A kind of tunnel excavation construction supplementary structure system
Technical field
The present invention relates to tunnel excavation technical field, specifically a kind of tunnel excavation construction supplementary structure system.
Background technology
With the acceleration of China's economic growth and urbanization process, urban traffic pressure constantly rises, urban track traffic
The process of construction is increasingly accelerated.But since municipal construction environment is complicated, building is intensive, and pipeline interlocks, and road traffic is busy, applies
Work space limits, and challenge is brought to subway work.Simultaneously for the abnormity of the big cross sections such as Subway Stop line, turn back line, branch-cut bridge
Structure, subway work frequently with shield method no longer be applicable in, and use mining method construction.
In city tunnel mining method construction, tunnel Mining Method, which excavates, to be needed by vertical shaft and transverse passage-way auxiliary construction, and
Due to being influenced by street building object and traffic circulation, needing careful selection Shaft Location and strictly controlling construction site size,
In the case where ensureing that self structure is stablized, stringent control structure system space size while ensureing that construction is smoothed out, is protected
Hinder the normal operation of earth's surface traffic, reduces influence of the construction to Nearby Structure, while larger construction is provided for main tunnel excavation
Working space, convenient for construction.
Invention content
The purpose of the present invention is to provide a kind of tunnel excavation construction supplementary structure systems, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the present invention provides the following technical solutions:
A kind of tunnel excavation is constructed supplementary structure system, including vertical shaft and transverse passage-way, the vertical shaft it is orthogonal with transverse passage-way and
Intersect in the silo bottom, the vertical shaft is equipped with main tunnel with transverse passage-way intersection and excavates mouth, the vertical shaft and transverse passage-way place
Plane is vertical with main tunnel excavation direction.
As a further solution of the present invention:The vertical shaft is being equipped with Guan Liang with ground intersection, is equipped in the vertical shaft
Multiple tracks ring beam.
As a further solution of the present invention:The shaft enclosure structure uses drilled pile, the drilled pile buried depth to be more than
Transverse passage-way and main tunnel elevation of bottom.
As a further solution of the present invention:The transverse passage-way uses the arched section structure of stalk.
As a further solution of the present invention:Transverse passage-way supporting is equipped in the transverse passage-way, the transverse passage-way supporting uses
Profile steel frame and in-network processing supporting construction.
As a further solution of the present invention:The ingate punishment that the vertical shaft is connect with transverse passage-way, transverse passage-way and main tunnel
Not She You the first steel arch-shelf and second of existing side by side exist side by side steel arch-shelf.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is made just by the way that vertical shaft and transverse passage-way is arranged
Hole position is in vertical shaft and transverse passage-way, is greatly shortened the distance between vertical shaft, transverse passage-way, three works of main tunnel, is kept structure whole
Body is located under driving road surface, the influence for avoiding the influence to Nearby Structure and constructing to earth's surface traffic;Vertical shaft and transverse passage-way
Larger working space is provided for main tunnel excavation, comes in and goes out convenient for personnel and machinery, is conducive to construction.
Description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is the shaft structure schematic diagram figure of the present invention.
Fig. 3 is the transverse passage-way structural schematic diagram of the present invention.
Fig. 4 is the main tunnel structure chart of the present invention.
Fig. 5 is the sectional view of the present invention.
In figure:1- vertical shafts, 2- transverse passage-ways, 3- main tunnels, 4- Guan Liangs, 5- ring beams, the supporting of 6- transverse passage-ways, the first steel arch-shelfs of 7-,
The second steel arch-shelfs of 8-.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig.1-5, in the embodiment of the present invention, a kind of tunnel excavation is constructed supplementary structure system, including vertical shaft 1 and cross
Channel 2, vertical shaft 1 are being equipped with Guan Liang 4 with ground intersection, multiple tracks ring beam 5 are being equipped in vertical shaft 1, vertical shaft 1 hangs down mutually with transverse passage-way 2
Directly and in 1 bottom of vertical shaft intersect, 1 building enclosure of vertical shaft uses drilled pile, drilled pile buried depth to be more than 3 bottom of transverse passage-way 2 and main tunnel
Absolute altitude, transverse passage-way 2 use the arched section structure of stalk, transverse passage-way supporting 6 are equipped in transverse passage-way 2, and transverse passage-way supporting uses shaped steel
Steelframe and in-network processing supporting construction, vertical shaft 1 are equipped with main tunnel 3 with 2 intersection of transverse passage-way and excavate mouth, 2 institute of vertical shaft 1 and transverse passage-way
Vertical with the excavation direction of main tunnel 3 in plane, main tunnel 3 is passed through from vertical shaft 1 and the intersection of transverse passage-way 2, i.e. vertical shaft 1,2 and of transverse passage-way
The spatially pairwise orthogonal of main tunnel 3, and then the distance between shorten vertical shaft 1, transverse passage-way 2 and main tunnel 3, at the same additionally provide compared with
Big working space, vertical shaft 1 are respectively equipped with first simultaneously with transverse passage-way 2, transverse passage-way 2 on the ingate of 3 junction of main tunnel
Vertical steel arch-shelf 7 and second is existed side by side steel arch-shelf 8, and construction is abolished in the walk around ingate of main tunnel 3 of 1 turn of transverse passage-way 2 of vertical shaft and transverse passage-way 2
In, it exists side by side steel arch-shelf 7 with ingate is existed side by side first and the second steel arch-shelf 8 of existing side by side can ensure that ingate abolishes the peace of construction
Entirely.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiment being appreciated that.