CN108388984A - Based on inspection project steel tower patrol plan method of adjustment of problems and system - Google Patents

Based on inspection project steel tower patrol plan method of adjustment of problems and system Download PDF

Info

Publication number
CN108388984A
CN108388984A CN201810137460.7A CN201810137460A CN108388984A CN 108388984 A CN108388984 A CN 108388984A CN 201810137460 A CN201810137460 A CN 201810137460A CN 108388984 A CN108388984 A CN 108388984A
Authority
CN
China
Prior art keywords
matrix
inspection
steel tower
inspection project
patrol
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810137460.7A
Other languages
Chinese (zh)
Inventor
严军荣
卢玉龙
江雅芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Houbo Technology Co Ltd
Original Assignee
Hangzhou Houbo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Houbo Technology Co Ltd filed Critical Hangzhou Houbo Technology Co Ltd
Priority to CN201810137460.7A priority Critical patent/CN108388984A/en
Publication of CN108388984A publication Critical patent/CN108388984A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • G06Q50/40

Abstract

The invention discloses based on inspection project steel tower patrol plan method of adjustment of problems and system.Its system includes that there are problem degree matrix module, adjustment patrol plan list blocks for generation steel tower patrol plan matrix module, reading history patrol record and generation inspection project.The method and system of the present invention solve the technical issues of cannot adjusting patrol plan according to inspection project number of problems.

Description

Based on inspection project steel tower patrol plan method of adjustment of problems and system
Technical field
The invention belongs to communication iron tower maintenance technology fields, are patrolled more particularly to based on inspection project steel tower of problems Examine Plan rescheduling method and system.
Background technology
Communication iron tower is mainly safeguarded by maintenance personnel according to the inspection project in patrol plan at present, is patrolled by fixed Project order is examined to execute, can not priority processing be frequently present of the emphasis inspection project of problem in the recent period.Currently without according to inspection item There are the technical solutions that problem log adjusts patrol plan for mesh.It proposes to be based on inspection project steel tower inspection meter of problems thus Draw method of adjustment and system.
Invention content
The technical problem to be solved by the present invention is to cannot adjust patrol plan according to inspection project number of problems The problem of, it proposes to be based on inspection project steel tower patrol plan method of adjustment of problems and system.Inspection of the present invention When project there are problem refers to inspection steel tower project, which is implicitly present in problem, such as when inspection Iron tower incline degree project, It was found that Iron tower incline degree is implicitly present in problem.
The present invention relies on existing communication iron tower maintenance system, and generating inspection according to the inspection project in patrol plan appoints Business, maintenance personnel carry out steel tower maintenance according to patrol task, and there are problems for the inspection project for recording in each inspection.Root of the present invention Patrol plan list is adjusted according to the number of problems of recent each inspection project.
The present invention's adjusts system based on inspection project steel tower patrol plan of problems, including generates steel tower inspection meter Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row Table module.
Generate steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol plan matrix X.
There are problem degree matrix modules for reading history patrol record and generation inspection project:Read steel tower history inspection note Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.
Adjust patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence Project adjusts patrol plan list.
System block diagram is adjusted based on inspection project steel tower patrol plan of problems, as shown in Figure 1.
The present invention's is realized as follows based on inspection project steel tower patrol plan method of adjustment of problems:
Step 1 is ranked up the inspection project of steel tower patrol plan, identify the inspection number of entry, be denoted as N, from greatly to Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N.
Step 2 reads steel tower history patrol record, counts inspection project number of problems, suitable according to inspection project Sequence generates inspection project, and there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y calculating patrol plans to refer to Show that matrix R, the element in descending permutation matrix R adjust inspection meter according to the corresponding inspection project of element in the matrix R after sequence Draw list.
Based on inspection project steel tower patrol plan method of adjustment flow chart of problems, as shown in Figure 2.
The method and system of the present invention this have the advantage that:It is of problems secondary according to inspection project in the recent inspection of steel tower Number adjustment patrol plan list, the inspection project for being frequently present of problem in the recent period for priority processing provide foundation.
Description of the drawings
Fig. 1 is the present invention based on inspection project steel tower patrol plan adjustment system block diagram of problems;
Fig. 2 is the present invention based on inspection project steel tower patrol plan method of adjustment flow chart of problems.
Specific implementation mode
It elaborates below to the preferred embodiment of the present invention.
The present invention relies on existing communication iron tower maintenance system, and generating inspection according to the inspection project in patrol plan appoints Business, maintenance personnel carry out steel tower maintenance according to patrol task, and there are problems for the inspection project for recording in each inspection.Root of the present invention According to recent each inspection project, there are the adjustment patrol plan lists of problem number.In the present embodiment, patrolled for certain triangle tower Examine the description of list of schedules adjustment system and method.Patrol officer carries out inspection process record simultaneously in the client of mobile terminal It is sent in system and preserves, history patrol record includes that there are problems for the inspection project of each inspection.
The present invention's adjusts system based on inspection project steel tower patrol plan of problems, including generates steel tower inspection meter Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row Table module.
Generate steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol plan matrix X.In the present embodiment, according to triangle tower inspection standard, 9 inspection projects in patrol plan list are arranged successively Sequence be microwave antenna inspection, the inspection of tower part, it is antiseptic and rustproof check, structural bolts connection tightness inspection, malformation and The inspection of yielding of foundation situation, steel tower verticality and height check, tower lamp inspection is looked into, steel tower ground connection checks, surrounding enviroment and attached set Standby to check, N=9 is successively numbered inspection project from 9 to 1, is indicated with i, generates 1 × 9 steel tower Maintenance Significant Items matrix X =(9,8,7,6,5,4,3,2,1).
There are problem degree matrix modules for reading history patrol record and generation inspection project:Read steel tower history inspection note Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.In the present embodiment, Setting time T is 3 months in advance, reads 4 patrol records of the steel tower in nearly 3 months, i.e. M=4;Each inspection project is counted to deposit It is respectively n in the number of problem9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3=0, n2=0, n1=0;Generate N × N Steel tower problem weight matrix Y=diag (2,0,1,0,1,1,0,0,0), matrix Y be diagonal matrix.
Adjust patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence Project adjusts patrol plan list.In the present embodiment, calculate 1 × N patrol plan oriental matrix R=XY=(18,0,7,0, 5,4,0,0,0), element obtains (18,7,5,4,0,0,0,0,0) in descending permutation matrix R, according to its corresponding inspection project tune Whole patrol plan list is:{ microwave antenna inspection, the tightness inspection of structural bolts connection, steel tower verticality and height are examined Look into, it is antiseptic and rustproof check, malformation and the inspection of yielding of foundation situation, the inspection of tower part, tower lamp inspection are looked into, steel tower ground connection checks, week Surrounding environment and auxiliary device inspection }.
The present invention's is realized as follows based on inspection project steel tower patrol plan method of adjustment of problems:
Step 1 is ranked up the inspection project of steel tower patrol plan, identify the inspection number of entry, be denoted as N, from greatly to Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N.This implementation In example, according to triangle tower inspection standard, microwave antenna inspection, tower are ordered as successively to 9 inspection projects in patrol plan list Part inspection, antiseptic and rustproof inspection, the tightness inspection of structural bolts connection, malformation and the inspection of yielding of foundation situation, iron Tower verticality and height check, tower lamp inspection is looked into, steel tower ground connection checks, surrounding enviroment and auxiliary device inspection, N=9, from 9 to 1 according to It is secondary that inspection project is numbered, indicated with i, generate 1 × 9 steel tower Maintenance Significant Items matrix X=(9,8,7,6,5,4,3,2, 1)。
Step 2 reads steel tower history patrol record, counts inspection project number of problems, suitable according to inspection project Sequence generates inspection project, and there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.In the present embodiment, Setting time T is 3 months in advance, reads 4 patrol records of the steel tower in nearly 3 months, i.e. M=4;Each inspection project is counted to deposit It is respectively n in the number of problem9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3=0, n2=0, n1=0;Generate N × N Steel tower problem weight matrix Y=diag (2,0,1,0,1,1,0,0,0), matrix Y be diagonal matrix.
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y calculating patrol plans to refer to Show that matrix R, the element in descending permutation matrix R adjust inspection meter according to the corresponding inspection project of element in the matrix R after sequence Draw list.In the present embodiment, the patrol plan oriental matrix R=XY=(18,0,7,0,5,4,0,0,0) of 1 × N, drop are calculated Element obtains (18,7,5,4,0,0,0,0,0) in sequence permutation matrix R, according to its corresponding inspection project adjustment patrol plan row Table is:{ microwave antenna inspection, the tightness inspection of structural bolts connection, steel tower verticality and height inspection, antiseptic and rustproof inspection It looks into, malformation and the inspection of yielding of foundation situation, the inspection of tower part, tower lamp inspection are looked into, steel tower ground connection checks, surrounding enviroment and attached are set It is standby to check }.
Certainly, those of ordinary skill in the art is it should be appreciated that above example is intended merely to illustrate this hair It is bright, and be not intended as limitation of the invention, as long as within the scope of the invention, all to the variation of above example, modification Protection scope of the present invention will be fallen into.

Claims (6)

1. adjusting system based on inspection project steel tower patrol plan of problems, it is characterised in that including generating steel tower inspection meter Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row Table module;
The generation steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N Patrol plan matrix X.
There are problem degree matrix modules for the reading history patrol record and generation inspection project:Read steel tower history inspection note Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
The adjustment patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence Project adjusts patrol plan list.
2. according to claim 1 adjust system based on inspection project steel tower patrol plan of problems, reading is gone through There are problem degree matrix modules to be characterized in that for history patrol record and generation inspection project, and the steel tower history patrol record is The patrol record of steel tower in time T, the time, T was arranged in advance, and the number of inspection is denoted as M;Of problems time of the inspection project Number variable niIt indicates, 1≤ni≤M;There are problem degree matrix Y=diag (n for the inspection projecti), matrix Y is N × N's Diagonal matrix.
3. according to claim 1 adjust system based on inspection project steel tower patrol plan of problems, adjustment is patrolled Inspection list of schedules module is characterized in that described there are problem degree matrix Y according to steel tower patrol plan matrix X and inspection project Calculate patrol plan oriental matrix R, calculation formula R=XY.
4. being based on inspection project steel tower patrol plan method of adjustment of problems, it is characterised in that include the following steps:
Step 1 is ranked up the inspection project of steel tower patrol plan, identifies the inspection number of entry, is denoted as N, uses from big to small Number is successively numbered inspection project, and number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N;
Step 2 reads steel tower history patrol record, counts inspection project number of problems, is given birth to according to inspection project order At inspection project, there are problem degree matrix Y;
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y to calculate patrol plan instruction square Element in battle array R, descending permutation matrix R, according to the corresponding inspection project adjustment patrol plan row of element in the matrix R after sequence Table.
5. according to claim 4 be based on inspection project steel tower patrol plan method of adjustment of problems, step 2 It is characterized in that, the steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection It is denoted as M;The inspection project number of problems variable niIt indicates, 1≤ni≤M;There are problem numbers for the inspection project Matrix Y=diag (ni), matrix Y is the diagonal matrix of N × N.
6. according to claim 4 be based on inspection project steel tower patrol plan method of adjustment of problems, step 3 It is characterized in that, described according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y to calculate patrol plan instruction Matrix R=XY.
CN201810137460.7A 2018-02-10 2018-02-10 Based on inspection project steel tower patrol plan method of adjustment of problems and system Pending CN108388984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810137460.7A CN108388984A (en) 2018-02-10 2018-02-10 Based on inspection project steel tower patrol plan method of adjustment of problems and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810137460.7A CN108388984A (en) 2018-02-10 2018-02-10 Based on inspection project steel tower patrol plan method of adjustment of problems and system

Publications (1)

Publication Number Publication Date
CN108388984A true CN108388984A (en) 2018-08-10

Family

ID=63075740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810137460.7A Pending CN108388984A (en) 2018-02-10 2018-02-10 Based on inspection project steel tower patrol plan method of adjustment of problems and system

Country Status (1)

Country Link
CN (1) CN108388984A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115660260A (en) * 2022-12-28 2023-01-31 深圳市四格互联信息技术有限公司 Method and system for dynamically generating inspection task of property management
CN115759996A (en) * 2022-11-23 2023-03-07 国网四川省电力公司达州供电公司 Machine room standardized inspection method, equipment and medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278702A1 (en) * 2013-03-15 2014-09-18 Lisa M. Giles Launch optimization system and method of use
CN106651731A (en) * 2016-12-25 2017-05-10 杭州博烁晟斐智能科技有限公司 Historical-data-based communication tower to-be-solved problem set generation method and system
CN106708786A (en) * 2016-12-25 2017-05-24 杭州博烁晟斐智能科技有限公司 Method and system for calculating problem severity of iron tower based on sensor detection

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140278702A1 (en) * 2013-03-15 2014-09-18 Lisa M. Giles Launch optimization system and method of use
CN106651731A (en) * 2016-12-25 2017-05-10 杭州博烁晟斐智能科技有限公司 Historical-data-based communication tower to-be-solved problem set generation method and system
CN106708786A (en) * 2016-12-25 2017-05-24 杭州博烁晟斐智能科技有限公司 Method and system for calculating problem severity of iron tower based on sensor detection

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115759996A (en) * 2022-11-23 2023-03-07 国网四川省电力公司达州供电公司 Machine room standardized inspection method, equipment and medium
CN115759996B (en) * 2022-11-23 2023-08-08 国网四川省电力公司达州供电公司 Machine room standardized inspection method, equipment and medium
CN115660260A (en) * 2022-12-28 2023-01-31 深圳市四格互联信息技术有限公司 Method and system for dynamically generating inspection task of property management

Similar Documents

Publication Publication Date Title
CN106199276B (en) The intelligent diagnosis system and method for exception information in a kind of power information acquisition system
CN110555785A (en) monthly plan safety and stability checking method and system
CN104392391A (en) Power grid running safety risk quantification method
CN104299116A (en) Quantitative evaluation method for security risk of operation of power network
CN108388984A (en) Based on inspection project steel tower patrol plan method of adjustment of problems and system
CN108334962A (en) Steel tower patrol task list method of adjustment and system based on steel tower problem weight
CN111222696B (en) Voltage sag treatment optimization method and device, computer equipment and storage medium
CN108923542A (en) A kind of VR system for power scheduling
CN108964113A (en) A kind of generation of electricity by new energy dispatching method and system
CN108399505B (en) Distributed photovoltaic power supply access capacity planning method and terminal equipment
CN108416511A (en) It is a kind of based on the patrol task method of adjustment and system of safeguarding duration
CN110555671A (en) Urban landscaping intelligent patrol management and maintenance system
CN109190845A (en) A kind of two stages dynamic optimization short-term wind power forecast method
CN105117435A (en) Dynamic data consistency comparison method and system
CN108540093A (en) Photovoltaic power station monitoring and warning system based on the acquisition of Fluctuation Method big data
CN109214615A (en) A method of suitable for the group's heap dosage risk control of high temperature gas cooled reactor nuclear power plant
WO2023202247A1 (en) Comprehensive weighting health evaluation method and system for top cover drainage system of hydroelectric generating set
CN110175196A (en) A kind of bill of materials problem statistical method and device
CN108346001A (en) A kind of steel tower regular visit project order method of adjustment and system
CN113253014B (en) Method, device and equipment for detecting abnormal topological relation of transformer area subscriber
CN114123190A (en) Method and device for determining target region to which ammeter belongs, electronic equipment and storage medium
CN105207807B (en) A kind of SIM card flow analysis method applied to power information acquisition system
CN207319058U (en) A kind of process industry control loop performance monitoring and adjusting system
CN110113471A (en) Number monitoring method and device
CN108510416A (en) Examination flux monitoring system and implementation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810