CN108411928A - One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method - Google Patents

One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method Download PDF

Info

Publication number
CN108411928A
CN108411928A CN201810239887.8A CN201810239887A CN108411928A CN 108411928 A CN108411928 A CN 108411928A CN 201810239887 A CN201810239887 A CN 201810239887A CN 108411928 A CN108411928 A CN 108411928A
Authority
CN
China
Prior art keywords
steel pile
pile casting
drilling
layer
solution cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810239887.8A
Other languages
Chinese (zh)
Inventor
陈全兴
高杰
靳春尚
张书良
刘曜玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China State Construction Bridge Corp Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201810239887.8A priority Critical patent/CN108411928A/en
Publication of CN108411928A publication Critical patent/CN108411928A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Paleontology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses one kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method, includes the following steps:Determine solution cavity parameter and earthing layer thickness during pile foundation construction;Determine decentralization steel pile casting parameter;Drilling integral diameters at different levels are determined according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels;Bore diameters at different levels in lithostratigraphy reach determining drilling integral diameters at different levels;Drilling construction is carried out, until entering overburden layer scar below;It transfers on work steel pile casting to overburden layer scar below;Start overburden layer bottom absolute altitude to the lithostratigraphy drilling construction between first layer solution cavity floor level:The second level steel pile casting of corresponding first layer solution cavity is transferred to the bottom plate scar below of first layer solution cavity;Corresponding steel pile casting at different levels is transferred successively;It is drilled down into, after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminates drilling.This method is efficient.

Description

One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method
Technical field
The present invention relates to large-diameter pile foundation boring methods, and it is big to pass through multilayer karst cave ultra-deep more specifically to one kind Diameter pile foundation boring method.
Background technology
With the continuous development of the scale of construction and construction technology, (depth reaches 90m or more to ultra-deep and large diameter, and diameter reaches To 2.5m or more) pile foundation applied by more and more in all kinds of engineerings, and Karst Geological Landscape be distributed at home it is extremely wide, Karst area ultra-deep and large diameter pile foundation have into rock compared with deep, rock strength is high, drilling when pass through the difficult points such as multilayer karst cave.Mesh The preceding such pile foundation in the country is often impact drill construction with construction method, and karst cave treatment method is to fill out punching repeatedly, but the method is constructed Progress extremely slowly, string-like or large and medium-sized karst cave treatment effect it is humble.
Invention content
The purpose of the present invention is to overcome the disadvantages of the prior art, provides the efficient, short construction period of one kind and can guarantee Construction quality passes through multilayer karst cave ultra-deep and large diameter pile foundation boring method.
The present invention is achieved through the following technical solutions:
One kind of the present invention passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method, includes the following steps:
(1) according to the related geology prospecting report of pile foundation, position, the solution cavity top of solution cavity during pile foundation construction are determined The distribution number of plies and earthing layer thickness of plate and floor level, type of cavern, solution cavity volume, solution cavity on facade;
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to the solution cavity number of plies, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting, steel pile casting to be transferred The number of plies determine that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting is arranged when churning driven construction, and work steel It is i that casing, which passes through overburden layer, the solution cavity number of plies, then shared i+1 grades of steel pile casting, steel pile casting be named as successively from outside to inside T1, T2, T3 ... Ti, Ti+1, wherein T1 are work steel pile casting, and Ti+1 is the steel pile casting of corresponding i-th layer of solution cavity, corresponding with steel pile castings at different levels Steel pile casting diameter is named as d1, d2, d3 ... di, di+1, wherein d1 > d2 > d3 > ... di > di+1 > D, the D represent stake Basic engineering diameter;
(b) length of steel pile castings at different levels is determined according to the thickness of overburden layer, the floor level of solution cavity and solution cavity size parameter Determine that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overlying soil with the length of steel pile casting wall thickness, steel pile casting Bottom surface, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil;Steel pile casting wall thickness determines that principle is to consider steel pile casting least Steel pile casting wall thickness corresponding to sharp stress;
(3) determine that drillings at different levels are whole according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter sets steel pile casting T1, T2, T3 ... Ti, Ti+1 and is corresponding in turn to drilling integral diameter as D1, D2, D3 ... Di, Di+1, wherein D1=d1, Di+1 > di+1 and Di+1 < di in Di, Di+1 in D2, D3 ..., then drilling integral diameters at different levels be followed successively by D1, D2, D3 ... Di, Di+1, D, wherein D1 > D2 > D3 > ... Di > Di+1 > D;
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, and bore diameter is finally made to reach true Fixed drilling integral diameters at different levels;
(5) the drilling integral diameter corresponding to the stake holes center of surveying and locating and work steel pile casting, utilizes churning driven Drilling construction is carried out, until drilling through overburden layer, oblique scar is polished, into overburden layer scar below;
(6) work steel pile casting is transferred, coordinates the technique of leading truck to transfer work steel pile casting to overburden layer using vibration hammer On scar below;
(7) after the decentralization in place of work steel pile casting, start overburden layer bottom absolute altitude to the rock between first layer solution cavity floor level Earth-boring is constructed, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, until bottom plate of the drilling to first layer solution cavity At absolute altitude, and the bottom plate of first layer solution cavity is polished, drilling integral diameter is D2, and specific method is:It is first used when drilling small straight The drill bit of diameter is crept into, and after creeping into certain depth, then is used major diameter drill bit to this section of stratum reaming, is recycled successively, bore diameter Gradually increase from small up to reaching this layer of determining drilling integral diameter D2;
(8) technique of vibration hammer cooperation leading truck is used to transfer the second level steel pile casting of corresponding first layer solution cavity to first On the bottom plate scar below of layer solution cavity;
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels according to Lithostratigraphy drilling between the secondary bottom plate for carrying out neighbouring two layers of solution cavity, and corresponding steel pile casting T3~Ti at different levels is transferred successively + 1, until the Ti+1 decentralizations of afterbody steel pile casting are completed;
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drilling is whole at this time A diameter of Design of Foundation diameter, and drilling depth reaches design pile foundation bottom hole absolute altitude;
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions are complete At.
The beneficial effects of the invention are as follows:It is easy to operation, it is efficient, can be rapidly completed and pass through multilayer karst cave ultra-deep and large diameter stake Basic drilling construction, and then accelerate the construction speed of pile foundation and entire engineering.
Description of the drawings
Fig. 1 is to pass through multilayer karst cave ultra-deep and large diameter pile foundation drilling schematic diagram.
Specific implementation mode
Below in conjunction with the accompanying drawings, the specific implementation mode of the present invention is described in detail.
One kind of the present invention as shown in Figure 1 passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method, including following Step:
(1) according to the related geology prospecting report of pile foundation, the position of solution cavity 3, solution cavity during pile foundation construction are determined 1 thickness of distribution number of plies i and overburden layer of top plate and floor level, type of cavern, solution cavity volume, solution cavity on facade.
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to 3 number of plies of solution cavity, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting.Steel shield to be transferred The number of plies of cylinder determines that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting, work need to be arranged when churning driven construction Make steel pile casting to pass through overburden layer 1, the solution cavity number of plies to be i, then shared i+1 grades of steel pile casting, steel pile casting be named as successively from outside to inside T1, T2, T3 ... Ti, Ti+1, wherein T1 are work steel pile casting, and Ti+1 is the steel pile casting of corresponding i-th layer of solution cavity.With steel pile castings pair at different levels The steel pile casting diameter answered is named as d1, d2, d3 ... di, di+1, wherein d1 > d2 > d3 > ... di > di+1 > D, the D generations Table Design of Foundation diameter.
Design of Foundation diameter D does not have corresponding steel pile casting, i.e., when being crept by design diameter, outside is no steel pile casting 's.Normal rock geology is had been enter at this time, and hole wall is all right, does not need steel pile casting and carries out supporting or isolation.
(b) length of steel pile castings at different levels is determined according to the thickness of overburden layer 1, the floor level of solution cavity 3 and solution cavity size parameter Degree and steel pile casting wall thickness.The length of steel pile casting determines that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overburden soil Layer bottom surface, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil;Steel pile casting wall thickness determines that principle is to consider steel pile casting most Unfavorable stress, the poor (peace of external and internal pressure that steel pile casting can be born when concrete perfusion generally at the maximum molten chamber of solution cavity Overall coefficient is chosen according to code requirement, to ensure that steel pile casting does not deform when bearing maximum external force) corresponding to steel Casing wall thickness, it is ensured that the rigidity and intensity of steel pile casting are met the requirements.
(3) determine that drillings at different levels are whole according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter sets steel pile casting T1, T2, T3 ... Ti, Ti+1 and is corresponding in turn to drilling integral diameter as D1, D2, D3 ... Di, Di+1, wherein D1=d1, Di+1 > di+1 and Di+1 < di in Di, Di+1 in D2, D3 ..., then drilling integral diameters at different levels be followed successively by D1, D2, D3 ... Di, Di+1, D, wherein D1 > D2 > D3 > ... Di > Di+1 > D, D represent Design of Foundation diameter.
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, according to including drilling depth, rock Combined factors including intensity, churning driven model and performance consider that the small punching diameter that lithostratigraphy drills by several times is generally 1.5m~1.8m, twice adjacent bore diameter difference general control so that bore diameter is reached determining between 0.5~1m Drilling integral diameters at different levels.
(5) the drilling integral diameter D1 corresponding to the stake holes center of surveying and locating and work steel pile casting T1, utilizes rotation It digs brill 4 and carries out drilling constructions, until drilling through overburden layer 1, oblique scar is polished, into 1 scar 2 below of overburden layer.
(6) work steel pile casting T1 is transferred, coordinates the technique of the leading truck steel pile casting T1 that will work to transfer to covering using vibration hammer On 1 scar 2 below of soil layer.
(7) after work steel pile casting T1 decentralizations in place, start 1 bottom absolute altitude of overburden layer between 3 floor level of first layer solution cavity Lithostratigraphy drilling construction, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, up to drilling to the bottom of first layer solution cavity 3 At plate absolute altitude, and the bottom plate of first layer solution cavity 3 is polished, drilling integral diameter is D2, and specific method is:It is first used when drilling small The drill bit of diameter is crept into, and after creeping into certain depth, then is used major diameter drill bit to this section of stratum reaming, is recycled successively, drilling is straight Diameter gradually increases up to reaching this layer of determining drilling integral diameter D2 from small.
(8) use the technique of vibration hammer cooperation leading truck by the second level steel pile casting T2 of corresponding first layer solution cavity 3 transfer to On the bottom plate scar 2 below of first layer solution cavity 3.
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels according to Rock between the secondary bottom plate (bottom plate of the bottom plate of first layer solution cavity 3 to i-th layer of solution cavity 3) for carrying out neighbouring two layers of solution cavity 3 Layer drilling, and corresponding steel pile casting T3~Ti+1 at different levels is transferred successively, until the Ti+1 decentralizations of afterbody steel pile casting are completed i.e. most Later layer (i-th layer) karst cave treatment is completed.
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drilling is whole at this time A diameter of Design of Foundation diameter D, and drilling depth reaches design pile foundation bottom hole absolute altitude.
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions are complete At.
Embodiment 1
(1) certain project is in karst area, design stake diameter D=2.5m.According to the related geological prospecting report of pile foundation It accuses, determines that position, Upper Plate of Karst Cave and the floor level of solution cavity, type of cavern, solution cavity volume, solution cavity exist during pile foundation construction The distribution number of plies on facade is two layers, and earthing layer thickness is 8m, and first layer cavern depth is range (23.5~29) m, the second layer Cavern depth range (54.8~62.9) m.
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to the solution cavity number of plies, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting.Steel pile casting to be transferred The number of plies determine that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting need to be arranged when churning driven construction.Work It is 2 that steel pile casting, which passes through overburden layer, the solution cavity number of plies, then steel pile casting shares 3 grades, steel pile casting be named as successively from outside to inside T1, T2, T3, wherein T1 are work steel pile casting, and T2 is the steel pile casting of corresponding 1st layer of solution cavity, and T3 is the steel pile casting of corresponding 2nd layer of solution cavity.Really Fixed steel pile casting diameters at different levels are respectively d1=3.05m, d2=2.86m, d3=2.65m.
(b) length of steel pile castings at different levels is determined according to the thickness of overburden layer, the floor level of solution cavity and solution cavity size parameter With steel pile casting wall thickness.The length of steel pile casting determines that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overlying soil Bottom surface, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil, that is, the rigid casing decentralization depth that works is 8.2m, first layer steel It is 29.2m that casing, which transfers depth, and it is 63.1m that second layer steel pile casting, which transfers depth,.
(3) determine that drillings at different levels are whole according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter, set steel pile casting T1, T2, T3 be corresponding in turn to drilling integral diameter as D1, D2, D3, wherein D1=d1, the D2 in D2, D3 > d2 and D2 < d1, D3 > d3 and D3 < d2 determine that each bore diameter is respectively D1=3.05m, D2=according to construction needs 2.92m D3=2.73m.
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, and lithostratigraphy drills first by several times Secondary bore diameter is 1.8mm, and adjacent bore diameter difference control twice finally makes bore diameter reach determining brills at different levels in 1m Hole integral diameter.
(5) the drilling integral diameter D1 corresponding to the stake holes center of surveying and locating and work steel pile casting T1, utilizes rotation It digs brill 4 and carries out drilling constructions, until drilling through overburden layer 1, oblique scar is polished, into 1 scar 2 below of overburden layer.
(6) work steel pile casting T1 is transferred, coordinates the technique of the leading truck steel pile casting T1 that will work to transfer to covering using vibration hammer On 1 scar 2 below of soil layer.
(7) after work steel pile casting T1 decentralizations in place, start 1 bottom absolute altitude of overburden layer between 3 floor level of first layer solution cavity Lithostratigraphy drilling construction, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, up to drilling to the bottom of first layer solution cavity 3 At plate absolute altitude, and the bottom plate of first layer solution cavity 3 is polished, drilling integral diameter is D2=2.92m, and specific method is:When drilling It first uses the drill bit of minor diameter to creep into, after creeping into certain depth, then uses major diameter drill bit to this section of stratum reaming, follow successively Ring, bore diameter gradually increase up to reaching this layer of determining drilling integral diameter D2=2.92m from small.
(8) use the technique of vibration hammer cooperation leading truck by the second level steel pile casting T2 of corresponding first layer solution cavity 3 transfer to On the bottom plate scar 2 below of first layer solution cavity 3.
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels according to Lithostratigraphy between the secondary bottom plate (bottom plate of the bottom plate of first layer solution cavity to second layer solution cavity) for carrying out neighbouring two layers of solution cavity 3 Drilling, transfers corresponding steel pile casting T3, and decentralization is completed to be that last layer (second layer) karst cave treatment is completed.
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drilling is whole at this time A diameter of Design of Foundation diameter D=2.5m, and drilling depth reaches design pile foundation bottom hole absolute altitude.
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions are complete At.
This kind of method operability is strong after testing, and it is repeatedly inefficient can effectively to solve two layers of solution cavity pile foundation construction karst cave treatment Problem accelerates pore-forming efficiency, improves construction quality.
Embodiment 2
(1) certain project is in karst area, design stake diameter D=2.5m.According to the related geological prospecting report of pile foundation It accuses, determines that position, Upper Plate of Karst Cave and the floor level of solution cavity, type of cavern, solution cavity volume, solution cavity exist during pile foundation construction The distribution number of plies on facade is three layers, and earthing layer thickness is 8m.First layer cavern depth be range (22.4~23.1) m, second Layer cavern depth range (55.8~67.7) m, third layer cavern depth range (74.2~78.3) m.
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to the solution cavity number of plies, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting.Steel pile casting to be transferred The number of plies determine that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting need to be arranged when churning driven construction, works It is 3 layers that steel pile casting, which passes through overburden layer, the solution cavity number of plies, then steel pile casting shares 4 grades, steel pile casting be named as successively from outside to inside T1, T2, T3, T4, wherein T1 are work steel pile casting, and T2 is the steel pile casting of corresponding 1st layer of solution cavity, and T3 is the steel pile casting of corresponding 2nd layer of solution cavity, T4 is the steel pile casting of corresponding 3rd layer of solution cavity.Determine that steel pile casting diameters at different levels are respectively d1=3.3m, d2=3.05m, d3= 2.86m d4=2.65m.
(b) length of steel pile castings at different levels is determined according to the thickness of overburden layer 1, the floor level of solution cavity 3 and solution cavity size parameter Degree and steel pile casting wall thickness.The length of steel pile casting determines that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overburden soil Layer bottom surface, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil, that is, the rigid casing decentralization depth that works is 8.2m, first layer It is 23.3m that steel pile casting, which transfers depth, and it is 67.9m that second layer steel pile casting, which transfers depth, and third layer steel pile casting decentralization depth is 78.5m;
(3) determine that drillings at different levels are whole according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter, set steel pile casting T1, T2, T3, T4 be corresponding in turn to drilling integral diameter as D1, D2, D3, D4, wherein D1=d1, D2, D2 > d2 and D2 < d1, D3 > d3 and D3 < d2, D4 > d4 and D4 < d3 in D3, D4 determine that each drilling is straight according to construction needs Diameter is respectively D1=3.3m, D2=3.14m, D3=2.92m, D4=2.73m.
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, and lithostratigraphy drills first by several times Secondary bore diameter is 1.5m, and adjacent bore diameter difference is generally in 0.5m twice, and bore diameter is finally made to reach determining at different levels Drill integral diameter.
(5) the drilling integral diameter D1 corresponding to the stake holes center of surveying and locating and work steel pile casting T1, utilizes rotation It digs brill 4 and carries out drilling constructions, until drilling through overburden layer 1, oblique scar is polished, into 1 scar 2 below of overburden layer.
(6) work steel pile casting T1 is transferred, coordinates the technique of the leading truck steel pile casting T1 that will work to transfer to covering using vibration hammer On 1 scar 2 below of soil layer.
(7) after work steel pile casting T1 decentralizations in place, start 1 bottom absolute altitude of overburden layer between 3 floor level of first layer solution cavity Lithostratigraphy drilling construction, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, up to drilling to the bottom of first layer solution cavity 3 At plate absolute altitude, and the bottom plate of first layer solution cavity 3 is polished, drilling integral diameter is D2=3.14m, and specific method is:When drilling It first uses the drill bit of minor diameter to creep into, after creeping into certain depth, then uses major diameter drill bit to this section of stratum reaming, follow successively Ring, bore diameter gradually increase up to reaching this layer of determining drilling integral diameter D2=3.14m from small.
(8) use the technique of vibration hammer cooperation leading truck by the second level steel pile casting T2 of corresponding first layer solution cavity 3 transfer to On the bottom plate scar 2 below of first layer solution cavity 3.
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels according to Lithostratigraphy between the secondary bottom plate (bottom plate of the bottom plate of first layer solution cavity to third layer solution cavity) for carrying out neighbouring two layers of solution cavity 3 Drilling, and corresponding steel pile casting T3~T4 at different levels is transferred successively, until the T4 decentralizations of afterbody steel pile casting are completed to be last layer (third layer) karst cave treatment is completed.
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drilling is whole at this time A diameter of Design of Foundation diameter D=2.5m, and drilling depth reaches design pile foundation bottom hole absolute altitude.
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions are complete At.
This kind of method operability is strong after testing, can effectively solve three layers of solution cavity pile foundation cavity and handle repeatedly inefficient ask Topic, improves pile foundation pore-forming efficiency, pile foundation pile quality significantly improves.
Embodiment 3
(1) certain project is in karst area, design stake diameter D=2.5m.According to the related geological prospecting report of pile foundation It accuses, determines that position, Upper Plate of Karst Cave and floor level, type of cavern, solution cavity volume, the solution cavity of solution cavity during pile foundation construction exist The distribution number of plies on facade is 4 layers and earthing layer thickness is 8m, and first layer cavern depth is range (24.5~27.6) m, the Two layers of cavern depth range (43.1~47.6) m, third layer cavern depth range (59.5~62.7) m, the 4th layer of cavern depth Range (79.5~86.7) m.
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to the solution cavity number of plies, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting.Steel pile casting to be transferred The number of plies determine that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting need to be arranged when churning driven construction, works It is four layers that steel pile casting, which passes through overburden layer, the solution cavity number of plies, then steel pile casting shares 5 grades, steel pile casting be named as successively from outside to inside T1, T2, T3, T4, T5, wherein T1 are work steel pile casting, and T2 is the steel pile casting of corresponding first layer solution cavity, and T3 is corresponding second layer solution cavity Steel pile casting, T4 is the steel pile casting of corresponding third layer solution cavity, and T5 be the steel pile casting of the 4th layer of solution cavity of correspondence.Determine steel pile castings at different levels Diameter is respectively d1=3.6m, d2=3.3m, d3=3.05m, d4=2.86m, d5=2.65m.
(b) length of steel pile castings at different levels is determined according to the thickness of overburden layer 1, the floor level of solution cavity 3 and solution cavity size parameter Degree and steel pile casting wall thickness.The length of steel pile casting determines that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overburden soil Layer bottom surface, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil;The rigid casing decentralization depth that works is 8.2m, first layer It is 27.8m that steel pile casting, which transfers depth, and it is 47.8m that second layer steel pile casting, which transfers depth, and third layer steel pile casting decentralization depth is 62.9m, the 4th layer of steel pile casting decentralization depth is 86.9m.
(3) determine that drillings at different levels are whole according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter, set steel pile casting T1, T2, T3, T4, T5 be corresponding in turn to drilling integral diameter as D1, D2, D3, D4, D5, wherein D1=d1, D2 > d2 and D2 < d1, D3 > d3 and D3 < d2, D4 > d4 and D4 < d3, D5 > d5 and D5 < d4, root in D2, D3, D4, D5 It is needed according to construction, determines that each bore diameter is respectively D1=3.6m, D2=3.4m, D3=3.14m, D4=2.92, D5= 2.73m。
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, and lithostratigraphy drills first by several times Secondary bore diameter is 1.6mm, and adjacent bore diameter difference general control finally makes bore diameter reach true between 0.8m twice Fixed drilling integral diameters at different levels.
(5) the drilling integral diameter D1 corresponding to the stake holes center of surveying and locating and work steel pile casting T1, utilizes rotation It digs brill 4 and carries out drilling constructions, until drilling through overburden layer 1, oblique scar is polished, into 1 scar 2 below of overburden layer.
(6) work steel pile casting T1 is transferred, coordinates the technique of the leading truck steel pile casting T1 that will work to transfer to covering using vibration hammer On 1 scar 2 below of soil layer.
(7) after work steel pile casting T1 decentralizations in place, start 1 bottom absolute altitude of overburden layer between 3 floor level of first layer solution cavity Lithostratigraphy drilling construction, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, up to drilling to the bottom of first layer solution cavity 3 At plate absolute altitude, and the bottom plate of first layer solution cavity 3 is polished, drilling integral diameter is D2=3.4m, and specific method is:It is first when drilling It is crept into using the drill bit of minor diameter, after creeping into certain depth, then uses major diameter drill bit to this section of stratum reaming, recycle successively, Bore diameter gradually increases up to reaching this layer of determining drilling integral diameter D2=3.4m from small.
(8) use the technique of vibration hammer cooperation leading truck by the second level steel pile casting T2 of corresponding first layer solution cavity 3 transfer to On the bottom plate scar 2 below of first layer solution cavity 3.
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels according to Lithostratigraphy between the secondary bottom plate (bottom plate of the bottom plate of first layer solution cavity to the 4th layer of solution cavity) for carrying out neighbouring two layers of solution cavity 3 Drilling, and corresponding steel pile casting T3~T5 at different levels is transferred successively, until the T5 decentralizations of afterbody steel pile casting are completed to be last layer (the 4th layer) karst cave treatment is completed.
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drilling is whole at this time A diameter of Design of Foundation diameter D=2.5m, and drilling depth reaches design pile foundation bottom hole absolute altitude.
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions are complete At.
This method operability is strong after testing, compared to traditional pile foundation drilling construction method, can effectively solve four layers of solution cavity Ultra-deep and large diameter pile foundation construction karst cave treatment inefficient problem repeatedly, pile foundation pore-forming efficiency and hole quality significantly improve.

Claims (2)

1. one kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method, it is characterised in that include the following steps:
(1) according to the related geology prospecting report of pile foundation, determine the position of solution cavity during pile foundation construction, Upper Plate of Karst Cave and The distribution number of plies and earthing layer thickness of floor level, type of cavern, solution cavity volume, solution cavity on facade;
(2) it determines decentralization steel pile casting parameter, is as follows:
(a) according to the solution cavity number of plies, determination need to transfer the diameter of the number of plies and each layer steel pile casting of steel pile casting, the layer of steel pile casting to be transferred Number determines that method is:Every layer of solution cavity transfers a steel pile casting, and work steel pile casting is arranged when churning driven construction, and work steel pile casting Across overburden layer, the solution cavity number of plies is i, then steel pile casting is i+1 grades shared, and steel pile casting is named as T1, T2, T3 successively from outside to inside ... Ti, Ti+1, wherein T1 are work steel pile casting, and Ti+1 is the steel pile casting of corresponding i-th layer of solution cavity, steel shield corresponding with steel pile castings at different levels Cylinder diameter is named as d1, d2, d3 ..., and di, di+1, wherein d1 > d2 > d3 > ... di > di+1 > D, the D represent pile foundation Design diameter;
(b) length and steel of steel pile castings at different levels are determined according to the thickness of overburden layer, the floor level of solution cavity and solution cavity size parameter The length of casing wall thickness, steel pile casting determines that principle is solution cavity bottom surface of each steel pile casting base opening less than respective layer or overlying soil bottom Face, it is ensured that steel pile casting can all be isolated solution cavity or overlying soil;Steel pile casting wall thickness determines that principle is to consider steel pile casting least favorable Steel pile casting wall thickness corresponding to stress;
(3) drilling integrated straights at different levels are determined according to steel pile casting diameters at different levels principle corresponding with drilling integral diameters at different levels Diameter sets steel pile casting T1, T2, T3 ... Ti, Ti+1 and is corresponding in turn to drilling integral diameter as D1, D2, D3 ... Di, Di+1, wherein D1 =d1, Di+1 > di+1 and Di+1 < di in Di, Di+1 in D2, D3 ..., then drilling integral diameters at different levels be followed successively by D1, D2, D3 ... Di, Di+1, D, wherein D1 > D2 > D3 > ... Di > Di+1 > D;
(4) drillings at different levels in lithostratigraphy are all made of the mode to drill by several times and carry out, and bore diameter is finally made to reach determining Drilling integral diameters at different levels;
(5) the drilling integral diameter corresponding to the stake holes center of surveying and locating and work steel pile casting, is carried out using churning driven Drilling construction polishes oblique scar, until drilling through overburden layer into overburden layer scar below;
(6) work steel pile casting is transferred, coordinates the technique of leading truck to transfer work steel pile casting to overburden layer using vibration hammer Scar on;
(7) after the decentralization in place of work steel pile casting, start overburden layer bottom absolute altitude to the lithostratigraphy between first layer solution cavity floor level Drilling construction, the specific steps are:
Lithostratigraphy is excavated by several times using the method that churning driven drills by several times, until floor level of the drilling to first layer solution cavity Place, and the bottom plate of first layer solution cavity is polished, drilling integral diameter is D2, and specific method is:Minor diameter is first used when drilling Drill bit is crept into, and after creeping into certain depth, then is recycled successively to this section of stratum reaming using major diameter drill bit, bore diameter is from small Gradually increase until reaching this layer of determining drilling integral diameter D2;
(8) technique of vibration hammer cooperation leading truck is used to transfer the second level steel pile casting of corresponding first layer solution cavity molten to first layer On the bottom plate scar below in hole;
(9) repeat step (7) and step (8), according to drilling integral diameters at different levels corresponding with steel pile casting diameters at different levels successively into Lithostratigraphy drilling between the bottom plate of neighbouring two layers of the solution cavity of row, and corresponding steel pile casting T3~Ti+1 at different levels is transferred successively, Until the Ti+1 decentralizations of afterbody steel pile casting are completed;
(10) continue to be drilled down into using gradation drilling construction method after the completion of all steel pile casting decentralizations, drill integral diameter at this time For Design of Foundation diameter, and drilling depth reaches design pile foundation bottom hole absolute altitude;
(11) after creeping into design pile foundation bottom hole absolute altitude, and bottom hole is polished, terminate drilling, all drilling constructions completions.
2. according to claim 1 pass through multilayer karst cave ultra-deep and large diameter pile foundation boring method, it is characterised in that:Rock A diameter of 1.5m~the 1.8m of small punching that stratum drills by several times, adjacent bore diameter difference control is between 0.5~1m twice.
CN201810239887.8A 2018-03-22 2018-03-22 One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method Pending CN108411928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810239887.8A CN108411928A (en) 2018-03-22 2018-03-22 One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810239887.8A CN108411928A (en) 2018-03-22 2018-03-22 One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method

Publications (1)

Publication Number Publication Date
CN108411928A true CN108411928A (en) 2018-08-17

Family

ID=63133212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810239887.8A Pending CN108411928A (en) 2018-03-22 2018-03-22 One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method

Country Status (1)

Country Link
CN (1) CN108411928A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852326A (en) * 2020-07-06 2020-10-30 深圳市工勘岩土集团有限公司 Karst development area rotary excavating mine type extrusion drill bit karst cave treatment method
CN113914309A (en) * 2021-09-29 2022-01-11 中国建筑第六工程局有限公司 Laminated karst cave stratum pile foundation construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553003A (en) * 2003-09-27 2004-12-08 叶照桂 Multi-layer assembled steel pipe embedding rock piling method
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN103485716A (en) * 2013-09-27 2014-01-01 福建成森建设集团有限公司 Karst-geology rotary-drill guide-hole construction method
CN203487528U (en) * 2013-09-30 2014-03-19 中铁二十局集团有限公司 Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN106284314A (en) * 2016-08-31 2017-01-04 中冶建工集团有限公司 Karst landform spiral-digging pore cast-in-place pile construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553003A (en) * 2003-09-27 2004-12-08 叶照桂 Multi-layer assembled steel pipe embedding rock piling method
CN103485716A (en) * 2013-09-27 2014-01-01 福建成森建设集团有限公司 Karst-geology rotary-drill guide-hole construction method
CN103485336A (en) * 2013-09-30 2014-01-01 中铁二十局集团有限公司 Drilling pile drilling construction method of bead-type karst area
CN203487528U (en) * 2013-09-30 2014-03-19 中铁二十局集团有限公司 Underground river karst cave treatment structure for underwater pier drilled pile construction in beaded type karst area
CN106284314A (en) * 2016-08-31 2017-01-04 中冶建工集团有限公司 Karst landform spiral-digging pore cast-in-place pile construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鲍庆伟等: "复杂岩溶地区超大径超长桩旋挖钻入岩施工技术", 《世界桥梁》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111852326A (en) * 2020-07-06 2020-10-30 深圳市工勘岩土集团有限公司 Karst development area rotary excavating mine type extrusion drill bit karst cave treatment method
CN113914309A (en) * 2021-09-29 2022-01-11 中国建筑第六工程局有限公司 Laminated karst cave stratum pile foundation construction method

Similar Documents

Publication Publication Date Title
EP3406802A1 (en) Offshore rock-drilling redriving-type large-diameter pile structure and construction method
CN104947690B (en) Grooving construction method for embedding underground continuous wall into rock
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
CN106245626A (en) A kind of hard formation churning driven enters method
CN104806251B (en) Subsidiary inverted excavation construction method for urban subway station under complex environment
CN102071683A (en) Water drill dug pile construction method
CN106759282B (en) A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN108729924A (en) A kind of urban hard rock tunnel mechanical excavation rapid constructing method
CN105421474B (en) For the plant pile cofferdam platform integral construction method of lithostratigraphy low pile cap
CN106194193A (en) The auxiliary excavation method of a kind of group hole, big cross section vertical shaft non-explosion large aperture
CN107059847A (en) A kind of competent bed water mill bores pouring pile hole structure and its construction from the bottom of one's heart
CN108589711A (en) A kind of construction method of bead string type solution cavity development area fender post
CN110374091A (en) A kind of rectangle friction pile mechanical hole building construction method
CN110821497A (en) Excavation method of tunnel vertical shaft
CN108411928A (en) One kind passing through multilayer karst cave ultra-deep and large diameter pile foundation boring method
CN110984132B (en) Construction method for grooving underground diaphragm wall under complex geological condition
CN116220546A (en) Construction method for combining super-thick hard rock condition large-diameter long piles into holes
CN203584301U (en) Hole guide equipment
CN204299468U (en) A kind of positioning and guiding system and device of hidden hole drilling boring
CN105019431B (en) Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
CN206956717U (en) Marine rock drilling strike-on type large diameter pile structure
CN107938652A (en) A kind of embedding lithotype steel cement mixing wall and its construction method
CN116181224A (en) Construction method of multi-layer oversized karst cave rock-socketed pile foundation in complex karst area
JP2010522289A (en) Rock blasting method for constructing foundation of transmission tower
CN110273413A (en) A kind of efficient construction method of prefabricated pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180817

WD01 Invention patent application deemed withdrawn after publication