Prior art keywords
rack
integral installation
installation method
plane grid
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810215639.XA
Other languages
Chinese (zh)
Inventor
厉广永
孟卫
刘金鹏
崔会金
孙家宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Permanent Gang Gou Co Ltd In Jiangsu
Original Assignee
Permanent Gang Gou Co Ltd In Jiangsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Permanent Gang Gou Co Ltd In Jiangsu filed Critical Permanent Gang Gou Co Ltd In Jiangsu
Priority to CN201810215639.XA priority Critical patent/CN108396970A/en
Publication of CN108396970A publication Critical patent/CN108396970A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of integral installation methods of plane grid, include the following steps:A, absolute altitude is checked and accepted, and the absolute altitude of rack support column to middle size and the bearing surface of concrete column is carried out an acceptance inspection;B, ground unwrapping wire carries out ground unwrapping wire using spirit level and theodolite;C, rack assembles, and by the practical setting-out size of rack, is assembled from an angle or a line, and leading group, to two web members, two top boom, forms herringbone junior unit;D, it determines crane quantity, determines that crane quantity is 2 or 4 according to arrangement and method for construction and construction width;E, determine that suspension centre, suspension centre should carry out examination on microcomputer and hang confirmation, Success in Experiment, that is, Liftable;F, examination is hung, and carrying out examination to the rack before lifting at the construction field (site) hangs, and confirmation is errorless to carry out integral hoisting;G, it lifts, is lifted using crane vertical-horizontal.In the integral installation method of plane grid in the present invention, the installment work of the project is installed into using truck crane, not only quick but also safety reduces cost.

Description

A kind of integral installation method of plane grid
Technical field
The present invention relates to steel structure technology fields, more particularly to a kind of integral installation method of plane grid.
Background technology
The installation of conventional planar rack uses full hall scaffold high altitude bulk, the requirement height for technology, cost Greatly, and elapsed time is more, and worker can also encounter some contingencies in operation process.
Invention content
In order to overcome the above-mentioned deficiencies of the prior art, the present invention provides a kind of integral installation methods of plane grid.This Technical solution is used by invention:A kind of integral installation method of plane grid, includes the following steps:
A, absolute altitude is checked and accepted, and the absolute altitude of rack support column to middle size and the bearing surface of concrete column is carried out an acceptance inspection;
B, ground unwrapping wire carries out ground unwrapping wire using spirit level and theodolite;
C, rack assembles, and by the practical setting-out size of rack, is assembled from an angle or a line, leading group on two web members two Chord member forms herringbone junior unit;
D, it determines crane quantity, determines that crane quantity is 2 or 4 according to arrangement and method for construction and construction width;
E, determine that suspension centre, suspension centre should carry out examination on microcomputer and hang confirmation, Success in Experiment, that is, Liftable should be as possible when determining suspension centre Symmetrical reconnaissance considers the isometric and intensity of steel wire rope, uniform force is made not tilt;
F, examination is hung, and lifting is preceding at the construction field (site) carries out trying to hang to the rack, and liftoff 200-300mm, confirmation is errorless to carry out entirety Lifting;
G, it lifts, is lifted using crane vertical-horizontal.
Further, in above-mentioned steps b, on ground, unwrapping wire half of the grid that should be staggered to support column is installed.
Further, in above-mentioned steps c, rack will reserve the height of maximum bolt bulb diameter when assembling.
Further, in above-mentioned steps c, when web member is connect with top boom, bushing pipe, external weld all around connection are internally provided with.
Further, in above-mentioned steps c, whether assembling 3-4 grid, to verify installation dimension wrong, after errorless Continue to install.
Further, in above-mentioned steps c, high-strength bolt, Ying Bao should be tightened simultaneously by installing herringbone junior unit and rack Card high-strength bolt is tightened in place.
Further, every crane should all there are 30% risk factor values.
Further, the safety coefficient when steel wire rope is without bending, should be 6-7 times of wire-rope safety factor.
Further, it is additionally provided with bracing means outside high-strength bolt, to consolidate the connection of bolt sphere.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the installation of plane grid, the installment work that the project is installed into using truck crane were not only quick but also safe.
2, simple and easy to make, it is convenient to use, installation cost is reduced, installation progress is processed.
Description of the drawings
Fig. 1 is a kind of flow chart of the integral installation method of plane grid of the present invention;
Fig. 2 is rack integral hoisting schematic diagram of the present invention;
Fig. 3 is herringbone junior unit structural schematic diagram of the present invention.
Wherein:1- chord members, 2- web members, 3- bracing means, 4- bolt spheres, 5- herringbone junior units.
Specific implementation mode
In order to deepen the understanding of the present invention, present invention will be further explained below with reference to the attached drawings and examples, the implementation Example is only used for explaining the present invention, does not constitute and limits to protection scope of the present invention.
Embodiment one:
As depicted in figs. 1 and 2, a kind of integral installation method of plane grid, includes the following steps:
A, absolute altitude is checked and accepted, and the absolute altitude of rack support column centre to centre size and the bearing surface of concrete column is carried out an acceptance inspection;
B, ground unwrapping wire carries out ground unwrapping wire using spirit level and theodolite, when unwrapping wire reply support column be staggered half of grid into Row installation;
C, rack assembles, and by the practical setting-out size of rack, is assembled from an angle, leading group to two web members, two top boom, shape At herringbone junior unit;
D, it determines crane quantity, determines that crane quantity is 2 according to arrangement and method for construction and construction width;
E, determine that suspension centre, suspension centre should carry out examination on microcomputer and hang confirmation, Success in Experiment, that is, Liftable;
F, examination is hung, and carrying out examination to the rack before lifting at the construction field (site) hangs, liftoff 200mm, and confirmation is errorless to carry out integral hoisting;
G, it lifts, is lifted using crane vertical-horizontal.
Embodiment two:
As depicted in figs. 1 and 2, a kind of integral installation method of plane grid, includes the following steps:
A, absolute altitude is checked and accepted, and the absolute altitude of rack support column centre to centre size and the bearing surface of concrete column is carried out an acceptance inspection;
B, ground unwrapping wire carries out ground unwrapping wire using spirit level and theodolite, when unwrapping wire reply support column be staggered half of grid into Row installation;
C, rack assembles, and by the practical setting-out size of rack, is assembled from a line, leading group to two web members, two top boom, shape At herringbone junior unit;
D, it determines crane quantity, determines that crane quantity is 4 according to arrangement and method for construction and construction width;
E, determine that suspension centre, suspension centre should carry out examination on microcomputer and hang confirmation, Success in Experiment, that is, Liftable;
F, examination is hung, and carrying out examination to the rack before lifting at the construction field (site) hangs, liftoff 300mm, and confirmation is errorless to carry out integral hoisting;
G, it lifts, is lifted using crane vertical-horizontal.
In the above-described embodiments, in step c, rack will reserve the height of maximum bolt bulb diameter when assembling, to adapt to Various sizes of bolt sphere, installation two chord members 1 and two web members 2 formation herringbone junior unit 5, when installation, should tighten bolt sphere 4 simultaneously With chord member 1, the high-strength bolt of 2 junction of web member, it should ensure that high-strength bolt is tightened in place, and in high-strength bolt peripheral hardware Bracing means 3 is set, and assembles 3-4 grid whether verify installation dimension wrong, continues to install after errorless.
In the above-described embodiments, every crane should all there are 30% risk factor values.
What the embodiment of the present invention was announced is preferred embodiment, and however, it is not limited to this, the ordinary skill people of this field Member understands the spirit of the present invention easily according to above-described embodiment, and makes different amplification and variation, but as long as not departing from this The spirit of invention, all within the scope of the present invention.

Claims (9)

1. a kind of integral installation method of plane grid, it is characterised in that:Include the following steps:
A, absolute altitude is checked and accepted, and the absolute altitude of rack support column to middle size and the bearing surface of concrete column is carried out an acceptance inspection;
B, ground unwrapping wire carries out ground unwrapping wire using spirit level and theodolite;
C, rack assembles, and by the practical setting-out size of rack, is assembled from an angle or a line, leading group on two web members two Chord member forms herringbone junior unit;
D, it determines crane quantity, determines that crane quantity is 2 or 4 according to arrangement and method for construction and construction width;
E, determine that suspension centre, suspension centre should carry out examination on microcomputer and hang confirmation, Success in Experiment, that is, Liftable;
F, examination is hung, and lifting is preceding at the construction field (site) carries out trying to hang to the rack, and liftoff 200-300mm, confirmation is errorless to carry out entirety Lifting;
G, it lifts, is lifted using crane vertical-horizontal.
2. the integral installation method of plane grid according to claim 1, it is characterised in that:In above-mentioned steps b, on ground Unwrapping wire half of the grid that should be staggered to support column in face is installed.
3. the integral installation method of plane grid according to claim 1, it is characterised in that:In above-mentioned steps c, rack The height of maximum bolt bulb diameter is reserved when assembling.
4. the integral installation method of plane grid according to claim 1 or 3, it is characterised in that:In above-mentioned steps c, When web member is connect with top boom, it is internally provided with bushing pipe, external weld all around connection.
5. the integral installation method of plane grid according to claim 1 or 3, it is characterised in that:In above-mentioned steps c, Whether assembling 3-4 grid, to verify installation dimension wrong, continues to install after errorless.
6. the integral installation method of plane grid according to claim 1 or 3, it is characterised in that:In above-mentioned steps c, Installation herringbone junior unit and rack should tighten high-strength bolt simultaneously, should ensure that high-strength bolt is tightened in place.
7. the integral installation method of plane grid according to claim 1, it is characterised in that:Every crane should all be there are 30% risk factor value.
8. the integral installation method of plane grid according to claim 1, it is characterised in that:When the steel wire rope is without bending Safety coefficient, should be 6-7 times of wire-rope safety factor.
9. the integral installation method of plane grid according to claim 6, it is characterised in that:High-strength bolt is additionally provided with outside Bracing means, to consolidate the connection of bolt sphere.
CN201810215639.XA 2018-03-15 2018-03-15 A kind of integral installation method of plane grid Pending CN108396970A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810215639.XA CN108396970A (en) 2018-03-15 2018-03-15 A kind of integral installation method of plane grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810215639.XA CN108396970A (en) 2018-03-15 2018-03-15 A kind of integral installation method of plane grid

Publications (1)

Publication Number Publication Date
CN108396970A true CN108396970A (en) 2018-08-14

Family

ID=63092559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810215639.XA Pending CN108396970A (en) 2018-03-15 2018-03-15 A kind of integral installation method of plane grid

Country Status (1)

Country Link
CN (1) CN108396970A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535442A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Welding ball net rack assembling construction process
CN111535439A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Integral installation construction method of planar net rack

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0882100A (en) * 1994-09-08 1996-03-26 Takenaka Komuten Co Ltd Lift-up method for constructing catwalk
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid
CN106703420A (en) * 2017-02-13 2017-05-24 山西宏厦建筑工程第三有限公司 Large-span ball joint spherical wire frame cluster rocker hoisting construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0882100A (en) * 1994-09-08 1996-03-26 Takenaka Komuten Co Ltd Lift-up method for constructing catwalk
CN101988308A (en) * 2010-09-30 2011-03-23 中国华西企业有限公司 Non-support installation method of long-span spatial bolt ball steel reticulated shell dome
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid
CN106703420A (en) * 2017-02-13 2017-05-24 山西宏厦建筑工程第三有限公司 Large-span ball joint spherical wire frame cluster rocker hoisting construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111535442A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Welding ball net rack assembling construction process
CN111535439A (en) * 2020-05-08 2020-08-14 安徽伟宏钢结构集团股份有限公司 Integral installation construction method of planar net rack

Similar Documents

Publication Publication Date Title
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN103883129B (en) A kind of steel structural roof beam installation method
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN105908761B (en) A kind of high slope hanging basket mobile platform construction technology
CN103924520B (en) Construction method and device of suspension bridge main cable anchorage prestressed pipes
CN203947771U (en) A kind of Bailey beam pendent form support system
CN103243926A (en) Construction method for hoisting pipe well vertical pipe in high-rise building engineering
CN105971294A (en) Stereoscopic supporting scaffold composed of universal standard joints and mounting method
CN103174302A (en) Construction method for large-diameter barrel cabin top
CN203905512U (en) Adjustable device for installing steel beams in place
CN105569242A (en) Assembling method for composite floor slabs
CN108396970A (en) A kind of integral installation method of plane grid
CN106006425A (en) Method of hoisting and transporting large-sized equipment arranged in underground machine rooms of super high-rise buildings
CN112211103A (en) Special safe construction process for assembling and installing coal conveying trestle steel truss
CN103216103A (en) Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof
CN101503908A (en) Construction method for spacing suspension cable structural template support platform
CN205777401U (en) A kind of moulding bed universal standard saves
CN107419907B (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN210884873U (en) Installation hanging beam and lifting device of pipeline
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN204080636U (en) Steel pipe arch bridge arch rib installs flat turn supporting and location platform
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN113323404A (en) Installation method of integrated steel truss
CN102733612B (en) Mounting method of electric hoist orbit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180814