CN108382540B - Barge disembarkation, launching method - Google Patents

Barge disembarkation, launching method Download PDF

Info

Publication number
CN108382540B
CN108382540B CN201810177112.2A CN201810177112A CN108382540B CN 108382540 B CN108382540 B CN 108382540B CN 201810177112 A CN201810177112 A CN 201810177112A CN 108382540 B CN108382540 B CN 108382540B
Authority
CN
China
Prior art keywords
trolley
rail
horizontal
triangle
barge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810177112.2A
Other languages
Chinese (zh)
Other versions
CN108382540A (en
Inventor
刘康
邢惟东
曾远
隋杨
淳长奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
China State Construction Bridge Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, China State Construction Bridge Corp Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201810177112.2A priority Critical patent/CN108382540B/en
Publication of CN108382540A publication Critical patent/CN108382540A/en
Application granted granted Critical
Publication of CN108382540B publication Critical patent/CN108382540B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C3/00Launching or hauling-out by landborne slipways; Slipways
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a kind of disembarkations of barge, launching method, comprising the following steps: is laid with two horizontal rail and two inclination rail;One triangle trolley is installed on two inclination rail, Horizontal trolley is moved to above triangle trolley, then Horizontal trolley and one piece of triangle trolley are transferred to the water surface along inclination rail hereinafter, guaranteeing that the height difference at the top of Horizontal trolley between the water surface is greater than barge draft;Barge is opened to inclination rail;It pulls triangle trolley to move up along inclination rail by hoist engine, so that triangle trolley and Horizontal trolley are moved to together below barge, and contacts barge bottom with Horizontal trolley top surface;Triangle trolley and Horizontal trolley are successively pulled, so that barge reaches girder steel processing workshop;Successively draw Horizontal trolley dynamic and triangle trolley, after triangle trolley is transferred in place, barge starts to float.It can realize that large-scale girder steel and steel member are directly loaded onto ship in processing workshop using this method.

Description

Barge disembarkation, launching method
Technical field
The present invention relates to a kind of disembarkations of barge, launching method.
Background technique
Steel construction girder has the characteristics that from heavy and light, intensity is high, the service life is long, and the country has built many large-scale in recent years Steel structure bridge;Girder steel generally takes factory to make, field erected construction method;For across river, girder steel over strait in factory By at barging to bridge location after completing;For being designed as the girder steel of whole segment installation, single segment weight is up to 500t, the harbour of part factory lifting equipment Lifting Capacity when loading and unloading steel girder segment are unable to satisfy requirement.
Summary of the invention
The barge that it is an object of the invention to overcome the deficiencies of the prior art and provide a kind of suitable for being equipped with whole segment girder steel It debarks, be lauched, solve the problems, such as the low barge disembarkation that can not be unloaded, be loaded onto ship of harbour lifting equipment Lifting Capacity, the side of being lauched Method.
A kind of disembarkation of barge, launching method, comprising the following steps:
(1) two horizontal rail are laid with along perpendicular to riverbank direction interval on the level ground of bank, between two rails Spacing is determined according to the idler wheel spacing of Horizontal trolley to be installed;It is extended downwardly on the sloping floor of bank along two horizontal rail Direction be laid with two inclination rail, two inclination rail spacing are greater than the spacing of two horizontal rail, and described two tilt Rail about two horizontal rail middle line be symmetrical arranged, two inclination rail extend to the water surface downwards hereinafter, Two inclination rail extend to water surface depth below and make one piece of edge of Horizontal trolley and triangle trolley to be installed Inclination rail when transferring to the water surface, the height difference at the top of Horizontal trolley between the water surface is greater than barge draft;
(2) stop rail device in two inclination rail top tip positions setting;
(3) a triangle trolley is installed on two inclination rail, Horizontal trolley is moved to above triangle trolley, Then Horizontal trolley and one piece of triangle trolley are transferred to the water surface along inclination rail hereinafter, guaranteeing Horizontal trolley top and water Height difference between face is greater than barge draft;
The triangle trolley includes frame body, and bottom surface and the inclination rail of the frame body are arranged in parallel, described Frame body bottom surface is equipped with after capable of being placed on inclination rail along the idler wheel of inclination rail sliding, triangle trolley, the frame The top surface of body is horizontality;Two top surface rail, two top surface rail are provided on the top surface of the frame body Spacing is identical as two horizontal rail spacing, when the triangle trolley is moved at the top of inclination rail, the top surface Rail and horizontal rail just dock, and in same level;
The Horizontal trolley includes trolley frame body, and being equipped in the trolley frame body bottom can be sliding along top surface rail The idler wheel of shifting, the top surface of the trolley frame body are horizontal plane;
It is respectively arranged with traction rope I and traction rope II before and after Horizontal trolley, traction is provided on triangle trolley Rope, Horizontal trolley and triangle trolley are all made of hoist engine as dynamical system;
(3) barge is opened to inclination rail;
(4) triangle trolley is pulled to move up along inclination rail by hoist engine, so that triangle trolley and level Trolley is moved to together below barge, and contacts barge bottom with Horizontal trolley top surface;
(5) triangle trolley is continued to pull up, so that barge is detached from the water surface, when the mobile rail device position to end of triangle trolley It postpones, stops movement;
(6) Horizontal trolley is pulled by hoist engine, so that Horizontal trolley is moved to level from the rail of top surface together with barge On rail, and girder steel processing workshop is reached along horizontal rail;
(7) after barge installs steel girder segment, Horizontal trolley is pulled by hoist engine, so that Horizontal trolley is together with barge from water It is moved on flat rail on the top surface rail of triangle trolley;
(8) triangle trolley is transferred by hoist engine, so that triangle trolley is together with Horizontal trolley and barge along inclination Rail is moved to the water surface or less;
(9) after triangle trolley is transferred in place, barge starts to float, and completes being lauched for barge.
The method of the present invention is easy to operate, it can be achieved that large-scale girder steel and steel member are directly loaded onto ship in processing workshop, solves code Head lifting equipment Lifting Capacity is unable to satisfy the problem of requiring.
Detailed description of the invention
Fig. 1 is the schematic diagram of a kind of barge disembarkation of the invention, launching method disembarkation process one;
Fig. 2 is the schematic diagram of a kind of barge disembarkation of the invention, launching method disembarkation process two;
Fig. 3 is the schematic diagram of a kind of barge disembarkation of the invention, launching method disembarkation process three;
Fig. 4 is that a kind of of the invention barge disembarkation, launching method are lauched the schematic diagram of process one;
Fig. 5 is that a kind of of the invention barge disembarkation, launching method are lauched the schematic diagram of process two;
Fig. 6 is that a kind of of the invention barge disembarkation, launching method are lauched the schematic diagram of process three.
Specific embodiment
With reference to the accompanying drawing, detailed description of the preferred embodiments.
A kind of barge of the invention disembarkation, launching method as shown in drawings, comprising the following steps:
(1) two horizontal rail 1 are laid with along perpendicular to riverbank direction interval on the level ground of bank, between two rails Spacing is determined according to the idler wheel spacing of Horizontal trolley to be installed, can be 5m;Along two horizontal steel on the sloping floor of bank The direction that rail 1 extends downwardly is laid with two inclination rail 2, and two inclination rail spacing are greater than the spacing of two horizontal rail, can Think that 7m, two inclination rail are symmetrical arranged about the middle line of two horizontal rail 1, two inclination rail 2 The water surface is extended to hereinafter, two inclination rail 2 extend to water surface depth below and make 6 He of Horizontal trolley downwards When 7 one pieces of triangle trolley is along below the inclination decentralization to the water surface of rail 2, the height difference between 6 top of Horizontal trolley and the water surface is big In barge draft, it can be the position 5m that two inclination rail 2, which extend to downwards water surface depth below,;
(2) stop rail device 11 in two 2 top tip positions of inclination rail setting, prevent triangle trolley 7 and ground Face collides;
(3) a triangle trolley 7 is installed on two inclination rail 2, Horizontal trolley 6 is moved to triangle trolley 7 Above, then Horizontal trolley 6 and 7 one pieces of triangle trolley are transferred to the water surface along inclination rail 2 hereinafter, guaranteeing Horizontal trolley Height difference between 6 tops and the water surface is greater than barge draft;
The triangle trolley 7 includes frame body, and bottom surface and the inclination rail 2 of the frame body are arranged in parallel, described Frame body bottom surface be equipped with can along inclination rail 2 slide idler wheel, triangle trolley 7 be placed on inclination rail 2 on after, it is described Frame body top surface be horizontality;Two top surface rail 3, two top surfaces are provided on the top surface of the frame body 3 spacing of rail is identical as two horizontal 1 spacing of rail, described when the triangle trolley is moved at the top of inclination rail Top surface rail 3 and horizontal rail 1 just dock, and in same level;
The Horizontal trolley 6 includes trolley frame body, and being equipped in the trolley frame body bottom can be along top surface rail 3 The idler wheel of sliding, the top surface of the trolley frame body are horizontal plane.
It is respectively arranged with traction rope I9 and traction rope II10 before and after Horizontal trolley, is provided with and leads on triangle trolley Messenger 8, Horizontal trolley and triangle trolley are all made of hoist engine as dynamical system;
(3) barge 4 is opened to inclination rail 2;
(4) triangle trolley 7 is pulled to move up along inclination rail 2 by hoist engine, so that triangle trolley 7 and water Platform truck is moved to 4 lower section of barge together, and contacts 4 bottom of barge with 6 top surface of Horizontal trolley;
(5) triangle trolley 7 is continued to pull up, so that barge 4 is detached from the water surface, when the mobile rail to end of triangle trolley 7 Behind 11 position of device, stop movement;
(6) Horizontal trolley 6 is pulled by hoist engine, so that Horizontal trolley 6 is moved to from top surface rail 3 together with barge 4 On horizontal rail 1, and girder steel processing workshop is reached along horizontal rail 1;
(7) after barge 4 installs steel girder segment, Horizontal trolley 6 is pulled by hoist engine, so that Horizontal trolley 6 is together with barge 4 On the top surface rail 3 for being moved to triangle trolley 7 from horizontal rail 1;
(8) triangle trolley 7 is transferred by hoist engine so that triangle trolley 7 together with Horizontal trolley 6 and barge 4 along Inclination rail 2 is moved to the water surface or less;
(9) after triangle trolley 7 is transferred in place, barge 4 starts to float, and completes being lauched for barge.

Claims (1)

1. a kind of barge disembarkation, launching method, it is characterised in that the following steps are included:
(1) two horizontal rail are laid with along perpendicular to riverbank direction interval on the level ground of bank, the spacing between two rails It is determined according to the idler wheel spacing of Horizontal trolley to be installed;Along the side that two horizontal rail extend downwardly on the sloping floor of bank To two inclination rail are laid with, two inclination rail spacing are greater than the spacing of two horizontal rail, two inclination rail Middle line about two horizontal rail is symmetrical arranged, and two inclination rail extend to the water surface downwards hereinafter, described Two inclination rail extend to water surface depth below and make one piece of Horizontal trolley to be installed and triangle trolley along inclining When oblique rail is transferred to the water surface, the height difference at the top of Horizontal trolley between the water surface is greater than barge draft;
(2) stop rail device in two inclination rail top tip positions setting;
(3) a triangle trolley is installed on two inclination rail, Horizontal trolley is moved to above triangle trolley, then One piece of Horizontal trolley and triangle trolley are transferred to the water surface along inclination rail hereinafter, guarantees at the top of Horizontal trolley and the water surface it Between height difference be greater than barge draft;
The triangle trolley includes frame body, and bottom surface and the inclination rail of the frame body are arranged in parallel, in the frame body Bottom surface is equipped with after capable of being placed on inclination rail along the idler wheel of inclination rail sliding, triangle trolley, the frame body Top surface is horizontality;Two top surface rail, two top surface rail spacing are provided on the top surface of the frame body It is identical as two horizontal rail spacing, when the triangle trolley is moved at the top of inclination rail, the top surface rail It is just docked with horizontal rail, and in same level;
The Horizontal trolley includes trolley frame body, and being equipped in the trolley frame body bottom can be along the sliding of top surface rail Idler wheel, the top surface of the trolley frame body are horizontal plane;
It is respectively arranged with traction rope I and traction rope II before and after Horizontal trolley, traction rope, water are provided on triangle trolley Platform truck and triangle trolley are all made of hoist engine as dynamical system;
(3) barge is opened to inclination rail;
(4) triangle trolley is pulled to move up along inclination rail by hoist engine, so that triangle trolley and Horizontal trolley It is moved to below barge together, and contacts barge bottom with Horizontal trolley top surface;
(5) triangle trolley is continued to pull up, so that barge is detached from the water surface, when the mobile rail device position to end of triangle trolley Afterwards, stop movement;
(6) Horizontal trolley is pulled by hoist engine, so that Horizontal trolley is moved to horizontal rail together with barge from the rail of top surface On, and girder steel processing workshop is reached along horizontal rail;
(7) after barge installs steel girder segment, Horizontal trolley is pulled by hoist engine, so that Horizontal trolley is together with barge from horizontal steel It is moved on rail on the top surface rail of triangle trolley;
(8) triangle trolley is transferred by hoist engine, so that triangle trolley is together with Horizontal trolley and barge along inclination rail It is moved to the water surface or less;
(9) after triangle trolley is transferred in place, barge starts to float, and completes being lauched for barge.
CN201810177112.2A 2018-03-04 2018-03-04 Barge disembarkation, launching method Active CN108382540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810177112.2A CN108382540B (en) 2018-03-04 2018-03-04 Barge disembarkation, launching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810177112.2A CN108382540B (en) 2018-03-04 2018-03-04 Barge disembarkation, launching method

Publications (2)

Publication Number Publication Date
CN108382540A CN108382540A (en) 2018-08-10
CN108382540B true CN108382540B (en) 2019-09-17

Family

ID=63069750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810177112.2A Active CN108382540B (en) 2018-03-04 2018-03-04 Barge disembarkation, launching method

Country Status (1)

Country Link
CN (1) CN108382540B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108382540B (en) * 2018-03-04 2019-09-17 中建桥梁有限公司 Barge disembarkation, launching method
CN113235656B (en) * 2021-04-25 2022-11-22 中交四航局第二工程有限公司 Slide launching system for steel shell immersed tube and use method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201932343U (en) * 2010-12-13 2011-08-17 舟山中远船务工程有限公司 Steel structure launching way for ships
CN104229099A (en) * 2014-09-15 2014-12-24 南通中远船务工程有限公司 Offshore engineering vessel loading and launching system and method
CN107323619A (en) * 2017-05-24 2017-11-07 中国建筑第六工程局有限公司 A kind of extra large land conveyer method of Large-diameter Steel cylinder
CN108382540A (en) * 2018-03-04 2018-08-10 中建桥梁有限公司 Barge disembarkation, launching method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100623201B1 (en) * 2004-12-13 2006-09-14 Stx조선주식회사 A Method for Shipbuilding on the ground and Launching Ships Using a Skid Launching System
KR20110039004A (en) * 2009-10-09 2011-04-15 주식회사 유넥스 Method for loading a ship onto a launching barge using self-driving ship transporting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201932343U (en) * 2010-12-13 2011-08-17 舟山中远船务工程有限公司 Steel structure launching way for ships
CN104229099A (en) * 2014-09-15 2014-12-24 南通中远船务工程有限公司 Offshore engineering vessel loading and launching system and method
CN107323619A (en) * 2017-05-24 2017-11-07 中国建筑第六工程局有限公司 A kind of extra large land conveyer method of Large-diameter Steel cylinder
CN108382540A (en) * 2018-03-04 2018-08-10 中建桥梁有限公司 Barge disembarkation, launching method

Also Published As

Publication number Publication date
CN108382540A (en) 2018-08-10

Similar Documents

Publication Publication Date Title
CN102127899B (en) System for lifting and sliding large-tonnage steel box girder in land area and shoal area and construction method thereof
CN102602712B (en) Method for shipping of segments of steel box girders by rolling
CN102337736B (en) Installation process of upper module on offshore oil platform
CN108382540B (en) Barge disembarkation, launching method
WO2019000758A1 (en) Method for transporting ship from land to water
CN107165046B (en) A kind of installation method of bridge inspection car
CN106043607B (en) Fixed quay is adaptively gone on board gangway ladder
CN101806053B (en) Integral installation method of cantilever beams of self lifting type well drilling platform
CN112609659B (en) Large floating type maintenance gate slope raising system and use method
CN105480387A (en) Overall shipping method for shipbuilding gantry crane
CN105692449A (en) Method for spud leg lengthening and folding of self-elevating drilling platform
CN102849470A (en) Shipping method for steel box girder section
KR101450229B1 (en) girder installation method
KR100895475B1 (en) Slip way lift system
CN104973210B (en) Artificial structure's facility construction technology waterborne
CN102530735B (en) Entire loading and transporting technology and equipment for portal crane
KR102453532B1 (en) Berthing device for ship
US4106638A (en) Ship and shore load handling system with an asymmetrical shaped pontoon for supporting carriage cables
KR101566130B1 (en) Method for constructing dam dock and mono rail using incline equipment
CN104420453A (en) Integral jointing method of cantilever beam of self-elevating drilling platform
JP4884082B2 (en) Bridge replacement method
CN217810777U (en) Unmanned ship wharf
CN202244020U (en) Mechanism used for driving ship-lifting hydraulic trolley to move transversally
CN113931070B (en) Beam unloading method for high-tide-difference wharf in shallow water area of sea area
RU2337038C2 (en) Ship launching device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant