CN108277926A - Slurry anchor connection part with detection hole and grouting plumpness detection method and benefit paste-making method - Google Patents
Slurry anchor connection part with detection hole and grouting plumpness detection method and benefit paste-making method Download PDFInfo
- Publication number
- CN108277926A CN108277926A CN201810097012.9A CN201810097012A CN108277926A CN 108277926 A CN108277926 A CN 108277926A CN 201810097012 A CN201810097012 A CN 201810097012A CN 108277926 A CN108277926 A CN 108277926A
- Authority
- CN
- China
- Prior art keywords
- slurry
- bellows
- grouting
- connection part
- detection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002002 slurry Substances 0.000 title claims abstract description 189
- 238000001514 detection method Methods 0.000 title claims abstract description 127
- 238000000034 method Methods 0.000 title claims abstract description 33
- 230000008901 benefit Effects 0.000 title claims abstract description 21
- 239000000523 sample Substances 0.000 claims abstract description 63
- 239000011440 grout Substances 0.000 claims abstract description 56
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 48
- 230000002262 irrigation Effects 0.000 claims abstract description 19
- 238000003973 irrigation Methods 0.000 claims abstract description 19
- 230000007547 defect Effects 0.000 claims abstract description 13
- 239000007788 liquid Substances 0.000 claims description 37
- 239000000463 material Substances 0.000 claims description 36
- 230000002787 reinforcement Effects 0.000 claims description 19
- 235000003642 hunger Nutrition 0.000 claims description 16
- 238000002347 injection Methods 0.000 claims description 12
- 239000007924 injection Substances 0.000 claims description 12
- 238000004519 manufacturing process Methods 0.000 claims description 11
- 235000013336 milk Nutrition 0.000 claims description 11
- 239000008267 milk Substances 0.000 claims description 11
- 210000004080 milk Anatomy 0.000 claims description 11
- 230000001276 controlling effect Effects 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 238000005553 drilling Methods 0.000 claims description 6
- 238000012797 qualification Methods 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 5
- 238000003825 pressing Methods 0.000 claims description 5
- 239000000284 extract Substances 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 230000008439 repair process Effects 0.000 abstract description 8
- 208000008918 voyeurism Diseases 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 19
- 238000012360 testing method Methods 0.000 description 9
- 229920002472 Starch Polymers 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 235000019698 starch Nutrition 0.000 description 6
- 239000004568 cement Substances 0.000 description 4
- 238000011065 in-situ storage Methods 0.000 description 4
- 239000000047 product Substances 0.000 description 4
- 239000008107 starch Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000000605 extraction Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000007711 solidification Methods 0.000 description 3
- 230000008023 solidification Effects 0.000 description 3
- 238000013016 damping Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000010412 perfusion Effects 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000009955 starching Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 201000004569 Blindness Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001066 destructive effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000005429 filling process Methods 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000012263 liquid product Substances 0.000 description 1
- 244000144985 peep Species 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000013055 pulp slurry Substances 0.000 description 1
- 238000004445 quantitative analysis Methods 0.000 description 1
- 230000035807 sensation Effects 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/161—Protective caps for the ends of reinforcing bars
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F23/00—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
- G01F23/22—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water
- G01F23/28—Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water by measuring the variations of parameters of electromagnetic or acoustic waves applied directly to the liquid or fluent solid material
- G01F23/284—Electromagnetic waves
- G01F23/292—Light, e.g. infrared or ultraviolet
- G01F23/2921—Light, e.g. infrared or ultraviolet for discrete levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Electromagnetism (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Thermal Sciences (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of the slurry anchor connection part with detection hole and grouting plumpness detection method and benefit paste-making method.The slurry anchor connection part uses pre-buried bellows pore-forming, bellows surface to be provided with slurry outlet and grout hole, and bellows upper end is equipped with plugging plate, detection hole is provided on plugging plate.The grouting plumpness detection method includes:The probe pipeline of industrial endoscope and water filling hose are stretched into bellows interior from detection hole, grouting plumpness is determined to peeping water filling in the grouting defect progress of bellows interior by the cooperation of industrial endoscope, syringe and water filling hose.The benefit paste-making method includes:It drills to pulp channel, pulp channel is made to penetrate through, supplementary irrigation slurry is carried out from pulp channel, from sense channel pulp.Slurry anchor connection part provided by the invention with detection hole is reasonable for structure, easily prepared, and detection hole can realize that a hole is dual-purpose, and subsequent detection is facilitated to repair;The method of the invention has the advantages that measuring speed is fast, precision is high, overall cost is low.
Description
Technical field
The present invention relates to assembled architecture fields, and in particular to a kind of slurry anchor connection part with detection hole and grouting are full
It spends detection method and mends paste-making method.
Background technology
Prefabricated assembled concrete structure has construction speed as a kind of structure type meeting industrialized production
Degree is fast, labor intensity is low, noise pollution and wet construction is few and the advantages such as product quality is easy to control, it has also become domestic and international construction industry
The main flow direction of development.
In assembled arthitecutral structure, especially in prefabricated concrete structure, component connection is to ensure that structure is whole
The key node of quality.It is the common bar connecting form in prefabricated concrete structure that reinforcing bar, which starches anchor overlap joint connection, starches anchor
It overlaps and is connected as concealed work, the plumpness of strength cement-based grouting material directly influences assembly concrete knot in slurry anchor connection part
The quality and safety of structure.But may be because personnel's lack of skill, misoperation in work progress or lack a sense of responsibility,
Spillage, running pulp phenomenon is caused to happen occasionally, the appearance of this phenomenon has seriously affected grouting quality, the feelings of " filling discontented " occurs
Condition causes fatal constructional deficiency.Therefore, it the detection method of strength cement-based grouting material plumpness and is being sent out in slurry anchor connection part
Benefit paste-making method when now grouting is insufficient is building trade extensive concern and urgent problem to be solved.
The detection method of the plumpness of slurry anchor connection part grouting at present is broadly divided into member exterior nondestructive determination and inside is pre-
The method for burying sensor.
Member exterior lossless detection method is mainly supercritical ultrasonics technology, Impact echo and x-ray method.Due to slurry anchor connection
Structure replaces for multilayer dielectricity, and detection environment is complicated, and strength cement-based grouting material is relatively thin in radial thickness, generally 10 ㎜~14
㎜, although supercritical ultrasonics technology and Impact echo to a certain extent it can be found that the uncompacted situation of grouting, to grout compartment and
The interface of non-grout compartment judges not accurate enough, can't be applied to engineering practice at present.X-ray method can more clearly judge
The interface of grout compartment and non-grout compartment inside single duct, but specimen thickness when its effective detection has apparent limitation.
It is more mature at present in internal pre-buried sensor method to be detected for pre-buried sensor DAMPED VIBRATION METHOD, it is grasped in grouting
Damping vibration sensor is embedded in the bottom of slurry outlet before making, in filling process and grouting material initial set advance row amplitude with
Energy value real-time testing judges whether sensor is coated by grouting material by checking the amplitude decay situation of sensor signal,
To determine whether grouting is full closely knit.But this method has the shortcomings that following three:(1) can only qualitative detection, can not to grouting
The turgor of material carries out quantitative analysis, and difficulty is brought for the result judgement in later stage;(2) damping vibration sensor must fill
It is installed in place before slurry construction, sensor is once embedded to and cannot reuse, if complete to all slurry anchor connection parts in engineering
Portion's placement sensor, later stage are taken a sample test at random, then testing cost is excessively high, each side is difficult to receive, if before grouting construction
It arranges that a limited number of sensors, construction party learn test point in advance according to sensing station at random, will be directed to known
Test point well construction finally loses the meaning inspected by random samples at random, and has still buried security risk.(3) it is painted in progress
When construction, the sensor for stretching out wall part must be cut off, it is time-consuming and laborious to ensure the planarization of wall.
In addition, when both the above detection method carries out late detection after grouting material solidification, even if finding slurry anchor connection part
Grouting is not filled, can not also be carried out in-situ repair, can only be replaced entire prefabricated components or underproof slurry anchor connection part is picked chisel
Out reinforcement welding is used to connect, is then repaired with new concrete or strength cement-based grouting material to picking the concrete chiseled out.
This method for repairing and mending can not only result in waste of resources, and can also influence the progress of next process, cause construction delay.
Publication No. is that the Chinese patent literature of CN106836657A, CN105865568A propose a kind of bar connecting use
Repair apparatus and method of the grout sleeve (or device) when being in the milk insufficient, and grouting defect non-destructive ration examining device,
Its essence is simply increase patching material input pipe, patching material efferent duct on grout sleeve (or slurry anchor connection part)
Road, detection liquid input tube road, detection liquid output pipe road amount to four newly-increased pipelines, and when Site Detection then utilizes input liquid
Body volume measuring instrument, output liquid volume measuring instrument and water supply installation will input the body of the volume and output liquid of liquid
Product, which makes the difference, obtains the liquid volume being trapped in grout sleeve, to judge grouting material plumpness situation, if grouting insatiable hunger
It is full, patching material is injected into grout sleeve (or slurry anchor connection part) by patching material input channel using grouter, and
The detection liquid displacement that will be left in grout sleeve (or slurry anchor connection part) comes out, and needs in the patching material output channel
Outlet sampled at times, until patching material output channel stablize discharge patching material density and to grouting cover
The density of injection patching material quite or when reaching setting density stops repairing in cylinder.Above-mentioned apparatus and method, which seem, simply may be used
Row, there are in fact following disadvantage and can lead to the erroneous judgement of testing result:(1) originally to grout sleeve (or slurry anchor connection part)
For body, four holes are added above slurry outlet for plugging four pipelines, the number of openings is excessively likely to result in grouting
The decline of sleeve (or slurry anchor connection part) mechanical property, brings major safety risks.(2) for the prefabricated components manufacturing,
The various pipes added on sleeve (or slurry anchor connection part) are excessive, and original grout lines and pulp pipeline will have the six roots of sensation in addition
Pipeline sleeve (or the slurry anchor connection part) position of centralized arrangement in prefabricated components simultaneously, if it is double sleeve (or double slurry
Anchor connector) then number of tubes will also be double, and this, which will undoubtedly vibrate to concreting, brings very big inconvenience, to influence
Production efficiency and component quality.(3) field detecting device is complicated, input liquid volume metrical instrument, output liquid volume metering
The device contexts assembly and adjustment such as instrument and water supply installation is cumbersome and inconvenient to carry.(4) quantitative detecting method is not associated with work
Cheng Shiji, there may be large errors for testing result, be easy to cause erroneous judgement;The above method by be trapped in grout sleeve (or slurry
Anchor connector) in liquid volume come judge grouting turgor, this partially liq do not crossed slurry outlet and be full of sleeve
The cavity area in cavity area and pulp pipeline in (or slurry anchor connection part) has been in the milk since grouting material viscosity is larger
Cheng Hou, grout outlet block tightly, even if the stream of slurry in sleeve (or slurry anchor connection part) is empty, in the pulp pipeline of horizontal direction
Still can there are grouting materials, but the final form of grouting material can not determine in pulp pipeline, i.e. cavity in pulp pipeline
The volume in region is unknown, and the above method is directly measured with the liquid volume being trapped in grout sleeve (or slurry anchor connection part)
The not turgor of grouting, does not consider the volume metering error that remaining grouting material is brought in pulp pipeline, it is easy to cause to miss
Sentence.(5) instead of selection will not carry out benefit slurry again after detection liquid extraction when mending slurry, be set by patching material by liquid is detected
It swaps out;When the above-mentioned repair apparatus of onsite application and method, patching material output channel stablize discharge patching material density without
Method fast and accurately detects, and the lasting benefit slurry of blindness be easy to cause the waste of grouting material, increases cost.
Invention content
It is full the purpose of the present invention is in view of the above technical problems, providing a kind of slurry anchor connection part with detection hole and grouting
Full scale detection method and benefit paste-making method, the slurry anchor connection part is reasonable for structure, easily prepared, and detection hole can realize that a hole is dual-purpose, side
Just subsequent detection is repaired, and there is extensive market prospects and promotional value, detection method provided by the invention to have measuring speed
Soon, the advantage that precision is high, overall cost is low, benefit paste-making method provided by the invention can carry out in situ repair after grouting material solidification
It mends.
In order to solve the above technical problem, the present invention provides a kind of slurry anchor connection part with detection hole is used for levels
The Vertical bar connection of prefabricated components, including bellows, the bellows are arranged in the first prefabricated components vertical reinforcement side,
The bellows upper end is equipped with plugging plate, and the bellows lower end head is set as being open, and the bellows is set in by opening
On second prefabricated components vertical reinforcement, the bellows surface is disposed with slurry outlet and grout hole from top to bottom, it is described go out
Slurry hole is connected to outside the first prefabricated components by grout outlet and forms pulp channel, and the grout hole is connected to by grout pipe
Grouting channel is formed outside first prefabricated components, passes through perfusion high intensity contraction-free grouting concrete and the second prefabricated structure in bellows
Part Vertical bar connection is provided with detection hole on the plugging plate, and the detection hole is connected to the first prefabricated structure by detection pipe
Sense channel is formed outside part.
Further, the detection pipe be linear hollow pipe, by it is oblique set up detection hole is prefabricated with first
Member exterior is connected to.
Further, the sense channel is provided with rubber stopper in one end of detection hole, and the rubber stopper is prefabricated
It is filled in component manufacturing process.
The detection method of slurry anchor connection part grouting plumpness of the kind with detection hole, including peeped in slurry anchor connection part, industry
Mirror, syringe, water filling hose and rubber stopper;
The slurry anchor connection part is used for the Vertical bar connection of levels prefabricated components, and slurry anchor connection part includes bellows,
In the first prefabricated components vertical reinforcement side, the bellows upper end is equipped with plugging plate, the ripple for the bellows setting
Pipe lower end is set as being open, and the bellows is set in by opening on the second prefabricated components vertical reinforcement, the bellows table
Face is disposed with slurry outlet and grout hole from top to bottom, and the slurry outlet is connected to by grout outlet outside the first prefabricated components
Portion forms pulp channel, and the grout hole is connected to outside the first prefabricated components by grout pipe and forms grouting channel, bellows
It is interior by the way that high intensity contraction-free grouting concrete and the second prefabricated components Vertical bar connection is perfused, be provided with inspection on the plugging plate
Gaging hole, the detection hole are connected to outside the first prefabricated components by detection pipe and form sense channel;
The detection pipe is linear hollow pipe, will be outside detection hole and the first prefabricated components by oblique set up
Connection;
The rubber stopper is arranged in prefabricated components manufacturing process in the sense channel of slurry anchor connection part, and is located at
Close to one end of detection hole;
The industrial endoscope includes probe pipeline, and the probe pipeline both ends are separately connected endoscope host and interior peep
Mirror is popped one's head in;
The dispensing end of the water filling hose and syringe connects;
Detection method includes the following steps for it:
A, after the slurry anchor connection part grouting being preset in prefabricated components terminates and cures, by the rubber in sense channel
Plug takes out;
B, and then by the endoscope probe of industrial endoscope it is stretched into from sense channel, by the control to endoscope probe,
The bellows interior grouting situation for observing endoscope probe shooting, when slurry face height is more than or equal to slurry outlet bottom
When height, as full grouting, grouting plumpness is determined as qualification;When slurry face height is less than the height of slurry outlet bottom,
As insatiable hunger full irrigation is starched, and need to be continued grouting plumpness and quantitatively be detected;
C, it when being starched for insatiable hunger full irrigation, first passes through syringe and extracts detection liquid, water filling hose is then connected to injection
On the dispensing end of device, and syringe is pressed, the liquid in syringe is made to enter in water filling hose, is discharged in water filling hose end
When, stop pressing, by initial capacity in calibration record syringe, water filling hose is then stretched into bellows from sense channel
It is interior, syringe is pressed again, is made in liquid injection bellows, liquid height is checked by industrial endoscope, when liquid reaches out
Starch hole bottom height when, stop pressing, and by calibration record syringe inject after capacity, initial capacity with injection after
The difference of capacity is the water injection rate of syringe, as filling defect capacity, the standard grout amount and filling defect of slurry anchor connection part
The difference of capacity is practical grouting quantity, and the ratio between practical grouting quantity and the standard grout amount of slurry anchor connection part are that practical grouting is full
Full scale;
D, practical grouting plumpness is compared with grouting plumpness Con trolling index, if practical grouting plumpness more than etc.
In grouting plumpness Con trolling index, then still it is determined as qualification, if practical grouting plumpness is less than grouting plumpness Con trolling index,
Then it is determined as unqualified;
E, water filling hose is stretched into the liquid in bellows, then pull syringe, liquid is extracted out, restore defect
Cavity completes detection.
Further, before calculating grouting plumpness, the advanced quasi- grouting quantity calibration of rower takes one section of bellows sample, wave
The length of line pipe sample is more than the height of grout outlet bottom in slurry anchor connection part, to bellows sample sealed bottom and by ripple
Pipe sample is placed vertically, and then to bellows sample interior water filling, when reaching, slurry outlet bottom in slurry anchor connection part is corresponding
When height, bellows sample interior water is measured, bellows sample capacity is obtained, it is pre- that bellows sample capacity is subtracted second
Component vertical reinforcement processed stretch into bellows and positioned at grout outlet bottom level with the volume of lower part to get to standard grout
Amount;
Wherein, bellows sample is consistent with the bellows model used in slurry anchor connection part.
Further, using measurer to bellows sample interior water filling, bellows sample is obtained by gage dial and is held
Amount.
It further, will be in sense channel before the slurry anchor connection part grouting end and initial set being preset in prefabricated components
Rubber stopper take out, the endoscope probe of industrial endoscope is stretched into from sense channel then, passes through the control to endoscope probe
System, the bellows interior grouting situation of observation endoscope probe shooting, when slurry face height is more than or equal to slurry outlet bottom
Height when, as full grouting;When slurry face height be less than slurry outlet bottom height when, as insatiable hunger full irrigation starch, when for
When insatiable hunger full irrigation is starched, rubber stopper is got back into sense channel, continues to be in the milk from grouting channel, observation pulp channel, pulp channel
When inside having slurry spilling, as mends slurry and terminate.
Further, when the end that the second prefabricated components vertical reinforcement stretches into bellows is not coated by grouting material completely
When, the bellows interior reinforcement location that can be shot by observing endoscope probe judges whether reinforcing bar requires foot according to the rules
In long insertion connector.
A kind of benefit paste-making method of the slurry anchor connection part with detection hole, when the slurry anchor connection part being preset in prefabricated components fills
After slurry terminates and cures, include the following steps:It is drilled first to pulp channel using drilling device, by cured slurry
It smashes and clears up, pulp channel is made to penetrate through, then supplementary irrigation slurry is carried out from pulp channel, when slurry is discharged from sense channel
It completes to mend slurry work.
Beneficial effects of the present invention:
1, the slurry anchor connection part with detection hole only adds a detection hole above the slurry outlet of traditional slurry anchor connection part,
Not only it can guarantee the mechanical property of slurry anchor connection part entirety, but also will not make troubles the manufacturing process of prefabricated components, and almost
The cost of manufacture of prefabricated components is not increased.
2, newly-increased detection hole may be implemented that a hole is dual-purpose, can not only be used for detection device when the detection of grouting material plumpness
Stretch into channel, can also be used as be in the milk it is not full in the case of carry out mend slurry gas vent (slurry outlet).
3, field detecting device is light and easy to operate, and detection method is convenient, and common testing staff is after simple training
It can be on duty.
4, live randomness detection may be implemented in the present invention, and need to only take out the rubber stopper in sense channel can carry out
Detection, without arranging measuring point in advance before grouting construction, virtually increases random checking dynamics, advantageously ensures that reinforcing bar
Starch quality and the safety of anchor overlap joint connection.
5, the situation inside slurry anchor connection part can directly be reflected using endoscope, qualitative detection turgor, and
Photo can be attached on examining report with film recording, increase the intuitive of examining report;Water flood is peeped using interior, it can
With the quantitative turgor for detecting grouting, increase the public trust and authority of examining report.
6, detection method of the invention, by the progress of endoscopic observation water filling, is finally filled to when carrying out water filling detection
Until slurry outlet bottom, so as to avoid the error brought of uncertainty of pulp pipeline inner cavity body product.
7, the not full slurry anchor connection part that is in the milk found for late detection, it is only necessary to drilling device in slurry outlet
Place drills, and grouting material disintegrating slag is cleared up in duct while drilling until slurry anchor connection part inner cavity, using slurry outlet as benefit
Slurry-feeding hole when slurry, using detection hole as the gas vent (slurry outlet) mended when starching, you can carry out in-situ repair.Before repairing
Liquid extraction will be detected by syringe and water filling hose, it is only necessary to just can reach connection after directly filling up the gap that do not fill
It is required that saving grouting material.
8, during grouting construction, or before grouting material initial set, unit in charge of construction or supervisor can also use the present invention's
Method carries out qualitative detection to grouting quality, if finding, grouting is not full, still can utilize original grout hole and pulp
Hole carries out benefit slurry, improves grouting quality.
Description of the drawings
Fig. 1 is the slurry anchor connection part schematic diagram of the present invention;
Fig. 2 is bellows schematic diagram of the present invention;
Structural schematic diagram when Fig. 3 is standard grout of the present invention;
Fig. 4 is the schematic diagram when present invention does not fill slurry and water filling detection;
Schematic diagram when Fig. 5 is spillage of the present invention and water filling detection;
Fig. 6 is flow diagram of the present invention.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments, so that those skilled in the art can
To more fully understand the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
Shown in referring to Figures 1 and 2, an embodiment of the slurry anchor connection part of the invention with detection hole is pre- for levels
The Vertical bar connection of component processed, including bellows 1, bellows are arranged in 2 side of the first prefabricated components vertical reinforcement, ripple
Pipe upper end is equipped with plugging plate 3, and bellows lower end head is set as opening 4, and bellows is set in the second prefabricated components by opening and erects
To on reinforcing bar 5, bellows surface is disposed with slurry outlet 6 and grout hole 7 from top to bottom, and slurry outlet is connected by grout outlet 8
Pulp channel is formed outside to the first prefabricated components, grout hole is connected to be formed outside the first prefabricated components by grout pipe 9 and be filled
Channel is starched, by being perfused high intensity contraction-free grouting concrete and the second prefabricated components Vertical bar connection in bellows, on plugging plate
It is provided with detection hole 10, detection hole is connected to outside the first prefabricated components by detection pipe 11 and forms sense channel, and inspection is passed through
The grouting situation in bellows can be observed by surveying channel, and can be surveyed to grouting plumpness by sense channel
Amount.
Due to slurry anchor connection part of the present invention, exist between the plugging plate at the top of grout outlet bottom and bellows
Certain distance terminates the part after grout outlet blocks in grouting and forms closed cavity, and follow-up grouting material can not continue into, most
End form leaves enough operating spaces in bellows interior at permanent cavity, for detection device.
In one embodiment, above-mentioned detection pipe is linear hollow pipe, forms a linear sense channel, is convenient for
Hard objects stretch into detection pipe, will be connected to outside detection hole and the first prefabricated components by oblique set up.
Sense channel is provided with rubber stopper in one end of detection hole, and rubber stopper is filled in prefabricated components manufacturing process
Enter, is formed and effectively blocked, slurry is avoided to enter sense channel.
It is a kind of standard type after slurry curing with reference to shown in Fig. 3.
Wherein, detection hole, which connect the sense channel to be formed with detection pipe, can observe grouting situation in bellows, and can
To be measured to grouting plumpness by detection hole.There are one the quantity of the detection hole, which is opened in plugging plate
On, that is, the original mechanical property for not destroying slurry anchor connection part at the top of bellows is set, it also being capable of more intuitive and side
The observation bellows interior situation of convenient to operate.
With reference to shown in Fig. 4, when worker lacks a sense of responsibility, there is the problems such as construction is lazy, grouting does not complete just to be stopped in advance
When operation, slurry exists only in the bellows of grout hole and slurry outlet bottom part down, and slurry face height A can not reach pulp
Slurry is also not present in hole bottom margin, pulp channel, is a kind of insatiable hunger full irrigation slurry, existing defects.
Referring to Figure 5, it is fluidised form at grouting construction initial stage because of slurry, when the first prefabricated components and the second prefabricated structure
When horizontal joint (sitting pulp layer) between part does not carry out peripheral seal work, there are spillage risks for slurry, when slurry spillage,
Slurry top surface in bellows can sink, and slurry face height A can not also reach slurry outlet bottom margin, form another insatiable hunger
Full irrigation is starched, existing defects risk.
With reference to shown in Fig. 6, in order to avoid the appearance of the not full problem of above-mentioned grouting, a kind of slurry anchor with detection hole is provided
Connector be in the milk plumpness detection method, including above-mentioned slurry anchor connection part, industrial endoscope, syringe, water filling hose and
Rubber stopper;
In grouting, first have to ensure that detection hole can not be blocked by slurry, rubber stopper is in prefabricated components manufacturing process
It is arranged in the sense channel of slurry anchor connection part, and positioned at close to one end of detection hole;Therefore when slurry is in perfusion, go out
Negative pressure space can be formed in bellows above slurry hole, slurry will not pour in detection hole, and the smooth of sense channel has been effectively ensured
It is logical.
Industrial endoscope includes probe pipeline, and probe pipeline both ends are separately connected endoscope host and endoscope probe;
The dispensing end of water filling hose and syringe connects;
Terminate and be detected after curing specifically, this method is the slurry anchor connection part grouting being preset in prefabricated components,
Steps are as follows for its detection method:
The rubber stopper in detection hole is taken out first;Then the endoscope probe of industrial endoscope is stretched from sense channel
Enter, passes through the control to endoscope probe, the bellows interior grouting situation of observation endoscope probe shooting, the picture of shooting
It can be used as the foundation that subsequent detection unit carries out result evaluation as the image observed in real time, photo be attached to inspection
It observes and predicts on announcement, increases the intuitive and authenticity of examining report;When bellows interior slurry face height is more than or equal to pulp
When the height of hole bottom, as full grouting, grouting plumpness is determined as qualification;When slurry face height is less than slurry outlet bottom
Height when, as insatiable hunger full irrigation starch, need to continue be in the milk plumpness quantitatively detect;
Wherein, the bellows interior reinforcement location that can also be shot using endoscope probe, when the second prefabricated components are vertical
When the end that reinforcing bar stretches into bellows is not coated by grouting material completely, you can to observe reinforcing bar, whether judge reinforcing bar with this
It requires according to the rules in the insertion connector of foot length.
It is judged as that insatiable hunger full irrigation is starched after above-mentioned detection, and grouting plumpness need to be carried out when quantitatively detecting, first passes through syringe
Detection liquid is extracted, then water filling hose is connected on the dispensing end of syringe, and press syringe, is made in syringe
Liquid enters in water filling hose, when water filling hose end is discharged, stops pressing, this operation can avoid empty in water filling hose
Setting leads to the generation of water filling error, improves accuracy of detection;It is then that water filling is soft by initial capacity in calibration record syringe
Pipe is stretched into from sense channel in bellows, presses syringe again, is made in liquid injection bellows, is looked by industrial endoscope
It sees liquid height, the uncertainty that pulp pipeline inner cavity body accumulates is avoided to bring measurement error, with reference to shown in Fig. 4 and Fig. 5, when
When liquid reaches the height of slurry outlet bottom, stop pressing, and by capacity after being injected in calibration record syringe, it is initial to hold
Amount and the water injection rate that the difference of capacity after injection is syringe, as filling defect capacity, the standard grout amount of slurry anchor connection part
Difference with filling defect capacity is practical grouting quantity, and the ratio between practical grouting quantity and the standard grout amount of slurry anchor connection part are
Practical grouting plumpness, which is easy to operate, high certainty of measurement, and carries and use convenient for building-site, testing cost pole
It is low;
In order to be more accurate obtain detection data, before calculating and being in the milk plumpness, the quasi- grouting quantity calibration of advanced rower,
One section of bellows sample is taken, the length of bellows sample is more than the height of grout outlet bottom in slurry anchor connection part, to bellows sample
Product sealed bottom simultaneously places bellows sample vertically, then to bellows sample interior water filling, when reaching in slurry anchor connection part
When the corresponding height in slurry outlet bottom, bellows sample interior water is measured, bellows sample capacity is obtained, by bellows
Sample capacity subtracts the second prefabricated components vertical reinforcement and stretches into bellows and positioned at grout outlet bottom level with the body of lower part
Product is to get to standard grout amount;
Wherein, bellows sample is consistent with the bellows model used in slurry anchor connection part, accurate to ensure to compare
Property.
Measurement can be compared with grouting plumpness Con trolling index, if practical grouting is full after obtaining practical grouting plumpness
Full scale is more than or equal to grouting plumpness Con trolling index, then is still determined as qualification, if practical grouting plumpness is less than grouting plumpness
Con trolling index, then be determined as it is unqualified, compared by the calculating of plumpness can avoid erroneous judgement situation appearance, increase detection
The public trust of report and authority;
Live randomness detection may be implemented in above-mentioned detection method, need to be by the taking-up of the rubber stopper in sense channel only
It can be detected, without arranging measuring point in advance before grouting construction, virtually increase random checking dynamics, there is no
The problem of causing construction party to ignore grouting quality except measuring point because arranging measuring point in advance, (grouting quality except measuring point could not
Detection), advantageously ensure that quality and the safety of reinforcing bar slurry anchor overlap joint connection.
And in order to ensure the durability subsequently used, water filling hose is stretched into the liquid in bellows, then pull
Syringe extracts liquid out, restores defect cavity, completes detection, avoids the liquid holdup of injection to bellows and and stretches
The the second prefabricated components vertical reinforcement entered in bellows causes quality to influence;
It is above-mentioned when to bellows water filling, measurer may be used to bellows sample interior water filling, obtained by gage dial
It is convenient and efficient to bellows sample capacity.
It when above-mentioned detection method is determined as unqualified, can carry out studying for a second time courses one has flunked operation, in the benefit paste-making method of the present invention
An embodiment in, carry out benefit slurry using following steps:It is drilled to pulp channel using drilling device, is bored on one side first
Grouting material disintegrating slag in duct is cleared up in hole on one side until ripple tube cavity, slurry-feeding hole when slurry outlet is starched as benefit, by detection hole
As the gas vent (slurry outlet) mended when starching, you can carry out in-situ repair, then carry out supplementary irrigation slurry from pulp channel, work as slurry
It completes to mend slurry work when being discharged from sense channel.Liquid extraction will be detected by syringe and water filling hose before repairing,
It only needs just to can reach connection request after directly filling up the gap that do not fill, saves grouting material.
Certainly this mends paste-making method and can also be used before not detecting plumpness, when construction party voluntarily judges very likely not
It when qualified, is directly studied for a second time courses one has flunked using above-mentioned benefit paste-making method, to achieve the effect that high quality is built.
And it due to the design structure of this slurry anchor connection part, is tied when the slurry anchor connection part being preset in prefabricated components is in the milk
After beam and solidification, is drilled first to pulp channel using drilling device, cured slurry is smashed and cleared up, pulp is made
Channel penetrates through, and then carries out supplementary irrigation slurry from pulp channel, the sense channel of the slurry anchor connection part is located at top, therefore works as slurry
It completes to mend slurry work when being discharged from sense channel, above-mentioned design, which effectively simplifies, repairs step, simple operations, and repairing quality is big
It is big to improve.
In another embodiment, the present invention or unit in charge of construction or supervisor also workable method, it is pre- when being preset in
Slurry anchor connection part grouting in component processed terminates and before initial set, the rubber stopper of sense channel is taken out, then by industrial endoscope
Endoscope probe stretched into from sense channel, pass through the control to endoscope probe, observation endoscope probe shooting bellows
Inside grouting situation, when slurry face height is more than or equal to the height of slurry outlet bottom, as full grouting;Work as slurry
When face height is less than the height of slurry outlet bottom, as insatiable hunger full irrigation is starched, and when being starched for insatiable hunger full irrigation, rubber stopper is got back into inspection
It surveys in channel, continues to be in the milk from grouting channel, observe pulp channel, when having slurry spilling in pulp channel, as mend slurry knot
Beam.This method enables to unit in charge of construction or management list voluntarily to carry out qualitative detection to grouting quality, if finding grouting insatiable hunger
It is full, then benefit slurry still can be carried out using original grout hole and slurry outlet, improve grouting quality.
Above example is only to absolutely prove preferred embodiment that is of the invention and being lifted, protection scope of the present invention
It is without being limited thereto.Those skilled in the art on the basis of the present invention made by equivalent substitute or transformation, the present invention
Within protection domain.Protection scope of the present invention is subject to claims.
Claims (9)
1. a kind of slurry anchor connection part with detection hole is used for the Vertical bar connection of levels prefabricated components, which is characterized in that packet
Bellows is included, in the first prefabricated components vertical reinforcement side, the bellows upper end is equipped with plugging plate for the bellows setting,
The bellows lower end head is set as being open, and the bellows is set in by opening on the second prefabricated components vertical reinforcement, described
Bellows surface is disposed with slurry outlet and grout hole from top to bottom, and it is prefabricated that the slurry outlet by grout outlet is connected to first
Member exterior forms pulp channel, and the grout hole is connected to outside the first prefabricated components by grout pipe and forms grouting channel,
By the way that high intensity contraction-free grouting concrete and the second prefabricated components Vertical bar connection is perfused in bellows, it is arranged on the plugging plate
There are detection hole, the detection hole to be connected to outside the first prefabricated components by detection pipe and form sense channel.
2. the slurry anchor connection part with detection hole as described in claim 1, which is characterized in that the detection pipe is that linear is hollow
Pipe will be connected to by oblique set up outside detection hole and the first prefabricated components.
3. the slurry anchor connection part with detection hole as described in claim 1, which is characterized in that the sense channel is close to detection hole
One end in be provided with rubber stopper, the rubber stopper is filled in prefabricated components manufacturing process.
4. it is a kind of with detection hole slurry anchor connection part grouting plumpness detection method, which is characterized in that including slurry anchor connection part,
Industrial endoscope, syringe, water filling hose and rubber stopper;
The slurry anchor connection part is used for the Vertical bar connection of levels prefabricated components, and slurry anchor connection part includes bellows, described
In the first prefabricated components vertical reinforcement side, the bellows upper end is equipped with plugging plate for bellows setting, under the bellows
End is set as being open, the bellows by opening be set on the second prefabricated components vertical reinforcement, the bellows surface from
Slurry outlet and grout hole are disposed under, the slurry outlet is connected to outside the first prefabricated components by grout outlet and is formed
Pulp channel, the grout hole are connected to outside the first prefabricated components by grout pipe and form grouting channel, are passed through in bellows
High intensity contraction-free grouting concrete and the second prefabricated components Vertical bar connection is perfused, is provided with detection hole on the plugging plate, institute
It states detection hole and formation sense channel outside the first prefabricated components is connected to by detection pipe;
The detection pipe is linear hollow pipe, will be connected to outside detection hole and the first prefabricated components by oblique set up;
The rubber stopper is arranged in prefabricated components manufacturing process in the sense channel of slurry anchor connection part, and positioned at close to inspection
One end of gaging hole;
The industrial endoscope includes probe pipeline, and the probe pipeline both ends are separately connected endoscope host and endoscope is visited
Head;
The dispensing end of the water filling hose and syringe connects;
Detection method includes the following steps for it:
A, after the slurry anchor connection part grouting being preset in prefabricated components terminates and cures, the rubber stopper in sense channel is taken
Go out;
B, and then by the endoscope probe of industrial endoscope it is stretched into from sense channel, passes through the control to endoscope probe, observation
The bellows interior grouting situation of endoscope probe shooting, when slurry face height is more than or equal to the height of slurry outlet bottom
When, as full grouting, grouting plumpness is determined as qualification;When slurry face height is less than the height of slurry outlet bottom, as
Insatiable hunger full irrigation is starched, and need to be continued grouting plumpness and quantitatively be detected;
C, it when being starched for insatiable hunger full irrigation, first passes through syringe and extracts detection liquid, water filling hose is then connected to syringe
On dispensing end, and syringe is pressed, the liquid in syringe is made to enter in water filling hose, when water filling hose end is discharged, stopped
It only presses, by initial capacity in calibration record syringe, then stretches into water filling hose in bellows from sense channel, again
Syringe is pressed, makes in liquid injection bellows, liquid height is checked by industrial endoscope, when liquid reaches slurry outlet bottom
Height when, stop pressing, and pass through in calibration record syringe inject after capacity, initial capacity with injection after capacity difference
For the water injection rate of syringe, as filling defect capacity, the difference of the standard grout amount and filling defect capacity of slurry anchor connection part
For practical grouting quantity, the ratio between practical grouting quantity and the standard grout amount of slurry anchor connection part are practical grouting plumpness;
D, practical grouting plumpness is compared with grouting plumpness Con trolling index, if practical grouting plumpness is more than or equal to grouting
Plumpness Con trolling index, then be still determined as qualification, if practical grouting plumpness is less than grouting plumpness Con trolling index, is determined as
It is unqualified;
E, water filling hose is stretched into the liquid in bellows, then pull syringe, liquid is extracted out, restore defect cavity,
Complete detection.
5. the detection method of the slurry anchor connection part grouting plumpness with detection hole as claimed in claim 4, which is characterized in that
Before calculating grouting plumpness, the advanced quasi- grouting quantity calibration of rower takes one section of bellows sample, the length of bellows sample to be more than slurry
The height of grout outlet bottom in anchor connector is placed vertically to bellows sample sealed bottom and by bellows sample, then right
Bellows sample interior water filling measures bellows sample when reaching the corresponding height in slurry outlet bottom in slurry anchor connection part
Internal water obtains bellows sample capacity, and bellows sample capacity, which is subtracted the second prefabricated components vertical reinforcement, stretches into ripple
In pipe and positioned at grout outlet bottom level with the volume of lower part to get to standard grout amount;
Wherein, bellows sample is consistent with the bellows model used in slurry anchor connection part.
6. the detection method of the slurry anchor connection part grouting plumpness with detection hole as claimed in claim 5, which is characterized in that adopt
With measurer to bellows sample interior water filling, bellows sample capacity is obtained by gage dial.
7. the detection method of the slurry anchor connection part grouting plumpness with detection hole as claimed in claim 4, which is characterized in that when
The slurry anchor connection part grouting being preset in prefabricated components terminates and before initial set, the rubber stopper in sense channel is taken out, and then will
The endoscope probe of industrial endoscope is stretched into from sense channel, and by the control to endoscope probe, observation endoscope probe is clapped
The bellows interior grouting situation taken the photograph, when slurry face height is more than or equal to the height of slurry outlet bottom, as full filling
Slurry;When slurry face height is less than the height of slurry outlet bottom, as insatiable hunger full irrigation is starched, when being starched for insatiable hunger full irrigation, by rubber
It gets back into sense channel, continues to be in the milk from grouting channel, observe pulp channel, when having slurry spilling in pulp channel, as
Slurry is mended to terminate.
8. the detection method of the slurry anchor connection part grouting plumpness with detection hole as claimed in claim 4, which is characterized in that when
It, can be by observing endoscope when the end that second prefabricated components vertical reinforcement stretches into bellows is not coated by grouting material completely
The bellows interior reinforcement location of probe shooting, judges whether reinforcing bar requires in the insertion connector of foot length according to the rules.
9. a kind of benefit paste-making method of the slurry anchor connection part with detection hole, which is characterized in that when the slurry anchor being preset in prefabricated components
After connector grouting terminates and cures, include the following steps:It is drilled, will be cured to pulp channel using drilling device first
Slurry smash and clear up, make pulp channel penetrate through, then from pulp channel carry out supplementary irrigation slurry, when slurry from sense channel be discharged
When complete mend slurry work.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810097012.9A CN108277926B (en) | 2018-01-31 | 2018-01-31 | Slurry anchor connection part grouting plumpness detection method with detection hole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810097012.9A CN108277926B (en) | 2018-01-31 | 2018-01-31 | Slurry anchor connection part grouting plumpness detection method with detection hole |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108277926A true CN108277926A (en) | 2018-07-13 |
CN108277926B CN108277926B (en) | 2019-09-03 |
Family
ID=62807087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810097012.9A Active CN108277926B (en) | 2018-01-31 | 2018-01-31 | Slurry anchor connection part grouting plumpness detection method with detection hole |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108277926B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098468A (en) * | 2018-09-11 | 2018-12-28 | 上海市建筑科学研究院 | Supplementary irrigation method is injected in drilling for sleeve grouting defect |
CN109707109A (en) * | 2019-01-25 | 2019-05-03 | 上海市建筑科学研究院 | Sleeve supplementary irrigation regulation method based on different grouting depth of defect |
CN109750795A (en) * | 2019-01-18 | 2019-05-14 | 浙江大学 | A kind of grout sleeve with detection pipe and its be in the milk plumpness detection and benefit paste-making method |
CN110007007A (en) * | 2019-04-09 | 2019-07-12 | 湖南普奇地质勘探设备研究院(普通合伙) | A kind of detection method and device of bellows slip casting plumpness |
CN110455917A (en) * | 2019-08-22 | 2019-11-15 | 福建博海工程技术有限公司 | A kind of repairing concrete crack quality determining method |
CN110514263A (en) * | 2019-08-25 | 2019-11-29 | 唐昌辉 | Standard curve is established to the detection method of grout sleeve pulp noodle height |
CN113668898A (en) * | 2021-09-26 | 2021-11-19 | 昆山市建设工程质量检测中心 | Filling and renovation method for defect of air pocket type grouting in middle of sleeve |
CN116297018A (en) * | 2023-02-28 | 2023-06-23 | 广东省源天工程有限公司 | Method and device for detecting backfill material of deep water area of reservoir |
WO2024060372A1 (en) * | 2022-09-21 | 2024-03-28 | 中建三局科创产业发展有限公司 | Sleeve grouting plumpness detection system and detection method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100827610B1 (en) * | 2007-09-05 | 2008-05-23 | 와이앤케이텍 주식회사 | A grouting system and the method using endoscopy |
CN105865568A (en) * | 2016-04-12 | 2016-08-17 | 北京市建筑设计研究院有限公司 | Device for nondestructive quantitative detection of steel bar connecting grouting sleeve |
CN106677437A (en) * | 2017-01-20 | 2017-05-17 | 周建 | Rebar connecting grout sleeve with standby holes and sleeve connection quality detecting method |
CN106836657A (en) * | 2017-03-17 | 2017-06-13 | 北京市建筑设计研究院有限公司 | The repair apparatus and method of bar connecting grout sleeve or device when being in the milk not enough |
CN107288268A (en) * | 2017-06-27 | 2017-10-24 | 浙江大学 | Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint |
CN206928522U (en) * | 2017-06-20 | 2018-01-26 | 北京汇丰鸿信科技有限公司 | It is easy to check the grout sleeve of Grouted density |
CN207863312U (en) * | 2018-01-31 | 2018-09-14 | 昆山市建设工程质量检测中心 | Slurry anchor connection part with detection hole |
-
2018
- 2018-01-31 CN CN201810097012.9A patent/CN108277926B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100827610B1 (en) * | 2007-09-05 | 2008-05-23 | 와이앤케이텍 주식회사 | A grouting system and the method using endoscopy |
CN105865568A (en) * | 2016-04-12 | 2016-08-17 | 北京市建筑设计研究院有限公司 | Device for nondestructive quantitative detection of steel bar connecting grouting sleeve |
CN106677437A (en) * | 2017-01-20 | 2017-05-17 | 周建 | Rebar connecting grout sleeve with standby holes and sleeve connection quality detecting method |
CN106836657A (en) * | 2017-03-17 | 2017-06-13 | 北京市建筑设计研究院有限公司 | The repair apparatus and method of bar connecting grout sleeve or device when being in the milk not enough |
CN206928522U (en) * | 2017-06-20 | 2018-01-26 | 北京汇丰鸿信科技有限公司 | It is easy to check the grout sleeve of Grouted density |
CN107288268A (en) * | 2017-06-27 | 2017-10-24 | 浙江大学 | Endoscope detects the structure and its method of grouting behind shaft or drift lining plug-in type sleeve reinforced bar joint |
CN207863312U (en) * | 2018-01-31 | 2018-09-14 | 昆山市建设工程质量检测中心 | Slurry anchor connection part with detection hole |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098468A (en) * | 2018-09-11 | 2018-12-28 | 上海市建筑科学研究院 | Supplementary irrigation method is injected in drilling for sleeve grouting defect |
CN109750795A (en) * | 2019-01-18 | 2019-05-14 | 浙江大学 | A kind of grout sleeve with detection pipe and its be in the milk plumpness detection and benefit paste-making method |
CN109750795B (en) * | 2019-01-18 | 2024-04-19 | 浙江大学 | Grouting sleeve with detection pipe and grouting fullness detection and slurry supplementing method thereof |
CN109707109A (en) * | 2019-01-25 | 2019-05-03 | 上海市建筑科学研究院 | Sleeve supplementary irrigation regulation method based on different grouting depth of defect |
CN109707109B (en) * | 2019-01-25 | 2020-12-22 | 上海市建筑科学研究院 | Sleeve filling and renovating method based on different grouting defect depths |
CN110007007A (en) * | 2019-04-09 | 2019-07-12 | 湖南普奇地质勘探设备研究院(普通合伙) | A kind of detection method and device of bellows slip casting plumpness |
CN110455917A (en) * | 2019-08-22 | 2019-11-15 | 福建博海工程技术有限公司 | A kind of repairing concrete crack quality determining method |
CN110514263A (en) * | 2019-08-25 | 2019-11-29 | 唐昌辉 | Standard curve is established to the detection method of grout sleeve pulp noodle height |
CN113668898A (en) * | 2021-09-26 | 2021-11-19 | 昆山市建设工程质量检测中心 | Filling and renovation method for defect of air pocket type grouting in middle of sleeve |
WO2024060372A1 (en) * | 2022-09-21 | 2024-03-28 | 中建三局科创产业发展有限公司 | Sleeve grouting plumpness detection system and detection method |
CN116297018A (en) * | 2023-02-28 | 2023-06-23 | 广东省源天工程有限公司 | Method and device for detecting backfill material of deep water area of reservoir |
CN116297018B (en) * | 2023-02-28 | 2023-09-12 | 广东省源天工程有限公司 | Method and device for detecting backfill material of deep water area of reservoir |
Also Published As
Publication number | Publication date |
---|---|
CN108277926B (en) | 2019-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108331260B (en) | Half grout sleeve grouting plumpness detection method with detection hole | |
CN108277926B (en) | Slurry anchor connection part grouting plumpness detection method with detection hole | |
CN108152297B (en) | Inside peep the method for water flood detection half grout sleeve of reinforcing bar grouting plumpness | |
CN207863311U (en) | Half grout sleeve with detection hole | |
CN207866729U (en) | Inside peep the device of water flood detection half grout sleeve of reinforcing bar grouting plumpness | |
CN106088174B (en) | A kind of soft clay area diaphram wall seepage detection system | |
CN107574742A (en) | The minimally invasive processing method of road deep layer disease | |
CN108519306B (en) | Detection apparatus for closely knit degree of grout in grout sleeve | |
CN105527661A (en) | Detection and leakage blocking methods of concrete building water leakage | |
CN108508189A (en) | Seepage field and oscillator field coupling lead to the experimental rig and method of foundation pit destruction | |
CN107860528B (en) | Fill field isolating membrane blowby area block detection method and device | |
WO2020119468A1 (en) | Method for detecting grout plumpness of sleeve cylinder with single-sided ultrasound detection along grout outlet channel | |
CN108061592B (en) | A method of for half grout sleeve standard grout amount of quick field calibration reinforcing bar | |
CN109856143A (en) | A method of detection prefabricated concrete structure sleeve grouting quality | |
CN109030279A (en) | A kind of detection method of reinforcing bar grout sleeve grouting quality | |
CN110514736A (en) | A kind of monitoring device and its application method of assembled steel reinforced sleeve grouting compactness | |
CN114280234A (en) | Test device and method for quality control and effect evaluation in earthen site anchoring and reinforcing process | |
CN109827886A (en) | The impervious experimental method of cement concrete joint sealing material | |
CN110455678A (en) | A kind of packaged type bridges pier stud node Grouted density detection method | |
CN207863312U (en) | Slurry anchor connection part with detection hole | |
CN111912867B (en) | Grouting metal sleeve compactness detection device and method based on electromagnetic wave time domain reflection | |
CN108894259A (en) | A kind of method of ultrasound examination subway construction of diaphragm wall quality | |
CN216816399U (en) | Water-stopping effect test device of deep foundation pit water-stopping curtain | |
CN115897491A (en) | Embedded pipe earth-rock dam diaphragm wall structure and defect detection and repair method | |
CN103105333B (en) | In-situ test measuring system for cross-fault buried pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |