CN101100876A - Net-shell net-rack overhanging high altitude bulk construction method for bolt sphere node - Google Patents

Net-shell net-rack overhanging high altitude bulk construction method for bolt sphere node Download PDF

Info

Publication number
CN101100876A
CN101100876A CNA2007100548872A CN200710054887A CN101100876A CN 101100876 A CN101100876 A CN 101100876A CN A2007100548872 A CNA2007100548872 A CN A2007100548872A CN 200710054887 A CN200710054887 A CN 200710054887A CN 101100876 A CN101100876 A CN 101100876A
Authority
CN
China
Prior art keywords
net
shell
ball
grid
endless belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100548872A
Other languages
Chinese (zh)
Other versions
CN100545367C (en
Inventor
焦安亮
翟国政
张银珠
盛文考
黄延铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
China Construction Seventh Engineering Division Corp Ltd
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Bureau Shanghai Corp Ltd
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Bureau Shanghai Corp Ltd, First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Bureau Shanghai Corp Ltd
Priority to CNB2007100548872A priority Critical patent/CN100545367C/en
Publication of CN101100876A publication Critical patent/CN101100876A/en
Application granted granted Critical
Publication of CN100545367C publication Critical patent/CN100545367C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

This is a high altitude impending construction method of node on plane web frame, sphere or column web frame. A falsework is built between two cycle zones along the web shell and assemble the web shell on the two cycle zones. From the third cycle zone, impending construction method is used from the outer cycle to the top of the shell. On each cycle two shifts build grid by grid along clock direction. Lifting an assemble part of one down ball, two down rods and three web rods to accomplished node for assembling. Then lifting an assemble part of one up ball, two up rods and one web rod for assembling to accomplish one grid.

Description

The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
Technical field
The present invention relates to a kind of plane grid in engineering construction, sphere net case, the net-shell net-rack overhanging high altitude bulk construction method of the bolted spherical node that uses in the net shell construction of cylindrical latticed shell and all the other similar bolted spherical nodes.
Background technology
In existing steel pipe arch of vault structure design, for example: the plane projection diameter is 98m, radius of a ball 56.4m, rise 28.5m, rise in certain engineering for 34.7m, needing steel using amount is 360t, needs cost of materials and steel pipe manufacturing installation fee (bend pipe, intersection making, assembling, lifting etc.), 11700 yuan of expenses per ton, not only expense height but also difficulty of construction are big.Aspect constructure scheme, there are three kinds at present, the one, all adopt steel pipe scaffold to set up full hall scaffold in whole racks plane, thereon with method assembling net shell in bulk, palpus pin hand steel pipe 955t, and also recruitment is many, long in time limit; Another kind method is to set up full hall scaffold on three endless belt of periphery, with method in bulk the net shell is installed thereon, and remainder is assembled into integral body on ground, with the unipods pole it is winched to the high-altitude again and connects with former peripheral net shell.This way needs equipment many, the peopleware height; The third way is assembled at high-altitude overhanging with the smallest assembled rigid unit method exactly, still must cooperate with crane and gin pole.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art and a kind of not only less investment of taking smallest assembled rigid unit high altitude bulk construction is provided, cost is low, and quality is good, the net-shell net-rack overhanging high altitude bulk construction method of fireballing bolted spherical node, the advantage of existing method in bulk has the advantage of the method for encorbelmenting again.
The present invention seeks to realize like this: concrete steps are as follows:
At first, in two endless belt of net shell (or being called rack) periphery, set up steel pipe scaffold, thereon with the net shell on two endless belt of method assembling in bulk,
Then, adopt the method construction in bulk of encorbelmenting since the 3rd endless belt, push up closely linked propelling by outer hoop shell, each endless belt is that grid of two groups of personnel of branch connects a grid up time direction propelling, each grid clicks string ball node and two rod members of lower edge and one one ball of three web member groups, five bar smallclothes again, winches to the high-altitude and is connected with the ball node that periphery has finished, again wind up a ball and two upper chords and a web member is formed a ball three bar smallclothes, winch to the high-altitude assembling with crane
Secondly, the grid of next net shell is installed after this grid is qualified by inspection again.
Before the net shell is installed to the absolute altitude of the embedded part that encircles the steel concrete top surface of the beam down with axis is measured and unwrapping wire.
Ball and rod member etc. are reviewed after marching into the arena all at produce in factory, and its material, specification, size, numbering adhere to specification.
Set up the endless belt steel pipe scaffold of two internodes in outer ring, require the scaffold supporting capacity greater than 2KN/m2, the calculating of vertical rod, cross bar and structure meet the current specifications requirement.
Net shell in bulk on two endless belt scaffolds setting up forms open shell, the requirement of the bearing capacity that the endless belt method of encorbelmenting is constructed after can bearing.
Construct with the 3rd the endless belt method that begins to encorbelment, connecing an endless belt at endless belt radially advances to the shell pushing tow, connecing a grid at grid of hoop advances, and each grid is assembled smallclothes respectively, hang high altitude bulk with crane, in a grid, be node with a lower edge ball E at first on the ground, with lower edge hoop EF, lower edge is EG and three web member EB radially, EC, ED connects to a ball five bar smallclothes, winch to the relevant position with crane, at B, F, C, G, five workmans on the D ball position are with the other end and corresponding B of five rod members, F, C, G, the butt joint of D ball node also tightens bolt, finishes first stage work, and another part is a node with the A ball, with the hoop bar AB that winds up, the radial bars of winding up AD, web member AE links to each other, form a ball three bar smallclothes, winch to the relevant position with crane, same B, E, the binding of D ball also tightens bolt, the assembling of this ABCD grid is finished, and detects and carries out next grid after qualified.
The present invention has the following advantages:
1, adopt the method job practices in bulk of encorbelmenting, the advantage of the existing method in bulk of this method also has the advantage of the method for encorbelmenting,
2, structural performance is good, cost is low, reduction of erection time, difficulty of construction are little.
3, the method for the encorbelmenting construction in bulk of Cai Yonging does not only need upright gin pole again, and only needs a spot of steel pipe scaffold, need not set up platform on the shell top when closing up, and the assembling of smallclothes also is very suitable, and both convenient construction also can be ensured the quality of products.
4, construction costs reduces more than the 30%--40% than conventional construction method.For example, changing former scheme into plane projection is the double-deck sphere net case of 98m bolted spherical node, and total steel using amount can drop to 250t, than adopting steel pipe arch of vault structure to economize on the use of funds 2,300,000 yuan.
Description of drawings
Fig. 1 is a grid drawing of the present invention.
The specific embodiment
In conjunction with the accompanying drawings, concrete job practices of the present invention is as follows:
At first, at the net shell or be called in two endless belt of rack periphery and set up steel pipe scaffold, assemble net shell on two endless belt with method in bulk thereon,
Then; Adopt the method construction in bulk of encorbelmenting since the 3rd endless belt; Push up closely linked propelling by outer hoop shell; Each endless belt is that grid of two groups of personnel of branch connects a grid up time direction propelling; Each grid clicks again string ball node and two rod members of lower edge and one ball of three web member groups five bar smallclothes; Winching to the high-altitude by QY25 (A) truck crane is connected with peripheral complete ball node; Again wind up a ball and two top booms and a web member are formed a ball three bar smallclothes; Winch to assembly with crane
Secondly, the grid of next net shell is installed after this grid is qualified by inspection again.
1, before the net shell is installed to the absolute altitude of the embedded part that encircles the steel concrete top surface of the beam down with axis is measured and unwrapping wire.
2, ball and rod member etc. are reviewed after marching into the arena all at produce in factory, and its material, specification, size, numbering adhere to specification.
3, set up the endless belt steel pipe scaffold of two internodes in outer ring, require the scaffold supporting capacity greater than 2KN/m2, the calculating of vertical rod, cross bar and structure meet the current specifications requirement.
4, net shell in bulk on two endless belt scaffolds setting up forms open shell, the requirement of the bearing capacity that the endless belt method of encorbelmenting is constructed after can bearing.
5, with begin the to encorbelment method construction of the 3rd endless belt, connect an endless belt at endless belt radially and advance to the shell pushing tow, connect a grid at grid of hoop and advance, and each grid is assembled smallclothes respectively, hangs high altitude bulk with crane.
In a grid, be node with a lower edge ball E at first on the ground, with lower edge hoop EF, lower edge is EG and three web member EB radially, EC, ED connects to a ball five bar smallclothes, winch to the relevant position with crane, at B, F, C, G, five workmans on the D ball position are with the other end and corresponding B of five rod members, F, C, G, the butt joint of D ball node also tightens bolt, finish first stage work, another part is a node with the A ball, with the hoop bar AB that winds up, the radial bars of winding up AD, web member AE links to each other, form a ball three bar smallclothes, winch to the relevant position with crane, same B, E, the D ball links and also to tighten bolt, and this ABCD grid assembling is finished, and detects and carries out next grid after qualified.
In sum, preferred forms is as follows: set up full hall scaffold in outer two endless belt of bolted spherical node net shell, carry out the assembling of net shell thereon with method in bulk.Form a stable open shell, it can bear progressively the inwardly deadweight and the working load of ring assembling net shell, and it is high more to push up its open net shell bearing capacity to shell more, till the shell top forms the sphere net case of sealing.What pay special attention to here is, the little composite member in each grid can form a stable system after must guaranteeing to winch to the high-altitude assembling, and hanging stick that can not the appearance activity could guarantee the personal security of work high above the ground like this.And the duration is short, and expense is low, the good economic and social benefit of obtaining.

Claims (6)

1, a kind of net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node is characterized in that:
(1), in two endless belt of net shell or rack periphery, set up steel pipe scaffold, assemble net shell on two endless belt with method in bulk thereon,
(2), adopt the construction of overhanging high altitude bulk method since the 3rd endless belt, push up closely linked propelling by outer hoop shell, each endless belt is that grid of two groups of personnel of branch connects a grid up time direction propelling, each grid clicks string ball node and two rod members of lower edge and one one ball of three web member groups, five bar smallclothes again, winching to the high-altitude is connected with the ball node that periphery has finished, again wind up a ball and two upper chords and a web member are formed a ball three bar smallclothes, winch to the high-altitude assembling with crane
(3), this grid is installed the grid of next net shell after qualified by inspection again.
2, the net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node according to claim 1 is characterized in that: before net shell or rack are installed to the absolute altitude of the embedded part that encircles the steel concrete top surface of the beam down with axis is measured and unwrapping wire.
3, the net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node according to claim 1 is characterized in that: ball and rod member etc. are reviewed after marching into the arena all at produce in factory, and its material, specification, size, numbering adhere to specification.
4, the net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node according to claim 1, it is characterized in that: the endless belt steel pipe scaffold of setting up two internodes in outer ring, require the scaffold supporting capacity greater than 2KN/m2, the calculating of vertical rod, cross bar and structure meet the current specifications requirement.
5, the net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node according to claim 1, it is characterized in that: net shell in bulk on two endless belt scaffolds setting up, form open shell, the requirement of the bearing capacity that the endless belt method of encorbelmenting is constructed after can bearing.
6, the net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node according to claim 1, it is characterized in that: construct with the 3rd the endless belt method that begins to encorbelment, connecing an endless belt at endless belt radially advances to the shell pushing tow, connecing a grid at grid of hoop advances, and each grid is assembled smallclothes respectively, hang high altitude bulk with crane, in a grid, be node with a lower edge ball E at first on the ground, with lower edge hoop EF, lower edge is EG and three web member EB radially, EC, ED connects to a ball five bar smallclothes, winch to the relevant position with crane, at B, F, C, G, five workmans on the D ball position are with the other end and corresponding B of five rod members, F, C, G, the butt joint of D ball node also tightens bolt, finish first stage work, another part is a node with the A ball, with the hoop bar AB that winds up, the radial bars of winding up AD, web member AE links to each other, form a ball three bar smallclothes, winch to the relevant position with crane, same B, E, the binding of D ball also tightens bolt, the assembling of this ABCD grid is finished, and detects and carries out next grid after qualified.
CNB2007100548872A 2007-08-02 2007-08-02 The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node Expired - Fee Related CN100545367C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2007100548872A CN100545367C (en) 2007-08-02 2007-08-02 The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2007100548872A CN100545367C (en) 2007-08-02 2007-08-02 The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node

Publications (2)

Publication Number Publication Date
CN101100876A true CN101100876A (en) 2008-01-09
CN100545367C CN100545367C (en) 2009-09-30

Family

ID=39035312

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2007100548872A Expired - Fee Related CN100545367C (en) 2007-08-02 2007-08-02 The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node

Country Status (1)

Country Link
CN (1) CN100545367C (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435224A (en) * 2008-12-24 2009-05-20 河南中美铝业有限公司 High altitude suspension selecting bulk construction method of barrel shell type bolt ball node network frame
CN102003078A (en) * 2010-12-24 2011-04-06 青建集团股份公司 Assembling method of net rack
CN102345393A (en) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 High-altitude bulk process of bolt ball net frame
CN102619281A (en) * 2012-03-23 2012-08-01 浙江大学 Spherical reticulated shell composed of connected quadrilateral-planed six-rod tetrahedron units
CN102953558A (en) * 2012-11-14 2013-03-06 中冶天工集团有限公司 Splitting method of basic unit of honeycomb-shaped triangular conical mesh shell structure
WO2013037253A1 (en) * 2011-09-14 2013-03-21 徐州中煤百甲重钢科技有限公司 Reverse installation construction process of bolt-ball net rack cylindrical shell storage bin
CN104878913A (en) * 2013-07-25 2015-09-02 中冶天工集团有限公司 Orthogonality-based all-round scaffold building method
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid
CN105386604A (en) * 2015-10-09 2016-03-09 多维联合集团有限公司 High altitude grid structure mounting method
CN105442854A (en) * 2015-12-15 2016-03-30 安徽伟宏钢结构集团股份有限公司 Construction technology for large-span reticulated shell steel structure roof
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame
CN108005232A (en) * 2017-11-21 2018-05-08 中冶京诚工程技术有限公司 The structural system and building structure that a kind of prestressed pipe truss is combined with reticulated shell
CN114960952A (en) * 2022-06-25 2022-08-30 山西二建集团有限公司 Lifting and mounting method for special-shaped hyperbolic space net rack

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435224A (en) * 2008-12-24 2009-05-20 河南中美铝业有限公司 High altitude suspension selecting bulk construction method of barrel shell type bolt ball node network frame
CN102003078A (en) * 2010-12-24 2011-04-06 青建集团股份公司 Assembling method of net rack
CN102345393A (en) * 2011-07-14 2012-02-08 中建八局第四建设有限公司 High-altitude bulk process of bolt ball net frame
CN102345393B (en) * 2011-07-14 2014-02-12 中建八局第四建设有限公司 High-altitude bulk process of bolt ball net frame
WO2013037253A1 (en) * 2011-09-14 2013-03-21 徐州中煤百甲重钢科技有限公司 Reverse installation construction process of bolt-ball net rack cylindrical shell storage bin
CN102619281A (en) * 2012-03-23 2012-08-01 浙江大学 Spherical reticulated shell composed of connected quadrilateral-planed six-rod tetrahedron units
CN102619281B (en) * 2012-03-23 2014-07-23 浙江大学 Spherical reticulated shell composed of connected quadrilateral-planed six-rod tetrahedron units
CN102953558A (en) * 2012-11-14 2013-03-06 中冶天工集团有限公司 Splitting method of basic unit of honeycomb-shaped triangular conical mesh shell structure
CN104878913B (en) * 2013-07-25 2017-03-15 中冶天工集团有限公司 It is based on orthogonal full hall scaffold erection method
CN104878913A (en) * 2013-07-25 2015-09-02 中冶天工集团有限公司 Orthogonality-based all-round scaffold building method
CN105178609A (en) * 2015-09-06 2015-12-23 中建二局第三建筑工程有限公司 High-altitude bulk construction method for steel-structure grid
CN105178609B (en) * 2015-09-06 2017-07-28 中建二局第三建筑工程有限公司 Steel structure net rack high altitude bulk construction method
CN105386604A (en) * 2015-10-09 2016-03-09 多维联合集团有限公司 High altitude grid structure mounting method
CN105386604B (en) * 2015-10-09 2018-03-16 多维联合集团有限公司 A kind of high-altitude wire frame installation method
CN105442854A (en) * 2015-12-15 2016-03-30 安徽伟宏钢结构集团股份有限公司 Construction technology for large-span reticulated shell steel structure roof
CN106592760A (en) * 2016-12-29 2017-04-26 青建集团股份公司 High-altitude assembling construction method for bolt-sphere net frame
CN106592760B (en) * 2016-12-29 2019-03-01 青建集团股份公司 Bolt-ball net frame high-altitude, which dissipates, spells construction method
CN108005232A (en) * 2017-11-21 2018-05-08 中冶京诚工程技术有限公司 The structural system and building structure that a kind of prestressed pipe truss is combined with reticulated shell
CN108005232B (en) * 2017-11-21 2023-11-03 中冶京诚工程技术有限公司 Structure system and house structure of prestressed pipe truss and latticed shell combination
CN114960952A (en) * 2022-06-25 2022-08-30 山西二建集团有限公司 Lifting and mounting method for special-shaped hyperbolic space net rack
CN114960952B (en) * 2022-06-25 2023-10-13 山西二建集团有限公司 Lifting and installing method for special-shaped hyperbolic space net rack

Also Published As

Publication number Publication date
CN100545367C (en) 2009-09-30

Similar Documents

Publication Publication Date Title
CN100545367C (en) The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
CN105625623B (en) A kind of round awning that Cable dome is combined with Steel Space Truss and its engineering method
CN101435224A (en) High altitude suspension selecting bulk construction method of barrel shell type bolt ball node network frame
CN111501997A (en) Steel truss structure construction method applied to stadium
CN204662661U (en) The two rope truss string structure system of the two case beam of large span
CN112482577B (en) Large-span space chord supporting wheel spoke type truss structure system and construction method
CN112343233A (en) Round roof space pipe truss structure and construction method thereof
CN113719139B (en) Construction method for hoisting irregular space net rack of stadium
CN102345393A (en) High-altitude bulk process of bolt ball net frame
CN101967887A (en) Large-span light steel structure roof girder hoisting method
CN211691069U (en) Installation and displacement monitoring structure of spoke type beam string
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN102425260A (en) Annular single-point installation method for large-span hemispherical roof steel-structured net rack
CN103866986A (en) Installing method of large-span variable-cross-section screw bolt ball node reticulated shell
CN103806639A (en) Steel tube truss support system for silo top and construction method of steel tube truss support system
CN102108748B (en) Quadrilateral endless rope chord supporting structure and construction process
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN114961282B (en) Single-layer latticed shell structure streamer construction method with middle cylinder column
CN109695317A (en) A kind of lighting roof Steel Structure Installation method
CN208056308U (en) A kind of dome structure for exempting from support installation
CN205777489U (en) A kind of support system of high and big die plate
CN109441101B (en) Construction platform for high-altitude operation concrete circular roof
CN105804401B (en) A kind of construction steel moulding bed and the method using its lighting roof steel construction of constructing
CN205617805U (en) Steel bed -jig is used in steel construction construction of daylighting top
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090930

Termination date: 20130802