CN202500072U - Permeable pavement structure - Google Patents

Permeable pavement structure Download PDF

Info

Publication number
CN202500072U
CN202500072U CN2012200699262U CN201220069926U CN202500072U CN 202500072 U CN202500072 U CN 202500072U CN 2012200699262 U CN2012200699262 U CN 2012200699262U CN 201220069926 U CN201220069926 U CN 201220069926U CN 202500072 U CN202500072 U CN 202500072U
Authority
CN
China
Prior art keywords
layer
pervious concrete
pavement structure
permeable pavement
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200699262U
Other languages
Chinese (zh)
Inventor
黄伟娟
姜龙
鲍仁富
张政
王少东
马昌军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING BIAOMEI COLOR STONE BUILDING MATERIAL CO Ltd
Original Assignee
NANJING BIAOMEI COLOR STONE BUILDING MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BIAOMEI COLOR STONE BUILDING MATERIAL CO Ltd filed Critical NANJING BIAOMEI COLOR STONE BUILDING MATERIAL CO Ltd
Priority to CN2012200699262U priority Critical patent/CN202500072U/en
Application granted granted Critical
Publication of CN202500072U publication Critical patent/CN202500072U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a permeable pavement structure which comprises an undisturbed soil layer. A graded crushed rock layer is laid on the undisturbed soil layer, a cement concrete layer is laid on the graded crushed rock layer, a drainage ditch leading to the edge of a footpath is reserved on at least one side of the cement concrete layer, a permeable concrete layer is laid on the drainage ditch, permeable concrete surface layers are laid on the cement concrete layer and the permeable concrete layer, road-edge flat stones are laid on two sides of the permeable pavement structure, a cement mortar layer is smeared on the road-edge flat stones, and the road-edge flat stones are adhered on the permeable concrete layer. By the aid of the permeable pavement structure, rainwater can flow into the ditch through permeable concrete in the ditch and accordingly flow into a roadside green belt, and environments are beautified.

Description

Permeable pavement structure
Technical field:
The utility model relates to the road structure field, especially a kind of permeable pavement structure.
Background technology:
In the road design of in the past afforesting scenic belt, exist the situation that narrow path does not have drainage system.Little supercrust is a pervious concrete; The path bottom is fluid-tight cement concrete constructions; The both sides is designed to the closed construction that brick is laid; Thereby make permeable surface layer become a wetland, water just accumulates in the pervious concrete surface layer when rainy, makes damage phenomenons such as fading appears in pervious concrete very soon, threshing, cracking.This is that the impermeable reason of rainwater causes, and this is a project organization of being inconvenient to use pervious concrete.
The utility model content:
The technical problem that the utility model will solve provides a kind of permeable pavement structure that can the water on the road surface be passed through the discharge of path both sides.
For solving the problems of the technologies described above; The technical scheme of the utility model is following: permeable pavement structure, comprise the original state soil layer, and said original state soil layer upper berth is provided with the graded broken stone layer; Be equipped with cement concrete layer on the wherein said graded broken stone layer; At least one side of cement concrete layer leaves the gutter of leading to the path edge, is covered with the pervious concrete layer on the gutter, is equipped with the pervious concrete surface layer on said cement concrete layer and the pervious concrete layer; The both sides of this permeable pavement structure are covered with the flat stone of curb, are wiped with cement sand bed on the flat stone of said curb and are bonded on the pervious concrete layer.
Preferably, said gutter width is 100mm-300mm, and the degree of depth is 100mm-150mm.
Preferably, said pervious concrete surface layer is ecological pervious concrete surface layer, is equipped with surface layer pervious concrete topping on this ecology pervious concrete surface layer.
Preferably, the porosity of said pervious concrete layer is 20%-35%.
Preferably, the compacting coefficient of said original state soil layer is greater than 93%.
Preferably, the compacting coefficient of said graded broken stone layer is greater than 94%.
Preferably, said pervious concrete layer is a primary colors pervious concrete layer.
Adopt this technical scheme; Through the gutter being set and on the gutter, laying the pervious concrete layer, make rainwater to communicate with the gutter in little roadside, form a water-permeable passage like this; Make rainwater enter the greenbelt of path side, soil that can moistening greenbelt through this passage.And when the path broad, can carry out the design of two-sided gutter, make rainwater to road greenery patches draining on both sides of the road.When reclaiming the moistening greenbelt of rainwater, changed the wetland performance of porous pavement, it is underground that rainwater can in time be entered, thereby protected the pervious concrete surface layer not receive the damage of water logging.Simultaneously, the permeable pavement structure of this structure, intensity is greater than the gutter or the french drain of general design.General gutter or french drain are designed to empty or do to filter the time spent and insert the rubble packing course, and this practical new technology is inserted the pervious concrete of macroporosity on the gutter, improved the intensity of bottom, and do not have apparent problem.Because of general gutter is located at the outer often and adds the lid of combing, on attractive in appearance not as being located at the pervious concrete gutter of bottom.
Description of drawings:
Further specify the utility model below in conjunction with the accompanying drawing and the specific embodiment.
Fig. 1 is first kind of embodiment of the utility model.
Fig. 2 is second kind of embodiment of the utility model.
The specific embodiment:
For technological means, creation characteristic that the utility model is realized, reach purpose and be easy to understand understanding with effect, below in conjunction with concrete diagram, further set forth the utility model.
As can be seen from Figure 1, the permeable pavement structure of this utility model comprises that original state soil layer 9, graded broken stone layer 8, cement concrete layer 7, pervious concrete surface layer 6, surface layer pervious concrete topping 5, cement sand bed 2 and curb put down stone 1.Original state soil layer 9 compacting coefficients were laid graded broken stone layer 8 in the above greater than 93% o'clock, and with 8 compacting of graded broken stone layer.When graded broken stone layer 8 compacting coefficients greater than 94% the time, lay cement concrete layer 7 above it, can select the C20 cement concrete for use.Side at cement concrete layer 7 leaves the gutter 4 of leading to the path edge, and through sum up finding, the width in this gutter 4 all can obtain drainage effect preferably in 100mm-300mm, the degree of depth during at 100mm-150mm; Before cement concrete layer 7 final set; On gutter 4, insert the pervious concrete layer 3 that porosity is 20%-35% immediately; This pervious concrete layer 3 can be primary colors pervious concrete layer; Carry out surface construction then simultaneously, on cement concrete layer 7 and pervious concrete layer 3, lay pervious concrete surface layer 6, and spread the flat stone 1 of curb on the both sides of path.Be wiped with cement sand bed 2 on the flat stone 1 of this curb, be bonded on the pervious concrete layer 3 through this cement sand bed 2.This pervious concrete surface layer 6 can be ecological pervious concrete surface layer (so-called ecological pervious concrete; Exactly through material screening, add functional additive, adopt that special process is produced to have special construction and a function; Can reduce carrying capacity of environment; Improve the harmony mutually with ecological environment, and the concrete that can contribute for environmental protection), laying surface layer pervious concrete topping 5 on pervious concrete surface layer 6.
As can be seen from Figure 2, when the broad of road surface, adopt bilateral gutter structure.The both sides of this porous pavement cement concrete layer 7 are equipped with the gutter 4 of leading to the path edge; All be equipped with permeable pervious concrete layer 3 in the gutter 4; Lay pervious concrete surface layer 6 on cement concrete layer 7 and the pervious concrete layer 3; And spread curb on the both sides of path and put down stone 1, draining is faster like this.
When causing on the road ponding when raining or snowing, rainwater flows in surface layer pervious concrete topping 5 and the pervious concrete surface layer 6 according to the direction of arrow among the figure, flows through the pervious concrete layer 3 on the gutter, porous pavement one or both sides 4 afterwards, flows in the greenery patches.In moistening greenbelt, changed the wetland performance of porous pavement, it is underground that rainwater can in time be entered, thereby protected the pervious concrete surface layer not receive the damage of water logging.
More than show and described basic principle of the utility model and the advantage of principal character and the utility model.The technician of the industry should understand; The utility model is not restricted to the described embodiments; The principle of describing in the foregoing description and the manual that the utility model just is described; Under the prerequisite that does not break away from the utility model spirit and scope, the utility model also has various changes and modifications, and these variations and improvement all fall in the utility model scope that requires protection.The utility model requires protection domain to be defined by appending claims and equivalent thereof.

Claims (7)

1. permeable pavement structure; Comprise the original state soil layer; Said original state soil layer upper berth is provided with the graded broken stone layer, it is characterized in that: be equipped with cement concrete layer on the said graded broken stone layer, at least one side of cement concrete layer leaves the gutter of leading to the path edge; Be covered with the pervious concrete layer on the gutter; Be equipped with the pervious concrete surface layer on said cement concrete layer and the pervious concrete layer, the both sides of this permeable pavement structure are covered with the flat stone of curb, are wiped with cement sand bed on the flat stone of said curb and are bonded on the pervious concrete layer.
2. according to the said permeable pavement structure of claim 1, it is characterized in that: said gutter width is 100mm-300mm, and the degree of depth is 100mm-150mm.
3. according to the said permeable pavement structure of claim 2, it is characterized in that: said pervious concrete surface layer is ecological pervious concrete surface layer, is equipped with surface layer pervious concrete topping on this ecology pervious concrete surface layer.
4. according to each said permeable pavement structure in the claim 1 to 3, it is characterized in that: the porosity of said pervious concrete layer is 20%-35%.
5. according to the said permeable pavement structure of claim 1, it is characterized in that: the compacting coefficient of said original state soil layer is greater than 93%.
6. according to the said permeable pavement structure of claim 1, it is characterized in that: the compacting coefficient of said graded broken stone layer is greater than 94%.
7. according to the said permeable pavement structure of claim 1, it is characterized in that: said pervious concrete layer is a primary colors pervious concrete layer.
CN2012200699262U 2012-02-28 2012-02-28 Permeable pavement structure Expired - Fee Related CN202500072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200699262U CN202500072U (en) 2012-02-28 2012-02-28 Permeable pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200699262U CN202500072U (en) 2012-02-28 2012-02-28 Permeable pavement structure

Publications (1)

Publication Number Publication Date
CN202500072U true CN202500072U (en) 2012-10-24

Family

ID=47036688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200699262U Expired - Fee Related CN202500072U (en) 2012-02-28 2012-02-28 Permeable pavement structure

Country Status (1)

Country Link
CN (1) CN202500072U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586816A (en) * 2016-02-24 2016-05-18 扬州大学 Ecological road accessory combination device
CN106747588A (en) * 2017-01-17 2017-05-31 河海大学 A kind of permeable flat stone with function of biological purification and preparation method thereof
CN110629626A (en) * 2019-11-11 2019-12-31 中信国安建工集团有限公司 Large-section tunnel construction structure and construction method
CN113550189A (en) * 2020-04-24 2021-10-26 国川国际建设有限公司 Heavy haul road and laying method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105586816A (en) * 2016-02-24 2016-05-18 扬州大学 Ecological road accessory combination device
CN105586816B (en) * 2016-02-24 2017-11-14 扬州大学 A kind of attached combination unit of environmental road
CN106747588A (en) * 2017-01-17 2017-05-31 河海大学 A kind of permeable flat stone with function of biological purification and preparation method thereof
CN106747588B (en) * 2017-01-17 2019-12-13 河海大学 Water permeable flat stone with biological purification function and preparation method thereof
CN110629626A (en) * 2019-11-11 2019-12-31 中信国安建工集团有限公司 Large-section tunnel construction structure and construction method
CN113550189A (en) * 2020-04-24 2021-10-26 国川国际建设有限公司 Heavy haul road and laying method thereof
CN113550189B (en) * 2020-04-24 2023-02-24 国川国际建设有限公司 Heavy haul road and laying method thereof

Similar Documents

Publication Publication Date Title
CN202031001U (en) Compound water-permeable road structure
CN204875416U (en) Porous pavement structure
CN105887609B (en) A kind of construction method on sponge urban ecology diafiltration ground
CN203295913U (en) Novel ecological permeable road structure
CN202500072U (en) Permeable pavement structure
CN101718069A (en) Permeable pavement structure
CN105803894A (en) Urban road rainwater regulation and storage system
CN108532401A (en) A kind of coral sand concrete road surface structure and its construction method
CN106193245A (en) A kind of paddy field underground reservoir for sponge city and construction method thereof
CN207362616U (en) Permeable brick paving structure
CN209338948U (en) A kind of water-permeable pavement structure
CN110145014A (en) A kind of ecological pavement shunting water guide function with municipal administration
CN107794822B (en) Permeable pavement based on sponge city idea
CN206418364U (en) A kind of permeable road structure
CN105484125B (en) A kind of step of Collection utilization rainwater
CN105421647B (en) A kind of step building block of Collection utilization rainwater
CN105544344B (en) A method of enhancing city gentle slope porous pavement permeability performance
CN105803888A (en) Sponge type road paving structure
CN109235187A (en) A kind of porous pavement method for paving being easy to construct and have landscape effect
CN203890824U (en) Recycled aggregate based total pervious concrete pavement structure
CN203923835U (en) Ecological rubble terrace structure
CN207933837U (en) Have both the paving structure of infiltration and drain function
CN206090204U (en) Height ecological road surface structure of permeating water
CN207391983U (en) A kind of sponge-type parking system
CN206581104U (en) A kind of easy dewatering type permeable pavement structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

Termination date: 20180228

CF01 Termination of patent right due to non-payment of annual fee