CN205617805U - Steel bed -jig is used in steel construction construction of daylighting top - Google Patents

Steel bed -jig is used in steel construction construction of daylighting top Download PDF

Info

Publication number
CN205617805U
CN205617805U CN201620439587.0U CN201620439587U CN205617805U CN 205617805 U CN205617805 U CN 205617805U CN 201620439587 U CN201620439587 U CN 201620439587U CN 205617805 U CN205617805 U CN 205617805U
Authority
CN
China
Prior art keywords
steel
anchor
moulding bed
steel plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620439587.0U
Other languages
Chinese (zh)
Inventor
李红卫
段亚静
张扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620439587.0U priority Critical patent/CN205617805U/en
Application granted granted Critical
Publication of CN205617805U publication Critical patent/CN205617805U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a steel bed -jig is used in steel construction construction of daylighting top, includes column base anchor assembly steel bed -jig and bearing steel sheet, column base anchor assembly is including four the column base anchor assembly s of distribution in steel bed -jig four corners in bottom, column base anchor assembly comprises reinforced rib plate, anchor muscle and anchor steel sheet, and the anchor muscle passes through the bolt and the anchor steel sheet is connected, the steel bed -jig by main limb, horizontal lacing and to one side the lacing constitutes, main limb stands to the setting, its bottom is through welded mode and the connection of anchor steel sheet, be provided with between the two upright to the reinforced rib plate, steel bed -jig upper end is equipped with horizontally bearing steel sheet, and the bearing steel sheet includes interconnect's last bearing steel sheet and lower bearing steel sheet, is equipped with hydraulic jack between the upper and lower bearing steel sheet. The utility model discloses a steel bed -jig replaces the full hall frame of tradition to carry out the installation of daylighting top steel joist, has solved the problem that traditional way consumes a large amount of manual works, material, solves the required long in time limit shortcoming of traditional way, has still solved the long -pending big problem of required time top surface on the traditional way floor.

Description

Lighting roof Construction of Steel Structure steel moulding bed
Technical field
The utility model relates to construction engineering technical field, particularly relates to lighting roof Construction of Steel Structure steel moulding bed.
Background technology
Large scale business synthesis often arranges large-span steel daylighting dome when design at Zhongting, due to daylighting Top span is generally individually more than the 3rd, 40 meters, and terrain clearance is generally individually more than 20 meters, and therefore lighting roof Steel Structure Installation is difficult Spend bigger.Lighting roof Construction of Steel Structure typically uses full hall frame to carry out installing to lighting roof steel joist, support, and lighting roof has been constructed Cheng Hou, fuller hall frame is removed, construction period is longer.What lighting roof Construction of Steel Structure typically used sets up the construction of full hall frame The shortcoming of method has: 1. setting up full hall support body amount big, required frame pipe quantity is many, and workmen is many, takies long in time limit;2. hall frame is expired Highly high, from great, floor space is big, and the Area of bearing that returns back to top needed for floor is big;3. expire hall frame to take up space greatly, affect remaining work Plant operation.
Utility model content
The purpose of this utility model is to provide a kind of lighting roof Construction of Steel Structure steel moulding bed, full to solve traditional utilization Hall frame is when carrying out installation to lighting roof steel joist, and required frame pipe quantity is many, and workmen is many, takies the duration and covers with a frame height Degree height, from great, floor space is big, and the Area of bearing that returns back to top needed for floor is big, and full hall frame takes up space greatly, affects remaining work post work The problems such as industry.
For achieving the above object, the utility model takes techniques below scheme:
A kind of lighting roof Construction of Steel Structure steel moulding bed, includes suspension column anchoring piece, steel moulding bed and support steel plate from bottom to top, It is characterized in that: described suspension column anchoring piece includes being distributed in four suspension column anchoring pieces in four corners in steel moulding bed bottom;Described post Pin anchoring piece is made up of deep floor, anchor rib and anchor plate, and described anchor rib passes through bolt and anchor plate connects;Described Steel moulding bed is made up of main limb, horizontal lacing and oblique lacing, and described main limb stands to setting, bottom it by welding by way of and anchoring steel Plate connects, arrange between simultaneously stand to deep floor;Described steel moulding bed upper end is provided with the support steel plate of level, described Support steel plate includes support steel plate and lower support steel plate, is provided with hydraulic jack between upper and lower support steel plate.
Preferably, described upper support steel plate and lower support steel plate are fixed by spacing angle bar with hydraulic jack.
It is further preferred that described lower support steel plate is by being connected with steel moulding bed by way of the welding of main limb;Hold under described The thickness of torr steel plate is 20~40mm, and described upper support steel plate thickness is 7.1~10.1mm.
Further, described hydraulic jack includes four hydraulic jack being distributed in lower support steel plate corner, each The tonnage of hydraulic jack is not less than 15t.
Additionally, arrange cable rope between described steel moulding bed and ground, one end of described cable rope is fixed on steel moulding bed, separately One end is fixed by anchoring piece and ground.
It is further preferred that described anchoring piece is made up of anchor ring, expansion anchor and anchor plate, described anchor ring is welded on anchoring On steel plate, described anchor plate is fixed by expansion anchor and ground.
The beneficial effects of the utility model are:
The technical program uses single assembled steel moulding bed and single truss to replace the full hall frame of tradition to carry out lighting roof steel dragon The installation of bone, truss load is undertaken by center steel moulding bed, after lighting roof installation, by truss and lighting roof main joist Cutting separates, and together removes with steel moulding bed, and when efficiently solving lighting roof Construction of Steel Structure, steel joist installs traditional method consuming A large amount of artificial, the problems of material, and steel joist installs big the asking of area that return back to top needed for long in time limit needed for traditional method, floor Topic.
Brief description
By the detailed description made in conjunction with the following drawings, of the present utility model above-mentioned and/or other aspects and advantage will Becoming more apparent upon and being easier to understand, these accompanying drawings simply schematically, are not limiting as the utility model, wherein:
Fig. 1 is the overall structure schematic diagram of the utility model a kind of lighting roof Construction of Steel Structure steel moulding bed;
Fig. 2 be the utility model a kind of lighting roof Construction of Steel Structure steel moulding bed the structural representation of anchor plate;
Fig. 3 is the side view of Fig. 2;
Fig. 4 is the structural representation of the steel moulding bed that the utility model relates to;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the structural representation of the support steel plate that relates to of the utility model and hydraulic jack;
Fig. 7 is the top view of Fig. 6;
Fig. 8 is the structural representation of the truss that the utility model relates to;
Fig. 9 is the structural representation that the cable wind rope that the utility model relates to is arranged;
Figure 10 is the connection node schematic diagram of the cable wind rope that relates to of the utility model and anchoring piece;
Figure 11 is the structural representation of the anchoring piece that the utility model relates to;
Figure 12 is the isolating construction schematic diagram of the truss that the utility model relates to;
Figure 13 is the truss that the utility model relates to and the structural representation being connected cross bar.
In accompanying drawing, the list of parts representated by each label is as follows: 1-suspension column anchoring piece;1.1-deep floor;1.2-anchoring Muscle;1.3-anchor plate;2-steel moulding bed;The main limb of 2.1-;The horizontal lacing of 2.2-;The oblique lacing of 2.3-;3-support steel plate;The upper support of 3.1- Steel plate;Support steel plate under 3.2-;4-hydraulic jack;5-cable wind rope;6-anchoring piece;6.1-anchor ring;6.2-expansion anchor;6.3- And anchor plate;7-truss;7.1-girder;7.2-truss vertical rod;7.3-truss cross bar;7.4-truss web;At the bottom of 7.5-truss Bar-;8-strut;9-annular girder;10-edge reversed beam;11-connects cross bar.
Detailed description of the invention
For make the utility model realize technological means, character of innovation, reach purpose and be easy to understand with effect, below In conjunction with accompanying drawing, the utility model is further illustrated.
The embodiment recorded at this is specific detailed description of the invention of the present utility model, is used for illustrating of the present utility model Design, is all explanatory and exemplary, should not be construed as the limit to the utility model embodiment and the utility model scope System.In addition to the embodiment recorded at this, those skilled in the art can also be public based on the application claims and specification institute The content opened uses other technical schemes obvious, and these technical schemes include using doing to the embodiment recorded at this Go out the technical scheme of any obvious substitutions and modifications.
The utility model provides a kind of lighting roof Construction of Steel Structure steel moulding bed, as shown in Fig. 1~7, and a kind of lighting roof steel Structure construction steel moulding bed, includes suspension column anchoring piece the 1st, steel moulding bed 2 and support steel plate 3 from bottom to top, and suspension column anchoring piece 1 includes point Cloth is at four suspension column anchoring pieces 1 in four corners in steel moulding bed 2 bottom;Suspension column anchoring piece 1 is by deep floor the 1.1st, anchor rib 1.2 and Anchor plate 1.3 forms, and anchor rib 1.2 is connected by bolt and anchor plate 1.3;Steel moulding bed 2 is by main limb the 2.1st, horizontal lacing 2.2 Forming with oblique lacing 2.3, main limb 2.1 isThe steel pipe of 152mm × 5mm, its length range is 22500mm~24500mm, horizontal sews Bar 2.2 is102mm × 4mm steel pipe, its length range is 1550mm~1650mm, and oblique lacing 2.3 is76mm × 5mm steel Pipe, its length range is 1650mm~2050mm;Main limb 2.1 stands to setting, bottom it by welding by way of and anchor plate 1.3 connect, arrange between simultaneously stand to deep floor 1.1, the thickness of deep floor 1.1 is 14mm~18mm;Anchor Gu a diameter of 30mm~50mm of muscle 1.2, the thickness of anchor plate 1.3 is 20~30mm;Steel moulding bed 2 upper end is provided with holding of level Torr steel plate 3, support steel plate 3 includes support steel plate 3.1 and lower support steel plate 3.2, is provided with hydraulic pressure thousand between upper and lower support steel plate Jin top 4, hydraulic jack 4 includes four hydraulic jack being distributed in lower support steel plate 3.2 corner, each hydraulic jack Tonnage is not less than 15t, and upper support steel plate 3.1 and lower support steel plate 3.2 fixed by spacing angle bar with hydraulic jack 4, under hold Torr steel plate 3.2 is by being connected with steel moulding bed 2 by way of the welding of main limb 2.1;The thickness of lower support steel plate 3.2 be 20mm~ 40mm, upper support steel plate 3.1 thickness is 7.1mm~10.1mm;Cable rope 5 is set between steel moulding bed 2 and ground, as it is shown in figure 9, One end of cable rope 5 is fixed on steel moulding bed 2, and the other end is fixed by anchoring piece 6 and ground, as shown in Figure 10 and 11, and anchor Firmware 6 is made up of anchor ring the 6.1st, expansion anchor 6.2 and anchor plate 6.3, and anchor ring 6.1 is welded on anchor plate 6.3, anchors steel Plate 6.3 is fixed by expansion anchor 6.2 and ground.
The concrete construction method of the utility model a kind of lighting roof Construction of Steel Structure steel moulding bed specifically includes following steps:
Prepare before step one, construction: include checking bottom bearing capacity of floor slab, steel as shown in Figure 4 required for calculating The height of moulding bed 2, calculates the size of each structure position, calculates steel moulding bed 2 bearing capacity, it is ensured that the axial compression of each component Ratio, shear span ratio and slenderness ratio are satisfied by specification needs;
Step 2, anchoring piece are arranged: the size according to steel moulding bed 2 and installation site, arrange such as Fig. 2 at ground correspondence position Shown suspension column anchoring piece 1;According to design lighting roof size and installation site, arrange on ground to fix and pull as shown in FIG. 10 and 11 The anchoring piece 6 of wind rope 5;Suspension column anchoring piece 1 and anchoring piece 6 can be configured by way of pre-buried or chemical anchoring
The skeleton welding of step 3, steel moulding bed 2 and truss 7: carry out steel moulding bed 2 and truss as shown in Figure 87 on ground Welding, welding knocks out welding slag mopping after completing, truss 7 is wing frame, by girder the 7.1st, truss vertical rod the 7.2nd, truss cross bar the 7.3rd, Truss web 7.4 and truss bottom bar 7.5 form, and girder 7.1 isThe curved steel tube of 152mm × 5mm;Truss vertical rod 7.2 and purlin Frame cross bar 7.3 isThe steel pipe of 102mm × 4mm;Truss web 7.4 is76mm × 4mm steel pipe.
Step 4, steel moulding bed 2 lift in place: lifting steel moulding bed 2 to design attitude, will anchor with suspension column bottom steel moulding bed 2 Part 1 is welded and fixed, and steel moulding bed 2 is overall again after using main limb connecting method integral manufacturing to complete to be lifted, or is fabricated to mark Carry out handling assembled after quasi-joint;
Step 5, the setting of cable wind rope 5: after steel moulding bed 2 completes with suspension column anchoring piece 1 welding, arrange at steel moulding bed 2 top Cable wind rope 5, as it is shown in figure 9, cable wind rope 5 one end is bundled on the main limb of steel moulding bed 2.1, the other end is fixed on pre-buried anchoring piece 6 On;
Step 6, the installation of support steel plate 3: the horizontal welding of lower support steel plate 3.1 is connected on main limb 2.1 top, lower support steel Pass through spacing angle bar fixed hydraulic jack 4 on plate 3.1 respectively in corner, hydraulic jack 4 is fixed by spacing angle bar and is held Torr steel plate 3.2;
Step 7, quality inspection is carried out to whole steel moulding bed;
Step 8, installation strut 8 and annular girder 9: strut 8 and annular girder 9, annular are installed at lighting roof periphery Beam 9 is arranged on the top of strut 8, and strut 8 is arranged on the top of edge reversed beam 10, cincture lighting roof one week;
Step 9, the lifting of truss 7: be lifted into welded good truss 7 on upper support steel plate 3.1, its one end with Upper support steel plate 3.1 welds, and the other end welds with annular girder 9, and multiple truss 7 are fixed in lifting successively so that it is above support Arrange radially centered on steel plate 3.1, form complete lighting roof skeleton;
Step 10, adjacent truss 7 fixing: as shown in figure 13, between the girder 7.1 of each truss 7, weld several company Connect cross bar 11, make all truss 7 be integrally fixed;
Step 11, truss 7 is carried out cutting separate: as shown in figure 12, retain truss 7 girder 7.1, remove its remaining part Point, Demolition Construction steel moulding bed simultaneously;
Step 12, installation fireproof coating and double glazing, and carry out overall quality inspection, so far, lighting roof Construction of Steel Structure Complete into.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all in this practicality Within novel spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in guarantor of the present utility model Within the scope of protecting.

Claims (6)

1. a lighting roof Construction of Steel Structure steel moulding bed, includes suspension column anchoring piece (1), steel moulding bed (2) and support from bottom to top Steel plate (3), it is characterised in that: described suspension column anchoring piece (1) includes four suspension columns being distributed in four corners in steel moulding bed (2) bottom Anchoring piece (1);Described suspension column anchoring piece (1) is made up of deep floor (1.1), anchor rib (1.2) and anchor plate (1.3), institute State anchor rib (1.2) and pass through bolt and anchor plate (1.3) connection;Described steel moulding bed (2) is by main limb (2.1), horizontal lacing (2.2) With oblique lacing (2.3) composition, described main limb (2.1) is stood to setting, connects with anchor plate (1.3) bottom it by way of welding Connect, arrange between simultaneously stand to deep floor (1.1);Described steel moulding bed (2) upper end is provided with the support steel plate of level (3), described support steel plate (3) includes support steel plate (3.1) and lower support steel plate (3.2), is provided with between upper and lower support steel plate Hydraulic jack (4).
2. a kind of lighting roof Construction of Steel Structure steel moulding bed according to claim 1, it is characterised in that: described upper support steel Plate (3.1) and lower support steel plate (3.2) are fixed by spacing angle bar with hydraulic jack (4).
3. a kind of lighting roof Construction of Steel Structure steel moulding bed according to claim 1, it is characterised in that: described lower support steel Plate (3.2) is connected with steel moulding bed (2) by way of welding with main limb (2.1);The thickness of described lower support steel plate (3.2) is 20 ~40mm, described upper support steel plate (3.1) thickness is 7.1~10.1mm.
4. a kind of lighting roof Construction of Steel Structure steel moulding bed according to claim 1, it is characterised in that: described hydraulic jack Top (4) includes four hydraulic jack being distributed in lower support steel plate (3.2) corner, and the tonnage of each hydraulic jack is not less than 15t。
5. a kind of lighting roof Construction of Steel Structure steel moulding bed according to claim 1, it is characterised in that: described steel moulding bed (2) and arranging cable rope (5) between ground, one end of described cable rope (5) is fixed on steel moulding bed (2), and the other end passes through anchor Firmware (6) and ground are fixed.
6. a kind of lighting roof Construction of Steel Structure steel moulding bed according to claim 1-5 any one, it is characterised in that: institute Stating anchoring piece (6) to be made up of anchor ring (6.1), expansion anchor (6.2) and anchor plate (6.3), described anchor ring (6.1) is welded on anchor Gu on steel plate (6.3), described anchor plate (6.3) is fixed by expansion anchor (6.2) and ground.
CN201620439587.0U 2016-05-16 2016-05-16 Steel bed -jig is used in steel construction construction of daylighting top Expired - Fee Related CN205617805U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620439587.0U CN205617805U (en) 2016-05-16 2016-05-16 Steel bed -jig is used in steel construction construction of daylighting top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620439587.0U CN205617805U (en) 2016-05-16 2016-05-16 Steel bed -jig is used in steel construction construction of daylighting top

Publications (1)

Publication Number Publication Date
CN205617805U true CN205617805U (en) 2016-10-05

Family

ID=57023088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620439587.0U Expired - Fee Related CN205617805U (en) 2016-05-16 2016-05-16 Steel bed -jig is used in steel construction construction of daylighting top

Country Status (1)

Country Link
CN (1) CN205617805U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804401A (en) * 2016-05-16 2016-07-27 中国建筑第二工程局有限公司 Construction steel jig frame and method for constructing daylighting roof steel structure by utilizing the same
CN113323362A (en) * 2021-06-08 2021-08-31 中国建筑第八工程局有限公司 Overhead supporting operation frame based on bottom steel platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804401A (en) * 2016-05-16 2016-07-27 中国建筑第二工程局有限公司 Construction steel jig frame and method for constructing daylighting roof steel structure by utilizing the same
CN113323362A (en) * 2021-06-08 2021-08-31 中国建筑第八工程局有限公司 Overhead supporting operation frame based on bottom steel platform

Similar Documents

Publication Publication Date Title
CN100545367C (en) The net-shell net-rack overhanging high altitude bulk construction method of bolted spherical node
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN102535845A (en) Construction method of bearing frame of corridor structure
CN102912972B (en) Multifunctional lifting steel platform switching jig and construction method
CN203296361U (en) Long-span steel structure cross assembling hoisting platform
CN105484502B (en) A kind of industrial premises steel structural roof purlin and support bar combined installation method
CN104831939A (en) Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN101435224A (en) High altitude suspension selecting bulk construction method of barrel shell type bolt ball node network frame
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN205617805U (en) Steel bed -jig is used in steel construction construction of daylighting top
CN105507427A (en) Mounting method for extending single-layer latticed shell structure
CN109695317A (en) A kind of lighting roof Steel Structure Installation method
CN101503908A (en) Construction method for spacing suspension cable structural template support platform
CN110185185B (en) Cantilever truss space structure system
CN107268422A (en) Across the self-anchored type suspension cable arched girder co-operative system bridge such as one kind
CN102003078A (en) Assembling method of net rack
CN105804401B (en) A kind of construction steel moulding bed and the method using its lighting roof steel construction of constructing
CN202090483U (en) Round structure with prestressed sheet metal roof
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN204126297U (en) A kind of temporary support of steel truss roof
CN111719699B (en) Annular large-span suspension structure capable of releasing temperature effect
CN212533734U (en) Cable buckle integrated tower
CN202745351U (en) Bailey truss supporting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20170516

CF01 Termination of patent right due to non-payment of annual fee