sound detecting
detecting pipe
wall
pipe
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810793591.0A
Other languages
Chinese (zh)
Inventor
贾建兵
张超兵
郝利斌
高山
刘艳龙
霍志刚
李玉平
张晶晶
张凯
张鑫鑫
郭峰
张佳琪
贾美玲
杨培勇
马占洲
吕亮
杜艳兵
王东岩
赵新平
李季
郭伟宏
王佳宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Huacheng Engineering Testing Co., Ltd.
TAIYUAN CITY TIANDINGHENG CONCRETE ADMIXTURES TECHNOLOGY DEVELOPMENT CO., LTD.
Original Assignee
Shanxi Huacheng Testing Engineering Co Ltd
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Huacheng Testing Engineering Co Ltd, TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical Shanxi Huacheng Testing Engineering Co Ltd
Priority to CN201810793591.0A priority Critical patent/CN108894259A/en
Publication of CN108894259A publication Critical patent/CN108894259A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention belongs to subway diaphram wall integrity detection field, specially a kind of method of ultrasound examination subway construction of diaphragm wall quality includes the following steps:(1)Coercion underground continuous wall steel reinforcement cage;(2)Arrange sound detecting pipe:Front two rows sound detecting pipe is arranged on steel reinforcement cage, the quantity of every row's sound detecting pipe is 3, and every row's sound detecting pipe is all equally spaced from setting, every width ground-connecting-wall 6 sound detecting pipes of total arrangement;(3)It transfers steel reinforcement cage and carries out in diaphram wall concreting;(4)Sound detecting pipe dredging, water filling and sealing:(5)It is put into energy converter in each sound detecting pipe, makes measuring point of each branch energy converter in each sound detecting pipe in same level;(6)Detection and data processing.For construction test detection, using this engineering method, it ensure that the reasonability and feasibility of testing inspection, improve the speed of testing inspection, provide guarantee for the quality of construction.

Description

A kind of method of ultrasound examination subway construction of diaphragm wall quality
Technical field
The invention belongs to subway diaphram wall integrity detection field, a kind of specially ultrasound examination subway underground connects The method of continuous wall construction quality.
Background technique
Diaphram wall is the periphery axis that foundation engineering uses chute forming machine along deep excavation project on the ground, in mud Under the conditions of retaining wall, a long and narrow deep trouth is excavated out, after clear slot, steel reinforcement cage is hung in slot, it is then underwater with tremie method placing Concrete builds up a unit groove section, so carries out paragraph by paragraph, builds up continuous armored concrete wall together in underground.Underground connects The effect of continuous wall has:1. earth-retaining acts on;2. the support as weight;3. the effect of intercepting water;4. antiseepage acts on.Therefore, wall coagulation The quality of soil is most important, if the defects of isolation, interlayer, folder mud, fracture occurs in wall concrete after construction, will lead to coagulation The integrality of soil is bad, phenomena such as percolating water or Lack of support occurs, seriously affects construction quality.Therefore, strict control is answered The construction quality of ground-connecting-wall, after ground-connecting-wall is constructed, the general integrality using supercritical ultrasonics technology detection wall concrete, but phase Pass technology is immature, should need to improve detection technique.
Summary of the invention
The present invention provides ultrasound examination subway underground continuous wall construction methods, are prevented using the construction of this engineering method because pre-buried The improper generation for leading to not detection or the inaccurate phenomenon of detection data of sound detecting pipe, has saved the increased construction cost because of detection With.
A kind of method of ultrasound examination subway construction of diaphragm wall quality, includes the following steps:
(1)Coercion underground continuous wall steel reinforcement cage;
(2)Arrange sound detecting pipe:Front two rows sound detecting pipe is arranged on steel reinforcement cage, the quantity of every row's sound detecting pipe is 3, every row's sounding Pipe is all equally spaced from setting, and front two rows sound detecting pipe or so is staggered or front two rows sound detecting pipe is arranged in rows, connects to every width Wall 6 sound detecting pipes of total arrangement;
(3)It transfers steel reinforcement cage and carries out in diaphram wall concreting;
(4)Sound detecting pipe dredging, water filling and sealing:Sound detecting pipe is dredged using reinforcing bar, go on smoothly detection can more;After dredging Plastic closures are filled the water and utilized in sound detecting pipe, prevent sundries from falling into;
(5)It is put into energy converter in each sound detecting pipe, by the way of marking sounding line, makes each branch energy converter in each sound detecting pipe In measuring point in same level;
(6)Detection and data processing:Energy converter detect and upload data in each measuring point, finally carries out to the data of upload Analysis and judgement.
This engineering method has the following advantages that:
(1)6 sound detecting pipes are buried, ground-connecting-wall detection range all standing, no dead angle makes detection data more really reflect wall Integrality.
(2)Sound detecting pipe is dredged by the way of sound detecting pipe water filling, and with reinforcing bar, go on smoothly test can more.
(3)By the way of marking sounding line, make each branch energy converter measuring point in same level.
For ground-connecting-wall detection of construction quality, using this engineering method, the accuracy and feasibility of testing inspection ensure that, The speed of testing inspection is improved, provides guarantee for the quality of construction.
Detailed description of the invention
Fig. 1 is existing sound detecting pipe " Z " font arrangement schematic diagram.
Fig. 2 is existing sound detecting pipe rectangular arrangement schematic diagram.
Fig. 3 is that this engineering method sound detecting pipe is dislocated arrangement schematic diagram.
Fig. 4 is this engineering method sound detecting pipe same column arrangement schematic diagram.
Specific embodiment
In conjunction with attached drawing, each key points for operation of this construction are described in detail.
The arrangement of sound detecting pipe:
The length of one width of subway ground-connecting-wall is generally 6m, generally arranges 4 soundings in construction site ground-connecting-wall ultrasound detection at present Pipe, at " Z " font or rectangular arrangement, " Z " font arrangement is as shown in Figure 1, rectangular arrangement mode is as shown in Figure 2.By dividing Analyse the arrangement of the above sound detecting pipe, it is found that subway ultrasonic wave ground-connecting-wall integrity detection haves the shortcomings that maximum at present For:Since the length of a width ground-connecting-wall is generally 6m, and the detecting distance of ultrasonic wave is usually no more than 2.5m, as above cloth Sound detecting pipe is set, since sound detecting pipe plane diagonal distance is too big, leads to not the mixed of the diagonal for detecting four sound detecting pipes Solidifying soil property amount, the range very little of ground-connecting-wall wall integrity detection are not achieved the 1/2 of whole picture ground-connecting-wall area, detection range with Outer there are biggish check frequencies, and there is great loopholes for the quality control aspect of ground-connecting-wall.For above situation, this engineering method Research embedding 6 sound detecting pipes in diaphram wall, plane diagonal distance is suitable, can detect the diagonal of sound detecting pipe Area of detection is significantly greatly increased in concrete quality, this engineering method, and detection range is effectively ensured, and reaches all standing, reinforces to wall coagulation Shown in the control of native integrality, guarantee ground-connecting-wall construction quality, sound detecting pipe layout drawing 3 and Fig. 4.
Dredging, water filling and the sealing of sound detecting pipe:It should be greater than the diameter of energy converter, and according to the caliber of sound detecting pipe to reduce number Make caliber slightly larger than transducer diameter according to error, therefore the reinforcing bar of Φ 28mm is used to dredge sound detecting pipe, makes detection can more smoothly It carries out.It is filled the water in sound detecting pipe after dredging and utilizes plastic closures.
It is put into energy converter and makes it in the same horizontal line:By the way of marking sounding line, make each branch energy converter each In measuring point same level in sound detecting pipe.
Detection and data processing:Energy converter detect and upload data in each measuring point, is sentenced using velocity of sound criterion, PSD According to, wave amplitude criterion, dominant frequency criterion, actual measurement the methods of acoustic waveform, carry out data analysis and judgement.

Claims (1)

1. a kind of method of ultrasound examination subway construction of diaphragm wall quality, it is characterised in that include the following steps:
(1)Coercion underground continuous wall steel reinforcement cage;
(2)Arrange sound detecting pipe:Front two rows sound detecting pipe is arranged on steel reinforcement cage, the quantity of every row's sound detecting pipe is 3, every row's sounding Pipe is all equally spaced from setting, and front two rows sound detecting pipe or so is staggered or front two rows sound detecting pipe is arranged in rows, connects to every width Wall 6 sound detecting pipes of total arrangement;
(3)It transfers steel reinforcement cage and carries out in diaphram wall concreting;
(4)Sound detecting pipe dredging, water filling and sealing:Sound detecting pipe is dredged using reinforcing bar, go on smoothly detection can more;After dredging Plastic closures are filled the water and utilized in sound detecting pipe, prevent sundries from falling into;
(5)It is put into energy converter in each sound detecting pipe, by the way of marking sounding line, makes each branch energy converter in each sound detecting pipe In measuring point in same level;
(6)Detection and data processing:Energy converter detect and upload data in each measuring point, finally carries out to the data of upload Analysis and judgement.
CN201810793591.0A 2018-07-19 2018-07-19 A kind of method of ultrasound examination subway construction of diaphragm wall quality Pending CN108894259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810793591.0A CN108894259A (en) 2018-07-19 2018-07-19 A kind of method of ultrasound examination subway construction of diaphragm wall quality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810793591.0A CN108894259A (en) 2018-07-19 2018-07-19 A kind of method of ultrasound examination subway construction of diaphragm wall quality

Publications (1)

Publication Number Publication Date
CN108894259A true CN108894259A (en) 2018-11-27

Family

ID=64351011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810793591.0A Pending CN108894259A (en) 2018-07-19 2018-07-19 A kind of method of ultrasound examination subway construction of diaphragm wall quality

Country Status (1)

Country Link
CN (1) CN108894259A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112666257A (en) * 2020-12-18 2021-04-16 广东二十冶建设有限公司 Concrete detection technology for encased multi-cavity steel plate concrete combined shear wall
CN114892640A (en) * 2022-05-12 2022-08-12 中建八局第三建设有限公司 Underground continuous wall guide wall and foundation pit top underground continuous wall and construction method thereof
CN117188652A (en) * 2023-11-06 2023-12-08 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Early warning-based fabricated building envelope and early warning method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1755016A (en) * 2004-09-28 2006-04-05 上海市第五建筑有限公司 Construction method for installing plastic sounding pipe
CN103526784A (en) * 2013-10-24 2014-01-22 江苏城市职业学院 Method for detecting and reinforcing flexible connector of ultra-deep underground continuous wall
CN108132263A (en) * 2017-12-13 2018-06-08 同济大学 Across the hole radar detection device of diaphram wall internal flaw and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1755016A (en) * 2004-09-28 2006-04-05 上海市第五建筑有限公司 Construction method for installing plastic sounding pipe
CN103526784A (en) * 2013-10-24 2014-01-22 江苏城市职业学院 Method for detecting and reinforcing flexible connector of ultra-deep underground continuous wall
CN108132263A (en) * 2017-12-13 2018-06-08 同济大学 Across the hole radar detection device of diaphram wall internal flaw and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐亮: "超声波透射法检测地连墙", 《建筑技术开发》 *
谭 杰,徐以艳: "声波透射法在地下连续墙检测中的应用", 《江西建材》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112666257A (en) * 2020-12-18 2021-04-16 广东二十冶建设有限公司 Concrete detection technology for encased multi-cavity steel plate concrete combined shear wall
CN114892640A (en) * 2022-05-12 2022-08-12 中建八局第三建设有限公司 Underground continuous wall guide wall and foundation pit top underground continuous wall and construction method thereof
CN114892640B (en) * 2022-05-12 2024-03-01 中建八局第三建设有限公司 Detection device for underground diaphragm wall guide wall and foundation pit top underground diaphragm wall
CN117188652A (en) * 2023-11-06 2023-12-08 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Early warning-based fabricated building envelope and early warning method
CN117188652B (en) * 2023-11-06 2024-01-09 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 Early warning-based fabricated building envelope and early warning method

Similar Documents

Publication Publication Date Title
CN105783800B (en) A method of rotary churning pile stake diameter is detected using sound wave transmission method
CN203100704U (en) Pressed pile shape and pile length ultrasonic detection device
CN108894259A (en) A kind of method of ultrasound examination subway construction of diaphragm wall quality
Rausche Non-destructive evaluation of deep foundations
CN101418579A (en) The detection method of diaphragm wall clay seam
CN108978740A (en) Drilled pile quality determining method based on distributed ultrasound wave sensor
CN106770643B (en) Method for detecting pile bottom grouting effect of expanded-bottom cast-in-place pile based on sound wave propagation principle
CN101581223B (en) Method for detecting slip casting effect of tunnel
Liu et al. Detection sensitivity analysis of pipe pile defects during low-strain integrity testing
CN106149770B (en) The large-section in-situ concrete pile hole wall rock mass integrality detection method that bored concrete pile pile foundation construction period synchronously carries out
CN108442420B (en) Diaphram wall defect inspection method based on subregion ultrasonic tomography
CN107991392A (en) A kind of lossless detection method using acoustic emission detection soil property synthesis earth material characteristic
CN107119729A (en) A kind of low strain dynamic coordinates the method that ultrasonic wave carries out foundation pile integrity detection
CN207964542U (en) A kind of monitoring ultrasonic system for sand pile quality real-time control
CN104655439B (en) The in-situ detection method of gravity type wharf security
CN110455915A (en) Tunnel Second Lining supplements grouting method
Qin et al. Detection of diaphragm wall defects using crosshole GPR
Amir Single-tube ultrasonic testing of pile integrity
Wang et al. Accurate detection technology of super long bored cast-in-place pile concrete pouring thickness based on ultrasonic inclined plane reflection measurement
CN206160969U (en) Ultra -deep pile hole concrete fills a height detection sensor
Yang et al. Large-scale model test for detecting pile defects using the parallel seismic method
Piscsalko et al. Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications
Hertlein et al. Project experience in assessment and reuse of old foundations
Kawanda Recent Advances of Cast-in-Situ Pile Integrity Test in Indonesia
Beckhaus et al. Ultrasonic integrity testing for bored piles-a challenge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190123

Address after: 030013 No. 570 Jianbei Road, Taiyuan City, Shanxi Province

Applicant after: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group

Applicant after: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Applicant after: Shanxi Huacheng Engineering Testing Co., Ltd.

Applicant after: TAIYUAN CITY TIANDINGHENG CONCRETE ADMIXTURES TECHNOLOGY DEVELOPMENT CO., LTD.

Address before: 100036 Wanshou Road, Haidian District, Beijing, No. 2

Applicant before: The Sixth Engineering Bureau Group Co., Ltd., China Railway

Applicant before: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group

Applicant before: Shanxi Huacheng testing Engineering Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication