CN108399505B - Distributed photovoltaic power supply access capacity planning method and terminal equipment - Google Patents

Distributed photovoltaic power supply access capacity planning method and terminal equipment Download PDF

Info

Publication number
CN108399505B
CN108399505B CN201810201381.8A CN201810201381A CN108399505B CN 108399505 B CN108399505 B CN 108399505B CN 201810201381 A CN201810201381 A CN 201810201381A CN 108399505 B CN108399505 B CN 108399505B
Authority
CN
China
Prior art keywords
median
difference
difference sequence
sequence
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810201381.8A
Other languages
Chinese (zh)
Other versions
CN108399505A (en
Inventor
安佳坤
邵华
康伟
凌云鹏
朱文亮
李振伟
贺春光
赵丙军
刘雪飞
韩璟琳
胡诗尧
翟广心
刘鹏
孙鹏飞
马国真
赵阳
胡珀
高珊
唐帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Hebei Electric Power Co Ltd, Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201810201381.8A priority Critical patent/CN108399505B/en
Publication of CN108399505A publication Critical patent/CN108399505A/en
Application granted granted Critical
Publication of CN108399505B publication Critical patent/CN108399505B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of photovoltaic access power grid planning, and provides a distributed photovoltaic power supply access capacity planning method and terminal equipment. The method comprises the following steps: acquiring daily load active electric quantity, daily load apparent power, photovoltaic daily power generation active electric quantity and photovoltaic daily power generation apparent power in a preset statistical period of a planning area, subtracting the photovoltaic daily power generation active electric quantity and the daily load active electric quantity to obtain a first difference sequence, and subtracting the photovoltaic daily power generation apparent power and the daily load apparent power to obtain a second difference sequence; calculating the median of the first difference sequence, and performing bilateral inspection on whether the median is reasonable; and determining the planning capacity of the planning area according to the result of the bilateral test, the first difference sequence and the second difference sequence. The method and the device can determine the planning capacity of the planning area by using the detected median of the daily net output electric quantity, and reduce the scale of transformation of the photovoltaic power supply to the power distribution network.

Description

分布式光伏电源接入容量规划方法及终端设备Distributed photovoltaic power supply access capacity planning method and terminal equipment

技术领域technical field

本发明涉及光伏接入电网规划技术领域,尤其涉及一种分布式光伏电源接入容量规划方法及终端设备。The invention relates to the technical field of photovoltaic access grid planning, in particular to a distributed photovoltaic power supply access capacity planning method and terminal equipment.

背景技术Background technique

光伏扶贫是我国实施精准扶贫的技术手段之一,但由于农村电网供电半径大,且负荷密度低,长期以来虽然经过多次农网改造,但主要解决了城镇化较好地区的供电质量问题,而光伏扶贫由于场地的要求,多在城镇以外交通条件及经济基础相对较差的村落以扶贫形式开展,原有网架难以满足光伏电能外送需求。目前光伏电源的接入容量规划是以发电极大值为依据,这样造成配电网改造中增容的容量标准较高,配电网改造规模巨大,进而导致光伏扶贫接入农村电网所需的投资规模太大,难以广泛实施。Photovoltaic poverty alleviation is one of the technical means to implement targeted poverty alleviation in my country. However, due to the large power supply radius of the rural power grid and the low load density, although the rural power grid has been reconstructed many times for a long time, it mainly solves the problem of power supply quality in well-urbanized areas. However, due to site requirements, photovoltaic poverty alleviation is mostly carried out in villages with relatively poor traffic conditions and economic foundations outside cities and towns in the form of poverty alleviation, and the original grid is difficult to meet the demand for photovoltaic power delivery. At present, the access capacity planning of photovoltaic power sources is based on the maximum value of power generation, which results in a higher capacity standard for capacity increase in the transformation of the distribution network, and the scale of the transformation of the distribution network is huge, which in turn leads to the need for photovoltaic poverty alleviation to connect to the rural power grid. The scale of the investment is too large to be widely implemented.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本发明实施例提供了分布式光伏电源接入容量规划方法及终端设备,以解决目前以发电极大值为依据进行光伏电源接入容量规划导致配电网改造规模巨大,实施成本大的问题。In view of this, the embodiments of the present invention provide a distributed photovoltaic power supply access capacity planning method and a terminal device, so as to solve the problem that the current photovoltaic power supply access capacity planning based on the maximum value of power generation results in a huge transformation of the distribution network and the implementation cost. big problem.

本发明实施例的第一方面提供了分布式光伏电源接入容量规划方法,包括:A first aspect of the embodiments of the present invention provides a distributed photovoltaic power supply access capacity planning method, including:

获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列;Acquire the daily load active power, daily load apparent power, photovoltaic daily power generation active power, and photovoltaic daily TV power within the preset statistical period of the planning area, and use the photovoltaic daily power generation active power and the daily load active power as a value. The first difference sequence is obtained by the difference, and the second difference sequence is obtained by making the difference between the daily photovoltaic power and the daily load apparent power;

计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验;Calculate the median of the first difference sequence, and perform a bilateral test on whether the median is reasonable;

根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量。The planned capacity of the planned area is determined according to the result of the bilateral test, the first difference sequence and the second difference sequence.

本发明实施例的第二方面提供了分布式光伏电源接入容量规划装置,包括:A second aspect of the embodiments of the present invention provides a distributed photovoltaic power supply access capacity planning device, including:

获取模块,用于获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列;The obtaining module is used to obtain the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power and the photovoltaic daily TV power in the preset statistical period of the planning area, and compare the photovoltaic daily power generation active power and the photovoltaic power generation daily power. The first difference sequence is obtained by making a difference in the active power of the daily load, and the second difference sequence is obtained by making the difference between the daily photovoltaic power and the apparent power of the daily load;

检验模块,用于计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验;a test module, configured to calculate the median of the first difference sequence, and to perform a bilateral test on whether the median is reasonable;

处理模块,用于根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量。A processing module, configured to determine the planned capacity of the planned area according to the result of the bilateral test, the first difference sequence and the second difference sequence.

本发明实施例的第三方面提供了终端设备,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,所述处理器执行所述计算机程序时实现第一方面中的分布式光伏电源接入容量规划方法。A third aspect of the embodiments of the present invention provides a terminal device, including a memory, a processor, and a computer program stored in the memory and running on the processor, where the processor implements the first computer program when the processor executes the computer program. Distributed photovoltaic power supply access capacity planning method in one aspect.

本发明实施例的第四方面提供了计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,所述计算机程序被处理器执行时实现第一方面中的分布式光伏电源接入容量规划方法。A fourth aspect of the embodiments of the present invention provides a computer-readable storage medium, where the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, realizes the distributed photovoltaic power supply access capacity in the first aspect planning method.

本发明实施例与现有技术相比存在的有益效果是:通过根据规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率得到第一差值序列和第二差值序列,并根据对第一差值序列中位数的双边检验结果、第一差值序列和第二差值序列确定规划区域的规划容量,能够利用经过检验的日净输出电量中位数确定规划区域的规划容量,避免以发电极大值为依据的容量规划造成配电网改造中增容的容量标准较高的问题,能够降低配电网增容容量,减小光伏电源接入配电网的改造规模,降低光伏电源接入配电网的实施成本。Compared with the prior art, the embodiment of the present invention has the beneficial effect that the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power and the photovoltaic daily power generation TV power in the preset statistical period according to the planning area are obtained. The first difference sequence and the second difference sequence, and the planning capacity of the planning area is determined according to the bilateral test result of the median of the first difference sequence, the first difference sequence, and the second difference sequence, and the tested capacity can be used. The median of the daily net output power can determine the planned capacity of the planned area, avoid the problem of higher capacity standards in the transformation of the distribution network caused by the capacity planning based on the maximum value of power generation, and can reduce the increased capacity of the distribution network. , reduce the transformation scale of photovoltaic power supply to the distribution network, and reduce the implementation cost of photovoltaic power supply to the distribution network.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the drawings in the following description are only for the present invention. In some embodiments, for those of ordinary skill in the art, other drawings can also be obtained according to these drawings without any creative effort.

图1是本发明实施例提供的分布式光伏电源接入容量规划方法的实现流程图;Fig. 1 is the realization flow chart of the distributed photovoltaic power supply access capacity planning method provided by the embodiment of the present invention;

图2是本发明实施例提供的分布式光伏电源接入容量规划方法中进行双边检验的实现流程图;2 is a flow chart of the implementation of bilateral inspection in the method for planning the access capacity of distributed photovoltaic power sources provided by an embodiment of the present invention;

图3是本发明实施例提供的分布式光伏电源接入容量规划装置的示意图;3 is a schematic diagram of a distributed photovoltaic power supply access capacity planning device provided by an embodiment of the present invention;

图4是本发明实施例提供的终端设备的示意图。FIG. 4 is a schematic diagram of a terminal device provided by an embodiment of the present invention.

具体实施方式Detailed ways

以下描述中,为了说明而不是为了限定,提出了诸如特定系统结构、技术之类的具体细节,以便透彻理解本发明实施例。然而,本领域的技术人员应当清楚,在没有这些具体细节的其它实施例中也可以实现本发明。在其它情况中,省略对众所周知的系统、装置、电路以及方法的详细说明,以免不必要的细节妨碍本发明的描述。In the following description, for the purpose of illustration rather than limitation, specific details such as specific system structures and technologies are set forth in order to provide a thorough understanding of the embodiments of the present invention. However, it will be apparent to those skilled in the art that the present invention may be practiced in other embodiments without these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present invention with unnecessary detail.

为了说明本发明所述的技术方案,下面通过具体实施例来进行说明。In order to illustrate the technical solutions of the present invention, the following specific embodiments are used for description.

图1为本发明实施例提供的分布式光伏电源接入容量规划方法的实现流程图,详述如下:Fig. 1 is the realization flow chart of the distributed photovoltaic power supply access capacity planning method provided by the embodiment of the present invention, and the details are as follows:

在S101中,获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列。In S101 , obtain the daily load active power, daily load apparent power, photovoltaic daily power generation active power, and photovoltaic daily power generation TV power within a preset statistical period of the planning area, and combine the photovoltaic daily power generation active power and the daily power generation active power A first difference sequence is obtained by making a difference in the active power of the load, and a second difference sequence is obtained by making a difference between the daily photovoltaic power and the apparent power of the daily load.

在本实施例中,规划区域为需要进行光伏电源接入容量规划的电网地区。预设统计周期为预先设置的获取电网用电和光伏发电的历史数据的时间周期,可以根据实际需求设定。例如,预设统计周期可以为三年、一年或一个季节等。In this embodiment, the planning area is a power grid area that needs to perform photovoltaic power supply access capacity planning. The preset statistical period is a preset time period for obtaining historical data of grid power consumption and photovoltaic power generation, which can be set according to actual needs. For example, the preset statistical period may be three years, one year, or one season.

可以通过电网数据库获取规划区域配电变压器监测的预设统计周期内每天的日负荷有功电量和日负荷视在功率,获取规划区域光伏电源接入电网的计量表计量的预设统计周期内每天的光伏日发电有功电量和光伏日发电视在功率。The daily active power and apparent power of the daily load in the preset statistical period for monitoring distribution transformers in the planning area can be obtained through the power grid database, and the daily load and apparent power in the preset statistical period for the metering of the photovoltaic power connected to the grid in the planning area can be obtained. PV daily active power and PV daily TV power.

将预设统计周期内各天的光伏日发电有功电量和日负荷有功电量作差得到第一差值序列,可以将第i天光伏日发电有功电量和日负荷有功电量作差得到的数据记为ΔWi。其中,ΔWi为正值表示第i天的发电大于用电,ΔWi为负值表示第i天的发电小于用电。将预设统计周期内各天的光伏日发电视在功率和日负荷视在功率作差得到第二差值序列,可以将第i天光伏日发电视在功率和日负荷视在功率作差得到的数据记为ΔSiThe first difference sequence is obtained by taking the difference between the daily photovoltaic active power generation and the daily load active power in each day in the preset statistical period, and the data obtained by the difference between the photovoltaic daily power generation active power and the daily load active power on the i-th day can be recorded as ΔW i . Among them, a positive value of ΔW i means that the power generation on the ith day is greater than the electricity consumption, and a negative value of ΔW i means that the power generation on the ith day is less than the electricity consumption. The second difference sequence is obtained by taking the difference between the PV daily TV power and the daily load apparent power of each day in the preset statistical period, and the difference between the photovoltaic daily TV power and the daily load apparent power on the i-th day can be obtained. The data is recorded as ΔS i .

在S102中,计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验。In S102, the median of the first difference sequence is calculated, and a bilateral test is performed on whether the median is reasonable.

在本实施例中,可以计算第一差值序列的中位数,并对利用双边检验来判断计算出的中位数是否合理。其中,双边检验又称双尾检验、双侧检验,是在假设检验中,用检验统计量的密度曲线和x轴所围成的面积的左右两边的尾部面积来构造临界区域进行检验的方法。In this embodiment, the median of the first difference sequence may be calculated, and a bilateral test may be used to determine whether the calculated median is reasonable. Among them, bilateral test, also known as two-tailed test and two-sided test, is a method of constructing a critical region for testing by using the density curve of the test statistic and the tail area of the left and right sides of the area enclosed by the x-axis in hypothesis testing.

作为本发明的一个实施例,S102中“计算所述第一差值序列的中位数”的步骤可以包括:As an embodiment of the present invention, the step of "calculating the median of the first difference sequence" in S102 may include:

对所述第一差值序列进行排序;所述第一差值序列表示为ΔW1,…,ΔWi,…,ΔWN,排序后的第一差值序列表示为ΔW(1),…,ΔW(j),…,ΔW(N);其中N为所述第一差值序列中的数据个数;Sort the first difference value sequence; the first difference value sequence is represented as ΔW 1 ,...,ΔW i ,...,ΔW N , and the sorted first difference value sequence is represented as ΔW (1) ,..., ΔW (j) , . . . , ΔW (N) ; wherein N is the number of data in the first difference sequence;

若N为奇数,则所述第一差值序列的中位数为ΔW((N+1)/2)If N is an odd number, the median of the first difference sequence is ΔW ((N+1)/2) ;

若N为偶数,则所述第一差值序列的中位数为1/2(ΔW(N/2)+ΔW((N+2)/2))。If N is an even number, the median of the first difference sequence is 1/2(ΔW (N/2) +ΔW ((N+2)/2) ).

在本实施例中,排序可以是按照升序排列,也可以是按照降序排列,在此不作限定。可以用ΔW0表示第一差值序列的中位数,若N为奇数则ΔW0=ΔW((N+1)/2),若N为偶数则ΔW0=1/2(ΔW(N/2)+ΔW((N+2)/2))。In this embodiment, the sorting may be in ascending order or in descending order, which is not limited here. ΔW 0 can be used to represent the median of the first difference sequence, if N is an odd number, then ΔW 0 =ΔW ((N+1)/2) , if N is an even number, then ΔW 0 =1/2(ΔW (N/ 2) +ΔW ((N+2)/2) ).

例如,若第一差值序列为-4,8,3,10,12,按照升序排列后的第一差值序列为-4,3,8,10,12,此时N=5为奇数,因此ΔW0=ΔW((N+1)/2)=ΔW(3)=8,即中位数为8;若第一差值序列为-4,8,3,10,12,2,按照升序排列后的第一差值序列为-4,2,3,8,10,12,此时N=6为偶数,因此ΔW0=1/2(ΔW(N/2)+ΔW((N+2)/2))=1/2(ΔW(3)+ΔW(4))=1/2(3+8),即中位数为5.5。For example, if the first difference sequence is -4, 8, 3, 10, 12, the first difference sequence in ascending order is -4, 3, 8, 10, 12. At this time, N=5 is an odd number, Therefore ΔW 0 =ΔW ((N+1)/2) =ΔW (3) =8, that is, the median is 8; if the first difference sequence is -4, 8, 3, 10, 12, 2, according to The first difference sequence after ascending order is -4, 2, 3, 8, 10, 12. At this time, N=6 is an even number, so ΔW 0 =1/2(ΔW (N/2) +ΔW ((N +2)/2) )=1/2(ΔW (3) +ΔW (4) )=1/2(3+8), which means the median is 5.5.

本实施例通过对第一差值序列进行排序,再根据排序后的序列确定第一差值序列的中位数,能够提高第一差值序列中位数的计算速度,进而减少分布式光伏电源接入容量规划所需的时间,提高规划效率。In this embodiment, by sorting the first difference sequence, and then determining the median of the first difference sequence according to the sorted sequence, the calculation speed of the median of the first difference sequence can be improved, thereby reducing distributed photovoltaic power generation Time required for access capacity planning and improve planning efficiency.

作为本发明的一个实施例,如图2所示,S102中“对所述中位数是否合理进行双边检验”的步骤可以包括:As an embodiment of the present invention, as shown in FIG. 2 , the step of “performing a bilateral test on whether the median is reasonable” in S102 may include:

在S201中,将所述第一差值序列中各个数据分别与所述中位数作差后求绝对值,得到绝对值序列;所述第一差值序列中的各个数据与所述绝对值序列中的各个数据一一对应。In S201, each data in the first difference sequence is compared with the median, and then an absolute value is obtained to obtain an absolute value sequence; each data in the first difference sequence and the absolute value are obtained Each data in the sequence corresponds one-to-one.

在本实施例中,若第一差值序列中的第i个数据用ΔWi表示,中位数用ΔW0表示,则绝对值序列的第i个数据可以表示为|ΔWi-ΔW0|。In this embodiment, if the i-th data in the first difference sequence is represented by ΔW i and the median is represented by ΔW 0 , the i-th data in the absolute value sequence can be represented as |ΔW i -ΔW 0 | .

在S202中,计算所述绝对值序列中各个数据对应的秩。In S202, a rank corresponding to each data in the absolute value sequence is calculated.

在本实施例中,一个序列中各个数据对应的秩为该序列按照升序排列后各个数据所在的位置。可以用Ri表示第i个数据对应的秩。例如,若绝对值序列为14,18,13,20,22,12,按照升序排列后的绝对值序列为12,13,14,18,20,22,那么绝对值序列各个数据对应的秩依次为3,4,2,5,6,1。In this embodiment, the rank corresponding to each data in a sequence is the position of each data after the sequence is arranged in ascending order. R i can be used to represent the rank corresponding to the i-th data. For example, if the absolute value sequence is 14, 18, 13, 20, 22, 12, and the absolute value sequence in ascending order is 12, 13, 14, 18, 20, 22, then the rank corresponding to each data in the absolute value sequence is in order 3, 4, 2, 5, 6, 1.

在S203中,确定双边检验的假设H0:M=ΔW0.<=>H1:M≠ΔW0,并计算检验统计量T=min(T+,T-),其中,M表示所述第一差值序列的实际中位数,ΔW0.表示计算出的所述第一差值序列的中位数,T+表示各个第一数据对应的秩的和,所述第一数据为所述第一差值序列中大于所述中位数的数据;T-表示各个第二数据对应的秩的和,所述第二数据为所述第一差值序列中小于所述中位数的数据。In S203, the hypothesis H 0 of the bilateral test is determined: M=ΔW 0 .<=>H 1 : M≠ΔW 0 , and the test statistic T=min(T+, T-) is calculated, where M represents the first The actual median of a difference sequence, ΔW 0 . represents the calculated median of the first difference sequence, and T+ represents the sum of the ranks corresponding to each first data, and the first data is the first data. The data in a difference sequence is greater than the median; T- represents the sum of ranks corresponding to each second data, and the second data is the data in the first difference sequence that is smaller than the median.

在本实施例中,假设H0表示计算出的中位数合理,假设H1表示计算出的中位数不合理。下面结合表1的示例数据对检验统计量进行说明。表1中第一行为第一差值序列;第二行为第一差值序列中各个数据与中位数作差的结果,在本示例中第一差值序列的中位数为8;第三行为绝对值序列;第四行为绝对值序列中各个数据对应的秩。In this embodiment, it is assumed that H 0 indicates that the calculated median is reasonable, and that H 1 is assumed to indicate that the calculated median is unreasonable. The test statistics are described below in conjunction with the example data in Table 1. The first row in Table 1 is the first difference sequence; the second row is the result of the difference between each data in the first difference sequence and the median. In this example, the median of the first difference sequence is 8; The row is the absolute value sequence; the fourth row is the rank corresponding to each data in the absolute value sequence.

第一数据为第一差值序列中大于中位数的数据,即第一数据为ΔWi-ΔW0>0的ΔWi,如表1第一行中的数据10和12。T+表示各个第一数据对应的秩的和,如表1中第四行中2(数据10对应的秩),3(数据12对应的秩)的和,即根据表1中示例数据得出的T+为5。The first data is data greater than the median in the first difference sequence, that is, the first data is ΔW i with ΔW i -ΔW 0 >0, such as data 10 and 12 in the first row of Table 1. T+ represents the sum of the ranks corresponding to each first data, such as the sum of 2 (rank corresponding to data 10) and 3 (rank corresponding to data 12) in the fourth row in Table 1, that is, obtained from the example data in Table 1 T+ is 5.

第二数据为第一差值序列中小于中位数的数据,即第一数据为ΔWi-ΔW0<0的ΔWi,如表1第一行中的数据-4和3。T-表示各个第二数据对应的秩的和,如表1中第四行中5(数据-4对应的秩),4(数据3对应的秩)的和,即根据表1中示例数据得出的T-为9。The second data is data less than the median in the first difference sequence, that is, the first data is ΔW i with ΔW i -ΔW 0 <0, such as data -4 and 3 in the first row of Table 1. T- represents the sum of the ranks corresponding to each second data, such as the sum of 5 (rank corresponding to data-4) and 4 (rank corresponding to data 3) in the fourth row in Table 1, that is, according to the example data in Table 1 The T- out is 9.

表1示例数据Table 1 Example data

Figure BDA0001594590410000061
Figure BDA0001594590410000061

在S204中,根据计算出的检验统计量在正态分布表中查找对应的p值,根据p值判断所述中位数是否合理。In S204, the corresponding p value is searched in the normal distribution table according to the calculated test statistic, and whether the median is reasonable is judged according to the p value.

在本实施例中,可以根据计算出的检验统计量在正态分布表中对应的p值判断中位数是否合理。In this embodiment, whether the median is reasonable can be judged according to the corresponding p value of the calculated test statistic in the normal distribution table.

可选地,可以根据计算出的检验统计量,在置信水平α下查正态分布表得到p值,如果T>p则接受H0,认为所得到的中位数合理,否则认为中位数不合理。Optionally, according to the calculated test statistic, check the normal distribution table at the confidence level α to obtain the p value, if T>p, accept H 0 , and consider the obtained median to be reasonable; otherwise, consider the median unreasonable.

可选地,可以建立检验统计量与p值对应的秩检验分布表,根据计算出的检验统计量在秩检验分布表中查找对应的p值,再将p值和预设阈值进行对比,若p值小于预设阈值,则接受H0,认为所得到的中位数合理,否则认为中位数不合理。Optionally, a rank test distribution table corresponding to the test statistic and the p value can be established, the corresponding p value is searched in the rank test distribution table according to the calculated test statistic, and then the p value is compared with the preset threshold. If the p value is less than the preset threshold, then accept H 0 , and consider the obtained median to be reasonable; otherwise, consider the median to be unreasonable.

在S103中,根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量。In S103, the planned capacity of the planned area is determined according to the result of the bilateral test, the first difference sequence and the second difference sequence.

在本实施例中,可以根据双边检验的结果,选择性的根据第一差值序列或第二差值序列确定规划区域的规划容量。In this embodiment, the planning capacity of the planning area may be selectively determined according to the first difference sequence or the second difference sequence according to the result of the bilateral test.

本发明实施例通过根据规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率得到第一差值序列和第二差值序列,并根据对第一差值序列中位数的双边检验结果、第一差值序列和第二差值序列确定规划区域的规划容量,能够利用经过检验的日净输出电量中位数确定规划区域的规划容量,避免以发电极大值为依据的容量规划造成配电网改造中增容的容量标准较高的问题,能够降低配电网增容容量,减小光伏电源接入配电网的改造规模,降低光伏电源接入配电网的实施成本。In the embodiment of the present invention, the first difference sequence and the second difference sequence are obtained by obtaining the first difference sequence and the second difference sequence according to the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power, and the photovoltaic daily power generation TV power in the preset statistical period of the planning area, The planned capacity of the planned area can be determined according to the bilateral test results of the median of the first difference sequence, the first difference sequence and the second difference sequence, and the tested median of the daily net output power can be used to determine the planned capacity of the planned area. Planning capacity, avoiding the problem of higher capacity standards in distribution network transformation caused by capacity planning based on the maximum value of power generation, which can reduce the capacity of distribution network to increase capacity and reduce the transformation of photovoltaic power into distribution network Scale and reduce the implementation cost of connecting photovoltaic power to the distribution network.

作为本发明的一个实施例,S103可以包括:As an embodiment of the present invention, S103 may include:

若所述双边检验的结果为所述中位数合理,则根据所述第一差值序列确定规划区域的规划容量;若所述双边检验的结果为所述中位数不合理,则将所述第二差值序列中的最大值作为规划区域的规划容量。If the result of the bilateral test is that the median is reasonable, the planned capacity of the planning area is determined according to the first difference sequence; if the result of the bilateral test is that the median is unreasonable, the The maximum value in the second difference sequence is used as the planned capacity of the planned area.

可选地,若双边检验的结果为中位数合理,则表征第一差值序列数据正常,可以将ΔWi/24确定为规划区域的规划容量;若双边检验的结果为中位数不合理,则表征第一差值序列数据存在异常,可以将第二差值序列中的最大值作为规划区域的规划容量。若用ΔSi表示第二差值序列中的第i个数据,则第二差值序列中的最大值可以表示为ΔSi_maxOptionally, if the result of the bilateral test is that the median is reasonable, it indicates that the first difference series data is normal, and ΔW i /24 can be determined as the planning capacity of the planning area; if the result of the bilateral test is that the median is unreasonable , it indicates that the first difference sequence data is abnormal, and the maximum value in the second difference sequence can be used as the planning capacity of the planning area. If ΔS i is used to represent the i-th data in the second difference value sequence, the maximum value in the second difference value sequence can be represented as ΔS i_max .

可选地,若双边检验的结果为中位数合理,则表征第一差值序列数据正常,可以将第一差值序列中的最大值(可以表示为ΔWi-max)除以24小时作为规划容量,即可以将ΔWi-max/24确定为规划区域的规划容量;若双边检验的结果为中位数不合理,则表征第一差值序列数据存在异常,可以将第二差值序列中的最大值作为规划区域的规划容量。Optionally, if the result of the bilateral test is that the median is reasonable, it indicates that the data of the first difference series is normal, and the maximum value in the first difference series (which can be expressed as ΔW i-max ) can be divided by 24 hours as Planning capacity, that is, ΔW i-max /24 can be determined as the planning capacity of the planning area; if the result of the bilateral test is that the median is unreasonable, it indicates that the first difference sequence data is abnormal, and the second difference sequence The maximum value in is used as the planned capacity of the planned area.

作为本发明的一个实施例,所述预设统计周期包括至少一个季节,所述第一差值序列包括各个季节对应的第一差值序列,所述第二差值序列包括各个季节对应的第二差值序列;As an embodiment of the present invention, the preset statistical period includes at least one season, the first difference sequence includes a first difference sequence corresponding to each season, and the second difference sequence includes a first difference sequence corresponding to each season two-difference sequence;

S102可以包括:S102 may include:

计算各个季节对应的第一差值序列的中位数,并对各个季节对应的中位数是否合理进行双边检验;Calculate the median of the first difference series corresponding to each season, and conduct a bilateral test to see if the median corresponding to each season is reasonable;

S103可以包括:S103 may include:

根据各个季节对应的双边检验的结果、各个季节对应的第一差值序列和各个季节对应的第二差值序列确定各个季节对应的规划容量;Determine the planning capacity corresponding to each season according to the results of the bilateral test corresponding to each season, the first difference sequence corresponding to each season, and the second difference sequence corresponding to each season;

将各个季节对应的规划容量中的最大值确定为所述规划区域的规划容量。The maximum value among the planned capacities corresponding to each season is determined as the planned capacity of the planned area.

在本实施例中,预设统计周期可以包括至少一个季节,先分别确定各个季节对应的规划容量,再将各个季节对应的规划容量中的最大值确定为规划区域的规划容量。In this embodiment, the preset statistical period may include at least one season, first determine the planned capacity corresponding to each season, and then determine the maximum value of the planned capacity corresponding to each season as the planned capacity of the planned area.

例如,预设统计周期可以为一年,由于春季和秋季用电较为相似,可以将春季和秋季作为一个季节进行处理,那么预设统计周期内包括春秋季、夏季和冬季三个季节。如夏季可以为5月1日至9月15日,冬季可以为10月20日至3月31日。For example, the preset statistical period can be one year. Since spring and autumn have similar electricity consumption, spring and autumn can be treated as one season, so the preset statistical period includes three seasons: spring and autumn, summer and winter. For example, summer can be from May 1st to September 15th, and winter can be from October 20th to March 31st.

可以将各个季节对应的光伏日发电有功电量和日负荷有功电量作差得到各个季节对应的第一差值序列,将各个季节对应的光伏日发电视在功率和日负荷视在功率作差得到各个季节对应的第二差值序列。The first difference sequence corresponding to each season can be obtained by taking the difference between the active power of photovoltaic daily generation and the active power of daily load corresponding to each season, and the difference between the daily photovoltaic power and apparent power of daily load corresponding to each season can be obtained. The second difference series corresponding to the season.

可选地,在将各个季节对应的规划容量中的最大值确定为所述规划区域的规划容量之后,可以根据用户拟建设农业情况灵活调节负荷最大值,再根据负荷最大值对确定的规划容量做进一步削减,得到最终的规划容量。Optionally, after determining the maximum value of the planned capacity corresponding to each season as the planned capacity of the planned area, the maximum load can be flexibly adjusted according to the user's proposed agricultural situation, and then the determined planned capacity can be adjusted according to the maximum load. Make further cuts to get the final planned capacity.

本实施例提出了一种考虑光伏分布式电源与可灵活调节负荷互动的接入极限容量规划方法,在考虑冬季电采暖负荷、夏季空调负荷及其他农业可灵活调节负荷对光伏扶贫发出电能进行就地消纳的影响因素下,利用经过校验的日净输出电量中位数与用户预期新增灵活调节电量差值确定最终交换电量,避免以发电极大值为依据的光伏扶贫接入农村电网规划中带来的资金浪费,降低光伏扶贫接入农村电网投资规模,提高配网投资利用效率。This embodiment proposes an access limit capacity planning method that considers the interaction between photovoltaic distributed power generation and flexibly adjustable loads. Considering the electric heating load in winter, the air conditioning load in summer and other agricultural flexibly adjustable loads, the electricity generated by photovoltaic poverty alleviation is considered. Under the influence factors of local consumption, the difference between the verified daily net output power median and the user's expected new flexible adjustment power is used to determine the final exchange power, so as to avoid the photovoltaic poverty alleviation based on the maximum value of power generation being connected to the rural power grid The waste of funds brought by the planning will reduce the investment scale of photovoltaic poverty alleviation in rural power grids, and improve the efficiency of distribution network investment and utilization.

本发明实施例通过根据规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率得到第一差值序列和第二差值序列,并根据对第一差值序列中位数的双边检验结果、第一差值序列和第二差值序列确定规划区域的规划容量,能够利用经过检验的日净输出电量中位数确定规划区域的规划容量,避免以发电极大值为依据的容量规划造成配电网改造中增容的容量标准较高的问题,能够降低配电网增容容量,减小光伏电源接入配电网的改造规模,降低光伏电源接入配电网的实施成本。In the embodiment of the present invention, the first difference sequence and the second difference sequence are obtained by obtaining the first difference sequence and the second difference sequence according to the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power, and the photovoltaic daily power generation TV power in the preset statistical period of the planning area, The planned capacity of the planned area can be determined according to the bilateral test results of the median of the first difference sequence, the first difference sequence and the second difference sequence, and the tested median of the daily net output power can be used to determine the planned capacity of the planned area. Planning capacity, avoiding the problem of higher capacity standards in distribution network transformation caused by capacity planning based on the maximum value of power generation, which can reduce the capacity of distribution network to increase capacity and reduce the transformation of photovoltaic power into distribution network Scale and reduce the implementation cost of connecting photovoltaic power to the distribution network.

应理解,上述实施例中各步骤的序号的大小并不意味着执行顺序的先后,各过程的执行顺序应以其功能和内在逻辑确定,而不应对本发明实施例的实施过程构成任何限定。It should be understood that the size of the sequence numbers of the steps in the above embodiments does not mean the sequence of execution, and the execution sequence of each process should be determined by its functions and internal logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.

对应于上文实施例所述的分布式光伏电源接入容量规划方法,图3示出了本发明实施例提供的分布式光伏电源接入容量规划装置的示意图。为了便于说明,仅示出了与本实施例相关的部分。Corresponding to the distributed photovoltaic power supply access capacity planning method described in the above embodiment, FIG. 3 shows a schematic diagram of a distributed photovoltaic power supply access capacity planning apparatus provided by an embodiment of the present invention. For convenience of explanation, only the parts related to this embodiment are shown.

参照图3,该装置包括获取模块31、检验模块32和处理模块33。Referring to FIG. 3 , the apparatus includes an acquisition module 31 , a verification module 32 and a processing module 33 .

获取模块31,用于获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列。The acquisition module 31 is used to acquire the daily load active power, daily load apparent power, photovoltaic daily power generation active power, and photovoltaic daily TV power in the preset statistical period of the planning area, and calculate the daily photovoltaic power generation active power and all the power. A first difference sequence is obtained by making a difference in the active power of the daily load, and a second difference sequence is obtained by making a difference between the daily photovoltaic power and the apparent power of the daily load.

检验模块32,用于计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验。The testing module 32 is configured to calculate the median of the first difference sequence, and perform a bilateral test on whether the median is reasonable.

处理模块33,用于根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量。The processing module 33 is configured to determine the planned capacity of the planned area according to the result of the bilateral test, the first difference sequence and the second difference sequence.

可选地,所述预设统计周期包括至少一个季节,所述第一差值序列包括各个季节对应的第一差值序列,所述第二差值序列包括各个季节对应的第二差值序列;Optionally, the preset statistical period includes at least one season, the first difference sequence includes a first difference sequence corresponding to each season, and the second difference sequence includes a second difference sequence corresponding to each season. ;

所述检验模块32用于:The inspection module 32 is used for:

计算各个季节对应的第一差值序列的中位数,并对各个季节对应的中位数是否合理进行双边检验;Calculate the median of the first difference series corresponding to each season, and conduct a bilateral test to see if the median corresponding to each season is reasonable;

所述处理模块33用于:The processing module 33 is used for:

根据各个季节对应的双边检验的结果、各个季节对应的第一差值序列和各个季节对应的第二差值序列确定各个季节对应的规划容量;Determine the planning capacity corresponding to each season according to the results of the bilateral test corresponding to each season, the first difference sequence corresponding to each season, and the second difference sequence corresponding to each season;

将各个季节对应的规划容量中的最大值确定为所述规划区域的规划容量。The maximum value among the planned capacities corresponding to each season is determined as the planned capacity of the planned area.

可选地,所述检验模块32用于:Optionally, the inspection module 32 is used for:

对所述第一差值序列进行排序;所述第一差值序列表示为ΔW1,…,ΔWi,…,ΔWN,排序后的第一差值序列表示为ΔW(1),…,ΔW(j),…,ΔW(N);其中N为所述第一差值序列中的数据个数;Sort the first difference value sequence; the first difference value sequence is represented as ΔW 1 ,...,ΔW i ,...,ΔW N , and the sorted first difference value sequence is represented as ΔW (1) ,..., ΔW (j) , . . . , ΔW (N) ; wherein N is the number of data in the first difference sequence;

若N为奇数,则所述第一差值序列的中位数为ΔW((N+1)/2)If N is an odd number, the median of the first difference sequence is ΔW ((N+1)/2) ;

若N为偶数,则所述第一差值序列的中位数为1/2(ΔW(N/2)+ΔW((N+2)/2))。If N is an even number, the median of the first difference sequence is 1/2(ΔW (N/2) +ΔW ((N+2)/2) ).

可选地,所述检验模块32用于:Optionally, the inspection module 32 is used for:

将所述第一差值序列中各个数据分别与所述中位数作差后求绝对值,得到绝对值序列;所述第一差值序列中的各个数据与所述绝对值序列中的各个数据一一对应;Each data in the first difference sequence is compared with the median to obtain an absolute value to obtain an absolute value sequence; each data in the first difference sequence is different from each data in the absolute value sequence. data one-to-one correspondence;

计算所述绝对值序列中各个数据对应的秩;calculating the rank corresponding to each data in the absolute value sequence;

确定双边检验的假设H0:M=ΔW0.<=>H1:M≠ΔW0,并计算检验统计量T=min(T+,T-),其中,M表示所述第一差值序列的实际中位数,ΔW0.表示计算出的所述第一差值序列的中位数,T+表示各个第一数据对应的秩的和,所述第一数据为所述第一差值序列中大于所述中位数的数据;T-表示各个第二数据对应的秩的和,所述第二数据为所述第一差值序列中小于所述中位数的数据;Determine the hypothesis H 0 of the bilateral test: M=ΔW 0. <=> H 1 : M≠ΔW 0 , and calculate the test statistic T=min(T+, T-), where M represents the first difference sequence The actual median of , ΔW 0. represents the calculated median of the first difference sequence, T+ represents the sum of the ranks corresponding to each first data, and the first data is the first difference sequence T-represents the sum of the ranks corresponding to each second data, and the second data is the data in the first difference sequence that is smaller than the median;

根据计算出的检验统计量在正态分布表中查找对应的p值,根据p值判断所述中位数是否合理。The corresponding p value is searched in the normal distribution table according to the calculated test statistic, and whether the median is reasonable is judged according to the p value.

可选地,所述处理模块33用于:Optionally, the processing module 33 is used for:

若所述双边检验的结果为所述中位数合理,则根据所述第一差值序列确定规划区域的规划容量;若所述双边检验的结果为所述中位数不合理,则将所述第二差值序列中的最大值作为规划区域的规划容量。If the result of the bilateral test is that the median is reasonable, the planned capacity of the planning area is determined according to the first difference sequence; if the result of the bilateral test is that the median is unreasonable, the The maximum value in the second difference sequence is used as the planned capacity of the planned area.

本发明实施例通过根据规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率得到第一差值序列和第二差值序列,并根据对第一差值序列中位数的双边检验结果、第一差值序列和第二差值序列确定规划区域的规划容量,能够利用经过检验的日净输出电量中位数确定规划区域的规划容量,避免以发电极大值为依据的容量规划造成配电网改造中增容的容量标准较高的问题,能够降低配电网增容容量,减小光伏电源接入配电网的改造规模,降低光伏电源接入配电网的实施成本。In the embodiment of the present invention, the first difference sequence and the second difference sequence are obtained by obtaining the first difference sequence and the second difference sequence according to the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power, and the photovoltaic daily power generation TV power in the preset statistical period of the planning area, The planned capacity of the planned area can be determined according to the bilateral test results of the median of the first difference sequence, the first difference sequence and the second difference sequence, and the tested median of the daily net output power can be used to determine the planned capacity of the planned area. Planning capacity, avoiding the problem of higher capacity standards in distribution network transformation caused by capacity planning based on the maximum value of power generation, which can reduce the capacity of distribution network to increase capacity and reduce the transformation of photovoltaic power into distribution network Scale and reduce the implementation cost of connecting photovoltaic power to the distribution network.

图4是本发明一实施例提供的终端设备的示意图。如图4所示,该实施例的终端设备4包括:处理器40、存储器41以及存储在所述存储器41中并可在所述处理器40上运行的计算机程序42,例如程序。所述处理器40执行所述计算机程序42时实现上述各个方法实施例中的步骤,例如图1所示的步骤101至103。或者,所述处理器40执行所述计算机程序42时实现上述各装置实施例中各模块/单元的功能,例如图3所示模块31至33的功能。FIG. 4 is a schematic diagram of a terminal device provided by an embodiment of the present invention. As shown in FIG. 4 , the terminal device 4 in this embodiment includes: a processor 40 , a memory 41 , and a computer program 42 , such as a program, stored in the memory 41 and executable on the processor 40 . When the processor 40 executes the computer program 42, the steps in each of the foregoing method embodiments are implemented, for example, steps 101 to 103 shown in FIG. 1 . Alternatively, when the processor 40 executes the computer program 42, the functions of the modules/units in each of the foregoing apparatus embodiments, such as the functions of the modules 31 to 33 shown in FIG. 3, are implemented.

示例性的,所述计算机程序42可以被分割成一个或多个模块/单元,所述一个或者多个模块/单元被存储在所述存储器41中,并由所述处理器40执行,以完成本发明。所述一个或多个模块/单元可以是能够完成特定功能的一系列计算机程序指令段,该指令段用于描述所述计算机程序42在所述终端设备4中的执行过程。例如,所述计算机程序42可以被分割成获取模块、检验模块和处理模块,各模块具体功能如下:Exemplarily, the computer program 42 may be divided into one or more modules/units, and the one or more modules/units are stored in the memory 41 and executed by the processor 40 to complete the this invention. The one or more modules/units may be a series of computer program instruction segments capable of performing specific functions, and the instruction segments are used to describe the execution process of the computer program 42 in the terminal device 4 . For example, the computer program 42 can be divided into an acquisition module, an inspection module and a processing module, and the specific functions of each module are as follows:

获取模块,用于获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列;The obtaining module is used to obtain the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power and the photovoltaic daily TV power in the preset statistical period of the planning area, and compare the photovoltaic daily power generation active power and the photovoltaic power generation daily power. The first difference sequence is obtained by making a difference in the active power of the daily load, and the second difference sequence is obtained by making the difference between the daily photovoltaic power and the apparent power of the daily load;

检验模块,用于计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验;a test module, configured to calculate the median of the first difference sequence, and to perform a bilateral test on whether the median is reasonable;

处理模块,用于根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量。A processing module, configured to determine the planned capacity of the planned area according to the result of the bilateral test, the first difference sequence and the second difference sequence.

所述终端设备4可以是桌上型计算机、笔记本、掌上电脑及云端服务器等计算设备。所述终端设备可包括,但不仅限于,处理器40、存储器41。本领域技术人员可以理解,图4仅仅是终端设备4的示例,并不构成对终端设备4的限定,可以包括比图示更多或更少的部件,或者组合某些部件,或者不同的部件,例如所述终端设备还可以包括输入输出设备、网络接入设备、总线、显示器等。The terminal device 4 may be a computing device such as a desktop computer, a notebook, a palmtop computer, and a cloud server. The terminal device may include, but is not limited to, the processor 40 and the memory 41 . Those skilled in the art can understand that FIG. 4 is only an example of the terminal device 4, and does not constitute a limitation on the terminal device 4, and may include more or less components than the one shown, or combine some components, or different components For example, the terminal device may further include an input and output device, a network access device, a bus, a display, and the like.

所称处理器40可以是中央处理单元(Central Processing Unit,CPU),还可以是其他通用处理器、数字信号处理器(Digital Signal Processor,DSP)、专用集成电路(Application Specific Integrated Circuit,ASIC)、现成可编程门阵列(Field-Programmable Gate Array,FPGA)或者其他可编程逻辑器件、分立门或者晶体管逻辑器件、分立硬件组件等。通用处理器可以是微处理器或者该处理器也可以是任何常规的处理器等。The so-called processor 40 may be a central processing unit (Central Processing Unit, CPU), and may also be other general-purpose processors, digital signal processors (Digital Signal Processors, DSP), application specific integrated circuits (Application Specific Integrated Circuit, ASIC), Off-the-shelf programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, and the like. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.

所述存储器41可以是所述终端设备4的内部存储单元,例如终端设备4的硬盘或内存。所述存储器41也可以是所述终端设备4的外部存储设备,例如所述终端设备4上配备的插接式硬盘,智能存储卡(Smart Media Card,SMC),安全数字(Secure Digital,SD)卡,闪存卡(Flash Card)等。进一步地,所述存储器41还可以既包括所述终端设备4的内部存储单元也包括外部存储设备。所述存储器41用于存储所述计算机程序以及所述终端设备所需的其他程序和数据。所述存储器41还可以用于暂时地存储已经输出或者将要输出的数据。The memory 41 may be an internal storage unit of the terminal device 4 , such as a hard disk or a memory of the terminal device 4 . The memory 41 may also be an external storage device of the terminal device 4, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) equipped on the terminal device 4. card, flash card (Flash Card) and so on. Further, the memory 41 may also include both an internal storage unit of the terminal device 4 and an external storage device. The memory 41 is used for storing the computer program and other programs and data required by the terminal device. The memory 41 can also be used to temporarily store data that has been output or will be output.

所属领域的技术人员可以清楚地了解到,为了描述的方便和简洁,仅以上述各功能单元、模块的划分进行举例说明,实际应用中,可以根据需要而将上述功能分配由不同的功能单元、模块完成,即将所述装置的内部结构划分成不同的功能单元或模块,以完成以上描述的全部或者部分功能。实施例中的各功能单元、模块可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中,上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。另外,各功能单元、模块的具体名称也只是为了便于相互区分,并不用于限制本申请的保护范围。上述系统中单元、模块的具体工作过程,可以参考前述方法实施例中的对应过程,在此不再赘述。Those skilled in the art can clearly understand that, for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. Module completion, that is, dividing the internal structure of the device into different functional units or modules to complete all or part of the functions described above. Each functional unit and module in the embodiment may be integrated in one processing unit, or each unit may exist physically alone, or two or more units may be integrated in one unit, and the above-mentioned integrated units may adopt hardware. It can also be realized in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing from each other, and are not used to limit the protection scope of the present application. For the specific working processes of the units and modules in the above-mentioned system, reference may be made to the corresponding processes in the foregoing method embodiments, which will not be repeated here.

在上述实施例中,对各个实施例的描述都各有侧重,某个实施例中没有详述或记载的部分,可以参见其它实施例的相关描述。In the foregoing embodiments, the description of each embodiment has its own emphasis. For parts that are not described or described in detail in a certain embodiment, reference may be made to the relevant descriptions of other embodiments.

本领域普通技术人员可以意识到,结合本文中所公开的实施例描述的各示例的单元及算法步骤,能够以电子硬件、或者计算机软件和电子硬件的结合来实现。这些功能究竟以硬件还是软件方式来执行,取决于技术方案的特定应用和设计约束条件。专业技术人员可以对每个特定的应用来使用不同方法来实现所描述的功能,但是这种实现不应认为超出本发明的范围。Those of ordinary skill in the art can realize that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Skilled artisans may implement the described functionality using different methods for each particular application, but such implementations should not be considered beyond the scope of the present invention.

在本发明所提供的实施例中,应该理解到,所揭露的装置/终端设备和方法,可以通过其它的方式实现。例如,以上所描述的装置/终端设备实施例仅仅是示意性的,例如,所述模块或单元的划分,仅仅为一种逻辑功能划分,实际实现时可以有另外的划分方式,例如多个单元或组件可以结合或者可以集成到另一个系统,或一些特征可以忽略,或不执行。另一点,所显示或讨论的相互之间的耦合或直接耦合或通讯连接可以是通过一些接口,装置或单元的间接耦合或通讯连接,可以是电性,机械或其它的形式。In the embodiments provided by the present invention, it should be understood that the disclosed apparatus/terminal device and method may be implemented in other manners. For example, the apparatus/terminal device embodiments described above are only illustrative. For example, the division of the modules or units is only a logical function division. In actual implementation, there may be other division methods, such as multiple units. Or components may be combined or may be integrated into another system, or some features may be omitted, or not implemented. On the other hand, the shown or discussed mutual coupling or direct coupling or communication connection may be through some interfaces, indirect coupling or communication connection of devices or units, and may be in electrical, mechanical or other forms.

所述作为分离部件说明的单元可以是或者也可以不是物理上分开的,作为单元显示的部件可以是或者也可以不是物理单元,即可以位于一个地方,或者也可以分布到多个网络单元上。可以根据实际的需要选择其中的部分或者全部单元来实现本实施例方案的目的。The units described as separate components may or may not be physically separated, and components displayed as units may or may not be physical units, that is, may be located in one place, or may be distributed to multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution in this embodiment.

另外,在本发明各个实施例中的各功能单元可以集成在一个处理单元中,也可以是各个单元单独物理存在,也可以两个或两个以上单元集成在一个单元中。上述集成的单元既可以采用硬件的形式实现,也可以采用软件功能单元的形式实现。In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically alone, or two or more units may be integrated into one unit. The above-mentioned integrated units may be implemented in the form of hardware, or may be implemented in the form of software functional units.

所述集成的模块/单元如果以软件功能单元的形式实现并作为独立的产品销售或使用时,可以存储在一个计算机可读取存储介质中。基于这样的理解,本发明实现上述实施例方法中的全部或部分流程,也可以通过计算机程序来指令相关的硬件来完成,所述的计算机程序可存储于一计算机可读存储介质中,该计算机程序在被处理器执行时,可实现上述各个方法实施例的步骤。其中,所述计算机程序包括计算机程序代码,所述计算机程序代码可以为源代码形式、对象代码形式、可执行文件或某些中间形式等。所述计算机可读介质可以包括:能够携带所述计算机程序代码的任何实体或装置、记录介质、U盘、移动硬盘、磁碟、光盘、计算机存储器、只读存储器(Read-Only Memory,ROM)、随机存取存储器(RandomAccess Memory,RAM)、电载波信号、电信信号以及软件分发介质等。需要说明的是,所述计算机可读介质包含的内容可以根据司法管辖区内立法和专利实践的要求进行适当的增减,例如在某些司法管辖区,根据立法和专利实践,计算机可读介质不包括是电载波信号和电信信号。The integrated modules/units, if implemented in the form of software functional units and sold or used as independent products, may be stored in a computer-readable storage medium. Based on this understanding, the present invention can implement all or part of the processes in the methods of the above embodiments, and can also be completed by instructing relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the program is executed by the processor, the steps of the foregoing method embodiments can be implemented. Wherein, the computer program includes computer program code, and the computer program code may be in the form of source code, object code, executable file or some intermediate form, and the like. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, removable hard disk, magnetic disk, optical disk, computer memory, Read-Only Memory (ROM) , Random Access Memory (Random Access Memory, RAM), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable media may be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction, for example, in some jurisdictions, according to legislation and patent practice, the computer-readable media Excluded are electrical carrier signals and telecommunication signals.

以上所述实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围,均应包含在本发明的保护范围之内。The above-mentioned embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it is still possible to implement the foregoing implementations. The technical solutions described in the examples are modified, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the within the protection scope of the present invention.

Claims (8)

1.一种分布式光伏电源接入容量规划方法,其特征在于,包括:1. A distributed photovoltaic power supply access capacity planning method, characterized in that, comprising: 获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列;Acquire the daily load active power, daily load apparent power, photovoltaic daily power generation active power, and photovoltaic daily TV power within the preset statistical period of the planning area, and use the photovoltaic daily power generation active power and the daily load active power as a value. The first difference sequence is obtained by the difference, and the second difference sequence is obtained by making the difference between the daily photovoltaic power and the daily load apparent power; 计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验;Calculate the median of the first difference sequence, and perform a bilateral test on whether the median is reasonable; 根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量;Determine the planned capacity of the planned area according to the result of the bilateral test, the first difference sequence and the second difference sequence; 其中,所述对所述中位数是否合理进行双边检验包括:Wherein, the bilateral test on whether the median is reasonable includes: 将所述第一差值序列中各个数据分别与所述中位数作差后求绝对值,得到绝对值序列;所述第一差值序列中的各个数据与所述绝对值序列中的各个数据一一对应;Each data in the first difference sequence is compared with the median to obtain an absolute value to obtain an absolute value sequence; each data in the first difference sequence is different from each data in the absolute value sequence. data one-to-one correspondence; 计算所述绝对值序列中各个数据对应的秩;calculating the rank corresponding to each data in the absolute value sequence; 确定双边检验的假设H0:M=ΔW 0.<=>H1:M≠ΔW 0,并计算检验统计量T=min(T+,T-),其中,M表示所述第一差值序列的实际中位数,ΔW 0.表示计算出的所述第一差值序列的中位数,T+表示各个第一数据对应的秩的和,所述第一数据为所述第一差值序列中大于所述中位数的数据;T-表示各个第二数据对应的秩的和,所述第二数据为所述第一差值序列中小于所述中位数的数据;Determine the hypothesis H 0 of the bilateral test: M=ΔW 0. <=> H 1 : M≠ΔW 0 , and calculate the test statistic T=min(T+, T-), where M represents the first difference sequence The actual median of , ΔW 0. represents the calculated median of the first difference sequence, T+ represents the sum of the ranks corresponding to each first data, and the first data is the first difference sequence T-represents the sum of the ranks corresponding to each second data, and the second data is the data in the first difference sequence that is smaller than the median; 根据计算出的检验统计量在正态分布表中查找对应的p值,根据p值判断所述中位数是否合理;Find the corresponding p value in the normal distribution table according to the calculated test statistic, and judge whether the median is reasonable according to the p value; 其中,所述H0表示计算出的中位数合理,所述H1表示计算出的中位数不合理;Wherein, the H 0 indicates that the calculated median is reasonable, and the H 1 indicates that the calculated median is unreasonable; 其中,所述根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量包括:Wherein, determining the planning capacity of the planning area according to the result of the bilateral test, the first difference sequence and the second difference sequence includes: 若所述双边检验的结果为所述中位数合理,则根据所述第一差值序列确定规划区域的规划容量;若所述双边检验的结果为所述中位数不合理,则将所述第二差值序列中的最大值作为规划区域的规划容量。If the result of the bilateral test is that the median is reasonable, the planned capacity of the planning area is determined according to the first difference sequence; if the result of the bilateral test is that the median is unreasonable, the The maximum value in the second difference sequence is used as the planned capacity of the planned area. 2.如权利要求1所述的分布式光伏电源接入容量规划方法,其特征在于,所述预设统计周期包括至少一个季节,所述第一差值序列包括各个季节对应的第一差值序列,所述第二差值序列包括各个季节对应的第二差值序列;2 . The method for planning distributed photovoltaic power supply access capacity according to claim 1 , wherein the preset statistical period includes at least one season, and the first difference sequence includes the first difference corresponding to each season. 3 . sequence, the second difference sequence includes the second difference sequence corresponding to each season; 所述计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验包括:The calculating the median of the first difference sequence and performing a bilateral test on whether the median is reasonable includes: 计算各个季节对应的第一差值序列的中位数,并对各个季节对应的中位数是否合理进行双边检验;Calculate the median of the first difference series corresponding to each season, and conduct a bilateral test to see if the median corresponding to each season is reasonable; 所述根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量包括:The determining the planning capacity of the planning area according to the result of the bilateral test, the first difference sequence and the second difference sequence includes: 根据各个季节对应的双边检验的结果、各个季节对应的第一差值序列和各个季节对应的第二差值序列确定各个季节对应的规划容量;Determine the planning capacity corresponding to each season according to the results of the bilateral test corresponding to each season, the first difference sequence corresponding to each season, and the second difference sequence corresponding to each season; 将各个季节对应的规划容量中的最大值确定为所述规划区域的规划容量。The maximum value among the planned capacities corresponding to each season is determined as the planned capacity of the planned area. 3.如权利要求1所述的分布式光伏电源接入容量规划方法,其特征在于,所述计算所述第一差值序列的中位数包括:3 . The method for planning distributed photovoltaic power supply access capacity according to claim 1 , wherein the calculating the median of the first difference sequence comprises: 3 . 对所述第一差值序列进行排序;所述第一差值序列表示为ΔW1,…,ΔWi,…,ΔWN,排序后的第一差值序列表示为ΔW(1),…,ΔW(j),…,ΔW(N);其中N为所述第一差值序列中的数据个数;Sort the first difference value sequence; the first difference value sequence is represented as ΔW 1 ,...,ΔW i ,...,ΔW N , and the sorted first difference value sequence is represented as ΔW (1) ,..., ΔW (j) , . . . , ΔW (N) ; wherein N is the number of data in the first difference sequence; 若N为奇数,则所述第一差值序列的中位数为ΔW((N+1)/2)If N is an odd number, the median of the first difference sequence is ΔW ((N+1)/2) ; 若N为偶数,则所述第一差值序列的中位数为1/2(ΔW(N/2)+ΔW((N+2)/2))。If N is an even number, the median of the first difference sequence is 1/2(ΔW (N/2) +ΔW ((N+2)/2) ). 4.一种分布式光伏电源接入容量规划装置,其特征在于,包括:4. A distributed photovoltaic power supply access capacity planning device, characterized in that, comprising: 获取模块,用于获取规划区域预设统计周期内的日负荷有功电量、日负荷视在功率、光伏日发电有功电量和光伏日发电视在功率,并将所述光伏日发电有功电量和所述日负荷有功电量作差得到第一差值序列,将所述光伏日发电视在功率和所述日负荷视在功率作差得到第二差值序列;The obtaining module is used to obtain the daily load active power, the daily load apparent power, the photovoltaic daily power generation active power and the photovoltaic daily TV power in the preset statistical period of the planning area, and compare the photovoltaic daily power generation active power and the photovoltaic power generation daily power. The first difference sequence is obtained by making a difference in the active power of the daily load, and the second difference sequence is obtained by making the difference between the daily photovoltaic power and the apparent power of the daily load; 检验模块,用于计算所述第一差值序列的中位数,并对所述中位数是否合理进行双边检验;a test module, configured to calculate the median of the first difference sequence, and to perform a bilateral test on whether the median is reasonable; 处理模块,用于根据所述双边检验的结果、所述第一差值序列和所述第二差值序列确定所述规划区域的规划容量;a processing module, configured to determine the planned capacity of the planned area according to the result of the bilateral test, the first difference sequence and the second difference sequence; 其中,所述检验模块还用于:Wherein, the inspection module is also used for: 将所述第一差值序列中各个数据分别与所述中位数作差后求绝对值,得到绝对值序列;所述第一差值序列中的各个数据与所述绝对值序列中的各个数据一一对应;Each data in the first difference sequence is compared with the median to obtain an absolute value to obtain an absolute value sequence; each data in the first difference sequence is different from each data in the absolute value sequence. data one-to-one correspondence; 计算所述绝对值序列中各个数据对应的秩;calculating the rank corresponding to each data in the absolute value sequence; 确定双边检验的假设H0:M=ΔW 0.<=>H1:M≠ΔW 0,并计算检验统计量T=min(T+,T-),其中,M表示所述第一差值序列的实际中位数,ΔW 0.表示计算出的所述第一差值序列的中位数,T+表示各个第一数据对应的秩的和,所述第一数据为所述第一差值序列中大于所述中位数的数据;T-表示各个第二数据对应的秩的和,所述第二数据为所述第一差值序列中小于所述中位数的数据;Determine the hypothesis H 0 of the bilateral test: M=ΔW 0. <=> H 1 : M≠ΔW 0 , and calculate the test statistic T=min(T+, T-), where M represents the first difference sequence The actual median of , ΔW 0. represents the calculated median of the first difference sequence, T+ represents the sum of the ranks corresponding to each first data, and the first data is the first difference sequence T-represents the sum of the ranks corresponding to each second data, and the second data is the data in the first difference sequence that is smaller than the median; 根据计算出的检验统计量在正态分布表中查找对应的p值,根据p值判断所述中位数是否合理;Find the corresponding p value in the normal distribution table according to the calculated test statistic, and judge whether the median is reasonable according to the p value; 其中,所述H0表示计算出的中位数合理,所述H1表示计算出的中位数不合理;Wherein, the H 0 indicates that the calculated median is reasonable, and the H 1 indicates that the calculated median is unreasonable; 其中,所述处理模块还用于:Wherein, the processing module is also used for: 若所述双边检验的结果为所述中位数合理,则根据所述第一差值序列确定规划区域的规划容量;若所述双边检验的结果为所述中位数不合理,则将所述第二差值序列中的最大值作为规划区域的规划容量。If the result of the bilateral test is that the median is reasonable, the planned capacity of the planning area is determined according to the first difference sequence; if the result of the bilateral test is that the median is unreasonable, the The maximum value in the second difference sequence is used as the planned capacity of the planned area. 5.如权利要求4所述的分布式光伏电源接入容量规划装置,其特征在于,所述预设统计周期包括至少一个季节,所述第一差值序列包括各个季节对应的第一差值序列,所述第二差值序列包括各个季节对应的第二差值序列;5 . The distributed photovoltaic power supply access capacity planning device according to claim 4 , wherein the preset statistical period includes at least one season, and the first difference sequence includes the first difference corresponding to each season. 6 . sequence, the second difference sequence includes the second difference sequence corresponding to each season; 所述检验模块用于:The inspection module is used for: 计算各个季节对应的第一差值序列的中位数,并对各个季节对应的中位数是否合理进行双边检验;Calculate the median of the first difference series corresponding to each season, and conduct a bilateral test to see if the median corresponding to each season is reasonable; 所述处理模块用于:The processing module is used for: 根据各个季节对应的双边检验的结果、各个季节对应的第一差值序列和各个季节对应的第二差值序列确定各个季节对应的规划容量;Determine the planning capacity corresponding to each season according to the results of the bilateral test corresponding to each season, the first difference sequence corresponding to each season, and the second difference sequence corresponding to each season; 将各个季节对应的规划容量中的最大值确定为所述规划区域的规划容量。The maximum value among the planned capacities corresponding to each season is determined as the planned capacity of the planned area. 6.如权利要求4所述的分布式光伏电源接入容量规划装置,其特征在于,所述检验模块用于:6. The distributed photovoltaic power supply access capacity planning device according to claim 4, wherein the inspection module is used for: 对所述第一差值序列进行排序;所述第一差值序列表示为ΔW1,…,ΔWi,…,ΔWN,排序后的第一差值序列表示为ΔW(1),…,ΔW(j),…,ΔW(N);其中N为所述第一差值序列中的数据个数;Sort the first difference value sequence; the first difference value sequence is represented as ΔW 1 ,...,ΔW i ,...,ΔW N , and the sorted first difference value sequence is represented as ΔW (1) ,..., ΔW (j) , . . . , ΔW (N) ; wherein N is the number of data in the first difference sequence; 若N为奇数,则所述第一差值序列的中位数为ΔW((N+1)/2)If N is an odd number, the median of the first difference sequence is ΔW ((N+1)/2) ; 若N为偶数,则所述第一差值序列的中位数为1/2(ΔW(N/2)+ΔW((N+2)/2))。If N is an even number, the median of the first difference sequence is 1/2(ΔW (N/2) +ΔW ((N+2)/2) ). 7.一种终端设备,包括存储器、处理器以及存储在所述存储器中并可在所述处理器上运行的计算机程序,其特征在于,所述处理器执行所述计算机程序时实现如权利要求1至3任一项所述方法的步骤。7. A terminal device, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, wherein the processor implements the computer program as claimed in the claims when executing the computer program Steps of any one of 1 to 3 of the method. 8.一种计算机可读存储介质,所述计算机可读存储介质存储有计算机程序,其特征在于,所述计算机程序被处理器执行时实现如权利要求1至3任一项所述方法的步骤。8. A computer-readable storage medium storing a computer program, characterized in that, when the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented .
CN201810201381.8A 2018-03-12 2018-03-12 Distributed photovoltaic power supply access capacity planning method and terminal equipment Active CN108399505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810201381.8A CN108399505B (en) 2018-03-12 2018-03-12 Distributed photovoltaic power supply access capacity planning method and terminal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810201381.8A CN108399505B (en) 2018-03-12 2018-03-12 Distributed photovoltaic power supply access capacity planning method and terminal equipment

Publications (2)

Publication Number Publication Date
CN108399505A CN108399505A (en) 2018-08-14
CN108399505B true CN108399505B (en) 2020-10-09

Family

ID=63092758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810201381.8A Active CN108399505B (en) 2018-03-12 2018-03-12 Distributed photovoltaic power supply access capacity planning method and terminal equipment

Country Status (1)

Country Link
CN (1) CN108399505B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110110893A (en) * 2019-04-03 2019-08-09 国网新疆电力有限公司昌吉供电公司 The distribution network structure optimization method of extensive electric heating equipment access
CN110783960B (en) * 2019-12-05 2021-09-28 国网河南省电力公司南阳供电公司 Distributed photovoltaic power generation disordered access method and device
CN113095611A (en) * 2019-12-23 2021-07-09 中国农业大学 Low-voltage distribution network coordinated planning method containing electric heating equipment and photovoltaic power supply
CN114374201B (en) * 2021-11-10 2024-11-22 温州电力建设有限公司 A collaborative planning method considering the orderly access of distributed photovoltaic power to the power grid

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150606A (en) * 2013-01-22 2013-06-12 中国电力科学研究院 Optimal power flow optimization method of distributed power supplies
CN103903073A (en) * 2014-04-23 2014-07-02 河海大学 Planning method and system for optimizing micro-grid containing distributed power sources and stored energy
CN104836256A (en) * 2015-05-29 2015-08-12 国家电网公司 Calculation method and system of photovoltaic consumption capability of power distribution network

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9977450B2 (en) * 2015-09-24 2018-05-22 Fujitsu Limited Micro-balance event resource selection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150606A (en) * 2013-01-22 2013-06-12 中国电力科学研究院 Optimal power flow optimization method of distributed power supplies
CN103903073A (en) * 2014-04-23 2014-07-02 河海大学 Planning method and system for optimizing micro-grid containing distributed power sources and stored energy
CN104836256A (en) * 2015-05-29 2015-08-12 国家电网公司 Calculation method and system of photovoltaic consumption capability of power distribution network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
无协调控制条件下分布式光伏电源的可接入容量分析;黄炜;《中国优秀硕士学位论文全文数据库》;20170215;第C042-1239页 *

Also Published As

Publication number Publication date
CN108399505A (en) 2018-08-14

Similar Documents

Publication Publication Date Title
CN108399505B (en) Distributed photovoltaic power supply access capacity planning method and terminal equipment
CN108197156B (en) Abnormal electric quantity data restoration method of electricity consumption information acquisition system and terminal equipment
CN109325603B (en) Fault request processing method, device and terminal device
CN108335010A (en) A kind of wind power output time series modeling method and system
CN113435625A (en) Dynamic economic dispatching optimization method and device for power system
CN109039342A (en) A kind of compression method, system and the decompression method of force data, system out
CN118133341A (en) A digital construction method and system for typical planning scenarios of county distribution networks
CN116826859A (en) A power supply carbon-electricity collaborative planning method, device, equipment and storage medium
CN116070728B (en) Photovoltaic power generation system power generation prediction method, equipment, system and medium
CN115796338A (en) Construction of Photovoltaic Power Forecasting Model and Method for Predicting Photovoltaic Power
CN110490220A (en) A kind of bus load discrimination method and system
CN109861295A (en) Multi-objective new energy planning method and device
CN114238856A (en) Method, device, equipment and storage medium for solving future forecast error of wind and solar resources
WO2025001830A1 (en) Wind energy resource evaluation method and apparatus, computer device, and storage medium
CN110443471A (en) The method and system of quantitative evaluation scene power output complementary effect
CN109344875B (en) Method and device for generating time series of daily wind power output based on cluster analysis
CN114139744B (en) Abnormal photovoltaic string branch identification method, device, electronic equipment and storage medium
CN107196298B (en) A method, device and computing device for coordinated planning of renewable energy and power grid
CN116862137A (en) Charging pile load flexible scheduling method and device based on data fusion
CN115912493A (en) Distributed power supply access method, electronic equipment, power distribution network and storage medium
CN116467564A (en) Method for calculating electric quantity of meter bottom, terminal equipment and computer readable storage medium
CN115422844A (en) Power system operation scene identification method and system based on artificial intelligence identification
CN114862615A (en) Method, device and computer equipment for aggregation of distributed power resources
CN108629356A (en) A kind of date storage method and device towards power load classification application
CN114362149B (en) New energy power generation bearing capacity assessment method, system, equipment and medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant