CN108334962A - Steel tower patrol task list method of adjustment and system based on steel tower problem weight - Google Patents

Steel tower patrol task list method of adjustment and system based on steel tower problem weight Download PDF

Info

Publication number
CN108334962A
CN108334962A CN201810137454.1A CN201810137454A CN108334962A CN 108334962 A CN108334962 A CN 108334962A CN 201810137454 A CN201810137454 A CN 201810137454A CN 108334962 A CN108334962 A CN 108334962A
Authority
CN
China
Prior art keywords
steel tower
matrix
patrol task
inspection
patrol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810137454.1A
Other languages
Chinese (zh)
Inventor
严军荣
卢玉龙
江雅芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Houbo Technology Co Ltd
Original Assignee
Hangzhou Houbo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Houbo Technology Co Ltd filed Critical Hangzhou Houbo Technology Co Ltd
Priority to CN201810137454.1A priority Critical patent/CN108334962A/en
Publication of CN108334962A publication Critical patent/CN108334962A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • G06Q50/40
    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07CTIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
    • G07C1/00Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
    • G07C1/20Checking timed patrols, e.g. of watchman

Abstract

The invention discloses steel tower patrol task list methods of adjustment and system based on steel tower problem weight.Its system includes generating steel tower patrol task matrix module, read history patrol record and generating steel tower problem weight matrix module, adjustment patrol task list block.The method and system of the present invention solve the technical issues of cannot adjusting steel tower patrol task list according to major safety risks.

Description

Steel tower patrol task list method of adjustment and system based on steel tower problem weight
Technical field
The invention belongs to communication iron tower maintenance technology fields, appoint more particularly to the steel tower inspection based on steel tower problem weight List method of adjustment of being engaged in and system.
Background technology
Communication iron tower mainly by manually carrying out regular visit and maintenance, according to fixed project order hold by patrol task at present Row, is unable to priority processing steel tower and occurs the emphasis Maintenance Significant Items of major safety risks problem in the recent period.Currently without according to great peace The technical solution of full hidden danger adjustment steel tower patrol task list proposes the steel tower patrol task row based on steel tower problem weight thus Table method of adjustment and system.
Invention content
The technical problem to be solved by the present invention is to cannot adjust steel tower patrol task list according to major safety risks Problem proposes steel tower patrol task list method of adjustment and system based on steel tower problem weight.
The present invention relies on existing communication iron tower maintenance system, maintenance personnel to carry out steel tower dimension according to patrol task list Shield records steel tower problem after the completion of safeguarding.
The hidden danger rank number of the corresponding steel tower problem of setting steel tower inspection project in advance, is denoted as P, each inspection project is arranged Hidden danger rank, the bigger expression hidden danger degree of value of hidden danger rank is higher.
The steel tower patrol task list based on steel tower problem weight of the present invention adjusts system, including generates steel tower inspection and appoint Business matrix module reads history patrol record and generates steel tower problem weight matrix module, adjustment patrol task list block.
Generate steel tower patrol task matrix module:The inspection project of steel tower patrol task is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol task matrix X.
It reads history patrol record and generates steel tower problem weight matrix module:History patrol record is read, according to inspection Project corresponds to the number of steel tower problem generation and the steel tower problem weight of hidden danger level calculation inspection project, suitable according to inspection project Sequence generates steel tower problem weight matrix Y;
Wherein, the history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;The number that the inspection project corresponds to the generation of steel tower problem is denoted as ni, 1≤ni≤M;The iron for calculating each inspection project Tower problem weight, uses yiIndicate steel tower problem weight, calculation formula yi=pi·ni, wherein piIt is each inspection set in advance Project corresponds to the hidden danger rank of steel tower problem;The steel tower problem weight matrix Y=diag (yi), matrix Y is the diagonal of N × N Matrix.
Adjust patrol task list block:Inspection is calculated according to steel tower patrol task matrix and steel tower problem weight matrix to appoint Be engaged in oriental matrix R;Element in descending permutation matrix R is patrolled according to the corresponding inspection project adjustment of element in the matrix R after sequence Examine task list;
Wherein, the patrol task that 1 × N is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y refers to Show matrix R, calculation formula R=XY.
Steel tower patrol task list based on steel tower problem weight adjusts system block diagram, as shown in Figure 1.
The steel tower patrol task list method of adjustment based on steel tower problem weight of the present invention is realized as follows:
Step 1 is ranked up the inspection project of steel tower patrol task, identify the inspection number of entry, be denoted as N, from greatly to Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol task matrix X of 1 × N.
Step 2 reads history patrol record, and the number and hidden danger rank meter of the generation of steel tower problem are corresponded to according to inspection project The steel tower problem weight for calculating inspection project generates steel tower problem weight matrix Y according to inspection project order;
Wherein, the history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;The number that the inspection project corresponds to the generation of steel tower problem is denoted as ni, 1≤ni≤M;The iron for calculating each inspection project Tower problem weight, uses yiIndicate steel tower problem weight, calculation formula yi=pi·ni, wherein piIt is each inspection set in advance Project corresponds to the hidden danger rank of steel tower problem;The steel tower problem weight matrix Y=diag (yi), matrix Y is the diagonal of N × N Matrix.
Step 3 calculates patrol task oriental matrix R according to steel tower patrol task matrix and steel tower problem weight matrix;Drop Element in sequence permutation matrix R adjusts patrol task list according to the corresponding inspection project of element in the matrix R after sequence;
Wherein, the patrol task that 1 × N is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y refers to Show matrix R, calculation formula R=XY.
Steel tower patrol task list method of adjustment flow chart based on steel tower problem weight, as shown in Figure 2.
The method and system of the present invention this have the advantage that:The more and hidden danger rank by the identification recent frequency of steel tower Higher inspection project obtains steel tower problem weighted value, and steel tower patrol task list is adjusted according to steel tower problem weighted value, is excellent The project of first inspection major safety risks provides foundation;
Description of the drawings
Fig. 1 is the steel tower patrol task list adjustment system block diagram based on steel tower problem weight of the present invention;
Fig. 2 is the steel tower patrol task list method of adjustment flow chart based on steel tower problem weight of the present invention.
Specific implementation mode
It elaborates below to the preferred embodiment of the present invention.
The present invention relies on existing communication iron tower maintenance system, maintenance personnel to carry out steel tower dimension according to patrol task list Shield records after the completion of safeguarding.In the present embodiment, the maintenance task list adjustment system and method for somewhere triangle tower are carried out Description.
In the present embodiment, index request is safeguarded according to existing triangle tower, the inspection project of patrol task in order according to It is secondary for microwave antenna inspection, the inspection of tower part, it is antiseptic and rustproof check, structural bolts connection tightness inspection, malformation and The inspection of yielding of foundation situation, steel tower verticality and height check, tower lamp inspection is looked into, steel tower ground connection checks, surrounding enviroment and attached set Standby to check, N=9 is numbered it from 9 to 1, and number is indicated with i.
The corresponding steel tower problem of steel tower project is divided into basic, normal, high 3 hidden danger ranks, i.e. P=3, each inspection project in advance The hidden danger rank of corresponding steel tower problem is respectively p9=3, p8=2, p7=1, p6=2, p5=1, p4=3, p3=1, p2=1, p1= 1。
The steel tower patrol task list based on steel tower problem weight of the present invention adjusts system, including generates steel tower inspection and appoint Business matrix module reads history patrol record and generates steel tower problem weight matrix module, adjustment patrol task list block.
Generate steel tower patrol task matrix module:The inspection project of steel tower patrol task is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol task matrix X.In the present embodiment, according to inspection project order generate 1 × 9 steel tower patrol task matrix X=(9,8,7, 6,5,4,3,2,1)。
It reads history patrol record and generates steel tower problem weight matrix module:History patrol record is read, according to inspection Project corresponds to the number of steel tower problem generation and the steel tower problem weight of hidden danger level calculation inspection project, suitable according to inspection project Sequence generates steel tower problem weight matrix Y;
Wherein, the history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;The number that the inspection project corresponds to the generation of steel tower problem is denoted as ni, 1≤ni≤M;The iron for calculating each inspection project Tower problem weight, uses yiIndicate steel tower problem weight, calculation formula yi=pi·ni, wherein piIt is each inspection set in advance Project corresponds to the hidden danger rank of steel tower problem;The steel tower problem weight matrix Y=diag (yi), matrix Y is the diagonal of N × N Matrix.In the present embodiment, time T is 3 months, reads 4 patrol records in nearly 3 months, i.e. M=4;Count each inspection project The number that corresponding steel tower problem occurs in time T, respectively n9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3= 0, n2=0, n1=0;The steel tower problem weight for calculating each inspection project is respectively y9=6, y8=0, y7=1, y6=0, y5=1, y4 =3, y3=0, y2=0, y1=0;By inspection project order generate N × N steel tower problem weight matrix Y=diag (6,0,1,0, 1,3,0,0,0), matrix Y is diagonal matrix.
Adjust patrol task list block:Inspection is calculated according to steel tower patrol task matrix and steel tower problem weight matrix to appoint Be engaged in oriental matrix R;Element in descending permutation matrix R is patrolled according to the corresponding inspection project adjustment of element in the matrix R after sequence Examine task list;
Wherein, the patrol task that 1 × N is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y refers to Show matrix R, calculation formula R=XY.In the present embodiment, the patrol task oriental matrix R=XY=of 1 × N is calculated (54,0,7,0,5,12,0,0,0), element obtains (54,12,7,5,0,0,0,0,0) in descending permutation matrix R, according to its correspondence Inspection project adjustment patrol task list be:Microwave antenna inspection, steel tower verticality and height check, it is antiseptic and rustproof check, Tightness inspection that malformation is connected with the inspection of yielding of foundation situation, the inspection of tower part, structural bolts, tower lamp inspection look into, steel tower Ground connection inspection, surrounding enviroment and auxiliary device inspection }.
The steel tower patrol task list method of adjustment based on steel tower problem weight of the present invention is realized as follows:
Step 1 is ranked up the inspection project of steel tower patrol task, identify the inspection number of entry, be denoted as N, from greatly to Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol task matrix X of 1 × N.This implementation In example, 1 × 9 steel tower patrol task matrix X=(9,8,7,6,5,4,3,2,1) is generated according to inspection project order.
Step 2 reads history patrol record, and the number and hidden danger rank meter of the generation of steel tower problem are corresponded to according to inspection project The steel tower problem weight for calculating inspection project generates steel tower problem weight matrix Y according to inspection project order;
Wherein, the history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;The number that the inspection project corresponds to the generation of steel tower problem is denoted as ni, 1≤ni≤M;The iron for calculating each inspection project Tower problem weight, uses yiIndicate steel tower problem weight, calculation formula yi=pi·ni, wherein piIt is each inspection set in advance Project corresponds to the hidden danger rank of steel tower problem;The steel tower problem weight matrix Y=diag (yi), matrix Y is the diagonal of N × N Matrix.In the present embodiment, time T is 3 months, reads 4 patrol records in nearly 3 months, i.e. M=4;Count each inspection project The number that corresponding steel tower problem occurs in time T, respectively n9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3= 0, n2=0, n1=0;The steel tower problem weight for calculating each inspection project is respectively y9=6, y8=0, y7=1, y6=0, y5=1, y4 =3, y3=0, y2=0, y1=0;By inspection project order generate N × N steel tower problem weight matrix Y=diag (6,0,1,0, 1,3,0,0,0), matrix Y is diagonal matrix.
Step 3 calculates patrol task oriental matrix R according to steel tower patrol task matrix and steel tower problem weight matrix;Drop Element in sequence permutation matrix R adjusts patrol task list according to the corresponding inspection project of element in the matrix R after sequence;
Wherein, the patrol task that 1 × N is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y refers to Show matrix R, calculation formula R=XY.In the present embodiment, the patrol task oriental matrix R=XY=of 1 × N is calculated (54,0,7,0,5,12,0,0,0), element obtains (54,12,7,5,0,0,0,0,0) in descending permutation matrix R, according to its correspondence Inspection project adjustment patrol task list be:Microwave antenna inspection, steel tower verticality and height check, it is antiseptic and rustproof check, Tightness inspection that malformation is connected with the inspection of yielding of foundation situation, the inspection of tower part, structural bolts, tower lamp inspection look into, steel tower Ground connection inspection, surrounding enviroment and auxiliary device inspection }.
Certainly, those of ordinary skill in the art is it should be appreciated that above example is intended merely to illustrate this hair It is bright, and be not intended as limitation of the invention, as long as within the scope of the invention, all to the variation of above example, modification Protection scope of the present invention will be fallen into.

Claims (8)

1. the steel tower patrol task list based on steel tower problem weight adjusts system, it is characterised in that appoint including generating steel tower inspection Business matrix module reads history patrol record and generates steel tower problem weight matrix module, adjustment patrol task list block;
The generation steel tower patrol task matrix module:The inspection project of steel tower patrol task is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol task matrix X;
The reading history patrol record and generation steel tower problem weight matrix module:History patrol record is read, according to inspection Project corresponds to the number of steel tower problem generation and the steel tower problem weight of hidden danger level calculation inspection project, suitable according to inspection project Sequence generates steel tower problem weight matrix Y;
The adjustment patrol task list block:Inspection is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y Element in task oriental matrix R, descending permutation matrix R is adjusted according to the corresponding inspection project of element in the matrix R after sequence Patrol task list.
2. the steel tower patrol task list according to claim 1 based on steel tower problem weight adjusts system, reading is gone through History patrol record and generation steel tower problem weight matrix module are characterized in that the history patrol record is steel tower in time T Patrol record, the time, T was arranged in advance, and the number of inspection is denoted as M;The inspection project corresponds to the secondary number scale of steel tower problem generation For ni, 1≤ni≤M;The steel tower problem weight for calculating each inspection project, uses yiIndicate steel tower problem weight, calculation formula For yi=pi·ni, wherein piIt is the hidden danger rank that each inspection project set in advance corresponds to steel tower problem;The steel tower problem power Weight matrix Y=diag (yi), matrix Y is the diagonal matrix of N × N.
3. the steel tower patrol task list according to claim 1 based on steel tower problem weight adjusts system, adjustment is patrolled Inspection task list module is characterized in that, described to calculate 1 × N according to steel tower patrol task matrix X and steel tower problem weight matrix Y Patrol task oriental matrix R, calculation formula R=XY.
4. the steel tower patrol task list according to claim 2 based on steel tower problem weight adjusts system, feature exists In setting inspection project corresponds to the hidden danger rank number of steel tower problem in advance, is denoted as P, 1≤pi≤ P, piValue it is bigger indicate it is hidden It is higher to suffer from degree.
5. the steel tower patrol task list method of adjustment based on steel tower problem weight, it is characterised in that include the following steps:
Step 1 is ranked up the inspection project of steel tower patrol task, identifies the inspection number of entry, is denoted as N, uses from big to small Number is successively numbered inspection project, and number is indicated with i, generates the steel tower patrol task matrix X of 1 × N;
Step 2 reads history patrol record, corresponds to the number of steel tower problem generation according to inspection project and hidden danger level calculation is patrolled The steel tower problem weight of inspection project generates steel tower problem weight matrix Y according to inspection project order;
Step 3 calculates patrol task oriental matrix R, descending according to steel tower patrol task matrix X and steel tower problem weight matrix Y Element in permutation matrix R adjusts patrol task list according to the corresponding inspection project of element in the matrix R after sequence.
6. the steel tower patrol task list method of adjustment according to claim 5 based on steel tower problem weight, step 2 It is characterized in that, the history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, and the number of inspection is denoted as M;The number that the inspection project corresponds to the generation of steel tower problem is denoted as ni, 1≤ni≤M;The steel tower for calculating each inspection project is asked Weight is inscribed, y is usediIndicate steel tower problem weight, calculation formula yi=pi·ni, wherein piIt is each inspection project set in advance The hidden danger rank of corresponding steel tower problem;The steel tower problem weight matrix Y=diag (yi), matrix Y is the diagonal matrix of N × N.
7. the steel tower patrol task list method of adjustment according to claim 5 based on steel tower problem weight, step 3 It is characterized in that, the patrol task that 1 × N is calculated according to steel tower patrol task matrix X and steel tower problem weight matrix Y indicates square Battle array R, calculation formula R=XY.
8. the steel tower patrol task list method of adjustment according to claim 6 based on steel tower problem weight, feature exist In setting inspection project corresponds to the hidden danger rank number of steel tower problem in advance, is denoted as P, 1≤pi≤ P, piValue it is bigger indicate it is hidden It is higher to suffer from degree.
CN201810137454.1A 2018-02-10 2018-02-10 Steel tower patrol task list method of adjustment and system based on steel tower problem weight Pending CN108334962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810137454.1A CN108334962A (en) 2018-02-10 2018-02-10 Steel tower patrol task list method of adjustment and system based on steel tower problem weight

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810137454.1A CN108334962A (en) 2018-02-10 2018-02-10 Steel tower patrol task list method of adjustment and system based on steel tower problem weight

Publications (1)

Publication Number Publication Date
CN108334962A true CN108334962A (en) 2018-07-27

Family

ID=62928762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810137454.1A Pending CN108334962A (en) 2018-02-10 2018-02-10 Steel tower patrol task list method of adjustment and system based on steel tower problem weight

Country Status (1)

Country Link
CN (1) CN108334962A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109448154A (en) * 2018-11-21 2019-03-08 北京国网富达科技发展有限责任公司 A kind of transmission line of electricity personnel method for inspecting and device
CN109636943A (en) * 2018-11-21 2019-04-16 北京国网富达科技发展有限责任公司 A kind of transmission line of electricity hand-held set method for inspecting and device
CN115660260A (en) * 2022-12-28 2023-01-31 深圳市四格互联信息技术有限公司 Method and system for dynamically generating inspection task of property management

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278702A1 (en) * 2013-03-15 2014-09-18 Lisa M. Giles Launch optimization system and method of use
CN106651731A (en) * 2016-12-25 2017-05-10 杭州博烁晟斐智能科技有限公司 Historical-data-based communication tower to-be-solved problem set generation method and system
CN106708786A (en) * 2016-12-25 2017-05-24 杭州博烁晟斐智能科技有限公司 Method and system for calculating problem severity of iron tower based on sensor detection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278702A1 (en) * 2013-03-15 2014-09-18 Lisa M. Giles Launch optimization system and method of use
CN106651731A (en) * 2016-12-25 2017-05-10 杭州博烁晟斐智能科技有限公司 Historical-data-based communication tower to-be-solved problem set generation method and system
CN106708786A (en) * 2016-12-25 2017-05-24 杭州博烁晟斐智能科技有限公司 Method and system for calculating problem severity of iron tower based on sensor detection

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109448154A (en) * 2018-11-21 2019-03-08 北京国网富达科技发展有限责任公司 A kind of transmission line of electricity personnel method for inspecting and device
CN109636943A (en) * 2018-11-21 2019-04-16 北京国网富达科技发展有限责任公司 A kind of transmission line of electricity hand-held set method for inspecting and device
CN109448154B (en) * 2018-11-21 2021-11-26 北京国网富达科技发展有限责任公司 Power transmission line personnel inspection method and device
CN109636943B (en) * 2018-11-21 2021-11-26 北京国网富达科技发展有限责任公司 Power transmission line handset inspection method and device
CN115660260A (en) * 2022-12-28 2023-01-31 深圳市四格互联信息技术有限公司 Method and system for dynamically generating inspection task of property management

Similar Documents

Publication Publication Date Title
CN108334962A (en) Steel tower patrol task list method of adjustment and system based on steel tower problem weight
CN104392391A (en) Power grid running safety risk quantification method
CN104299116A (en) Quantitative evaluation method for security risk of operation of power network
CN107122884B (en) Evaluation method and device for information safety protection of power distribution automation system
CN103837777A (en) Method and system for power quality assessment of power supply system
CN109359892A (en) A method of the unit check period is determined according to equipment Risk grade
CN104240781A (en) Signal distribution method and signal distribution system of digital instrument control system (DCS) of nuclear power plant
CN108399505B (en) Distributed photovoltaic power supply access capacity planning method and terminal equipment
CN108388984A (en) Based on inspection project steel tower patrol plan method of adjustment of problems and system
CN111930802A (en) Anti-electricity-stealing analysis method based on Lasso analysis
CN106651206A (en) Method for evaluating testability evaluation index system of relay protection
CN108416511A (en) It is a kind of based on the patrol task method of adjustment and system of safeguarding duration
CN109214615A (en) A method of suitable for the group's heap dosage risk control of high temperature gas cooled reactor nuclear power plant
CN108346001A (en) A kind of steel tower regular visit project order method of adjustment and system
WO2023098410A1 (en) Quantitative evaluation method for evaluating independence of defense-in-depth levels for nuclear power plant, and system for implementing same
CN114818382A (en) Green assessment method for carbon emission of enterprise
CN105160171B (en) A kind of analysis of electronic system thermal reliability and Forecasting Methodology based on multimode transductive reasoning
CN108416469A (en) A kind of extreme weather causes the prediction technique and system of steel tower security risk
CN114334194B (en) High-temperature gas cooled reactor helium gas leakage early warning method, device, equipment and storage medium
CN108416510A (en) A kind of steel tower patrol task list method of real-time adjustment and system
Deng et al. The risk-based assessment of static voltage stability issues with consideration of load and wind power uncertainties
CN112488465B (en) Method for estimating total fission times of triuranium octoxide in critical accident emergency
CN108510416A (en) Examination flux monitoring system and implementation method
Zhang et al. Research of Probabilistic Safety Assessment of CPR1000 Considering Aging Effects
Civlez et al. Security Applications for Reliable Energy Management in a Microgrid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727