paves block, preparation method and building waste processing method |
CN109554973A (en) * | 2018-11-19 | 2019-04-02 | 深圳市绿建环保工程有限公司 | Environment friendly road and environment friendly road pave the preparation method of block |
CN109554973B (en) * | 2018-11-19 | 2021-08-06 | 深圳市图益环保科技有限公司 | Environment-friendly road and preparation method of environment-friendly road paving block |
CN109400090B (en) * | 2018-11-19 | 2021-08-10 | 深圳市图益环保科技有限公司 | Environment-friendly road paving block, preparation method thereof and construction waste treatment method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587243B (en) | Urban road water permeability cement concrete pavement structure and construction process thereof | |
CN203295913U (en) | Novel ecological permeable road structure | |
CN108301280B (en) | Permeable pavement structure | |
CN202220319U (en) | Unidirectional water permeable sidewalk base course | |
CN105735082A (en) | Water-permeable planting formwork frame and multifunctional water-permeable pavement structure system and pavement method thereof | |
CN206256334U (en) | A kind of novel environment friendly paving structure | |
CN104313967A (en) | Drainage and seepage type felting composite structure | |
CN205711609U (en) | Framed and the multi-functional porous pavement structural system of permeable plantation | |
CN204039856U (en) | Row's water-seepage type is mated formation combining structure | |
CN107761504A (en) | Porous pavement with pervious concrete post | |
CN206189231U (en) | Gardens permeable pavement structure | |
CN107794822B (en) | Permeable pavement based on sponge city idea | |
CN1644799B (en) | Porous brickwalk laying method | |
CN211596259U (en) | Sponge city structure of mating formation of permeating water | |
CN202519561U (en) | Urban road permeable cement concrete pavement structure | |
CN104594155A (en) | Permeable pavement laying method | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN204608556U (en) | A kind of water permeable pavement | |
CN208748462U (en) | Can rapid construction high-bearing capacity pervious surface | |
CN207862717U (en) | Porous pavement with pervious concrete column | |
CN105421189A (en) | Road structure provided with water permeable retaining walls | |
CN105332328A (en) | Collapsible loess road structure capable of preventing water seepage and construction method of road with structure | |
CN211848696U (en) | Type bituminous paving structure permeates water | |
CN212052147U (en) | Novel gap permeable pavement structure | |
CN106996063A (en) | A kind of pavement structure of permeable road |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20120516 |