CN105178609A - High-altitude bulk construction method for steel-structure grid - Google Patents

High-altitude bulk construction method for steel-structure grid Download PDF

Info

Publication number
CN105178609A
CN105178609A CN201510558274.7A CN201510558274A CN105178609A CN 105178609 A CN105178609 A CN 105178609A CN 201510558274 A CN201510558274 A CN 201510558274A CN 105178609 A CN105178609 A CN 105178609A
Authority
CN
China
Prior art keywords
rack
construction
steel structure
follow
structure net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510558274.7A
Other languages
Chinese (zh)
Other versions
CN105178609B (en
Inventor
李长安
侯利成
舒伟强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201510558274.7A priority Critical patent/CN105178609B/en
Publication of CN105178609A publication Critical patent/CN105178609A/en
Application granted granted Critical
Publication of CN105178609B publication Critical patent/CN105178609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a high-altitude bulk construction method for a steel-structure grid. The method comprises the steps as follows: 1), the steel-structure grid is divided into a starting grid and a follow-up grid; 2), a scaffold construction platform is set up at the position of the starting grid, and then construction of the starting grid is carried out by means of the scaffold construction platform; and 3), a constructor carries out the construction of the follow-up grid by considering the starting grid as an operation platform. In the steps above, before construction of the starting grid and the follow-up grid, basic parts such as bolt spheres, chord members and web members are spliced into an assembled unit, and then the assembled unit is hoisted to a construction position, so that splicing construction of the starting grid and the follow-up grid is carried out. According to the method, workload required for setting up a scaffold is reduced; revolving material consumption is low; setting-up time for the scaffold is saved at the same time; and the construction cost is reduced. Besides, the basic parts are spliced into the assembled unit and a high-altitude assembled unit simultaneously, so that the construction progress can be accelerated.

Description

Steel structure net rack high altitude bulk construction method
Technical field
The invention belongs to steel structure net rack assembling technique field, particularly relate to a kind of steel structure net rack high altitude bulk construction method.
Background technology
Steel structure net rack is the space structures linked by node by many rod members according to certain space lattice form, its simple structure, easy to connect, stressed clear and definite, node stiffness by itself is large, lightweight and handsome in appearance etc.
The mounting method of rack is a lot, is generally: high altitude bulk, piecemeal Method for Installation, aerial sliding methed, whole hanging method etc., wherein Assembly in pieces at height is divided into again full Support Method, piecemeal activity Support Method, method of encorbelmenting three kinds.The process of full Support Method sets up a working platform substantially identical with rack size, and rack is assembled on platform.The advantage of full Support Method is assembled system easy to control the quality, but there is following shortcoming: the workload of scaffold building is comparatively large, and circulation material consumption is large, and time span is long, and construction cost is high, and is difficult to ensure to complete on schedule, affects whole engineering and hands on schedule.
Summary of the invention
The object of this invention is to provide a kind of steel structure net rack high altitude bulk construction method, comparatively large with the workload solving the full Support Method scaffold of rack, construction cost is large, the technical problem that the rack installation cycle is long.
The technical scheme that the present invention solves the problems of the technologies described above is as follows: a kind of steel structure net rack high altitude bulk construction method, comprises the following steps:
Step 1, is divided into starting rack and follow-up rack by steel structure net rack;
Step 2, sets up scaffold construction platform in starting rack position, then utilizes scaffold construction platform to carry out starting Construction of The Grids;
Step 3, constructor carries out the construction of follow-up rack with rack of starting to walk for operating platform;
In above-mentioned steps, before carrying out starting rack and follow-up Construction of The Grids, on ground, base parts and components bolt sphere, chord member and web member are spliced into assembled unit, starting rack and follow-up rack concatenation construction are carried out in assembled unit lifting to construction location.
The present invention's steel structure net rack high altitude bulk construction method as above, further, before step 1, also comprise the step of base parts and components taxonomic revision, base parts and components is carried out taxonomic revision, specification, kind are stacked neatly in order by size, are convenient to search use in steel structure net rack installation process.
The present invention's steel structure net rack high altitude bulk construction method as above, further, in step 3, constructor with start to walk rack for operating platform carry out the construction of follow-up rack time, follow-up rack is increased and supports, namely set up scaffold or steel column on ground and support to increase follow-up rack and support.
The present invention's steel structure net rack high altitude bulk construction method as above, further, after whole steel structure net rack installation, check whether correct all rod members, bolt sphere install, measure the amount of deflection of rack longitudinal direction, lateral length, bearing absolute altitude and off-centring, rack deadweight.
The present invention's steel structure net rack high altitude bulk construction method as above, further, described steel structure net rack comprises upper chord, lower chord, bolt sphere and web member; Described upper chord and upper bolt ball connect and compose the upper strata of rack; Described lower chord and lower bolt ball connect and compose the lower floor of rack; Described web member connects with corresponding upper bolt ball and lower bolt ball respectively.
The present invention's steel structure net rack high altitude bulk construction method as above, further, described assembled unit comprises two upper chords, two web members and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.
Or described assembled unit comprises four web members and a bolt sphere; Described web member is connected in described bolt sphere, forms quadrangular pyramid structure.
Or described assembled unit comprises two upper chords, a web member and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.
The invention has the beneficial effects as follows:
Steel structure net rack is divided into starting rack and follow-up rack by the inventive method; Only set up scaffold construction platform in starting rack position, then utilize scaffold construction platform to carry out starting Construction of The Grids; Decrease the workload of scaffold building, circulation material consumption reduces, and saves the scaffold building time simultaneously, reduces construction cost.In addition, before carrying out starting rack and follow-up Construction of The Grids, on ground, base parts and components bolt sphere, chord member and web member are spliced into assembled unit, starting rack and follow-up rack concatenation construction are carried out in assembled unit lifting to construction location.Ground construction and high-altitude construction are carried out simultaneously, can accelerating construction progress.The inventive method be whole engineering hand on schedule provide the time ensure.
Accompanying drawing explanation
By detailed description done in conjunction with the following drawings, above-mentioned and/or other aspects of the present invention and advantage will become clearer and be easier to understand, and these accompanying drawings just schematically, do not limit the present invention, wherein:
Fig. 1 is the steel structure net rack high altitude bulk construction method schematic flow sheet of an embodiment of the present invention;
Fig. 2 is the starting rack of an embodiment of the present invention and follow-up rack schematic diagram;
Fig. 3 is the assembled unit schematic diagram of the first embodiment of the present invention;
Fig. 4 is the assembled unit schematic diagram of the second embodiment of the present invention;
Fig. 5 is the assembled unit schematic diagram of the third embodiment of the present invention;
Fig. 6 A-6F is the assembled process schematic of starting rack.
In accompanying drawing, the list of parts representated by each label is as follows:
1, to start to walk rack, 2, follow-up rack, 3, bolt sphere, 4, upper chord, 5, web member, 6, lower chord, 7, one ball one winds up the pyrometric cone of two web members, and 8, one ball two winds up the quadrangular pyramid of two web members.
Detailed description of the invention
Hereinafter, the embodiment of steel structure net rack high altitude bulk construction method of the present invention is described with reference to the accompanying drawings.
The embodiment recorded at this is specific detailed description of the invention of the present invention, for illustration of design of the present invention, is all explanatory and exemplary, should not be construed as the restriction to embodiment of the present invention and the scope of the invention.Except the embodiment recorded at this, those skilled in the art can also adopt other technical scheme apparent based on the content disclosed in the application's claims and manual, and these technical schemes comprise the technical scheme making any apparent substitutions and modifications adopted the embodiment recorded at this.
The embodiment of the present invention provides a kind of steel structure net rack high altitude bulk construction method, comprises the following steps:
The step of base parts and components taxonomic revision, carries out taxonomic revision base parts and components, and specification, kind are stacked neatly in order by size, is convenient to search use in steel structure net rack installation process.
Step 1, is divided into starting rack 1 and follow-up rack 2, as shown in Figure 2 by steel structure net rack;
Step 2, sets up scaffold construction platform in starting rack 1 position, then utilizes scaffold construction platform to carry out starting Construction of The Grids;
Step 3, constructor carries out the construction of follow-up rack 2 with rack 1 of starting to walk for operating platform;
Step 4, after whole steel structure net rack installation, checks whether correct all rod members, bolt sphere install, measures the amount of deflection of rack longitudinal direction, lateral length, bearing absolute altitude and off-centring, rack deadweight.
In above-mentioned steps, before carrying out starting rack and follow-up Construction of The Grids, on ground, base parts and components bolt sphere 3, chord member (upper chord 4 and lower chord 6) and web member 5 are spliced into assembled unit, starting rack and follow-up rack concatenation construction are carried out in assembled unit lifting to construction location.
The above embodiment of the present invention has the following advantages:
Steel structure net rack is divided into starting rack and follow-up rack by the method for above-described embodiment; Only set up scaffold construction platform in starting rack position, then utilize scaffold construction platform to carry out starting Construction of The Grids; Decrease the workload of scaffold building, circulation material consumption reduces, and saves the scaffold building time simultaneously, reduces construction cost.In addition, before carrying out starting rack and follow-up Construction of The Grids, on ground, base parts and components bolt sphere, chord member and web member are spliced into assembled unit, starting rack and follow-up rack concatenation construction are carried out in assembled unit lifting to construction location.Ground construction and high-altitude construction are carried out simultaneously, can accelerating construction progress.The inventive method be whole engineering hand on schedule provide the time ensure.
The present invention's steel structure net rack high altitude bulk construction method as above, further, in step 3, constructor with start to walk rack for operating platform carry out the construction of follow-up rack time, follow-up rack is increased and supports, namely set up scaffold or steel column on ground and support to increase follow-up rack and support.
State in the steel structure net rack high altitude bulk construction method of embodiment on the invention, described steel structure net rack comprises upper chord, lower chord, bolt sphere and web member; Described upper chord and upper bolt ball connect and compose the upper strata of rack; Described lower chord and lower bolt ball connect and compose the lower floor of rack; Described web member connects with corresponding upper bolt ball and lower bolt ball respectively.
State in the steel structure net rack high altitude bulk construction method of embodiment on the invention, as shown in Figure 3, described assembled unit comprises two upper chords, two web members and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.Or as shown in Figure 4, described assembled unit comprises four web members and a bolt sphere; Described web member is connected in described bolt sphere, forms quadrangular pyramid structure.Or as shown in Figure 5, described assembled unit comprises two upper chords, a web member and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.
In order to further illustrate steel structure net rack high altitude bulk construction method of the present invention, be specifically described for certain engineering below.As shown in Figure 1, the schematic flow sheet of this project enforcement.
One, preparation of construction
The relative elevation of rack embedded board on civil engineering bearing surface is all measured and is indicated in the corresponding position of plane drawing by civil engineering unit application level instrument, and this datagram is supplied to project supervision and rack installation engineer, as the foundation of installing and check and accept each supporting-point repetition measurement.
Two, construction march into the arena material divide
Rack adopt scaffold coordinative construction platform assembled formation standard across, then install to assembled unit Assembly in pieces at height, from installing to another side on one side, standard across the emphasis being installed as this installation.Rack component, as rod member, bolt sphere, will carry out taxonomic revision in a pre-installation, by specification size, numbering kind marshalling in order, is convenient to search use in installation process.Then the rod member needing to install, bolt sphere are arranged out by the sequencing installed, after everything preparation is carried out, just can carry out the installation on ground of rack.Before installing, bolt sphere classification is put.
2, rod member for grid becomes assembled unit according to erection sequence well at installation on ground, puts by construction location.
Three, start to walk the assembled of rack
1, lower edge plane grid is installed, by first across bearing installation in position, install first across lower bolt sphere, a lower chord, composition fore-and-aft plane grid, as shown in Figure 6A; Sequence interim fulcrum, ensure that lower bolt sphere is in same level; Install the web member between first module and upper bolt sphere, the junior unit of to be generally first cone be ball four web member, is screwed into lower bolt sphere after in place, fixes, as shown in Figure 6B; Second pyrometric cone of having bored as first filling ball one chord member two web member, as shown in Figure 6 C, then inserts other two web members, as shown in Figure 6 D, and the progressively rack of the complete first module of cycle installation, as illustrated in fig. 6e.
2, the inverted triangle grid that winds up is installed; Rack second unit rise adopt limit continue install assembling, as fig 6 f illustrates, first wind up a ball one pyrometric cone 7 of two web members from end bay, be that a ball two winds up the quadrangular pyramid 8 of two web members later, two diagonal web members are supported in lower bolt sphere, strain upper chord up, make upper chord progressively near mounted upper bolt sphere, be screwed into.
Four, the high altitude bulk of follow-up rack
Assembly in pieces at height the component of rack (base parts and components or assembled unit) is winched to design attitude directly carry out assembled method.When adopting suspender to assist installation at high altitude method, the amount of deflection of rack installation process should be controlled, otherwise should take to increase the measure supported, scaffold or steel column need be set up on ground and support and install.
1, base parts and components is spliced into assembled unit;
Rack is reasonably divided into various assembled unit according to actual conditions: such as, is directly always combined into rack by single rod member, individual node, ball one bar, two ball one bars.Or such as, by assembled unit, ball four bar (corner cone), ball three bar (triangular pyramids) are always combined into rack; Again such as, form intermediate combination unit by assembled unit and be always combined into rack again.
2, temporary support point is arranged: temporary support point is arranged and undertaken by rack erection sequence, and supporting-point is arranged should be even.Should control at below 5mm by the total settlement that the factors such as the joint distortion of supporting bracket, elastic compression, foundation settlement cause, supporting-point place can arrange the jack adjusting absolute altitude between rack lower edge and support.
3, grid structure with bolt-sphere joints is always spelled:
Bolt-ball net frame first, across when starting assembled, is generally first spell lower edge, after the absolute altitude of lower edge, axis trimming is good, all tight a bolt, plays the role of positioning.
Then carry out connection web member and wind up.In construction, general employing is by the assembled unit being combined into quadrangular pyramid with web member that winds up, and carries out the installation of assembled unit.The bolt of each assembled unit should be tightened simultaneously, and indivedual bolt should be prevented during construction by jam-packed, causes bolt not effectively to be in place.
Later lower edge and another side web member can adopt single-piece to install, and the method for installing quadrangular pyramid also can be adopted to install.The installation of above-mentioned steps is carried out in circulation, completes the installation of whole rack.It is a row with a grid that rack is installed general, advances by row.
4, net rack support dropping place:
Supporting-point after net rack support dropping place refers to that rack is assembled and completes on striking, makes rack by the operating process of temporary support state smooth transition to the permanent bearing of design.Rack dropping place should follow following principle: declined realized load equilibrium transfer by the jack be placed on the bearing trace that repeatedly circulates during the dismounting of temporary support.Need before dropping place to check whether the descending stroke of jack meets the requirement of this deflection value, the value because rack sinking causes stroke to increase when calculating jack stroke, will be considered, accordingly reserved enough stroke surpluses.
Five, the inspection of rack and measurement and subsequent treatment
After whole rack installation, must check comprehensively, check whether bolt is tightened, and now jackscrew should be in the position of high-strength bolt keyway deep trouth.Whether the parts such as all rod members, ball are installed correct, with or without distortion.The amount of deflection of rack longitudinal direction, lateral length, bearing absolute altitude and off-centring, rack deadweight should be measured.
The allowable variation (mm) that steel grid structure is installed
The subsequent treatment of rack
Rack installs rear bolt sphere to touching off in work progress, sleeve paint carries out benefits and brushes, and unnecessary cavity and gap oil loam block.
Each technical characteristic of above-mentioned disclosure is not limited to that disclosed with combination that is further feature, other combination that those skilled in the art also can carry out between each technical characteristic according to the object of invention, is as the criterion with the object realizing the present invention.

Claims (8)

1. a steel structure net rack high altitude bulk construction method, comprises the following steps:
Step 1, is divided into starting rack and follow-up rack by steel structure net rack;
Step 2, sets up scaffold construction platform in starting rack position, then utilizes scaffold construction platform to carry out starting Construction of The Grids;
Step 3, constructor carries out the construction of follow-up rack with rack of starting to walk for operating platform;
In above-mentioned steps, before carrying out starting rack and follow-up Construction of The Grids, on ground, base parts and components bolt sphere, chord member and web member are spliced into assembled unit, starting rack and follow-up rack concatenation construction are carried out in assembled unit lifting to construction location.
2. steel structure net rack high altitude bulk construction method according to claim 1, it is characterized in that, before step 1, also comprise the step of base parts and components taxonomic revision, base parts and components is carried out taxonomic revision, specification, kind are stacked neatly in order by size, are convenient to search use in steel structure net rack installation process.
3. steel structure net rack high altitude bulk construction method according to claim 1, it is characterized in that, in step 3, constructor with start to walk rack for operating platform carry out the construction of follow-up rack time, follow-up rack is increased and supports, namely set up scaffold or steel column on ground and support to increase follow-up rack and support.
4. steel structure net rack high altitude bulk construction method according to claim 1, it is characterized in that, after whole steel structure net rack installation, check whether correct all rod members, bolt sphere install, measure the amount of deflection of rack longitudinal direction, lateral length, bearing absolute altitude and off-centring, rack deadweight.
5. the steel structure net rack high altitude bulk construction method according to any one of claim 1-4, is characterized in that, described steel structure net rack comprises upper chord, lower chord, bolt sphere and web member; Described upper chord and upper bolt ball connect and compose the upper strata of rack; Described lower chord and lower bolt ball connect and compose the lower floor of rack; Described web member connects with corresponding upper bolt ball and lower bolt ball respectively.
6. steel structure net rack high altitude bulk construction method according to claim 5, is characterized in that, described assembled unit comprises two upper chords, two web members and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.
7. steel structure net rack high altitude bulk construction method according to claim 5, is characterized in that, described assembled unit comprises four web members and a bolt sphere; Described web member is connected in described bolt sphere, forms quadrangular pyramid structure.
8. steel structure net rack high altitude bulk construction method according to claim 5, is characterized in that, described assembled unit comprises two upper chords, a web member and a bolt sphere; Described upper chord and web member are connected in described bolt sphere.
CN201510558274.7A 2015-09-06 2015-09-06 Steel structure net rack high altitude bulk construction method Active CN105178609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510558274.7A CN105178609B (en) 2015-09-06 2015-09-06 Steel structure net rack high altitude bulk construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510558274.7A CN105178609B (en) 2015-09-06 2015-09-06 Steel structure net rack high altitude bulk construction method

Publications (2)

Publication Number Publication Date
CN105178609A true CN105178609A (en) 2015-12-23
CN105178609B CN105178609B (en) 2017-07-28

Family

ID=54900989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510558274.7A Active CN105178609B (en) 2015-09-06 2015-09-06 Steel structure net rack high altitude bulk construction method

Country Status (1)

Country Link
CN (1) CN105178609B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame
CN107165269A (en) * 2017-06-16 2017-09-15 中国五冶集团有限公司 A kind of method that use hanger structure installs high-altitude bolt-ball net frame
CN107345427A (en) * 2017-07-31 2017-11-14 中建安装工程有限公司 Large span bolt-ball net frame and its modularization installation method
CN108396970A (en) * 2018-03-15 2018-08-14 江苏恒久钢构有限公司 A kind of integral installation method of plane grid
CN108952242A (en) * 2018-08-11 2018-12-07 中国电建集团贵州电力设计研究院有限公司 A kind of construction method of indoor coal storage yard arch-shaped space truss
CN109235902A (en) * 2018-09-26 2019-01-18 中建钢构有限公司 Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN110528891A (en) * 2019-09-06 2019-12-03 成都建工第一建筑工程有限公司 Large-span Spherical rack integral hoisting method
CN113123609A (en) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 Method for mounting steel structure dome net rack with two low ends and high middle
CN113434929A (en) * 2021-06-11 2021-09-24 江苏兴厦建设工程集团有限公司 BIM-based large-span steel structure spherical curved surface latticed shell installation method
CN113502923A (en) * 2021-06-30 2021-10-15 中国二十二冶集团有限公司 Construction method for assisting second start-free of reticulated shell structure at expansion joint
CN114922435A (en) * 2022-05-17 2022-08-19 山东电力工程咨询院有限公司 Construction method of bolt-sphere joint net rack of garbage power station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284922A (en) * 2006-04-13 2007-11-01 Shimizu Corp Method of constructing steel frame of building
CN101100876A (en) * 2007-08-02 2008-01-09 中国建筑第七工程局 Net-shell net-rack overhanging high altitude bulk construction method for bolt sphere node
CN102003078A (en) * 2010-12-24 2011-04-06 青建集团股份公司 Assembling method of net rack
CN102345393A (en) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 High-altitude bulk process of bolt ball net frame
CN102425326A (en) * 2011-09-14 2012-04-25 徐州中煤百甲重钢结构有限公司 Installation construction process of bolt net rack cylindrical shell storage bin

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007284922A (en) * 2006-04-13 2007-11-01 Shimizu Corp Method of constructing steel frame of building
CN101100876A (en) * 2007-08-02 2008-01-09 中国建筑第七工程局 Net-shell net-rack overhanging high altitude bulk construction method for bolt sphere node
CN102003078A (en) * 2010-12-24 2011-04-06 青建集团股份公司 Assembling method of net rack
CN102345393A (en) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 High-altitude bulk process of bolt ball net frame
CN102425326A (en) * 2011-09-14 2012-04-25 徐州中煤百甲重钢结构有限公司 Installation construction process of bolt net rack cylindrical shell storage bin

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592760B (en) * 2016-12-29 2019-03-01 青建集团股份公司 Bolt-ball net frame high-altitude, which dissipates, spells construction method
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame
CN107165269A (en) * 2017-06-16 2017-09-15 中国五冶集团有限公司 A kind of method that use hanger structure installs high-altitude bolt-ball net frame
CN107345427A (en) * 2017-07-31 2017-11-14 中建安装工程有限公司 Large span bolt-ball net frame and its modularization installation method
CN108396970A (en) * 2018-03-15 2018-08-14 江苏恒久钢构有限公司 A kind of integral installation method of plane grid
CN108952242A (en) * 2018-08-11 2018-12-07 中国电建集团贵州电力设计研究院有限公司 A kind of construction method of indoor coal storage yard arch-shaped space truss
CN109235902A (en) * 2018-09-26 2019-01-18 中建钢构有限公司 Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN110528891A (en) * 2019-09-06 2019-12-03 成都建工第一建筑工程有限公司 Large-span Spherical rack integral hoisting method
CN110528891B (en) * 2019-09-06 2021-04-16 成都建工第一建筑工程有限公司 Integral hoisting method for large-span spherical net rack
CN113123609A (en) * 2021-04-20 2021-07-16 贵州建工集团第一建筑工程有限责任公司 Method for mounting steel structure dome net rack with two low ends and high middle
CN113434929A (en) * 2021-06-11 2021-09-24 江苏兴厦建设工程集团有限公司 BIM-based large-span steel structure spherical curved surface latticed shell installation method
CN113502923A (en) * 2021-06-30 2021-10-15 中国二十二冶集团有限公司 Construction method for assisting second start-free of reticulated shell structure at expansion joint
CN114922435A (en) * 2022-05-17 2022-08-19 山东电力工程咨询院有限公司 Construction method of bolt-sphere joint net rack of garbage power station

Also Published As

Publication number Publication date
CN105178609B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN105178609A (en) High-altitude bulk construction method for steel-structure grid
CN101200916B (en) Construction method of prestressed suspension type building structure
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
CN105649252A (en) Beam string steel structure roof and installation method thereof
CN102345393A (en) High-altitude bulk process of bolt ball net frame
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN103963998A (en) Main force-bearing satellite structure with hexagonal framework
CN103866986A (en) Installing method of large-span variable-cross-section screw bolt ball node reticulated shell
CN102409864A (en) Steel truss construction method and temporary reinforcing device used in hoisting process of same
CN108505443A (en) A kind of big segment lifting self-anchored suspension bridge construction method not setting camber
CN102277980B (en) Device for integrally jacking roof of single-layer industrial factory building and construction method thereof
CN106760559B (en) The installation method of hemispherical spherical crown reticulated shell
CN106013784A (en) Angle iron frame template and construction method
CN104060841A (en) Large-span steel girder installation construction method
CN106452302A (en) Bracket for photovoltaic power station
CN104775363A (en) Assembling method of upper tower column reinforcing steel bar segment
CN107190860A (en) The automatic lifting system of Steel Structure Installation
CN201695674U (en) Modular cantilever concrete structure pouring framework
CN109083408A (en) A kind of shear wall pours device for fixing module and construction method
CN105133774A (en) Combined assembly type suspended ceiling reverse support system structure and designing and installing integrated method
CN103015526A (en) Regularly-triangular combined surface same-unit space truss structure
CN102535693B (en) Curtain wall column mounting method and mounting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant