CN108407822A - Pipeline train comprehensive monitoring control system - Google Patents

Pipeline train comprehensive monitoring control system Download PDF

Info

Publication number
CN108407822A
CN108407822A CN201810273354.1A CN201810273354A CN108407822A CN 108407822 A CN108407822 A CN 108407822A CN 201810273354 A CN201810273354 A CN 201810273354A CN 108407822 A CN108407822 A CN 108407822A
Authority
CN
China
Prior art keywords
control system
monitoring
pipeline
vacuum
compartment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810273354.1A
Other languages
Chinese (zh)
Inventor
张可池
张昂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810273354.1A priority Critical patent/CN108407822A/en
Publication of CN108407822A publication Critical patent/CN108407822A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B13/00Other railway systems
    • B61B13/10Tunnel systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades

Abstract

The present invention relates to a kind of pipeline train comprehensive monitoring control systems, provide a pipeline training devices, and the pipeline training devices include:Section vacuum pipe in rounded shape and the multiple tracks being distributed in vacuum pipe body, have hung outer compartment on the multiple track respectively, equipped with the interior compartment mutually buffered with its side in the outer compartment;The one pipeline vacuum degree monitoring system for monitoring level of vacuum in the vacuum pipe is also provided;The pipeline vacuum degree monitors system and the centralized control system being set at monitoring center without lines matching, and the data of monitoring are uploaded to the centralized control system.A kind of pipeline train comprehensive monitoring control system provided by the invention matches with the compartment that can run at high speed is set in vacuum pipe, greatly improves the management and control to compartment and the degree of automation of status monitoring, ensure that high speed reliability service.

Description

Pipeline train comprehensive monitoring control system
Technical field
The present invention relates to a kind of pipeline train comprehensive monitoring control systems.
Background technology
Subway is a kind of form of urban public transport transport, and to the word, there are two types of understand:Refer to based on being run in underground City Rail Transit System, i.e. " underground railway " or " subway " (beautiful subway;English tube, underground) abbreviation;Perhaps Mostly such system considers construction and operation costs to coordinate the environment of build, may turn in area other than down town At ground or overhead section.Refer to cover all can the various undergrounds in area and ground right of way is proprietary, city of high density, high freight volume Rail Transit System (Metro), TaiWan, China are then known as " rapid transit " (Rapid transit), and Hong Kong is known as " large conveying quantity commuting iron Road " (Mass Transit Railway).Other than above-mentioned subway, city rail traffic route can also be laid in height Bridge formation and ground.Therefore, subway is that right of way is proprietary, no usual friendship, this is also the essence that subway is different from Light Rail Transit Mark.However above-mentioned subway can not run multi-group trains in the same track, to cause traffic efficiency relatively low, simultaneously It also lacks corresponding efficiently and accurately and can ensure the monitor control system of operation.
Invention content
The purpose of the present invention is to provide a kind of pipeline train comprehensive monitoring control systems, are existed in the prior art with overcoming Defect.
To achieve the above object, the technical scheme is that:A kind of pipeline train comprehensive monitoring control system, provides one Pipeline training devices, the pipeline training devices include:It section vacuum pipe in rounded shape and is distributed in vacuum pipe body Multiple tracks, hung outer compartment on the multiple track respectively, be equipped in the outer compartment and mutually buffered with its side Interior compartment;The one pipeline vacuum degree monitoring system for monitoring level of vacuum in the vacuum pipe is also provided;The pipeline is true Reciprocal of duty cycle monitors system and the centralized control system being set at monitoring center without lines matching, and the data of monitoring are uploaded to the concentration Control system.
In an embodiment of the present invention, four tracks are uniformly provided in the vacuum pipe body.
In an embodiment of the present invention, between the vacuum pipe and outer compartment by magnetic levitation, the outer compartment with Pass through magnetic levitation between interior compartment.
In an embodiment of the present invention, further include for monitoring magnetic suspension state between the vacuum pipe and outer compartment First magnetic suspension state monitors system, and the system and the centralized control system are without lines matching;Further include described for monitoring The second magnetic suspension state of magnetic suspension state monitors system, and the system and the centralized control system between outer compartment and interior compartment System is without lines matching.
In an embodiment of the present invention, branch pipe, each branch pipe construction and vacuum pipe structure are connected on the vacuum pipe It is identical.
In an embodiment of the present invention, on the vacuum pipe be located at bus stop position be equipped with valve, if the valve by A dry mutually isostructural blade composition round, each blade radially stretching motion.
In an embodiment of the present invention, further include blade drive system for driving the blade, the blade driving System is with the centralized control system without lines matching.
In an embodiment of the present invention, the vacuum pipe is equipped with vacuum lead and gas ducting.
In an embodiment of the present invention, further include being filled with the matched pumped vacuum systems of the vacuum lead and with described The matched inflation system of feed channel, and the pumped vacuum systems and the inflation system with wireless of the centralized control system Match.
In an embodiment of the present invention, vehicle-mounted complex control system is provided in the interior compartment, including:Vehicle-mounted control list Member, temperature monitoring unit, oxygen concentration monitoring unit, oxygen supply equipment, car position monitoring unit, power supply power supply list Member, wireless communication unit and compartment drive system;The wireless communication unit is with the centralized control system without lines matching.
Compared to the prior art, the invention has the advantages that:A kind of pipeline train synthesis prison provided by the invention Survey control system, matched with the compartment that can run at high speed is set in vacuum pipe, greatly improve management and control to compartment and The degree of automation of status monitoring ensure that high speed reliability service, be conducive to the quantity for improving running train in pipeline, improve logical Line efficiency.
Description of the drawings
Fig. 1 is the main view organigram of the present invention;
Fig. 2 is the A-A sectional views of Fig. 1;
Fig. 3 is the B-B sectional views of Fig. 1;
Fig. 4 is the profile construction schematic diagram of solar power supply apparatus;
Fig. 5 is the cross section organigram of Fig. 4;
Fig. 6 is the profile construction schematic diagram of retractable sack;
Fig. 7 is the circuit connection structure diagram of retractable sack;
Fig. 8 is a kind of working state figure of solar power supply apparatus.
Specific implementation mode
Below in conjunction with the accompanying drawings, technical scheme of the present invention is specifically described.
The present invention provides a kind of pipeline train comprehensive monitoring control system, provides the device of a pipeline train, pipeline row The device of vehicle includes section vacuum pipe 1 in rounded shape and multiple tracks 2 for being distributed in 1 body of vacuum pipe, multiple tracks 2 It is upper to have hung outer compartment 3 respectively, it is equipped with the interior compartment 4 mutually buffered with its side in outer compartment.It is true for monitoring also to provide one The pipeline vacuum degree of level of vacuum monitors system in vacant duct;The collection that pipeline vacuum degree monitors system and is set at monitoring center Middle control system is uploaded to the centralized control system without lines matching, by the data of monitoring.In the present embodiment, vacuum-degree monitoring system System includes gas gauge, microcontroller and radio communication circuit, and the gas pressure data that monitoring is obtained uploads.
Further, for reasonable design, four tracks 2 are uniformly provided in above-mentioned vacuum pipe body.
Further, for reasonable design, pass through magnetic levitation, outer compartment 3 between above-mentioned vacuum pipe 1 and outer compartment 3 Pass through magnetic levitation between interior compartment 4.In the present embodiment, further include for monitoring magnetcisuspension between vacuum pipe and outer compartment First magnetic suspension state of floating state monitors system, and the system and centralized control system are without lines matching;Further include for monitoring The second magnetic suspension state of magnetic suspension state monitors system between outer compartment and interior compartment, and the system and centralized control system without Lines matching.It includes for monitoring magnetic suspension spacing that first magnetic suspension state, which monitors system and the second magnetic suspension state monitoring system, Infrared monitoring unit, microcontroller and radio communication circuit, the obtained spacing of monitoring is uploaded.
Further, branch pipe 5 is connected on above-mentioned vacuum pipe, each branch pipe construction is identical as vacuum pipe structure.
Further, bus stop position is located on above-mentioned vacuum pipe and is equipped with valve 6, valve 6 is by several identical structures Blade 7 constitute round, the radially stretching motion of each blade 7.In the present embodiment, further include blade for driving blade Drive system, blade drive system is with centralized control system without lines matching.Electromagnetic driving system can be used in drive system, hydraulic pressure drives Dynamic system or Pneumatically driven system, and driven by microcontroller and driving circuit, microcontroller also with radio communication circuit It is connected, with centralized control system without lines matching, receives its instruction issued.
Further, above-mentioned vacuum pipe 1 is equipped with vacuum lead 8 and gas ducting 9.In the present embodiment, it also wraps Include with the matched pumped vacuum systems of vacuum lead and with the matched inflation system of gas ducting, and pumped vacuum systems and inflation System is with centralized control system without lines matching.Pumped vacuum systems uses aspiration pump, and inflation system uses inflator pump, and passes through respectively Microcontroller and driver driving, microcontroller are also connected with radio communication circuit, with centralized control system without lines matching, connect The instruction issued by it.
Further, vehicle-mounted complex control system is provided in interior compartment, including:Vehicular control unit, temperature monitoring list Member, oxygen concentration monitoring unit, oxygen supply equipment, car position monitoring unit, power supply power supply unit, wireless communication are single Member and compartment drive system;Wireless communication unit is with centralized control system without lines matching.Vehicle-mounted complex control system can be passed through The state of interior compartment is obtained in real time and realizes the operation for controlling outer compartment.
Further, centralized control system is configured with radio communication circuit.
Further, the gangway ladder that bus stop position is equipped with connect the side and compartment outside bottom is located on above-mentioned vacuum pipe 1 10, the top of vacuum pipe 1, bottom outer compartment be equipped with the scalable ladder access 11 being connected to pipeline external.
In the case that train operation speed per hour be 500 kilometers per hour, vacuum degree in vacuum pipe is 62%, outer compartment with Vacuum degree between interior compartment is 31%, and the vacuum degree in interior compartment is 0;It is 1000 kilometers of feelings per hour in train operation speed per hour Under condition, the vacuum degree in vacuum pipe is 80%, and the vacuum degree between outer compartment and interior compartment is 40%, the vacuum degree in interior compartment It is 0.
The device of the working method of inventive pipeline training devices, pipeline train includes section vacuum pipe in rounded shape 1 and multiple tracks 2 for being distributed in 1 body of vacuum pipe, hung outer compartment 3 on multiple tracks 2 respectively, in outer compartment equipped with The interior compartment 4 that its side mutually buffers;When work, multiple outer compartments are not done mutually each other along independent operating in vacuum pipe It disturbs.
Further, the gangway ladder that bus stop position is equipped with connect the side and compartment outside bottom is located on above-mentioned vacuum pipe 10, at the top of vacuum pipe, the outer compartment of bottom be equipped with the scalable ladder access 11 being connected to pipeline external;It is rested in very in outer compartment When the bus stop of vacant duct, scalable ladder access from stretching into vacuum pipe, outer compartment and interior compartment successively outside, and passenger is from scalable Ladder access by gangway ladder into and out of being transferred to.
The vacuum pipe of the device of inventive pipeline train is equipped with solar power supply apparatus 15, above-mentioned solar powered dress It includes the pedestal 16 being fixed on the machine body on surface and the power generating glass 17 being located on pedestal, the electricity output of power generating glass 17 to set 15 End connection accumulator 14, is equipped with power generating glass guiding mechanism 18 between pedestal 16 and power generating glass 17.It can be supplied by the solar energy Denso is set to power supply power supply unit and provides power supply.
Further, in order to keep solar energy utilization ratio high, above-mentioned power generating glass is cadmium telluride power generating glass.
Further, it can be directed at the sun in real time in order to improve power generating glass, above-mentioned power generating glass guiding mechanism 18 includes column Shape shell 19, the multiple retractable sacks 20 being filled in cylindrical outer cover and the seat board 21 for being located at retractable sack uppermost surface, retractable sack Including theca externa 22, the heat dissipation alloy sheet 23 being located in theca externa body and the mercury 24 being filled in theca externa, radiate alloy sheet 23 are fitted and connected with heating wire 25, and the retractable sack in shell 19 has the multilayer of proper alignment, and every layer is respectively provided with multiple annulars The retractable sack of array, to form a retractable sack for arranging vertically stacked arrangement, wherein same row retractable sack in cylindrical outer cover Interior heating wire is uniformly connected to a power control switch 26, and central part is equipped with a upright bar 27 vertically in outer housing, in upright bar The universal connection in center of end and seat board lower surface, seat board upper surface connect the bottom surface of power generating glass by intermediate bar 33.
Further, for the ease of control, the sun can be directed in real time by improving power generating glass, each row in above-mentioned cylindrical outer cover The power control switch that retractable sack is connected is time switch.
By power generating glass guiding mechanism make power generating glass can real-time rotation, to make power generating glass surface close and sunlight Line is vertical, improves generating efficiency.Further, above-mentioned power generating glass guiding mechanism includes cylindrical outer cover, is filled in cylindrical outer cover Interior multiple retractable sacks and the seat board for being located at retractable sack uppermost surface, retractable sack include theca externa, are located in theca externa body Heat dissipation alloy sheet and the mercury being filled in theca externa, heat dissipation alloy sheet are fitted and connected with heating wire, the retractable sack tool in shell There are the multilayer of proper alignment, every layer of retractable sack for being respectively provided with multiple annular arrays to be arranged to form one in cylindrical outer cover The retractable sack of vertically stacked arrangement, the wherein heating wire in same row retractable sack are uniformly connected to a power control switch, outside Central part is equipped with a upright bar, the universal connection in center of upright bar upper end and seat board lower surface vertically in shell, and seat board upper surface leads to Cross the bottom surface of intermediate bar connection power generating glass;When work, the power control switch of a certain row retractable sack in cylindrical outer cover connects After logical, the heating wire in the row retractable sack is begun to warm up, and with the heating of heating wire, mercury in retractable sack is made to start to expand, Retractable sack is driven to expand, and then the seat board lifting of the permutation retractable sack expansion driven row retractable sack position, power generating glass are put It is dynamic, by controlling whether a certain row retractable sack power control switch is connected, realize the different rotation positions on power generating glass surface.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.

Claims (10)

1. a kind of pipeline train comprehensive monitoring control system, which is characterized in that provide a pipeline training devices, the pipeline train Device includes:Section vacuum pipe in rounded shape and the multiple tracks being distributed in vacuum pipe body, on the multiple track Outer compartment has been hung respectively, and the interior compartment mutually buffered with its side is equipped in the outer compartment;One is also provided for monitoring institute State the pipeline vacuum degree monitoring system of level of vacuum in vacuum pipe;The pipeline vacuum degree monitors system and is set in monitoring The data of monitoring are uploaded to the centralized control system by the centralized control system at the heart without lines matching.
2. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that in the vacuum pipe body It is uniformly provided with four tracks.
3. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that the vacuum pipe with it is outer By magnetic levitation between compartment, pass through magnetic levitation between the outer compartment and interior compartment.
4. pipeline train comprehensive monitoring control system according to claim 3, which is characterized in that further include for monitoring The first magnetic suspension state monitoring system of magnetic suspension state between vacuum pipe and outer compartment is stated, and the system is controlled with the concentration System wireless matching processed;It further include the second magnetic suspension state for monitoring magnetic suspension state between the outer compartment and interior compartment Monitoring system, and the system and the centralized control system are without lines matching.
5. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that connect on the vacuum pipe It is connected to branch pipe, each branch pipe construction is identical as vacuum pipe structure.
6. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that the vacuum pipe is upper It is equipped with valve in stopping station location, the valve constitutes round by several mutually isostructural blades, and each blade is radially stretched Contracting movement.
7. pipeline train comprehensive monitoring control system according to claim 6, which is characterized in that further include for driving The blade drive system of blade is stated, the blade drive system is with the centralized control system without lines matching.
8. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that set on the vacuum pipe There are vacuum lead and gas ducting.
9. pipeline train comprehensive monitoring control system according to claim 8, which is characterized in that further include being taken out very with described The matched pumped vacuum systems of vacant duct and with the matched inflation system of the gas ducting, and the pumped vacuum systems with it is described Inflation system is with the centralized control system without lines matching.
10. pipeline train comprehensive monitoring control system according to claim 1, which is characterized in that set in the interior compartment It is equipped with vehicle-mounted complex control system, including:Vehicular control unit, temperature monitoring unit, oxygen concentration monitoring unit, oxygen supply Equipment, car position monitoring unit, power supply power supply unit, wireless communication unit and compartment drive system;It is described wireless Communication unit is with the centralized control system without lines matching.
CN201810273354.1A 2018-03-29 2018-03-29 Pipeline train comprehensive monitoring control system Withdrawn CN108407822A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810273354.1A CN108407822A (en) 2018-03-29 2018-03-29 Pipeline train comprehensive monitoring control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810273354.1A CN108407822A (en) 2018-03-29 2018-03-29 Pipeline train comprehensive monitoring control system

Publications (1)

Publication Number Publication Date
CN108407822A true CN108407822A (en) 2018-08-17

Family

ID=63133992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810273354.1A Withdrawn CN108407822A (en) 2018-03-29 2018-03-29 Pipeline train comprehensive monitoring control system

Country Status (1)

Country Link
CN (1) CN108407822A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114326671A (en) * 2021-12-28 2022-04-12 北京动力机械研究所 Vacuum pipeline control system of magnetic suspension train

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114326671A (en) * 2021-12-28 2022-04-12 北京动力机械研究所 Vacuum pipeline control system of magnetic suspension train

Similar Documents

Publication Publication Date Title
CN103158566B (en) Alternating current transmission system
CN1944146A (en) High speed magnetic suspension train travel control system
US20100319565A1 (en) Smart mass transit rail system
CN106114521A (en) New forms of energy extended-range overhead rail train and use the empty ferrum system of this train
CN201186654Y (en) City track traffic system
CN105696429A (en) Novel vehicle with dual rails in parallel up and down
CN102602400A (en) Circular pipeline wind-driven train running system with circuit control and magnetic attraction
CN209142124U (en) The contact net upkeep operation vehicle of internal combustion alternating current drive suitable for long steep grade
CN101774355A (en) Rail transportation system powered by solar energy
CN101327798B (en) Method of vacuum pipelines for long-distance passenger transport
CN201268233Y (en) Electric power supply system for city track tramcar and city track tramcar
WO2005003553A1 (en) System for generating power by vehicle passing by
CN108407822A (en) Pipeline train comprehensive monitoring control system
CN202463811U (en) Train operating system capable of controlling magnetic-force-attractive annular pipeline wind-force through circuit
CN206437000U (en) Closed traffic system
CN104228883A (en) Control method under automatic drive mode of tramcar
CN203670108U (en) Wind power generation utilization system for subway tunnel
CN106828517A (en) Split type electrical railcar
CN109278771A (en) Multi-platform operation vehicle for contact wire
CN206470982U (en) A kind of Signal Simulation tutoring system
EP2829725B1 (en) Power supply system
CN209142125U (en) Multi-platform operation vehicle for contact wire
CN107471932A (en) A kind of combined tractor of battery
CN106864467B (en) A kind of traffic system on track road surface and ground intercommunication
CN205554184U (en) To open tunnel type railcar operation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180817

WW01 Invention patent application withdrawn after publication