CN108386209B - Tunnel Second Lining trolley localization method - Google Patents

Tunnel Second Lining trolley localization method Download PDF

Info

Publication number
CN108386209B
CN108386209B CN201810228995.5A CN201810228995A CN108386209B CN 108386209 B CN108386209 B CN 108386209B CN 201810228995 A CN201810228995 A CN 201810228995A CN 108386209 B CN108386209 B CN 108386209B
Authority
CN
China
Prior art keywords
point
tunnel
lining trolley
conducting wire
secondary lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810228995.5A
Other languages
Chinese (zh)
Other versions
CN108386209A (en
Inventor
夏孝军
李玲娇
李吉
周泽林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201810228995.5A priority Critical patent/CN108386209B/en
Publication of CN108386209A publication Critical patent/CN108386209A/en
Application granted granted Critical
Publication of CN108386209B publication Critical patent/CN108386209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel Second Lining trolley localization method of the present invention, belongs to constructing tunnel field, it is therefore an objective to improve measuring device turnover utilization rate.Go out tunnel survey including setting-out and sets conducting wire;It calculates left side support block point, right side support block point and tunnel middle line and surveys distance L1, L2 and the L3 for setting conducting wire place perpendicular to tunnel;Step 3: on same mileage section inverted arch filling surface on setting-out go out away from tunnel survey set conducting wire as the A of L1 point, be L2 B point and be L3 D point;Step 4: measuring the practical elevation of A point, B point;Obtain the relative elevation of A point, B point;Secondary lining trolley is mobile in place.The invention, secondary lining trolley adjusts step in place without using measuring devices such as total stations, therefore, total station can be moved to other and need place by this process, total station can also be installed, the surveying and lay out of multiple mileage sections is carried out, to improve total station turnover utilization rate, the measuring devices such as total station and survey crew is made to be fully used.

Description

Tunnel Second Lining trolley localization method
Technical field
The invention belongs to constructing tunnel field, particularly Tunnel Second Lining trolley localization method.
Background technique
Currently, there are many Tunnel Second Lining trolley localization method, currently, common method is as follows: firstly, passing through construction drawing Paper finds out secondary lining corresponding with theoretical profile point on theoretical profile point and secondary lining trolley in tunnel camber profile Trolley profile point;Then, set up total station, surveyed in tunnel camber profile using total station set out it is corresponding with theoretical profile point Actual profile point;Finally, and using total station guidance adjust secondary lining trolley, make the secondary lining platform of secondary lining trolley Vehicle profile point and the point centering of the actual profile in tunnel.But this method has the disadvantage that is, it needs to wait secondary lining platform It could be removed after vehicle adjustment is in place, Tunnel construction survey equipment and personnel is on the one hand caused to use insufficient in this way, on the other hand Cause Tunnel construction survey equipment and personnel not enough, equipment and personnel need to be increased, increases construction cost.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of Tunnel Second Lining trolley localization methods, to improve measurement Equipment has enough to meet the need utilization rate.
The technical solution adopted by the present invention is that: Tunnel Second Lining trolley localization method, comprising the following steps:
Step 1: going out tunnel survey by total station setting-out sets conducting wire;
Step 2: according to construction drawing calculate left side support block point survey to tunnel set between the perpendicular of conducting wire place away from The distance between perpendicular L2 and tunnel middle line where setting conducting wire is surveyed to tunnel from L1, right side support block point to survey to set to tunnel and lead The distance between perpendicular L3 where line;
Step 3: the distance of mileage section to be measured to upper mileage secondary lining trolley front end is the length of secondary lining trolley Degree, with total station inverted arch filling surface on setting-out go out away from tunnel survey set conducting wire as the A of L1 point, apart from tunnel survey set conducting wire as L2 B point and away from tunnel survey set conducting wire as the D of L3 point;
Step 4: measuring the practical elevation H of A pointA, B point practical elevation HB
Step 5: obtaining the relative elevation h of left side support block point and A pointA, B point relative elevation hB
Step 6: secondary lining trolley is mobile in place, the secondary lining poured by a upper mileage is to mileage to be measured After secondary lining trolley rear end is positioned, the C point of end dome before secondary lining trolley is made to hang phase of the vertical line in inverted arch filling On the line of two D points on neighbourhood's journey section;
Step 7: adjusting side form by transverse hydraulic oil cylinder, left side support block point is made to be located at the surface of A point, makes right side mould Pin point is located at the surface of B point;
Step 8: secondary lining trolley front end, makes left side support block point hanging down to A point by adjusting vertical jack-up hydraulic ram Straight distance is hA, make right side support block point to B point vertical range hB
Further, in step 5, pass through formula: hA=HC-HA- H and hB=HC-HB- H calculates hAAnd hB;Wherein, H Vertical range of the backform vertex to side form pin point when all being supported to place for secondary lining trolley side form;HCFor where A point and B point Mileage section on, the design altitude of vault C point.
Further, HCBy construction drawing by being calculated.
Further, after step 8, after several mileages, elevation, the side form of secondary lining trolley vault are checked Whether the horizontal distance of pin point meets design Clearance requirement.
Further, step 2 can carry out before step 1.
The beneficial effects of the present invention are: the Tunnel Second Lining trolley localization method, only Step 1: step 3 and step It needs during four survey is set and during the check of step 9 using total station, and it is other for the adjustment of secondary lining trolley Step in place is not necessarily to the measuring devices such as total station and its investment of survey crew, therefore, in place in the adjustment of secondary lining trolley Process can remove the measuring devices such as total station and survey crew for other and need place, so that total station etc. be made to measure Equipment and survey crew are fully used, and are utilized using the turnover for improving the measuring devices such as total station and survey crew Rate.Exactly because the secondary lining trolley adjustment process also surveyed after the process that sets is not necessarily to the assistance of total station, therefore, it can install primary Total station carries out the surveying and lay out of multiple mileage sections, compared with the surveying and lay out for once carrying out a mileage section, reduces The number of total station is set up, to reduce the secondary lining trolley positioning surveying and lay out time of entire constructing tunnel;Also, into After the surveying and lay out of the multiple mileage sections of row, during the adjustment of the secondary lining trolley of multiple mileage section is in place, Not use total station and survey crew, to extend the time that total station puts into him, it is more conducive to survey total station etc. Amount equipment and survey crew are fully used.
Detailed description of the invention
Fig. 1 is tunnel lateral direction measurement point position cross-section diagram;
Fig. 2 is tunnel longitudinal direction measurement point position plan view.
In figure, survey sets conducting wire 1, left side support block point 2, right side support block point 3, tunnel middle line 4.
Specific embodiment
It is as follows that the present invention is described further with reference to the accompanying drawings and examples:
As depicted in figs. 1 and 2, Tunnel Second Lining trolley localization method, comprising the following steps:
Step 1: going out tunnel survey by total station setting-out sets conducting wire 1;
It is set between 1 place perpendicular of conducting wire Step 2: calculating left side support block point 2 according to construction drawing and being surveyed to tunnel Distance L1, right side support block point 3 are surveyed to tunnel sets the distance between 1 place perpendicular of conducting wire L2 and tunnel middle line 4 to tunnel Survey sets the distance between 1 place perpendicular of conducting wire L3;
Step 3: the distance of mileage section to be measured to upper secondary lining trolley front end is the length of secondary lining trolley, With total station inverted arch filling surface on setting-out go out away from tunnel survey set conducting wire 1 be the A of L1 point, apart from tunnel survey set conducting wire 1 as L2 B point and away from tunnel survey set conducting wire 1 as the D of L3 point;
Step 4: measuring the practical elevation H of A pointA, B point practical elevation HB
Step 5: obtaining the relative elevation h of left side support block point 2 with A pointA, B point relative elevation hB
Step 6: secondary lining trolley is mobile in place, the secondary lining poured by a upper mileage is to mileage to be measured After secondary lining trolley rear end is positioned, the C point of end dome before secondary lining trolley is made to hang phase of the vertical line in inverted arch filling On the line of two D points on neighbourhood's journey section;
Step 7: adjusting side form by transverse hydraulic oil cylinder, left side support block point 2 is made to be located at the surface of A point, makes right side mould Pin point 3 is located at the surface of B point;
Step 8: secondary lining trolley front end, makes left side support block point 2 to A point by adjusting vertical jack-up hydraulic ram Vertical range is hA, make right side support block point to B point vertical range hB
The Tunnel Second Lining trolley localization method, only during Step 1: the survey of step 3 and step 4 is set and Check after secondary lining trolley is adjusted in place is needed using total station in the process, and other secondary lining trolleys that are used for adjust just Position the step of without the measuring devices such as total station and its investment of survey crew, therefore, mistake in place is adjusted in secondary lining trolley Journey can remove the measuring devices such as total station and survey crew for other and need place, so that the measurements such as total station be made to set Standby and survey crew is fully used, and utilizes the turnover utilization rate for improving the measuring devices such as total station and survey crew. Exactly because the secondary lining trolley adjustment process also surveyed after the process that sets is not necessarily to the assistance of total station, therefore, it can install primary complete It stands instrument, carries out the surveying and lay out of multiple mileage sections, the n-n section that sets 1-1,2-2 as shown in Fig. 2, can disposably survey ..., Middle n is positive integer.Compared with the surveying and lay out for once carrying out a mileage section, reduce the number for setting up total station, thus Reduce the secondary lining trolley positioning surveying and lay out time of entire constructing tunnel;Also, the survey for carrying out multiple mileage sections is set After setting-out, during the adjustment of the secondary lining trolley of multiple mileage section is in place, total station and survey can not be used Amount personnel are more conducive to obtain the measuring devices such as total station and survey crew to extend the time that total station puts into him To making full use of;Furthermore secondary lining trolley positioning when, what the end of secondary lining trolley had been poured by a upper mileage Secondary lining is positioned, and it is left that 10cm is formed between the secondary lining for such as having poured the end of secondary lining trolley and a upper mileage Right overlap joint etc., therefore, each mileage section only needs to carry out the measurement of front end, so as to shorten time of measuring.
Surface is filled as positioning reference data by left side support block point 2, right side support block point 3 and inverted arch, and it is fixed to be conducive to improve The accuracy of position.
Preferably, in step 5, pass through formula: hA=HC-HA- H and hB=HC-HB- H calculates hAAnd hB;Wherein, H is Vertical range of the backform vertex to side form pin point when secondary lining trolley side form all supports to place;HCFor where A point and B point On mileage section, the design altitude of vault C point.
HCIt can be obtained by measurement, but there are measurement errors by measuring obtained numerical value, therefore, it is preferred that HCPass through Construction drawing is by being calculated.
Can the horizontal distance of elevation and side form pin point of each mileage to secondary lining trolley vault verify, But total station and the frequency of use of survey crew are increased, it is unfavorable for economizing on resources.Therefore, it is preferred that after step 8, often After being spaced several mileages, whether the horizontal distance of the elevation, side form pin point of checking secondary lining trolley vault meets design headroom It is required that.
Preferably, step 2 can carry out before step 1.

Claims (5)

1. Tunnel Second Lining trolley localization method, it is characterised in that: the following steps are included:
Step 1: going out tunnel survey by total station setting-out sets conducting wire (1);
It is set between the perpendicular of conducting wire (1) place Step 2: calculating left side support block point (2) according to construction drawing and being surveyed to tunnel Distance L1, right side support block point (3) are surveyed to tunnel sets the distance between conducting wire (1) place perpendicular L2 and tunnel middle line (4) The distance between perpendicular L3 where setting conducting wire (1) is surveyed to tunnel;
Step 3: the distance of mileage section to be measured to upper mileage secondary lining trolley front end is the length of secondary lining trolley, With total station inverted arch filling surface on setting-out go out away from tunnel survey set conducting wire (1) be the A of L1 point, apart from tunnel survey set conducting wire (1) Conducting wire (1) is set for the B point of L2 and away from tunnel survey as the D of L3 point;
Step 4: measuring the practical elevation H of A pointA, B point practical elevation HB
Step 5: obtaining the relative elevation h of left side support block point (2) and A pointA, B point relative elevation hB
Step 6: secondary lining trolley is mobile in place, the secondary lining poured by a upper mileage is secondary to mileage to be measured After lining trolley rear end is positioned, the C point of end dome before secondary lining trolley is made to hang phase neighbourhood of the vertical line in inverted arch filling On the line of two D points on journey section;
Step 7: adjusting side form by transverse hydraulic oil cylinder, left side support block point (2) is made to be located at the surface of A point, makes right side support block Point (3) is located at the surface of B point;
Step 8: secondary lining trolley front end, makes left side support block point (2) hanging down to A point by adjusting vertical jack-up hydraulic ram Straight distance is hA, make right side support block point to B point vertical range hB
2. Tunnel Second Lining trolley localization method as described in claim 1, it is characterised in that: in step 5, pass through formula: hA=HC-HA- H and hB=HC-HB- H calculates hAAnd hB;Wherein, H is backform when secondary lining trolley side form all supports to place Vertical range of the vertex to side form pin point;HCFor on the mileage section where A point and B point, the design altitude of vault C point.
3. Tunnel Second Lining trolley localization method as claimed in claim 2, it is characterised in that: HCBy construction drawing by counting It obtains.
4. the Tunnel Second Lining trolley localization method as described in claim 1-3 any one claim, it is characterised in that: After step 8, after several mileages, check the elevation of secondary lining trolley vault, side form pin point horizontal distance whether Meet design Clearance requirement.
5. the Tunnel Second Lining trolley localization method as described in claim 1-3 any one claim, it is characterised in that: Step 2 can carry out before step 1.
CN201810228995.5A 2018-03-20 2018-03-20 Tunnel Second Lining trolley localization method Active CN108386209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810228995.5A CN108386209B (en) 2018-03-20 2018-03-20 Tunnel Second Lining trolley localization method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810228995.5A CN108386209B (en) 2018-03-20 2018-03-20 Tunnel Second Lining trolley localization method

Publications (2)

Publication Number Publication Date
CN108386209A CN108386209A (en) 2018-08-10
CN108386209B true CN108386209B (en) 2019-06-04

Family

ID=63067221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810228995.5A Active CN108386209B (en) 2018-03-20 2018-03-20 Tunnel Second Lining trolley localization method

Country Status (1)

Country Link
CN (1) CN108386209B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703845A (en) * 2016-12-26 2017-05-24 中建山东投资有限公司 Underground engineering arch-shaped support assembling, positioning and adjusting system, adjusting bogie and adjusting method
CN106703834A (en) * 2016-12-23 2017-05-24 中建八局第二建设有限公司 Secondary lining integral formworking construction method for tunnel with super-large cross section
CN107143357A (en) * 2017-07-17 2017-09-08 商丘工学院 A kind of mobile tunnel lining trolley
CN107288663A (en) * 2017-08-11 2017-10-24 中建山东投资有限公司 A kind of tunnel arch is accurately positioned and fixed construction method and device
CN206987843U (en) * 2017-05-19 2018-02-09 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703834A (en) * 2016-12-23 2017-05-24 中建八局第二建设有限公司 Secondary lining integral formworking construction method for tunnel with super-large cross section
CN106703845A (en) * 2016-12-26 2017-05-24 中建山东投资有限公司 Underground engineering arch-shaped support assembling, positioning and adjusting system, adjusting bogie and adjusting method
CN206987843U (en) * 2017-05-19 2018-02-09 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth
CN107143357A (en) * 2017-07-17 2017-09-08 商丘工学院 A kind of mobile tunnel lining trolley
CN107288663A (en) * 2017-08-11 2017-10-24 中建山东投资有限公司 A kind of tunnel arch is accurately positioned and fixed construction method and device

Also Published As

Publication number Publication date
CN108386209A (en) 2018-08-10

Similar Documents

Publication Publication Date Title
CN103761401B (en) CRTS III type non-fragment orbit fabric swatch and construction integrated data processing method
CN103090842B (en) The method of a kind of circular shield tunnel multi sphere section cross section correct
CN108444432B (en) Existing railway line control network and track line shape synchronous measurement method
CN102319882B (en) Method for establishing and determining slab caster-overhauling reference coordinate system
CN106123776B (en) A kind of push pipe intelligence jacking measuring system and measurement method
CN101825662B (en) Short-distance measurement method and structure of grounding resistance of grounding network
CN102592692B (en) Method for installing steam generator in nuclear island of nuclear power plant
CN106840129B (en) Method for rapidly measuring three-dimensional coordinates of center of subway segment
CN111021253A (en) Construction method for automatically positioning tunnel anchor anchoring system based on APP system and total station
CN110017823B (en) Rail positioning coordinate calculation method and device based on total station instrument free-standing station
CN101819035B (en) Detection method used for manufacturing CRTS II type track slabs
CN108413946A (en) A kind of measurement method of vehicle-mounted total powerstation location parameter
CN105136391A (en) Method of measuring distance between ground force bearing points of plane and system
CN108318011B (en) Method for monitoring peripheral displacement of construction site through unmanned aerial vehicle carrying total station
CN106289195A (en) The method for building up of plateau distance heavy construction Measurement and Control System
CN115638777A (en) Trackless measurement method for whole system of tunnel rail transit
CN107063207A (en) A kind of method that Multistage Control net measures power transmission cable tunnel axis
CN102979018A (en) Ballast-installation and track-regulation measurement quick positioning method for ballast track engineering
CN108386209B (en) Tunnel Second Lining trolley localization method
CN110130168A (en) A kind of railroad track control net triangulated height data correction processing method
CN208456625U (en) A kind of tunnel lining trolley automatic measurement regulating device
CN105821728B (en) A kind of plane net measuring systems of CP III
CN109751983B (en) Method for emergency setting laser data and transmission point elevation
CN108507452A (en) A kind of assay method of PDL Catenary mast gauge
CN103398704B (en) Method for measuring foundation frame at continuous-casting sector-shaped section

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant