CN108252539A - Hoisting structure and hanging device - Google Patents
Hoisting structure and hanging device Download PDFInfo
- Publication number
- CN108252539A CN108252539A CN201810239533.3A CN201810239533A CN108252539A CN 108252539 A CN108252539 A CN 108252539A CN 201810239533 A CN201810239533 A CN 201810239533A CN 108252539 A CN108252539 A CN 108252539A
- Authority
- CN
- China
- Prior art keywords
- fixed
- precast segment
- hoisting structure
- hoisting
- public transport
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a kind of hoisting structure and hanging devices, are related to the technical field that lifting is transported, fixed precast segment, prefabricated connector and the structure of falling pawl are lifted including being used for;The precast segment includes:First precast segment and the second precast segment;First precast segment and second precast segment are detachably connected respectively with the prefabricated connector, and second precast segment is arranged in the structure of falling pawl, solve it is in the prior art at printing to building transport when, due to heavier, it either is not easy to lift, occurs the technical issues of building damage during lifting.
Description
Technical field
The present invention relates to lifting transportation techniques field, more particularly, to a kind of hoisting structure and hanging device.
Background technology
Building at present, such as bus platform, outdoor display area, the construction period is long, of high cost, and on the other hand, 3D is beaten
Print the building that forms, such as bus platform, when being transported at printing to building, due to it is heavier or be not easy to lift or
Occurs building damage when being lifting.
As 3D printing technique is in the application of building field, the material property of especially 3D printing technique building ink has
The application that very big raising is 3D printing technique in panel structure provides possibility.It is filled out outside the building of conventional frame structure
It fills wall generally use building block to be filled, tedious process, labor intensive;In addition, filling wall external wall waterproof layer, insulating layer, decoration
Layer will be layered, multiple working procedure is divided to construct, and construction efficiency is low.And use the outer filling wall of 3D printing building, then it can enable frame column
Between monoblock filling wall one-pass molding, and 3D printing can realize waterproof layer, insulating layer, decorative layer one-pass molding, print
Finishing only need to carry out integral hoisting installation, remove the cumbersome of conventional construction method multiple working procedure from, can effectively shorten the construction period, and reduce the energy
It is consumed with labour, creates good economic benefit and social benefit.
The information for being disclosed in the background technology part is merely intended to deepen understanding of the general background technology to the present invention, and
It is not construed as recognizing or implies that the information forms the prior art known to those skilled in the art in any form.
Invention content
The purpose of the present invention is to provide hoisting structure and hanging device, to alleviate in the prior art printing
When place is transported to building, due to heavier or be not easy to lift, there is the technical issues of building damage in when lifting.
In a first aspect, a kind of hoisting structure provided by the invention, for 3D printing mobile public transport platform, including:For hanging
Fill fixed precast segment, prefabricated connector and the structure of falling pawl;
The precast segment includes:First precast segment and the second precast segment;
First precast segment and second precast segment are detachably connected, and institute with the prefabricated connector respectively
The second precast segment is stated to be arranged in the structure of falling pawl.
Further,
First precast segment and the second precast segment include:Fixed part, connecting portion and tight lock part;
The fixed part is connect by the connecting portion with the tight lock part, and the fixed part be used for hanging device into
Row is fixed, and the prefabricated connector is plugged in the tight lock part, and the prefabricated connector is locked by tight lock part.
Further,
The fixed part is in cylindrical shape;And the one end contacted with the connecting portion is top, is connect far from the connecting portion
Tactile one end is lower part, and the area of a circle on the top is less than the area of a circle of the lower part.
Further,
The bottom of the fixed part is provided with connecting hole and clamping seat;
The connecting hole is set along the even circumferential of the fixed part bottom;The clamping seat is arranged on the connecting hole packet
In the region for enclosing the inside to be formed.
Further,
First precast segment is symmetrically arranged on the both ends of the prefabricated connector with second precast segment.
Further,
The structure of falling pawl includes:Two the first fixed jaws and two the second fixed jaws;
Two the first fixed jaw parallel interval settings, two the second fixed jaw parallel interval settings, and it is described
First fixed jaw is vertically arranged with second fixed jaw.
Further,
First fixed jaw and the second fixed jaw include:Lateral fixed link and two vertical fixing rods;
The transverse direction fixed link is vertically arranged with the vertical fixing rod, and described in two vertical fixing rods are arranged on
The end of lateral fixed link.
Second aspect, a kind of hanging device provided by the invention, including:3D printing mobile public transport platform and four rights will
Seek 1-8 any one of them hoisting structures;
Four hoisting structures are separately positioned on four corners of the 3D printing mobile public transport platform.
Further,
The 3D printing mobile public transport platform includes:Bar-mat reinforcement;
When being printed to the 3D printing mobile public transport platform, the bar-mat reinforcement is laid with one layer every 20cm height.
Further,
The structure of falling pawl is arranged in the lower end of one layer of the bottom of the bar-mat reinforcement, for positioning the fixed lifting knot
Structure causes it to impact and generates offset after avoiding casting concrete.
Using hoisting structure provided by the invention and hanging device, have the advantages that:
Hoisting structure provided by the invention, including:For lifting fixed precast segment, prefabricated connector and the knot of falling pawl
Structure;Precast segment includes:First precast segment and the second precast segment;First precast segment and the second precast segment respectively in advance
Connector processed is detachably connected, and the second precast segment is arranged in the structure of falling pawl.
Here, hoisting structure can be used as vertical muscle, and upper and lower side has precast segment, can be connected suspender and be hung
Dress, after it is ajusted, can connect upper and lower side precast segment and be moved horizontally, and this lifting mode will not cause wall to appoint
What is damaged.
Hanging device provided by the invention, including:The hoisting structure of 3D printing mobile public transport platform and four first aspects;
Four hoisting structures are separately positioned on four corners of 3D printing mobile public transport platform.
Here hanging device has the advantages that all that above-mentioned hoisting structure has, also, and passes through four hoisting structures
So that lifting 3D printing mobile public transport platform is more stablized.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of 3D printing mobile public transport platform provided in an embodiment of the present invention;
Fig. 2 is the structure diagram of bar-mat reinforcement provided in an embodiment of the present invention;
Fig. 3 is the structure diagram of hoisting structure provided in an embodiment of the present invention;
Fig. 4 is the structure diagram of fixed part provided in an embodiment of the present invention.
Icon:100- precast segments;The first precast segments of 110-;The second precast segments of 120-;130- fixed parts;
131- connecting holes;132- is clamped seat;140- connecting portions;150- tight lock parts;The prefabricated connectors of 200-;The 300- knots of falling pawl
Structure;The first fixed jaws of 310-;The second fixed jaws of 320-;330- transverse direction fixed links;340- vertical fixing rods;400-3D is beaten
Print mobile public transport platform;500- hoisting structures;600- bar-mat reinforcements.
Specific embodiment
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation
Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill
Personnel's all other embodiments obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instructions such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to
Convenient for the description present invention and simplify description rather than instruction or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" third " is only used for description purpose, and it is not intended that instruction or hint relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or be integrally connected;It can
To be mechanical connection or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, Ke Yishi
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition
Concrete meaning in invention.
The specific embodiment of the present invention is described in detail below in conjunction with attached drawing.It should be understood that this place is retouched
The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
Fig. 1 is the structure diagram of 3D printing mobile public transport platform provided in an embodiment of the present invention;Fig. 2 is implemented for the present invention
The structure diagram for the bar-mat reinforcement that example provides;Fig. 3 is the structure diagram of hoisting structure provided in an embodiment of the present invention;Fig. 4 is
The structure diagram of fixed part provided in an embodiment of the present invention.
Fig. 1, Fig. 2, Fig. 3 and Fig. 4 are please referred to, to hoisting structure provided in an embodiment of the present invention and is hung below in conjunction with attached drawing
Installing is standby to elaborate.
A kind of hoisting structure that at least one embodiment of the present invention provides, for 3D printing mobile public transport platform 400, packet
It includes:For lifting fixed precast segment 100, prefabricated connector 200 and the structure of falling pawl 300;
Precast segment 100 includes:First precast segment 110 and the second precast segment 120;
First precast segment 110 and the second precast segment 120 are detachably connected, and second respectively with prefabricated connector 200
Precast segment 120 is arranged in the structure of falling pawl 300.
It should be noted that here, hoisting structure 500 can be used as vertical muscle, and upper and lower side has precast segment
100, suspender can be connected and lifted, after it is ajusted, upper and lower side precast segment 100 can be connected and moved horizontally, this
Kind lifting mode will not cause wall any damage.
In addition, the first precast segment 110 and the second precast segment 120 include:Fixed part 130, connecting portion 140 and locking
Portion 150;
Fixed part 130 is connect by connecting portion 140 with tight lock part 150, and fixed part 130 is used to be consolidated with hanging device
Fixed, prefabricated connector 200 is plugged in tight lock part 150, and prefabricated connector 200 is locked by tight lock part 150.
It should be noted that fixed part 130 is connect with hanging device when being lifted, and connecting portion 140 can be with
It is hollow either solid, mainly plays the connection to fixed part 130 and tight lock part 150, and tight lock part 150
Outside be provided with protrusion, effectively raise frictional force, convenient stress easy during tightening.Due to tight lock part 150
It is connect with prefabricated connector 200, and prefabricated connector 200 can be threadedly coupled with tight lock part 150, threaded connection is conveniently torn open
It unloads, convenience in transport,
Specifically, fixed part 130 is in cylindrical shape;And the one end contacted with connecting portion 140 is top, far from connecting portion
One end of 140 contacts is lower part, and the area of a circle on top is less than the area of a circle of lower part.
In order to increase bonding strength, after grafting is either threadedly coupled between connecting portion 140 and fixed part 130 here,
Fillable certain fixing glue.
Since fixed part 130 mainly plays important connecting link, fixed part 130 and hanging device in lifting
The stability of connection ensure that the safety of entire hoisting process.
Here the bottom of fixed part 130 is provided with connecting hole 131 and clamping seat 132;
Connecting hole 131 is set along the even circumferential of 130 bottom of fixed part;Clamping seat 132 is arranged on connecting hole 131 and surrounds shape
Into inside region in.The mode being used cooperatively of a kind of such connecting hole 131 and clamping seat 132 causes connection more to step up
It is close, meanwhile, first by being clamped seat 132 by the two rapid abutting joint, so as to both relative position determine, later by bolt or
Person's screw is attached fixation across connecting hole 131.
In addition, the first precast segment 110 and the second precast segment 120 are symmetrically arranged on the both ends of prefabricated connector 200.
First precast segment 110 on top due to being fixed and connect simultaneously with prefabricated connector 200 when lifting, and
Second precast segment 120 of lower part is connect with prefabricated connector 200, and prefabricated connector 200 here may be selected to be reinforcing bar.
Specifically, the structure of falling pawl 300 includes:Two the first fixed jaws 310 and two the second fixed jaws 320;
Two 310 parallel interval of the first fixed jaw settings, two 320 parallel interval of the second fixed jaw settings, and first is solid
Determine pawl 310 to be vertically arranged with the second fixed jaw 320.
It should be noted that the above-mentioned structure of falling pawl 300 is in " well " font, it is formed on 3D printing mobile public transport platform 400 in advance
Lower end is stuck in the lower end of following one layer of bar-mat reinforcement 6003, plays the role of fixed entire reinforcing bar, it is made after avoiding casting concrete
Offset is generated into impact.And the first fixed jaw 310 is arranged on the lower part of the first fixed jaw 310, and its first fixed jaw 310
Include with the second fixed jaw 320:Lateral fixed link 330 and two vertical fixing rods 340;Here vertical fixing rod 340
Free end is set in a plane, and lateral fixed link 330 is vertically arranged with vertical fixing rod 340, and two vertical fixing rods 340
It is arranged on the end of lateral fixed link 330.
Second aspect, a kind of hanging device that at least one embodiment of the present invention provides, including:3D printing mobile public transport station
Platform 400 and four first aspect any one of them hoisting structures 500;
Four hoisting structures 500 are separately positioned on four corners of the 3D printing mobile public transport platform 400.
It should be noted that hanging device here has the advantages that all that above-mentioned hoisting structure 500 has, also, and
3D printing mobile public transport platform 400 is lifted by four hoisting structures 500 more to stablize.And due to 3D printing here
Four turnings of mobile public transport platform 400 are C-shaped, and 3D printing mobile public transport platform 400 includes:Bar-mat reinforcement 600;
When being printed to the 3D printing mobile public transport platform 400, the bar-mat reinforcement 600 is laid with one every 20cm height
Layer.
This hoisting structure 500 is after printing is built, and four are placed in four corners, then carries out concrete and pours
It builds.Bar-mat reinforcement 600 at lower end plays the role of fixed entire reinforcing bar, it is caused to impact and generate after avoiding casting concrete
Offset.
Meanwhile the structure of falling pawl 300 is arranged in the lower end of one layer of the bottom of the bar-mat reinforcement 600, for positioning fixed institute
Hoisting structure 500 is stated, it is caused to impact and generates offset after avoiding casting concrete.
The hanging device that at least one embodiment of the present invention provides can be used as vertical muscle;
Simultaneously because upper and lower side has precast segment 100, suspender can be connected and lifted, after it is ajusted, Ke Yilian
It connects lower end precast segment 100 to be moved horizontally, this lifting mode will not cause wall any damage.
The hoisting structure and hanging device of the present invention are illustrated above, still, the present invention is not limited to above-mentioned tools
The embodiment of body without departing from the scope of the claims, can carry out various deformations or change.The present invention includes
Various modifications within the scope of the claims and change.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to
Can so modify to the technical solution recorded in foregoing embodiments either to which part or all technical features into
Row equivalent replacement;And these modifications or replacement, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (10)
1. a kind of hoisting structure, for 3D printing mobile public transport platform, which is characterized in that including:It is fixed prefabricated for lifting
Component, prefabricated connector and the structure of falling pawl;
The precast segment includes:First precast segment and the second precast segment;
First precast segment and second precast segment are detachably connected respectively with the prefabricated connector, and described
Two precast segments are arranged in the structure of falling pawl.
2. hoisting structure according to claim 1, which is characterized in that first precast segment and the second precast segment are equal
Including:Fixed part, connecting portion and tight lock part;
The fixed part is connect by the connecting portion with the tight lock part, and the fixed part is used to be consolidated with hanging device
Fixed, the prefabricated connector is plugged in the tight lock part, and the prefabricated connector is locked by tight lock part.
3. hoisting structure according to claim 2, which is characterized in that the fixed part is in cylindrical shape;And with the company
One end of socket part contact is top, and one end far from connecting portion contact is lower part, and the area of a circle on the top is less than institute
State the area of a circle of lower part.
4. hoisting structure according to claim 2, which is characterized in that the bottom of the fixed part is provided with connecting hole and card
Joint chair;
The connecting hole is set along the even circumferential of the fixed part bottom;The clamping seat is arranged on the connecting hole and surrounds shape
Into inside region in.
5. hoisting structure according to claim 1, which is characterized in that first precast segment and described second prefabricated group
Part is symmetrically arranged on the both ends of the prefabricated connector.
6. hoisting structure according to claim 1, which is characterized in that the structure of falling pawl includes:Two the first fixed jaws
With two the second fixed jaws;
Two the first fixed jaw parallel interval settings, two the second fixed jaw parallel interval settings, and described first
Fixed jaw is vertically arranged with second fixed jaw.
7. hoisting structure according to claim 6, which is characterized in that first fixed jaw and the second fixed jaw wrap
It includes:Lateral fixed link and two vertical fixing rods;
The transverse direction fixed link is vertically arranged, and two vertical fixing rods are arranged on the transverse direction with the vertical fixing rod
The end of fixed link.
8. a kind of hanging device, which is characterized in that including:Any one of 3D printing mobile public transport platform and four claim 1-7
The hoisting structure;
Four hoisting structures are separately positioned on four corners of the 3D printing mobile public transport platform.
9. hanging device according to claim 8, which is characterized in that the 3D printing mobile public transport platform includes:Reinforcing bar
Net;
When being printed to the 3D printing mobile public transport platform, the bar-mat reinforcement is laid with one layer every 20cm height.
10. hanging device according to claim 9, which is characterized in that the structure of falling pawl is arranged in the bar-mat reinforcement
Lower end one layer bottom for positioning the fixed hoisting structure, causes it to impact and generate after avoiding casting concrete
Offset.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810239533.3A CN108252539A (en) | 2018-03-22 | 2018-03-22 | Hoisting structure and hanging device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810239533.3A CN108252539A (en) | 2018-03-22 | 2018-03-22 | Hoisting structure and hanging device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108252539A true CN108252539A (en) | 2018-07-06 |
Family
ID=62747295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810239533.3A Pending CN108252539A (en) | 2018-03-22 | 2018-03-22 | Hoisting structure and hanging device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108252539A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661243A (en) * | 2018-07-25 | 2018-10-16 | 上海言诺建筑材料有限公司 | 3D printing house reinforcement mesh structure and reinforcement structure |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2504900A1 (en) * | 1981-04-30 | 1982-11-05 | Moreau Pierre | Device connecting concrete elements to lifting hook - comprises body embedded in concrete and locked by transverse staple with hooked element projecting from free end |
AU2011100063A4 (en) * | 2011-01-13 | 2011-02-17 | Illinois Tool Works Inc. | Lifting anchors |
CN202625609U (en) * | 2012-06-26 | 2012-12-26 | 中铁十二局集团第七工程有限公司 | Pile foundation reinforcement cage lifting device |
DE202013103581U1 (en) * | 2013-08-08 | 2013-10-09 | Smm Stahl- Und Maschinenbau Gmbh | pergola kit |
CN103437298A (en) * | 2013-09-04 | 2013-12-11 | 中国十九冶集团有限公司 | Hoisting method and hoisting device for concrete prefabricated box beam |
CN104671071A (en) * | 2015-02-12 | 2015-06-03 | 富于安(福建)环保模板有限公司 | Concrete formwork hoisting method and connecting clamp used in concrete formwork hoisting method |
KR20160141918A (en) * | 2015-06-01 | 2016-12-12 | (주)알씨에스코리아 | the improved prefabricated reinforcing bar net unit for easy mechanical Re-bar splicing, spacing and leveling on the site |
CN106285051A (en) * | 2015-05-11 | 2017-01-04 | 有利华建筑预制件有限公司 | A kind of prefabricated toilet and construction thereof and installation method |
CN206408947U (en) * | 2016-12-27 | 2017-08-15 | 中铁三局集团有限公司 | Prefabricated stair hoisting appliance |
CN208310300U (en) * | 2018-03-22 | 2019-01-01 | 上海言诺建筑材料有限公司 | Hoisting structure and hanging device |
-
2018
- 2018-03-22 CN CN201810239533.3A patent/CN108252539A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2504900A1 (en) * | 1981-04-30 | 1982-11-05 | Moreau Pierre | Device connecting concrete elements to lifting hook - comprises body embedded in concrete and locked by transverse staple with hooked element projecting from free end |
AU2011100063A4 (en) * | 2011-01-13 | 2011-02-17 | Illinois Tool Works Inc. | Lifting anchors |
CN202625609U (en) * | 2012-06-26 | 2012-12-26 | 中铁十二局集团第七工程有限公司 | Pile foundation reinforcement cage lifting device |
DE202013103581U1 (en) * | 2013-08-08 | 2013-10-09 | Smm Stahl- Und Maschinenbau Gmbh | pergola kit |
CN103437298A (en) * | 2013-09-04 | 2013-12-11 | 中国十九冶集团有限公司 | Hoisting method and hoisting device for concrete prefabricated box beam |
CN104671071A (en) * | 2015-02-12 | 2015-06-03 | 富于安(福建)环保模板有限公司 | Concrete formwork hoisting method and connecting clamp used in concrete formwork hoisting method |
CN106285051A (en) * | 2015-05-11 | 2017-01-04 | 有利华建筑预制件有限公司 | A kind of prefabricated toilet and construction thereof and installation method |
KR20160141918A (en) * | 2015-06-01 | 2016-12-12 | (주)알씨에스코리아 | the improved prefabricated reinforcing bar net unit for easy mechanical Re-bar splicing, spacing and leveling on the site |
CN206408947U (en) * | 2016-12-27 | 2017-08-15 | 中铁三局集团有限公司 | Prefabricated stair hoisting appliance |
CN208310300U (en) * | 2018-03-22 | 2019-01-01 | 上海言诺建筑材料有限公司 | Hoisting structure and hanging device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108661243A (en) * | 2018-07-25 | 2018-10-16 | 上海言诺建筑材料有限公司 | 3D printing house reinforcement mesh structure and reinforcement structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104109999A (en) | Construction method for bridge tower transverse beams | |
CN101892742B (en) | High low building-cross deformation joint low section shear wall construction method | |
WO2017045625A1 (en) | Pile frame and method of using and mounting same | |
CN208251132U (en) | Cup-shaped foundation internal model formwork and cup foundation build device | |
CN110093977A (en) | Prefabricated component mounting structure and its installation method | |
CN105544382B (en) | Construction method of dumbbell-shaped bearing platform | |
CN210914946U (en) | Lifting appliance with sling tensioning device | |
CN108252539A (en) | Hoisting structure and hanging device | |
CN208310300U (en) | Hoisting structure and hanging device | |
CN107338809A (en) | Subway station portal template and its Fast Installation construction method under super-high voltage | |
CN207988165U (en) | Device for shear wall and concrete floor in connecting building structure | |
CN105951683A (en) | Construction method for corbel steel reinforcements of gate pier | |
CN207293909U (en) | A kind of precast beam reinforced bar skeleton hanging apparatus | |
CN108791702A (en) | A kind of corrugated bulkhead scaffold installation method | |
CN213418531U (en) | Supporting and adjusting device for connecting steel members with prefabricated wall panels | |
CN205206301U (en) | Integrally lift up formula shaft template | |
CN210558917U (en) | Detachable oiling machine hoisting frame | |
CN208686109U (en) | Lift beam steel bar colligation support frame and beam steel bar colligation auxiliary tool | |
CN208456117U (en) | A kind of post-cast strip overhanging end independent support device | |
CN206681336U (en) | The operating platform of encorbelmenting poured for detached column top concrete | |
CN206888536U (en) | One kind can have enough to meet the need split heads | |
CN205870845U (en) | Telescopic box girder baseplate web reforcement steel bar ligature mould | |
CN105298125B (en) | Hanging hang structure system and its construction method are held under one kind | |
CN211498514U (en) | Pier cap template with adjustable | |
CN105088960B (en) | A kind of tower crane method to set up being applied on bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |