- CN108265745A CN108265745A CN201611252657.2A CN201611252657A CN108265745A CN 108265745 A CN108265745 A CN 108265745A CN 201611252657 A CN201611252657 A CN 201611252657A CN 108265745 A CN108265745 A CN 108265745A
- Authority
- CN
- China
- Prior art keywords
- bolt
- steel plate
- fixing steel
- localization method
- sized
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Abstract
本发明公开了一种大型螺栓的定位方法,包括在所述螺栓桩基础上设置定位钢板,所述定位钢板上标有螺栓的位置;将所述灯笼架与所述定位钢板相连,所述灯笼架的第一底边设置于所述定位钢板上的螺栓的位置的外围或内围;将所述螺栓与所述灯笼架的第一底边及其相对的第一顶边滑动连接,通过滑动将所述螺栓调整到所述定位钢板上的螺栓的位置。本发明的技术方案施工简单,比较容易操作,简单实用,解决了大型螺栓在精确定位方面的难题。
Description
技术领域
本发明属于工程建筑领域,涉及一种螺栓的定位方法,尤其涉及一种大型螺栓的定位方法。
背景技术
在设备基础施工过程中,设备基础地脚螺栓要求精度高,且螺栓重量较大特别是M90的大型地脚螺栓,普通的螺栓定位难以实现。
发明内容
有鉴于此,本发明提供了一种安装快速、简便、精度高的大型螺栓的定位方法。
为达到上述目的,具体技术方案如下:
一种大型螺栓的定位方法,包括以下步骤:
步骤1,建造螺栓的桩基础;
步骤2,在所述桩基础上设置定位钢板,所述定位钢板上标有螺栓的位置;
步骤3,制造灯笼架,并将所述灯笼架与所述定位钢板相连,所述灯笼架的第一底边设置于所述定位钢板上的螺栓的位置的外围或内围;
步骤4,将所述螺栓与所述灯笼架的第一底边及其相对的第一顶边滑动连接,通过滑动将所述螺栓调整到所述定位钢板上的螺栓的位置。
优选的,所述步骤2中的定位钢板与所述桩基础的钢筋焊接固定。
优选的,所述螺栓的数量有4个,所述步骤2中的定位钢板上设有4个螺栓的位置,所述4个螺栓的位置位于长方形的四角。
优选的,所述步骤3中的灯笼架的底边均位于所述4个螺栓的位置的外围。
优选的,所述螺栓通过卡扣与所述灯笼架的底边及其相对的顶边相连。
优选的,所述步骤3中灯笼架与所述定位钢板焊接固定。
优选的,还包括步骤5,通过水平仪对所述螺栓的高度进行调整。
优选的,所述步骤7中还包括通过经纬仪对所述螺栓的位置进行调整。
相对于现有技术,本发明的技术方案简单实用,解决了大型螺栓在精确定位方面的难题。
附图说明
构成本发明的一部分的附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:
图1和图2为本发明实施例的实施时的示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。
以下将结合附图对本发明的实施例做具体阐释。
如图1和图2中所示,本发明的实施例的大型螺栓的定位方法,其中,包括以下步骤:
步骤1,建造螺栓1的桩基础2;
步骤2,在桩基础2上设置定位钢板3,定位钢板上标有螺栓的位置4;
步骤3,制造灯笼架5,灯笼架5具有相互平行且位于垂直方向的第一顶边6和第一底边7。将灯笼架5与定位钢板3相连,灯笼架5的第一底边7设置于定位钢板3上的螺栓的位置4的外围或内围,并临近螺栓的位置4;
步骤4,将螺栓1与灯笼架5的第一底边7及其相对的第一顶边6滑动连接,通过均位于垂直方向的第一顶边6和第一底边7保证螺栓1的垂直度,并通过滑动将螺栓1调整到第一底边7周围的螺栓的位置4。
如图1和图2中所示,本发明的实施例中,定位钢板3上设有4个螺栓的位置4。4个螺栓的位置4位于长方形的四角。灯笼架5的底边均位于4个螺栓的位置4的外围,将螺栓1限定于灯笼架5的底边内滑动。
并定位钢板3与桩基础2的钢筋焊接固定。灯笼架5与定位钢板3焊接固定。
并优选还包括步骤5,通过水平仪和经纬仪对螺栓进行调整。进一步提高定位的精度。
本发明的实施例施工简单,比较容易操作,简单实用,解决了大型螺栓在精确定位方面的难题。
以上对本发明的具体实施例进行了详细描述,但其只是作为范例,本发明并不限制于以上描述的具体实施例。对于本领域技术人员而言,任何对本发明进行的等同修改和替代也都在本发明的范畴之中。因此,在不脱离本发明的精神和范围下所作的均等变换和修改,都应涵盖在本发明的范围内。
Claims (8)
1.一种大型螺栓的定位方法,其特征在于,包括以下步骤:
步骤1,建造螺栓的桩基础;
步骤2,在所述桩基础上设置定位钢板,所述定位钢板上标有螺栓的位置;
步骤3,制造灯笼架,并将所述灯笼架与所述定位钢板相连,所述灯笼架的第一底边设置于所述定位钢板上的螺栓的位置的外围或内围;
步骤4,将所述螺栓与所述灯笼架的第一底边及其相对的第一顶边滑动连接,通过滑动将所述螺栓调整到所述定位钢板上的螺栓的位置。
2.根据权利要求1所述的大型螺栓的定位方法,其特征在于,所述步骤2中的定位钢板与所述桩基础的钢筋焊接固定。
3.根据权利要求2所述的大型螺栓的定位方法,其特征在于,所述螺栓的数量有4个,所述步骤2中的定位钢板上设有4个螺栓的位置,所述4个螺栓的位置位于长方形的四角。
4.根据权利要求3所述的大型螺栓的定位方法,其特征在于,所述步骤3中的灯笼架的底边均位于所述4个螺栓的位置的外围。
5.根据权利要求4所述的大型螺栓的定位方法,其特征在于,所述螺栓通过卡扣与所述灯笼架的底边及其相对的顶边相连。
6.根据权利要求1所述的大型螺栓的定位方法,其特征在于,所述步骤3中灯笼架与所述定位钢板焊接固定。
7.根据权利要求1所述的大型螺栓的定位方法,其特征在于,还包括步骤5,通过水平仪对所述螺栓的高度进行调整。
8.根据权利要求7所述的大型螺栓的定位方法,其特征在于,所述步骤7中还包括通过经纬仪对所述螺栓的位置进行调整。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611252657.2A CN108265745A (zh) | 2016-12-30 | 2016-12-30 | 一种大型螺栓的定位方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611252657.2A CN108265745A (zh) | 2016-12-30 | 2016-12-30 | 一种大型螺栓的定位方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108265745A true CN108265745A (zh) | 2018-07-10 |
Family
ID=62754102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611252657.2A Pending CN108265745A (zh) | 2016-12-30 | 2016-12-30 | 一种大型螺栓的定位方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108265745A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6055125A (ja) * | 1983-08-31 | 1985-03-30 | Toshiba Eng Constr Co Ltd | 機器設置用基礎ボルトの設置装置 |
CN101266011A (zh) * | 2008-04-22 | 2008-09-17 | 中冶天工建设有限公司 | 用于预埋高精度大直径地脚螺栓的安装装置及使用该装置的安装方法 |
CN105544589A (zh) * | 2015-12-15 | 2016-05-04 | 贵州电力设计研究院 | 一种大型溶洞处立塔的梁-柱式基础结构 |
-
2016
- 2016-12-30 CN CN201611252657.2A patent/CN108265745A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6055125A (ja) * | 1983-08-31 | 1985-03-30 | Toshiba Eng Constr Co Ltd | 機器設置用基礎ボルトの設置装置 |
CN101266011A (zh) * | 2008-04-22 | 2008-09-17 | 中冶天工建设有限公司 | 用于预埋高精度大直径地脚螺栓的安装装置及使用该装置的安装方法 |
CN105544589A (zh) * | 2015-12-15 | 2016-05-04 | 贵州电力设计研究院 | 一种大型溶洞处立塔的梁-柱式基础结构 |
Non-Patent Citations (2)
Title |
---|
中铁电气化局集团第一工程有限公司主编: "《电气化铁道施工手册 接触网》", 30 September 2015, 中国铁道出版社 * |
于辉等: "《结构设计原理 第2版》", 31 August 2014, 北京理工大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102767176A (zh) | 一种桩基钢筋笼吊装定位施工方法 | |
CN104674854B (zh) | 一种用于工程桩基检测的压载系统 | |
US20170159260A1 (en) | Offshore support structure, offshore tower installation with the offshore support structure and offshore wind power plant with the offshore tower installation | |
CN105804041A (zh) | 大面积超软弱地基沉降监测装置及监测方法 | |
CN108265745A (zh) | 一种大型螺栓的定位方法 | |
US9347599B2 (en) | Support system for an equipment item on a concrete slab | |
CN207392771U (zh) | 一种导向式钢柱定位器 | |
CN103470058B (zh) | 钢桁架上、下弦杆的安装方法与临时支撑 | |
CN102828519A (zh) | 矩形基础分坑及地脚螺栓的找正方法 | |
CN105887918B (zh) | 一种塔吊基础及其施工方法 | |
CN208187393U (zh) | 一种用于城市地表沉降变形测量的磁性尺垫及测量装置 | |
CN204590241U (zh) | 一种坡地建营房的快装钢构基础 | |
CN205328499U (zh) | 一种起重机支腿 | |
WO2016084916A1 (ja) | 再生可能エネルギー発電設備の設置方法 | |
CN206635797U (zh) | 一种用于塔式起重机基础的定位标高框架结构 | |
CN206736881U (zh) | 浅海区测量控制点平台 | |
CN205712053U (zh) | 大面积超软弱地基沉降监测装置 | |
CN109740200A (zh) | 一种爆炸荷载作用下钢筋混凝土板震塌直径的计算方法 | |
CN202561395U (zh) | 脚架安全稳定保护装置 | |
CN205857184U (zh) | 一种斜桩施工用角度定位装置 | |
CN205935209U (zh) | 气膜建筑锚固装置 | |
CN105157672A (zh) | 一种用于杆塔间的高差测量仪 | |
CN109113040A (zh) | 水中测量观测平台及其施工方法和水中测量观测系统 | |
CN204174980U (zh) | 一种磨机检修平台 | |
Fraser-Campbell | Wind farm construction in the rugged Roggeveld |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |
|
RJ01 | Rejection of invention patent application after publication |