CN108301485A CN201810122035.0A CN201810122035A CN108301485A CN 108301485 A CN108301485 A CN 108301485A CN 201810122035 A CN201810122035 A CN 201810122035A CN 108301485 A CN108301485 A CN 108301485A
Authority
CN
China
Prior art keywords
inorganic filler
permeable
particle diameter
outside
disposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810122035.0A
Other languages
Chinese (zh)
Inventor
尹平保
袁科
杨莹
贺炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201810122035.0A priority Critical patent/CN108301485A/en
Publication of CN108301485A publication Critical patent/CN108301485A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F1/00Methods, systems, or installations for draining-off sewage or storm water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements

Abstract

The invention discloses a kind of sewers,Including permeable sheet pile,PVC water pipes,Waterproof layer,Permeable geotextiles,Big particle diameter inorganic filler,Middle particle diameter inorganic filler and small particle inorganic filler,The waterproof layer is horizontally disposed in substrate surface layer,The PVC water pipes are moved towards along ditch body,It is arranged on the waterproof layer center line,The PVC water pipes top layout has drilling,The permeable sheet pile is connected in the form of being mutually inserted,It moves towards to be disposed with two rows perpendicular to the substrate along the ditch body,Inside and outside two layers of permeable geotextiles are disposed on the outside of the permeable sheet pile,Among inside and outside two layers of permeable geotextiles,It is disposed with small particle inorganic filler described in certain thickness,Middle particle diameter inorganic filler described in certain thickness is disposed on the outside of the permeable geotextiles of the outer layer,Among two rows of permeable sheet piles,It is disposed with big particle diameter inorganic filler.The invention also discloses a kind of production methods of sewer.The present invention has the characteristics that good water permeability, construction are convenient, permanent efficient.

Description

A kind of sewer and preparation method thereof
Technical field
The present invention relates to a kind of sewers, more particularly to a kind of sewer and preparation method thereof.
Background technology
The higher regional heavy rain season gutter of level of ground water is difficult that water is smoothly discharged, and is lowering of watertable or interception Underground water, and prevent subsurface flow from entering in roadbed, it is lowering of watertable or interception underground to influence the service life of roadbed Sewer can be arranged in underground in water.Sewer is suitable for that Groundwater buried depth is shallow or stratum without fixed water-bearing layer.
Invention content
The purpose of the invention is to overcome sewer impeded drainage of the existing technology, it is easy blocked problem, is carried For a kind of sewer and preparation method thereof, the sewer and preparation method thereof, have drain it is unobstructed, be not easy to plug, construct it is convenient, efficient Durable feature.
To achieve the goals above, one aspect of the present invention provides a kind of sewer, including permeable sheet pile, PVC water pipes, waterproof Layer, permeable geotextiles, big particle diameter inorganic filler, middle particle diameter inorganic filler and small particle inorganic filler;
The waterproof layer is horizontally disposed in substrate surface layer, and the PVC water pipes are moved towards along ditch body, are arranged in the waterproof layer On line, the PVC water pipes top layout has drilling;
The permeable sheet pile is connected in the form of being mutually inserted, and moves towards to be disposed with two perpendicular to the substrate along the ditch body Row is disposed with inside and outside two layers of permeable geotextiles, in inside and outside two layers of permeable geotextiles on the outside of the permeable sheet pile Between, it is disposed with small particle inorganic filler described in certain thickness, certain thickness institute is disposed on the outside of the permeable geotextiles of the outer layer Middle particle diameter inorganic filler is stated, among two rows of permeable sheet piles, is disposed with big particle diameter inorganic filler.
Preferably, the permeable sheet pile be porous plastics sheet pile, cross section be it is trapezoidal, for obstruct the small particle without Machine filler enters the PVC water pipes.
Preferably, the big particle diameter inorganic filler is the mixed fillers of slabstone and gravel.
Preferably, the middle particle diameter inorganic filler is sandstone.
Preferably, the small particle inorganic filler is hack stone.
Preferably, the permeable sheet pile bottom basement certain depth.
Second aspect of the present invention provides a kind of production method of sewer, includes the following steps:
(1) in the ditch body of slope toe excavation certain depth;
(2) along ditch body direction, two rows of permeable sheet piles are vertically arranged with substrate, and squeezed into substrate certain depth;
(3) mat formation waterproof layer on the substrate surface layer;
(4) on the center line of the waterproof layer, there are the PVC water pipes of drilling along ditch body direction arrangement top;
(5) it is close to arrange one layer of permeable geotextiles on the outside of the permeable sheet pile;
(6) certain thickness small particle inorganic filler is filled on the outside of the permeable geotextiles, and is compacted;
(7) the permeable geotextiles of another layer are arranged on the outside of the small particle inorganic filler;
(8) particle diameter inorganic filler in certain thickness is filled on the outside of another permeable geotextiles of layer, and is compacted;
(9) in two rows of permeable sheet piles, big particle diameter inorganic filler is filled, and be compacted;
(10) backfill behind ditch is built by laying bricks or stones on the big particle diameter inorganic filler so that the upper table of described ditch one side side wall Face is flushed with earth's surface, and the upper surface of another side side wall is flushed with slope foot bottom.
Through the above technical solutions, using the water penetration and compactness of permeable geotextiles and porous plastics sheet pile, effectively Hack stone particle is completely cut off to permeate to adjacent area, has ensured the unimpeded of PVC water pipes, extended the service life of sewer.It is porous Plastic sheet pile is constructed using inserting mode, increases the intensity of sheet pile, improves the densification between construction efficiency and sheet pile Property, effectively reduce construction cost.
Description of the drawings
Fig. 1 is the structural schematic diagram (vertical view) of sewer one embodiment of the present invention;
Fig. 2 (a) is sectional view along A-A in Fig. 1;
Fig. 2 (b) is B-B direction sectional view in Fig. 1;
Fig. 3 is the structural schematic diagram that sewer of the present invention makes embodiment;
Fig. 4 is the structural schematic diagram of porous plastics sheet pile in the present invention.
Reference sign
Permeable geotextiles 1;Big particle diameter inorganic filler 2;Permeable sheet pile 3;Small particle inorganic filler 4;Middle particle diameter inorganic filler 5;PVC water pipes 6;Waterproof layer 7;Ditch 8;Earth's surface 9;Slope foot 10.
Specific implementation mode
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, left and right " typically refers to Illustrated orientation, " inside and outside " refer to shown position.
As depicted in figs. 1 and 2, a kind of sewer, including it is permeable geotextiles 1, big particle diameter inorganic filler 2, permeable sheet pile 3, small Particle diameter inorganic filler 4, middle particle diameter inorganic filler 5, PVC water pipes 6 and waterproof layer 7.Waterproof layer 7 is horizontally disposed in substrate surface layer, uses To completely cut off the infiltration of underground water, improves sewer and satisfy the need the expulsion efficiency of base underground water.PVC water pipes 6 are moved towards along ditch body, are arranged in anti- On the center line of water layer 7,6 top layout of PVC water pipes has drilling, for collecting underground water, and sewer is discharged.Permeable sheet pile 3 is with phase The form connection of mutual grafting is moved towards to be disposed with two rows perpendicular to substrate along ditch body, to increase the convenience and sheet pile of construction Intensity, labor cost height enterprise instantly, can realize mechanization and rapid installation.In 3 outside arrangement of permeable sheet pile There are inside and outside two layers of permeable geotextiles 1 to be disposed with certain thickness small particle inorganic filler among inside and outside two layers permeable geotextiles 1 4, it does so, can effectively avoid small particle inorganic filler 4 from being flowed into ditch body with underground water, prevent it to ditch body and PVC water Pipe 6 results in blockage, and effectively extends the service life of sewer, improves the service efficiency of sewer.In the permeable geotextiles of outer layer 1 Outside be disposed with particle diameter inorganic filler 5 in certain thickness, among two rows of permeable sheet piles 3, be disposed with big particle diameter inorganic filler 2, the gap of middle particle diameter inorganic filler 5 and big particle diameter inorganic filler 2 is made full use of with this, increases the drainage effect and knot of sewer Structure intensity.
Specifically, permeable sheet pile 3 is porous plastics sheet pile as shown in Figure 4, cross section is trapezoidal, for obstructing granule Diameter inorganic filler 5 enters PVC water pipes 6, and porous structure not only can guarantee the smooth discharge of underground water, but also can be according to different undergrounds Hydrological environment fully adjusts hole diameter and density, the effective scope of application for increasing the present invention.Meanwhile according to small particle without The grain size of machine filler 5 determines the diameter of hole, avoids the small particle inorganic filler 5 of leakage, is put by cellular-plastic panels Enter ditch body, ensured the unimpeded of ditch body, extends the service life of ditch body.In addition, special using the water-fast corrosion-resistant material of plastics Point extends the usage time of sewer.
Specifically, big particle diameter inorganic filler 2 is the mixed fillers of slabstone and gravel, cost is both reduced in this way, with increase The deriving from a wealth of sources property of material.Using the gap between slabstone and gravel, increase the water penetration of sewer.Middle particle diameter inorganic filler 5 For sandstone, cost is both reduced in this way, with the deriving from a wealth of sources property for increasing material.Using the gap between slabstone and gravel, increase The water permeability of sewer is added.Small particle inorganic filler 4 is hack stone, and the construction material of roadbed is effectively utilized in this way, subtracts Lack cost, increases the structural strength and compactness of sewer.
Specifically, 3 basement certain depth of permeable sheet pile, to which underground water barrier with except ditch body, is prevented underground Water is goed deep by base in ditch body, and the underground water in roadbed is conducive to, and is discharged by ditch body, and is increased using the structure of sheet pile The structural strength and block-water performance of sewer.
As shown in figure 3, a kind of production method of sewer, includes the following steps:
(1) the ditch body of certain depth is excavated in the bottom of slope foot 10;
(2) along ditch body direction, two rows of permeable sheet piles 3 are vertically arranged with substrate, and squeezed into substrate certain depth;
(3) mat formation waterproof layer 7 on substrate surface layer;
(4) on the center line of waterproof layer 7, there are the PVC water pipes 6 of drilling along ditch body direction arrangement top;
(5) one layer of permeable geotextiles 1 are arranged in the outside for being close to permeable sheet pile 3;
(6) certain thickness small particle inorganic filler 4 is filled in the outside of permeable geotextiles 1, and be compacted;
(7) the permeable geotextiles of another layer 1 are arranged in the outside of small particle inorganic filler 4;
(8) the particle diameter inorganic filler 5 in certain thickness is filled in the outside of the permeable geotextiles of another layer 1, and be compacted;
(9) in two rows of permeable sheet piles 3, big particle diameter inorganic filler 2 is filled, and be compacted;
(10) build backfill behind ditch 8 by laying bricks or stones on big particle diameter inorganic filler 2 so that the upper surface of 8 one side side wall of ditch with Earth's surface 9 flushes, and the upper surface of another side side wall is flushed with the bottom of slope foot 10.
The preferred embodiment of the present invention is described in detail to Fig. 4 in figure 1 above, and still, the present invention is not limited thereto.At this In the range of the technology design of invention, a variety of simple variants, including each particular technique can be carried out to technical scheme of the present invention Feature is combined in any suitable manner.In order to avoid unnecessary repetition, the present invention is to various combinations of possible ways No longer separately illustrate.But it should also be regarded as the disclosure of the present invention for these simple variants and combination, belongs to the present invention Protection domain.

Claims (7)

1. a kind of sewer, which is characterized in that filled out including permeable sheet pile, PVC water pipes, waterproof layer, permeable geotextiles, big particle diameter inorganic Material, middle particle diameter inorganic filler and small particle inorganic filler;
The waterproof layer is horizontally disposed in substrate surface layer, and the PVC water pipes are moved towards along ditch body, are arranged in the waterproof layer center line On, the PVC water pipes top layout has drilling, the permeable sheet pile to be connected in the form of being mutually inserted, and is moved towards along the ditch body Two rows are disposed with perpendicular to the substrate, inside and outside two layers of permeable geotextiles are disposed on the outside of the permeable sheet pile, in institute It states among inside and outside two layers of permeable geotextiles, small particle inorganic filler described in certain thickness is disposed with, in the permeable geotechnique of the outer layer Middle particle diameter inorganic filler described in certain thickness is disposed on the outside of cloth, among two rows of permeable sheet piles, be disposed with big grain size without Machine filler.
2. sewer according to claim 1, which is characterized in that the permeable sheet pile is porous plastics sheet pile, cross section To be trapezoidal, enter the PVC water pipes for obstructing the small particle inorganic filler.
3. sewer according to claim 1, which is characterized in that the big particle diameter inorganic filler is the mixing of slabstone and gravel Filler.
4. sewer according to claim 1, which is characterized in that the middle particle diameter inorganic filler is sandstone.
5. sewer according to claim 1, which is characterized in that the small particle inorganic filler is hack stone.
6. sewer according to claim 1, which is characterized in that the permeable sheet pile bottom basement certain depth.
7. a kind of production method of sewer, which is characterized in that include the following steps
(1) in the ditch body of slope toe excavation certain depth;
(2) along ditch body direction, two rows of permeable sheet piles are vertically arranged with substrate, and squeezed into substrate certain depth;
(3) mat formation waterproof layer on the substrate surface layer;
(4) on the center line of the waterproof layer, there are the PVC water pipes of drilling along ditch body direction arrangement top;
(5) it is close to arrange one layer of permeable geotextiles on the outside of the permeable sheet pile;
(6) certain thickness small particle inorganic filler is filled on the outside of the permeable geotextiles, and is compacted;
(7) the permeable geotextiles of another layer are arranged on the outside of the small particle inorganic filler;
(8) particle diameter inorganic filler in certain thickness is filled on the outside of another permeable geotextiles of layer, and is compacted;
(9) in two rows of permeable sheet piles, big particle diameter inorganic filler is filled, and be compacted;
(10) build backfill behind ditch by laying bricks or stones on the big particle diameter inorganic filler so that the upper surface of described ditch one side side wall with Earth's surface flushes, and the upper surface of another side side wall is flushed with slope foot bottom.
CN201810122035.0A 2018-02-07 2018-02-07 A kind of sewer and preparation method thereof Pending CN108301485A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810122035.0A CN108301485A (en) 2018-02-07 2018-02-07 A kind of sewer and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810122035.0A CN108301485A (en) 2018-02-07 2018-02-07 A kind of sewer and preparation method thereof

Publications (1)

Publication Number Publication Date
CN108301485A true CN108301485A (en) 2018-07-20

Family

ID=62864744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810122035.0A Pending CN108301485A (en) 2018-02-07 2018-02-07 A kind of sewer and preparation method thereof

Country Status (1)

Country Link
CN (1) CN108301485A (en)

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0321437U (en) * 1989-07-06 1991-03-04
JPH05311643A (en) * 1992-05-07 1993-11-22 Tokyu Constr Co Ltd Sheet pile for underground continuous wall and underground continuous wall construction method
JPH108445A (en) * 1996-06-25 1998-01-13 Kawasaki Steel Corp Laying method for piping
JPH10114939A (en) * 1996-10-14 1998-05-06 Horiuchi Kensetsu Kk Concrete sheet pile with drain hole and earth-retaining method preventing landslide by use thereof
JP2002212943A (en) * 2001-01-19 2002-07-31 Sumitomo Metal Ind Ltd Steel member for diaphragm wall, and diaphragm wall
JP2003336252A (en) * 2002-05-22 2003-11-28 Sumitomo Metal Ind Ltd Water permeable steel sheet pile wall
JP3115445U (en) * 2004-08-09 2005-11-04 国立臺北科技大學 Natural water collection type sand discharge pipe
CN101392544A (en) * 2007-09-19 2009-03-25 北京泰宁科创科技有限公司 Gap catchment infiltration type drainage ditch
JP2011214250A (en) * 2010-03-31 2011-10-27 Sumitomo Metal Ind Ltd Structure for reinforcing embankment
CN202247720U (en) * 2011-09-09 2012-05-30 中铁二院工程集团有限责任公司 Draining structure for cutting bed of rapid transit railway
CN102535289A (en) * 2012-01-09 2012-07-04 长沙理工大学 Variable-cross-section structure for deep sewer of roadbed and construction method thereof
CN202913366U (en) * 2012-11-12 2013-05-01 中交第二公路勘察设计研究院有限公司 Device for repairing waterproof and drainage capacity of original medial strip of road in non-excavation manner
CN203716064U (en) * 2013-12-16 2014-07-16 长安大学 Roadbed sewer convenient for dredging
CN204082174U (en) * 2014-01-19 2015-01-07 陈志敏 A kind of tunnel water-stopping structure with blind pipe
CN204212018U (en) * 2014-11-04 2015-03-18 甘肃路桥建设集团有限公司 A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section
CN204282343U (en) * 2014-10-29 2015-04-22 武汉市政工程设计研究院有限责任公司 A kind of cofferdam construction that is applicable to can sluice and the steel sheet pile device of mud
CN205475600U (en) * 2016-03-22 2016-08-17 河北钢铁集团矿业有限公司 Ore dressing plant wet -type preliminary election drainage device for refuse bin
CN205530626U (en) * 2016-03-08 2016-08-31 广州普邦园林股份有限公司 Multi -functional linear escape canal
CN106480865A (en) * 2016-10-31 2017-03-08 长沙理工大学 A kind of built-up boat brake structure
CN206428543U (en) * 2016-12-29 2017-08-22 中交第一公路勘察设计研究院有限公司 A kind of frozen earth roadbed insulation discharge structure
CN207846602U (en) * 2018-02-07 2018-09-11 长沙理工大学 A kind of sewer

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0321437U (en) * 1989-07-06 1991-03-04
JPH05311643A (en) * 1992-05-07 1993-11-22 Tokyu Constr Co Ltd Sheet pile for underground continuous wall and underground continuous wall construction method
JPH108445A (en) * 1996-06-25 1998-01-13 Kawasaki Steel Corp Laying method for piping
JPH10114939A (en) * 1996-10-14 1998-05-06 Horiuchi Kensetsu Kk Concrete sheet pile with drain hole and earth-retaining method preventing landslide by use thereof
JP2002212943A (en) * 2001-01-19 2002-07-31 Sumitomo Metal Ind Ltd Steel member for diaphragm wall, and diaphragm wall
JP2003336252A (en) * 2002-05-22 2003-11-28 Sumitomo Metal Ind Ltd Water permeable steel sheet pile wall
JP3115445U (en) * 2004-08-09 2005-11-04 国立臺北科技大學 Natural water collection type sand discharge pipe
CN101392544A (en) * 2007-09-19 2009-03-25 北京泰宁科创科技有限公司 Gap catchment infiltration type drainage ditch
JP2011214250A (en) * 2010-03-31 2011-10-27 Sumitomo Metal Ind Ltd Structure for reinforcing embankment
CN202247720U (en) * 2011-09-09 2012-05-30 中铁二院工程集团有限责任公司 Draining structure for cutting bed of rapid transit railway
CN102535289A (en) * 2012-01-09 2012-07-04 长沙理工大学 Variable-cross-section structure for deep sewer of roadbed and construction method thereof
CN202913366U (en) * 2012-11-12 2013-05-01 中交第二公路勘察设计研究院有限公司 Device for repairing waterproof and drainage capacity of original medial strip of road in non-excavation manner
CN203716064U (en) * 2013-12-16 2014-07-16 长安大学 Roadbed sewer convenient for dredging
CN204082174U (en) * 2014-01-19 2015-01-07 陈志敏 A kind of tunnel water-stopping structure with blind pipe
CN204282343U (en) * 2014-10-29 2015-04-22 武汉市政工程设计研究院有限责任公司 A kind of cofferdam construction that is applicable to can sluice and the steel sheet pile device of mud
CN204212018U (en) * 2014-11-04 2015-03-18 甘肃路桥建设集团有限公司 A kind of road structure preventing and treating the soft soil roadbed freeze thawing disease of high and cold mountain area cheuch section
CN205530626U (en) * 2016-03-08 2016-08-31 广州普邦园林股份有限公司 Multi -functional linear escape canal
CN205475600U (en) * 2016-03-22 2016-08-17 河北钢铁集团矿业有限公司 Ore dressing plant wet -type preliminary election drainage device for refuse bin
CN106480865A (en) * 2016-10-31 2017-03-08 长沙理工大学 A kind of built-up boat brake structure
CN206428543U (en) * 2016-12-29 2017-08-22 中交第一公路勘察设计研究院有限公司 A kind of frozen earth roadbed insulation discharge structure
CN207846602U (en) * 2018-02-07 2018-09-11 长沙理工大学 A kind of sewer

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
沈晓松;: "广州新光大桥钢板桩围堰设计", 公路交通技术, no. 1 *
高幸;李佳成;: "浅谈路堑高边坡的防护与加固", 科技资讯, no. 10 *

Similar Documents

Publication Publication Date Title
CN103510441B (en) Three-dimensional-drainage roadbed structure for preventing water damage of road in cold region and construction method thereof
CN112392127B (en) Dendritic embedded type flexible ecological slope drainage ditch and construction method
CN203498721U (en) Three-dimensional drainage roadbed structure preventing damage by water of road in cold region
CN207143981U (en) 3rd is rich water half diagenesis Sandstone Section Metro station excavation discharge structure
CN108843386A (en) Tunnel roof waterproof flow guiding structure and its water seepage treatment method
CN101748734A (en) Foundation pit side slope sandy soil drainage method
CN102383408A (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN206245444U (en) Rainwater penetration system
CN102425175B (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN211228269U (en) High-grade highway central separation strip structure
CN207846602U (en) A kind of sewer
KR101201544B1 (en) Underground Penetration Type Side Gutter Assembly
JP3181823B2 (en) Drainage with water permeability
CN202627002U (en) Tailing dam for river cutting type tailing pond water bursting section
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN108222216B (en) Rainwater ecological drainage system and construction method thereof
CN108301485A (en) A kind of sewer and preparation method thereof
CN214363925U (en) Cut water seepage ditch system
CN213805707U (en) Road enhancement mode infiltration well and sleeve based on sponge city construction
CN211172113U (en) Anti-floating structure of siphon drainage method
CN210507326U (en) Cut and lead ecological escape canal of type
CN210395567U (en) Road bed groundwater infiltration structure
CN208633235U (en) A kind of sandstone seepage well suitable for sponge urban construction
CN206360052U (en) Heat-extraction system is received in a kind of sponge type rain penetration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination