CN108360506B - 一种市政工程用的方桩成型设备 - Google Patents
一种市政工程用的方桩成型设备 Download PDFInfo
- Publication number
- CN108360506B CN108360506B CN201810463448.5A CN201810463448A CN108360506B CN 108360506 B CN108360506 B CN 108360506B CN 201810463448 A CN201810463448 A CN 201810463448A CN 108360506 B CN108360506 B CN 108360506B
- Authority
- CN
- China
- Prior art keywords
- casting
- ring
- cement
- drill bit
- universal joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000465 moulding Methods 0.000 title claims abstract description 13
- 238000005266 casting Methods 0.000 claims abstract description 131
- 239000004568 cement Substances 0.000 claims abstract description 84
- 230000007246 mechanism Effects 0.000 claims abstract description 26
- 230000008859 change Effects 0.000 claims abstract description 3
- 230000037361 pathway Effects 0.000 claims description 31
- 230000003014 reinforcing effect Effects 0.000 claims description 30
- 238000009434 installation Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 210000000481 breast Anatomy 0.000 claims description 2
- 210000003205 muscle Anatomy 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 230000000149 penetrating effect Effects 0.000 claims 1
- 239000002689 soil Substances 0.000 abstract description 13
- 238000010586 diagram Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 7
- 230000008901 benefit Effects 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000008602 contraction Effects 0.000 description 2
- 239000007921 spray Substances 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 230000001413 cellular effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007373 indentation Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B4/00—Drives for drilling, used in the borehole
- E21B4/16—Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
- E02D15/04—Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/46—Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B10/00—Drill bits
- E21B10/44—Bits with helical conveying portion, e.g. screw type bits; Augers with leading portion or with detachable parts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B3/00—Rotary drilling
- E21B3/02—Surface drives for rotary drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/003—Drilling with mechanical conveying means
- E21B7/005—Drilling with mechanical conveying means with helical conveying means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/16—Shapes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0007—Production methods using a mold
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Engineering & Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Earth Drilling (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810463448.5A CN108360506B (zh) | 2017-03-08 | 2017-03-08 | 一种市政工程用的方桩成型设备 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810463448.5A CN108360506B (zh) | 2017-03-08 | 2017-03-08 | 一种市政工程用的方桩成型设备 |
CN201710135805.0A CN106801579B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的弧形方桩成型设备 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710135805.0A Division CN106801579B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的弧形方桩成型设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108360506A CN108360506A (zh) | 2018-08-03 |
CN108360506B true CN108360506B (zh) | 2019-10-22 |
Family
ID=58987970
Family Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810464074.9A Active CN108589710B (zh) | 2017-03-08 | 2017-03-08 | 一种市政工程用的弧形方桩成型设备 |
CN201810463450.2A Active CN108360507B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的方桩成型设备 |
CN201810463448.5A Active CN108360506B (zh) | 2017-03-08 | 2017-03-08 | 一种市政工程用的方桩成型设备 |
CN201710135805.0A Active CN106801579B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的弧形方桩成型设备 |
CN201810463449.XA Withdrawn CN108612095A (zh) | 2017-03-08 | 2017-03-08 | 一种弧形市政土建用的方桩成型设备 |
CN201810464075.3A Withdrawn CN108385675A (zh) | 2017-03-08 | 2017-03-08 | 一种土建工程用的弧形方桩成型设备 |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810464074.9A Active CN108589710B (zh) | 2017-03-08 | 2017-03-08 | 一种市政工程用的弧形方桩成型设备 |
CN201810463450.2A Active CN108360507B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的方桩成型设备 |
Family Applications After (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710135805.0A Active CN106801579B (zh) | 2017-03-08 | 2017-03-08 | 一种市政土建工程用的弧形方桩成型设备 |
CN201810463449.XA Withdrawn CN108612095A (zh) | 2017-03-08 | 2017-03-08 | 一种弧形市政土建用的方桩成型设备 |
CN201810464075.3A Withdrawn CN108385675A (zh) | 2017-03-08 | 2017-03-08 | 一种土建工程用的弧形方桩成型设备 |
Country Status (1)
Country | Link |
---|---|
CN (6) | CN108589710B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589710B (zh) * | 2017-03-08 | 2020-08-14 | 杭州银湖机械弹簧有限公司 | 一种市政工程用的弧形方桩成型设备 |
CN111927340A (zh) * | 2020-06-29 | 2020-11-13 | 北京贝威通石油科技有限公司 | 一种导向钻井装置 |
CN114555888B (zh) * | 2021-01-04 | 2023-01-31 | 成都欣皓地基基础工程有限责任公司 | 一种旋挖钻机方桩工法及设备 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07119462B2 (ja) * | 1991-11-15 | 1995-12-20 | 大商新基株式会社 | 地盤改良用攪拌装置及びそれを使用した地盤改良工法 |
CN101245597A (zh) * | 2007-02-16 | 2008-08-20 | 夏传清 | 护壁式钻孔灌注桩施工方法及其桩机 |
CN100591855C (zh) * | 2009-05-15 | 2010-02-24 | 凌德祥 | 预应力混凝土空心方桩及其成型模具 |
CN201671096U (zh) * | 2010-06-01 | 2010-12-15 | 上海中技桩业股份有限公司 | 一种基础方桩 |
CN102383431B (zh) * | 2011-04-21 | 2016-04-13 | 上海城地建设股份有限公司 | 中掘预应力离心管桩沉桩装置及其沉桩法 |
CN103174387B (zh) * | 2013-01-24 | 2016-01-20 | 贺德新 | 挤土排土钻杆、螺旋钻、桩机和挤土排土桩施工方法 |
CN103103977A (zh) * | 2013-02-07 | 2013-05-15 | 江苏固丰管桩集团有限公司 | 部分预应力钢筋混凝土实心方桩下段及其制作方法 |
CN105347744A (zh) * | 2015-11-24 | 2016-02-24 | 江苏兴厦建筑工程集团有限公司 | 一种高强度预制钢筋混凝土空心方桩 |
CN105649011A (zh) * | 2016-01-12 | 2016-06-08 | 深圳市工勘岩土集团有限公司 | 方形桩孔成型方法 |
CN105735894B (zh) * | 2016-03-11 | 2017-11-24 | 黄种继 | 一种用于浅井钻井的机构 |
CN105887876B (zh) * | 2016-03-28 | 2018-01-02 | 陶明安 | 一种现浇大直径组合薄壁螺纹管桩的施工方法及其成桩装置 |
CN106246757B (zh) * | 2016-10-08 | 2018-05-04 | 珠海市斯派诺电子科技有限公司 | 一种可控双向同轴离合器 |
CN108589710B (zh) * | 2017-03-08 | 2020-08-14 | 杭州银湖机械弹簧有限公司 | 一种市政工程用的弧形方桩成型设备 |
-
2017
- 2017-03-08 CN CN201810464074.9A patent/CN108589710B/zh active Active
- 2017-03-08 CN CN201810463450.2A patent/CN108360507B/zh active Active
- 2017-03-08 CN CN201810463448.5A patent/CN108360506B/zh active Active
- 2017-03-08 CN CN201710135805.0A patent/CN106801579B/zh active Active
- 2017-03-08 CN CN201810463449.XA patent/CN108612095A/zh not_active Withdrawn
- 2017-03-08 CN CN201810464075.3A patent/CN108385675A/zh not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
CN108360507A (zh) | 2018-08-03 |
CN108360506A (zh) | 2018-08-03 |
CN108589710A (zh) | 2018-09-28 |
CN108589710B (zh) | 2020-08-14 |
CN106801579A (zh) | 2017-06-06 |
CN108385675A (zh) | 2018-08-10 |
CN106801579B (zh) | 2018-11-02 |
CN108360507B (zh) | 2019-10-22 |
CN108612095A (zh) | 2018-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108360506B (zh) | 一种市政工程用的方桩成型设备 | |
CN110080810B (zh) | 一种液压驱动式矿用巷道锚索安装设备 | |
CN109235449A (zh) | 一种基坑复合桩墙的支护结构 | |
CN210562152U (zh) | 可实现多种桩型成桩的搅拌钻具 | |
KR101219377B1 (ko) | 장심도 다축 오거 지반개량굴착교반장치 | |
CN106975641A (zh) | 一种多功能仿生清管器及其清洁方法 | |
RU2607824C1 (ru) | Способ проходки и крепления вертикальных и наклонных выработок и щитовой комплекс для его осуществления | |
CN100485156C (zh) | 多轴钻机及其施工方法 | |
CN110306542B (zh) | 内芯为高压水泥土的水泥混凝土复合桩的施工方法 | |
CN106368213A (zh) | 节能高效自反力多向搅拌桩成桩设备 | |
CN106978815B (zh) | 一种沉井施工装置及施工方法 | |
CN207919561U (zh) | 一种锚拉式基坑支护结构 | |
CN106869775B (zh) | 一种市政桩基工程用的弧形地桩螺旋钻 | |
CN206801471U (zh) | 一种用于水平注浆钻机的导向注浆钻头 | |
CN201771419U (zh) | 一种打桩机 | |
KR102155343B1 (ko) | 더블 케이싱오거 구동 감속기 | |
KR101109055B1 (ko) | 이중관 로드 형상을 가지는 오거 및 이를 이용한 지반강화 시공방법 | |
US20070014637A1 (en) | Equipment and method for mixing in loco for the formation of diaphragms | |
CN206267792U (zh) | 伸缩钻杆 | |
KR20160024563A (ko) | 굴착로드 자동 승강기능을 가진 지중 차수 연속벽 시공용 지반굴착장치 | |
KR101280997B1 (ko) | 지반 굴착기용 슬라이딩 로드 | |
CN206143763U (zh) | 节能高效自反力多向搅拌桩成桩设备 | |
CN215927280U (zh) | 一种套管施工装置 | |
CN106351582B (zh) | 一种变向钻杆动力传递装置 | |
KR100727229B1 (ko) | 지반보강공법에 사용되는 축회전식 교반혼합장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190919 Address after: 311404 Songxi Village Xinyan, Xindeng Town, Fuyang District, Hangzhou City, Zhejiang Province Applicant after: Hangzhou Fuyang Xinyan Paper Products Co., Ltd. Applicant after: Li Wen Xin Address before: 311400 Fuyang Cheng Cheng Construction Engineering Co., Ltd., 656 Guihua Road, Fuyang District, Zhejiang, Hangzhou Applicant before: Li Wen Xin |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201209 Address after: No.2-2, Xigu Village, Zhongbao Town, Xinghua City, Taizhou City, Jiangsu Province Patentee after: Wang Qin Address before: 311404 Xin Deng Zhen Song Xi Cun Xin Yan, Fuyang District, Hangzhou City, Zhejiang Province Patentee before: Hangzhou Fuyang Xinyan Paper Products Co.,Ltd. Patentee before: Li Wenxin |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210121 Address after: 215000 No.18 Xiexing Road, Yuewang Xinjian village, Shaxi Town, Taicang City, Suzhou City, Jiangsu Province Patentee after: Taicang road and Bridge Engineering Co.,Ltd. Address before: No.2-2, Xigu Village, Zhongbao Town, Xinghua City, Taizhou City, Jiangsu Province Patentee before: Wang Qin |
|
TR01 | Transfer of patent right |