CN108330997A - A kind of horizontal well construction and construction method of Landfill precipitation - Google Patents

A kind of horizontal well construction and construction method of Landfill precipitation Download PDF

Info

Publication number
CN108330997A
CN108330997A CN201810012131.XA CN201810012131A CN108330997A CN 108330997 A CN108330997 A CN 108330997A CN 201810012131 A CN201810012131 A CN 201810012131A CN 108330997 A CN108330997 A CN 108330997A
Authority
CN
China
Prior art keywords
casing
well
well casing
construction
trepanning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810012131.XA
Other languages
Chinese (zh)
Inventor
胡杰
兰吉武
张海华
詹良通
柯瀚
徐晓兵
黄耆馨
赵军
夏睿祺
孙顺杰
唐素琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Zhejiang University ZJU
Sinohydro Foundation Engineering Co Ltd
Original Assignee
HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Zhejiang University ZJU
Sinohydro Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU ENVIRONMENTAL GROUP CO Ltd, Zhejiang University ZJU, Sinohydro Foundation Engineering Co Ltd filed Critical HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Priority to CN201810012131.XA priority Critical patent/CN108330997A/en
Publication of CN108330997A publication Critical patent/CN108330997A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0076Drilling

Abstract

The invention discloses a kind of horizontal well construction of Landfill precipitation and construction methods.Well casing leading portion is the coating steel pipe of not trepanning, as negative pressure ventilation seal section;Stage casing is the coating steel pipe of upper semi-circle trepanning, lower half circle not trepanning, and upper semi-circle enters stream interface as percolate, and lower half circle is as percolate flow channel;Back segment is the coating steel pipe of not trepanning, and end is blocked using plug;Well casing has 3% 15% angle that raises up.Horizontal well construction uses guide rod to be crept into forward by the specified angle that raises up first, and casing uses to synchronize with pipe direct circulation drilling process forms wellbore with proceeding to design length, it is ensured that installation well casing space;Then it withdraws guide rod and well casing is stretched into casing section by section, finally withdrawing casing makes to realize draining in well casing implantation heap body.Horizontal well construction is completed to be drained by the way of gravity flow, if silting, which occurs, for follow-up longtime running can be used high pressure backwashing technology dredging.

Description

A kind of horizontal well construction and construction method of Landfill precipitation
Technical field
The present invention relates to percolate from garbage filling field water level control fields, and in particular to a kind of Landfill precipitation Horizontal well construction and construction method.
Background technology
The existing municipal solid waste sanitary landfill in China, rubbish day amount of landfill and diafiltration output of fluid it is big, percolate is long Phase guide is unsmooth, can not effectively guide percolate siltation it is internal in landfill, cause the universal harmony of junk-heap body leachate level high. When percolate from garbage filling field water level is excessively high, part percolate is laterally oozed along the generation of junk-heap body side cladding layers weakness Leakage, seriously pollutes surrounding enviroment, while causing various forms of landfill body slope instabilities.Excessively high leachate level can also inhibit The generation of methane gas and Collection utilization are easy to form hyperbar band inside, cause security risk.
To ensure the safe operation of refuse landfill, leachate level need to be controlled under warning line.For guide Layer gradually fails or the landfill yard without guide system, mostly set vertical shaft in junk-heap body in the past and carries out precipitation.However pump drainage is perpendicular Well is commonly present the problems such as construction depth is inadequate, pump drainage efficiency is too low and operation and maintenance cost is excessively high, and single using vertical shaft precipitation It is difficult to meet heap body water level control requirement.
Invention content
In order to overcome the problems, such as that single pump drainage vertical shaft is difficult to meet heap body water level control requirement, the present invention provides a kind of rubbish The structure and construction method of the novel dewatering measure-horizontal well of landfill yard, horizontal well as a kind of artesian well have management it is convenient, Being used in conjunction with for the advantages that flow section area is big and work efficiency is high, horizontal well and vertical shaft can realize three-dimensional guide, can be more preferable Meet heap body water level control requirement.
To achieve the above object, the technical solution adopted in the present invention is as follows:A kind of water of Landfill precipitation Horizontal well structure, well casing leading portion is the coating steel pipe of not trepanning, as negative pressure ventilation seal section;Stage casing is upper semi-circle trepanning, lower half The coating steel pipe of circle not trepanning, upper semi-circle enter stream interface as percolate, and lower half circle is as percolate flow channel;Back segment is not open The coating steel pipe in hole, end are blocked using plug, prevent rubbish from entering well casing;Well casing outer wall wraps up one layer of filtration material;Well casing The angle that raises up with 3%-15%;After valve is installed in well casing front end, guide branch pipe is accessed.
Further, it to ensure that every well casing upper semi-circle is in top, is all made of and is bolted between each section well casing.
Further, the well casing outer diameter 100-150mm, wall thickness 5-10mm, upper semi-circle open pore size 8-15mm.
Further, the length of the seal section is no less than 10m, ensures the feasibility that follow-up negative pressure ventilation is safeguarded.
Further, the filtration material, which is the filtering of the nylon wire or aperture 0.3-1mm of aperture 1-2mm, spinning geotechnique Cloth.
A kind of construction method of the horizontal well construction of Landfill precipitation, it is characterised in that:
(1) guide rod is used to be crept into forward by the specified angle that raises up, casing synchronizes follow-up, guide rod and casing drilling Wellbore is formed to design length;
(2) guide rod is withdrawn after wellbore is formed, and is taken back drilling cuttings while withdrawing marginal not and entering flushing liquor, is ensured in casing without miscellaneous Object;
(3) guide rod is all withdrawn out cleaned out in casing and casing after, the well casing of filtration material will be wrapped up section by section It stretches into casing;
(4) after well casing all stretches into casing, withdrawing casing makes well casing implantation junk-heap body realize draining.
Further, in the step (1), the advanced 1-3m of guide rod controls boring direction;Described sleeve pipe is used with pipe Direct circulation drilling process follows up, it is ensured that installation well casing space.
Further, in the step (1), a diameter of 50-80mm of guide rod, casing is not trepanning seamless steel pipe, A diameter of 170-200mm;Guide rod and casing front end all have enlarged diameter type cut drill.
Further, in the step (2), flushing liquor is the mixing of clear water and saponification agent or high molecular polymer drag reducer Liquid.
Further, it in the step (4), needs piece mandril of tripping in withstand well casing before withdrawing casing, prevents well casing It synchronizes and takes out of, then steel wire rope is connected on casing, extract casing section by section.
The invention has the advantages that:
1) it is proved by live long-term practice, construction method using the present invention can successfully set water in refuse landfill Horizontal well;
2) it is drawn water and is compared using immersible pump with pump drainage vertical shaft, horizontal well is drained by way of gravity flow, without special Arrangement personnel carry out operation and maintenance, save operating cost;
3) it is compared with pump drainage vertical shaft construction depth 30m or so, it is longer that horizontal well sets length, can reach 100m;If need to reach Same water level control effect, the quantity that need to be set using horizontal well is few, management easy to produce;
4) mesh portion of horizontal well can be entirely located in water level line hereinafter, flow section area is larger, and drain discharge is big, together When can preferably reduce leachate level above horizontal well;
5) horizontal well front end not trepanning section has preferable air-tightness, it is ensured that the feasibility of follow-up negative pressure pump drainage, it can be further It improves the standard well working performance;
6) well casing can play the role of good corrosion-resistant and resistance to deformation using coating steel pipe.
Description of the drawings
Fig. 1 is guide rod and casing drilling schematic diagram in the present invention;
Fig. 2 is that guide rod and borehole cleaning schematic diagram are withdrawn in the present invention;
Fig. 3 is to stretch into well casing schematic diagram in the present invention after borehole cleaning;
Fig. 4 is to withdraw casing in the present invention and be implanted into well casing schematic diagram;
In figure:1, horizontally-guided drilling machine, 2, fixed earth anchor, 3, casing, 4, guide rod, 5, pipe bit, 6, orientation drill Rod bit, 7, drilling cuttings, 8, junk-heap body, 9, well casing.
Specific implementation mode
Invention is further described in detail in the following with reference to the drawings and specific embodiments.
Horizontal well the well casing 9 a diameter of 133mm, wall thickness 6mm of the present invention;Leading portion is the coating steel pipe of not trepanning, as negative Press air extracting seal section, length 12m;Stage casing is the coating steel pipe of upper semi-circle trepanning, lower half circle not trepanning, and wherein upper semi-circle is opened Hole, open pore size 12mm, percent opening 6% enter stream interface as percolate, and lower half circle not trepanning is long as percolate flow channel Degree is 42m;Back segment is the coating steel pipe of not trepanning, and end is blocked using plug, prevents rubbish from entering well casing, length 3m;Well Pipe joint length is 3m, to ensure that every well casing upper semi-circle is in top, is all made of and is bolted between each section well casing;Well casing Outer wall wraps up the nylon wire of one layer of aperture 1-2mm, as loaded filter;To ensure that diafiltration liquid energy voluntarily flows out, well casing 9 has 5% The angle that raises up.
Horizontal well construction is crept into forward using guide rod 4 by the specified angle that raises up, and casing 3 synchronizes follow-up, guide rod 4 And the drilling of casing 3 to design length forms wellbore;Wellbore withdraws guide rod 4 after being formed, taken back while withdrawing marginal not and entering flushing liquor Drilling cuttings 7 ensures no-sundries in casing 3;Guide rod 4 is all withdrawn out cleaned out in casing 3 and casing 3 after, will package it is anti- The well casing 9 of filter material material is stretched into section by section in casing 3;After well casing 9 all stretches into casing 3, withdrawing casing 3 makes well casing 9 be implanted into rubbish heap Body 8 realizes draining;Specific construction process is as follows:
(1) drilling machine is installed:Horizontally-guided drilling machine 1 is placed in the concrete foundation of thick 500mm, it is solid by fixed earth anchor 2 Determine rig substructure;After adjusting horizontal hole site and drilling extending direction, using being welded to connect rig substructure;
(2) horizontal well positions:According to horizontal well design floor plan, Horizontal Well is discharged with reference to well casing center line control point Position and determine drilling extending direction, under normal circumstances well location deviation≤30mm;
(3) horizontal well pore-forming:After the completion of positioning, if Fig. 1 shows, first use guide rod 4 synchronous by specified angle with casing 3 Drilling to design length forms wellbore, and pipe bit 5 and guide rod drill bit 6 are all made of enlarged diameter type cut drill.Drilling process In need to inject flushing liquor to play cooling drill bit and lubrication drag reduction, flushing liquor be preferably that clear water subtracts with saponification agent or high molecular polymer The mixed liquor of resist.Then, guide rod 4 is withdrawn as Fig. 2 shows, takes back drilling cuttings 7 while withdrawing marginal not and entering flushing liquor, ensures casing 3 Interior no-sundries;
(4) well casing is stretched into:If Fig. 3 shows, after being cleaned out in casing 3, the well casing 9 for wrapping up filtration material is slowly advanced into In casing 3.9 interface position of well casing to connect it is smooth securely, avoid scratch casing, 9 outlet section of well casing that valve to be installed;
(5) casing is withdrawn:If Fig. 4 shows, after well casing 9 all stretches into casing 3, start to withdraw casing 3;It is needed before withdrawing casing 3 Piece mandril of tripping in withstands well casing 9, prevents from synchronizing well casing 9 and take out of;Then using steel wire rope be connected on casing 3 recession by Section extraction casing 3;After casing 3 is extracted completely, well casing 9 has been implanted into junk-heap body 8, and so far horizontal well construction is completed.
After the completion of horizontal well construction, connect after corresponding discharge pipe line can self-draining, if follow-up longtime running occurs High pressure backwashing technology dredging can be used in silting.
Above-described is only presently preferred embodiments of the present invention, is not intended to limit the invention, all in the scope of the present invention Within, any modification, equivalence replacement for being made etc. should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of horizontal well construction of Landfill precipitation, it is characterised in that:Well casing leading portion is the galvanized steel of not trepanning Pipe, as negative pressure ventilation seal section;Stage casing is the coating steel pipe of upper semi-circle trepanning, lower half circle not trepanning, and upper semi-circle is as diafiltration Liquid enters stream interface, and lower half circle is as percolate flow channel;Back segment is the coating steel pipe of not trepanning, and end is blocked using plug, is prevented Only rubbish enters well casing;Well casing outer wall wraps up one layer of filtration material;Well casing has the angle that raises up of 3%-15%;Pacify well casing front end After filling valve, guide branch pipe is accessed.
2. the horizontal well construction of Landfill precipitation according to claim 1, it is characterised in that:To ensure every Well casing upper semi-circle is in top, is all made of and is bolted between each section well casing.
3. the horizontal well construction of Landfill precipitation according to claim 1, it is characterised in that:Outside the well casing Diameter 100-150mm, wall thickness 5-10mm, upper semi-circle open pore size 8-15mm.
4. the horizontal well construction of Landfill precipitation according to claim 1, it is characterised in that:The seal section Length be no less than 10m, ensure the feasibility that follow-up negative pressure ventilation is safeguarded.
5. the horizontal well construction of Landfill precipitation according to claim 1, it is characterised in that:The anti-filter material Material is the nylon wire of aperture 1-2mm or the filtering Woven geofabric of aperture 0.3-1mm.
6. a kind of construction method of the horizontal well construction of Landfill precipitation, it is characterised in that:Include the following steps:
(1) guide rod is used to be crept into forward by the specified angle that raises up, casing synchronizes follow-up, guide rod and casing drilling to setting It counts length and forms wellbore;
(2) guide rod is withdrawn after wellbore is formed, and is taken back drilling cuttings while withdrawing marginal not and entering flushing liquor, is ensured no-sundries in casing;
(3) guide rod is all withdrawn out cleaned out in casing and casing after, the well casing for wrapping up filtration material is stretched into section by section In casing;
(4) after well casing all stretches into casing, withdrawing casing makes well casing implantation junk-heap body realize draining.
7. construction method according to claim 6, it is characterised in that:In the step (1), the advanced 1-3m of guide rod, Control boring direction;Described sleeve pipe is used to follow up with pipe direct circulation drilling process, it is ensured that installation well casing space.
8. construction method according to claim 6, it is characterised in that:In the step (1), guide rod it is a diameter of 50-80mm, casing are not trepanning seamless steel pipe, a diameter of 170-200mm;Guide rod and casing front end all have enlarged diameter type and cut Cut drill bit.
9. construction method according to claim 6, it is characterised in that:In the step (2), flushing liquor is clear water and saponification The mixed liquor of agent or high molecular polymer drag reducer.
10. construction method according to claim 6, it is characterised in that:In the step (4), tripping in is needed before withdrawing casing A piece mandril withstands well casing, prevents from synchronizing well casing and take out of, then steel wire rope is connected on casing, extracts casing section by section.
CN201810012131.XA 2018-01-05 2018-01-05 A kind of horizontal well construction and construction method of Landfill precipitation Pending CN108330997A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810012131.XA CN108330997A (en) 2018-01-05 2018-01-05 A kind of horizontal well construction and construction method of Landfill precipitation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810012131.XA CN108330997A (en) 2018-01-05 2018-01-05 A kind of horizontal well construction and construction method of Landfill precipitation

Publications (1)

Publication Number Publication Date
CN108330997A true CN108330997A (en) 2018-07-27

Family

ID=62924760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810012131.XA Pending CN108330997A (en) 2018-01-05 2018-01-05 A kind of horizontal well construction and construction method of Landfill precipitation

Country Status (1)

Country Link
CN (1) CN108330997A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113546953A (en) * 2021-08-05 2021-10-26 山东中海新科环境技术有限公司 Process for repairing sewage and soil of refuse landfill
CN115288609A (en) * 2022-07-28 2022-11-04 河南盛邦环境工程有限公司 Construction method of landfill body horizontal well and perforated pipe connecting device

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436776A (en) * 2016-09-18 2017-02-22 上海胜义环境科技有限公司 Method for applying horizontal directional drilling to refuse landfill leachate drainage

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436776A (en) * 2016-09-18 2017-02-22 上海胜义环境科技有限公司 Method for applying horizontal directional drilling to refuse landfill leachate drainage

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113546953A (en) * 2021-08-05 2021-10-26 山东中海新科环境技术有限公司 Process for repairing sewage and soil of refuse landfill
CN115288609A (en) * 2022-07-28 2022-11-04 河南盛邦环境工程有限公司 Construction method of landfill body horizontal well and perforated pipe connecting device
CN115288609B (en) * 2022-07-28 2023-11-14 河南盛邦环境工程有限公司 Construction method for horizontal well of landfill pile body and perforated pipe connecting device

Similar Documents

Publication Publication Date Title
CN105822347B (en) A kind of tunnel siphon drainge system and its method of construction
CN107326918B (en) Hidden type plugging impervious water collecting well penetrating through raft plates and construction process thereof
CN106836438A (en) Step for municipal Storm Sewer Network blocks water with water system of regulating and storing
CN111335344A (en) Super pressure suction combined well point dewatering construction method for subway deep foundation pit
CN103374965B (en) Venturi self-circulation negative-pressure drainage system of refuse landfill
CN102383437B (en) Well point positioned pumping tubular well and well point positioned pumping method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN105625445A (en) Foundation pit dewatering method in coastal sandy soil region
CN108330997A (en) A kind of horizontal well construction and construction method of Landfill precipitation
CN208733690U (en) A kind of discharge structure for refuse landfill control junk-heap body water level
CN206721904U (en) A kind of integrated precipitation pumping system
CN205894121U (en) Emergent anti structure of floating of basement
CN211228566U (en) Recoverable vacuum light well point dewatering system
CN109736337A (en) A kind of substrate elevator catch pit drift sand processing guarantees the dewatering device and method of bed course integrality
CN114197508B (en) Easy-to-seal water draining device, manufacturing method and using method thereof
CN203795442U (en) Sealing cover plate system for underground deep wells
CN106836232A (en) Deep basal pit pressure-bearing water seal drainage construction technique
CN114151131A (en) Tunnel drainage system suitable for strong water-rich stratum and construction method
CN207193994U (en) A kind of concealed type, which passes through raft plate, can block impervious sump
CN203514331U (en) Large-aperture deep well point precipitation system arranged outside foundation pit
CN215211470U (en) Pumping and draining well for leachate of refuse landfill
CN217378963U (en) Pressure reducing pipe device for underground structure construction
CN105649098B (en) Sand hole forming method is taken suitable for the Multi-stage sleeve of medium coarse sand geology Application of light well point precipitation
CN114575359B (en) Weak-permeability soil layer side slope underground flood control method
CN212270980U (en) Cage device in cage of subway station bottom plate drainage open well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180727

RJ01 Rejection of invention patent application after publication