CN108388984A - Based on inspection project steel tower patrol plan method of adjustment of problems and system - Google Patents
Based on inspection project steel tower patrol plan method of adjustment of problems and system Download PDFInfo
- Publication number
- CN108388984A CN108388984A CN201810137460.7A CN201810137460A CN108388984A CN 108388984 A CN108388984 A CN 108388984A CN 201810137460 A CN201810137460 A CN 201810137460A CN 108388984 A CN108388984 A CN 108388984A
- Authority
- CN
- China
- Prior art keywords
- matrix
- inspection
- steel tower
- inspection project
- patrol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 169
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 80
- 239000010959 steel Substances 0.000 title claims abstract description 80
- 238000000034 method Methods 0.000 title claims abstract description 17
- 239000011159 matrix material Substances 0.000 claims abstract description 92
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 14
- 238000012423 maintenance Methods 0.000 description 10
- 229910052742 iron Inorganic materials 0.000 description 7
- 230000002421 anti-septic effect Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 230000036244 malformation Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G06Q50/40—
Abstract
The invention discloses based on inspection project steel tower patrol plan method of adjustment of problems and system.Its system includes that there are problem degree matrix module, adjustment patrol plan list blocks for generation steel tower patrol plan matrix module, reading history patrol record and generation inspection project.The method and system of the present invention solve the technical issues of cannot adjusting patrol plan according to inspection project number of problems.
Description
Technical field
The invention belongs to communication iron tower maintenance technology fields, are patrolled more particularly to based on inspection project steel tower of problems
Examine Plan rescheduling method and system.
Background technology
Communication iron tower is mainly safeguarded by maintenance personnel according to the inspection project in patrol plan at present, is patrolled by fixed
Project order is examined to execute, can not priority processing be frequently present of the emphasis inspection project of problem in the recent period.Currently without according to inspection item
There are the technical solutions that problem log adjusts patrol plan for mesh.It proposes to be based on inspection project steel tower inspection meter of problems thus
Draw method of adjustment and system.
Invention content
The technical problem to be solved by the present invention is to cannot adjust patrol plan according to inspection project number of problems
The problem of, it proposes to be based on inspection project steel tower patrol plan method of adjustment of problems and system.Inspection of the present invention
When project there are problem refers to inspection steel tower project, which is implicitly present in problem, such as when inspection Iron tower incline degree project,
It was found that Iron tower incline degree is implicitly present in problem.
The present invention relies on existing communication iron tower maintenance system, and generating inspection according to the inspection project in patrol plan appoints
Business, maintenance personnel carry out steel tower maintenance according to patrol task, and there are problems for the inspection project for recording in each inspection.Root of the present invention
Patrol plan list is adjusted according to the number of problems of recent each inspection project.
The present invention's adjusts system based on inspection project steel tower patrol plan of problems, including generates steel tower inspection meter
Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row
Table module.
Generate steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item
Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N
Patrol plan matrix X.
There are problem degree matrix modules for reading history patrol record and generation inspection project:Read steel tower history inspection note
Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection
It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project
Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.
Adjust patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y
Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence
Project adjusts patrol plan list.
System block diagram is adjusted based on inspection project steel tower patrol plan of problems, as shown in Figure 1.
The present invention's is realized as follows based on inspection project steel tower patrol plan method of adjustment of problems:
Step 1 is ranked up the inspection project of steel tower patrol plan, identify the inspection number of entry, be denoted as N, from greatly to
Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N.
Step 2 reads steel tower history patrol record, counts inspection project number of problems, suitable according to inspection project
Sequence generates inspection project, and there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection
It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project
Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y calculating patrol plans to refer to
Show that matrix R, the element in descending permutation matrix R adjust inspection meter according to the corresponding inspection project of element in the matrix R after sequence
Draw list.
Based on inspection project steel tower patrol plan method of adjustment flow chart of problems, as shown in Figure 2.
The method and system of the present invention this have the advantage that:It is of problems secondary according to inspection project in the recent inspection of steel tower
Number adjustment patrol plan list, the inspection project for being frequently present of problem in the recent period for priority processing provide foundation.
Description of the drawings
Fig. 1 is the present invention based on inspection project steel tower patrol plan adjustment system block diagram of problems;
Fig. 2 is the present invention based on inspection project steel tower patrol plan method of adjustment flow chart of problems.
Specific implementation mode
It elaborates below to the preferred embodiment of the present invention.
The present invention relies on existing communication iron tower maintenance system, and generating inspection according to the inspection project in patrol plan appoints
Business, maintenance personnel carry out steel tower maintenance according to patrol task, and there are problems for the inspection project for recording in each inspection.Root of the present invention
According to recent each inspection project, there are the adjustment patrol plan lists of problem number.In the present embodiment, patrolled for certain triangle tower
Examine the description of list of schedules adjustment system and method.Patrol officer carries out inspection process record simultaneously in the client of mobile terminal
It is sent in system and preserves, history patrol record includes that there are problems for the inspection project of each inspection.
The present invention's adjusts system based on inspection project steel tower patrol plan of problems, including generates steel tower inspection meter
Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row
Table module.
Generate steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item
Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N
Patrol plan matrix X.In the present embodiment, according to triangle tower inspection standard, 9 inspection projects in patrol plan list are arranged successively
Sequence be microwave antenna inspection, the inspection of tower part, it is antiseptic and rustproof check, structural bolts connection tightness inspection, malformation and
The inspection of yielding of foundation situation, steel tower verticality and height check, tower lamp inspection is looked into, steel tower ground connection checks, surrounding enviroment and attached set
Standby to check, N=9 is successively numbered inspection project from 9 to 1, is indicated with i, generates 1 × 9 steel tower Maintenance Significant Items matrix X
=(9,8,7,6,5,4,3,2,1).
There are problem degree matrix modules for reading history patrol record and generation inspection project:Read steel tower history inspection note
Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection
It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project
Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.In the present embodiment,
Setting time T is 3 months in advance, reads 4 patrol records of the steel tower in nearly 3 months, i.e. M=4;Each inspection project is counted to deposit
It is respectively n in the number of problem9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3=0, n2=0, n1=0;Generate N × N
Steel tower problem weight matrix Y=diag (2,0,1,0,1,1,0,0,0), matrix Y be diagonal matrix.
Adjust patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y
Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence
Project adjusts patrol plan list.In the present embodiment, calculate 1 × N patrol plan oriental matrix R=XY=(18,0,7,0,
5,4,0,0,0), element obtains (18,7,5,4,0,0,0,0,0) in descending permutation matrix R, according to its corresponding inspection project tune
Whole patrol plan list is:{ microwave antenna inspection, the tightness inspection of structural bolts connection, steel tower verticality and height are examined
Look into, it is antiseptic and rustproof check, malformation and the inspection of yielding of foundation situation, the inspection of tower part, tower lamp inspection are looked into, steel tower ground connection checks, week
Surrounding environment and auxiliary device inspection }.
The present invention's is realized as follows based on inspection project steel tower patrol plan method of adjustment of problems:
Step 1 is ranked up the inspection project of steel tower patrol plan, identify the inspection number of entry, be denoted as N, from greatly to
Small that inspection project is numbered successively with number, number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N.This implementation
In example, according to triangle tower inspection standard, microwave antenna inspection, tower are ordered as successively to 9 inspection projects in patrol plan list
Part inspection, antiseptic and rustproof inspection, the tightness inspection of structural bolts connection, malformation and the inspection of yielding of foundation situation, iron
Tower verticality and height check, tower lamp inspection is looked into, steel tower ground connection checks, surrounding enviroment and auxiliary device inspection, N=9, from 9 to 1 according to
It is secondary that inspection project is numbered, indicated with i, generate 1 × 9 steel tower Maintenance Significant Items matrix X=(9,8,7,6,5,4,3,2,
1)。
Step 2 reads steel tower history patrol record, counts inspection project number of problems, suitable according to inspection project
Sequence generates inspection project, and there are problem degree matrix Y;
Wherein, steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection
It is denoted as M;Each inspection project number of problems in time T is counted, with variable niIt indicates, 1≤ni≤M;According to inspection project
Being sequentially generated the inspection project of N × N, there are problem degree matrix Y=diag (ni), matrix Y is diagonal matrix.In the present embodiment,
Setting time T is 3 months in advance, reads 4 patrol records of the steel tower in nearly 3 months, i.e. M=4;Each inspection project is counted to deposit
It is respectively n in the number of problem9=2, n8=0, n7=1, n6=0, n5=1, n4=1, n3=0, n2=0, n1=0;Generate N × N
Steel tower problem weight matrix Y=diag (2,0,1,0,1,1,0,0,0), matrix Y be diagonal matrix.
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y calculating patrol plans to refer to
Show that matrix R, the element in descending permutation matrix R adjust inspection meter according to the corresponding inspection project of element in the matrix R after sequence
Draw list.In the present embodiment, the patrol plan oriental matrix R=XY=(18,0,7,0,5,4,0,0,0) of 1 × N, drop are calculated
Element obtains (18,7,5,4,0,0,0,0,0) in sequence permutation matrix R, according to its corresponding inspection project adjustment patrol plan row
Table is:{ microwave antenna inspection, the tightness inspection of structural bolts connection, steel tower verticality and height inspection, antiseptic and rustproof inspection
It looks into, malformation and the inspection of yielding of foundation situation, the inspection of tower part, tower lamp inspection are looked into, steel tower ground connection checks, surrounding enviroment and attached are set
It is standby to check }.
Certainly, those of ordinary skill in the art is it should be appreciated that above example is intended merely to illustrate this hair
It is bright, and be not intended as limitation of the invention, as long as within the scope of the invention, all to the variation of above example, modification
Protection scope of the present invention will be fallen into.
Claims (6)
1. adjusting system based on inspection project steel tower patrol plan of problems, it is characterised in that including generating steel tower inspection meter
Drawing matrix module, reading history patrol record and generation inspection project, there are problem degree matrix module, adjustment patrol plan row
Table module;
The generation steel tower patrol plan matrix module:The inspection project of steel tower patrol plan is ranked up, identifies inspection item
Mesh number amount is denoted as N, and inspection project is numbered successively with number from big to small, and number is indicated with i, generates the steel tower of 1 × N
Patrol plan matrix X.
There are problem degree matrix modules for the reading history patrol record and generation inspection project:Read steel tower history inspection note
Record counts inspection project number of problems, and generating inspection project according to inspection project order, there are problem degree matrix Y;
The adjustment patrol plan list block:According to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y
Calculate patrol plan oriental matrix R, the element in descending permutation matrix R, according to the corresponding inspection of element in the matrix R after sequence
Project adjusts patrol plan list.
2. according to claim 1 adjust system based on inspection project steel tower patrol plan of problems, reading is gone through
There are problem degree matrix modules to be characterized in that for history patrol record and generation inspection project, and the steel tower history patrol record is
The patrol record of steel tower in time T, the time, T was arranged in advance, and the number of inspection is denoted as M;Of problems time of the inspection project
Number variable niIt indicates, 1≤ni≤M;There are problem degree matrix Y=diag (n for the inspection projecti), matrix Y is N × N's
Diagonal matrix.
3. according to claim 1 adjust system based on inspection project steel tower patrol plan of problems, adjustment is patrolled
Inspection list of schedules module is characterized in that described there are problem degree matrix Y according to steel tower patrol plan matrix X and inspection project
Calculate patrol plan oriental matrix R, calculation formula R=XY.
4. being based on inspection project steel tower patrol plan method of adjustment of problems, it is characterised in that include the following steps:
Step 1 is ranked up the inspection project of steel tower patrol plan, identifies the inspection number of entry, is denoted as N, uses from big to small
Number is successively numbered inspection project, and number is indicated with i, generates the steel tower patrol plan matrix X of 1 × N;
Step 2 reads steel tower history patrol record, counts inspection project number of problems, is given birth to according to inspection project order
At inspection project, there are problem degree matrix Y;
Step 3, according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y to calculate patrol plan instruction square
Element in battle array R, descending permutation matrix R, according to the corresponding inspection project adjustment patrol plan row of element in the matrix R after sequence
Table.
5. according to claim 4 be based on inspection project steel tower patrol plan method of adjustment of problems, step 2
It is characterized in that, the steel tower history patrol record is the patrol record of steel tower in time T, and the time, T was arranged in advance, the number of inspection
It is denoted as M;The inspection project number of problems variable niIt indicates, 1≤ni≤M;There are problem numbers for the inspection project
Matrix Y=diag (ni), matrix Y is the diagonal matrix of N × N.
6. according to claim 4 be based on inspection project steel tower patrol plan method of adjustment of problems, step 3
It is characterized in that, described according to steel tower patrol plan matrix X and inspection project, there are problem degree matrix Y to calculate patrol plan instruction
Matrix R=XY.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810137460.7A CN108388984A (en) | 2018-02-10 | 2018-02-10 | Based on inspection project steel tower patrol plan method of adjustment of problems and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810137460.7A CN108388984A (en) | 2018-02-10 | 2018-02-10 | Based on inspection project steel tower patrol plan method of adjustment of problems and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108388984A true CN108388984A (en) | 2018-08-10 |
Family
ID=63075740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810137460.7A Pending CN108388984A (en) | 2018-02-10 | 2018-02-10 | Based on inspection project steel tower patrol plan method of adjustment of problems and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108388984A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115660260A (en) * | 2022-12-28 | 2023-01-31 | 深圳市四格互联信息技术有限公司 | Method and system for dynamically generating inspection task of property management |
CN115759996A (en) * | 2022-11-23 | 2023-03-07 | 国网四川省电力公司达州供电公司 | Machine room standardized inspection method, equipment and medium |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278702A1 (en) * | 2013-03-15 | 2014-09-18 | Lisa M. Giles | Launch optimization system and method of use |
CN106651731A (en) * | 2016-12-25 | 2017-05-10 | 杭州博烁晟斐智能科技有限公司 | Historical-data-based communication tower to-be-solved problem set generation method and system |
CN106708786A (en) * | 2016-12-25 | 2017-05-24 | 杭州博烁晟斐智能科技有限公司 | Method and system for calculating problem severity of iron tower based on sensor detection |
-
2018
- 2018-02-10 CN CN201810137460.7A patent/CN108388984A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140278702A1 (en) * | 2013-03-15 | 2014-09-18 | Lisa M. Giles | Launch optimization system and method of use |
CN106651731A (en) * | 2016-12-25 | 2017-05-10 | 杭州博烁晟斐智能科技有限公司 | Historical-data-based communication tower to-be-solved problem set generation method and system |
CN106708786A (en) * | 2016-12-25 | 2017-05-24 | 杭州博烁晟斐智能科技有限公司 | Method and system for calculating problem severity of iron tower based on sensor detection |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115759996A (en) * | 2022-11-23 | 2023-03-07 | 国网四川省电力公司达州供电公司 | Machine room standardized inspection method, equipment and medium |
CN115759996B (en) * | 2022-11-23 | 2023-08-08 | 国网四川省电力公司达州供电公司 | Machine room standardized inspection method, equipment and medium |
CN115660260A (en) * | 2022-12-28 | 2023-01-31 | 深圳市四格互联信息技术有限公司 | Method and system for dynamically generating inspection task of property management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106199276B (en) | The intelligent diagnosis system and method for exception information in a kind of power information acquisition system | |
CN110555785A (en) | monthly plan safety and stability checking method and system | |
CN104392391A (en) | Power grid running safety risk quantification method | |
CN104299116A (en) | Quantitative evaluation method for security risk of operation of power network | |
CN108388984A (en) | Based on inspection project steel tower patrol plan method of adjustment of problems and system | |
CN108334962A (en) | Steel tower patrol task list method of adjustment and system based on steel tower problem weight | |
CN111222696B (en) | Voltage sag treatment optimization method and device, computer equipment and storage medium | |
CN108923542A (en) | A kind of VR system for power scheduling | |
CN108964113A (en) | A kind of generation of electricity by new energy dispatching method and system | |
CN108399505B (en) | Distributed photovoltaic power supply access capacity planning method and terminal equipment | |
CN108416511A (en) | It is a kind of based on the patrol task method of adjustment and system of safeguarding duration | |
CN110555671A (en) | Urban landscaping intelligent patrol management and maintenance system | |
CN109190845A (en) | A kind of two stages dynamic optimization short-term wind power forecast method | |
CN105117435A (en) | Dynamic data consistency comparison method and system | |
CN108540093A (en) | Photovoltaic power station monitoring and warning system based on the acquisition of Fluctuation Method big data | |
CN109214615A (en) | A method of suitable for the group's heap dosage risk control of high temperature gas cooled reactor nuclear power plant | |
WO2023202247A1 (en) | Comprehensive weighting health evaluation method and system for top cover drainage system of hydroelectric generating set | |
CN110175196A (en) | A kind of bill of materials problem statistical method and device | |
CN108346001A (en) | A kind of steel tower regular visit project order method of adjustment and system | |
CN113253014B (en) | Method, device and equipment for detecting abnormal topological relation of transformer area subscriber | |
CN114123190A (en) | Method and device for determining target region to which ammeter belongs, electronic equipment and storage medium | |
CN105207807B (en) | A kind of SIM card flow analysis method applied to power information acquisition system | |
CN207319058U (en) | A kind of process industry control loop performance monitoring and adjusting system | |
CN110113471A (en) | Number monitoring method and device | |
CN108510416A (en) | Examination flux monitoring system and implementation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180810 |
|
RJ01 | Rejection of invention patent application after publication |