cushion cap
circular
cap
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510916182.1A
Other languages
Chinese (zh)
Other versions
CN105544382A (en
Inventor
赵小静
潘东发
张春新
陈治任
毛伟琦
涂满明
吴方明
马涛
张睿智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd filed Critical China Railway Major Bridge Engineering Group Co Ltd
Priority to CN201510916182.1A priority Critical patent/CN105544382B/en
Publication of CN105544382A publication Critical patent/CN105544382A/en
Application granted granted Critical
Publication of CN105544382B publication Critical patent/CN105544382B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/02—Piers; Abutments ; Protecting same against drifting ice
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00—Keeping dry foundation sites or other areas in the ground
    • E02D19/02—Restraining of open water
    • E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00—Material constitution of bridges
    • E01D2101/20—Concrete, stone or stone-like material
    • E01D2101/24—Concrete
    • E01D2101/26—Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种哑铃型承台的施工方法,步骤如下:在哑铃型承台设计位置的外围建立双壁钢围堰,其中围堰包括:两封闭圆形围堰,其包括第一圆形围堰和第二圆形围堰,所述第一圆形围堰设第一承台区,所述第二圆形围堰设第二承台区;位于两圆形围堰中间的两直线段围堰的两端分别连接第一圆形围堰和第二圆形围堰,且两所述直线段围堰之间设第三承台区;两封闭圆形围堰位于两直线段围堰之间的圆弧段围堰为中间部分围堰;将围堰整体下放到承台设计位置进行水平限位;再对第一承台区和第二承台区进行承台施工;对第三承台区进行承台施工。本发明具有成本低、工期短的优点。

The invention discloses a construction method of a dumbbell-shaped cap. The steps are as follows: a double-wall steel cofferdam is built on the periphery of the design position of the dumbbell-shaped cap, wherein the cofferdam includes: two closed circular cofferdams, which include a first circular cofferdam shaped cofferdam and a second circular cofferdam, the first circular cofferdam is provided with a first platform area, and the second circular cofferdam is provided with a second platform area; the two circular cofferdams located in the middle The two ends of the straight section cofferdam are respectively connected to the first circular cofferdam and the second circular cofferdam, and the third platform area is set between the two straight section cofferdams; the two closed circular cofferdams are located between the two straight section cofferdams The arc section cofferdam between the cofferdams is the middle part of the cofferdam; the whole cofferdam is lowered to the design position of the cap for horizontal limit; then the caps are constructed for the first cap area and the second cap area; The third platform area carries out the platform construction. The invention has the advantages of low cost and short construction period.

Description

一种哑铃型承台的施工方法A construction method of a dumbbell-shaped platform

技术领域technical field

本发明涉及桥梁工程中深水基础的施工技术领域,具体涉及一种哑铃型承台的施工方法。The invention relates to the technical field of construction of deep-water foundations in bridge engineering, in particular to a construction method of a dumbbell-shaped cap.

背景技术Background technique

在悬索桥主塔基础设计中,设中央系梁连接的哑铃型承台基础是较常采用的承台形式。为配合承台施工,均采用的哑铃型双壁钢围堰,其堰壁钢壳是由带加强竖肋的内外壁板和若干水平型钢桁架所组成,中央系梁段的直线段围堰在水平力作用下须设置强大的内支撑,使用大量的钢结构。圆形围堰与直线段围堰交叉位置处的受力复杂,设计处理较为困难。为了确保承台施工的干环境,围堰内需要浇筑水下封底砼进行抽水。围堰内抽水后,封底砼必然承受较大的浮力,两侧承台位置的双壁钢围堰壁板和钻孔桩钢护筒为封底砼提供竖向约束力,有效减小其承受浮力的跨度。但是由于在主体设计时,中央系梁仅考虑承受水平力,因此其下方一般不设钻孔桩,中央系梁处封底砼跨度大,封底砼受力最为不利,现有技术中采用设临时钻孔桩的方式来为中央系梁处封底砼提供竖向约束,然而由于临时钻孔桩的增设,改变了作为永久结构的中央系梁的受力状态,同时延长了基础施工的工期,增加了设备投入。In the design of the main tower foundation of suspension bridges, the dumbbell-shaped cap foundation connected by the central tie beam is a more commonly used cap form. In order to cooperate with the cap platform construction, dumbbell-shaped double-wall steel cofferdams are used. The steel shell of the weir wall is composed of inner and outer wall panels with reinforced vertical ribs and several horizontal steel trusses. The straight section cofferdam of the central beam section is in the Under the action of horizontal force, strong internal support must be set up, and a large number of steel structures must be used. The force at the intersection of the circular cofferdam and the straight section cofferdam is complex, and the design and handling are more difficult. In order to ensure a dry environment for platform cap construction, underwater bottom sealing concrete needs to be poured in the cofferdam for pumping. After the water is pumped into the cofferdam, the concrete for the bottom cover will inevitably bear a large buoyancy force. The double-walled steel cofferdam wall panels and steel casings for drilled piles at the caps on both sides provide vertical restraint for the concrete bottom cover, effectively reducing its buoyancy span. However, in the design of the main body, the central tie beam is only considered to bear the horizontal force, so there is generally no bored pile under it. Hole piles are used to provide vertical restraint for the bottom cover concrete at the central tie beam. However, due to the addition of temporary bored piles, the stress state of the central tie beam as a permanent structure has been changed, and the construction period of the foundation has been extended, increasing the Equipment input.

发明内容Contents of the invention

针对现有技术中存在的缺陷,本发明的目的在于提供一种哑铃型承台的施工方法,具有施工效率高、成本低和工期短的优点。In view of the defects existing in the prior art, the object of the present invention is to provide a construction method for a dumbbell-shaped cap, which has the advantages of high construction efficiency, low cost and short construction period.

为达到以上目的,本发明采取的技术方案是:For achieving above object, the technical scheme that the present invention takes is:

一种哑铃型承台的施工方法,包括以下步骤:A construction method for a dumbbell-shaped cap, comprising the following steps:

在哑铃型承台设计位置的外围建立双壁钢围堰,其中围堰包括:A double-walled steel cofferdam is established on the periphery of the design position of the dumbbell-shaped cap, and the cofferdam includes:

两封闭圆形围堰,其包括第一圆形围堰和第二圆形围堰,所述第一圆形围堰设第一承台区,所述第二圆形围堰设第二承台区;Two closed circular cofferdams, which include a first circular cofferdam and a second circular cofferdam, the first circular cofferdam is provided with a first platform area, and the second circular cofferdam is provided with a second bearing platform Taiwan area;

位于两圆形围堰中间的两直线段围堰的两端分别连接第一圆形围堰和第二圆形围堰,且两所述直线段围堰之间设第三承台区;The two ends of the two straight-line cofferdams located in the middle of the two circular cofferdams are respectively connected to the first circular cofferdam and the second circular cofferdam, and a third platform area is set between the two straight-line cofferdams;

两封闭圆形围堰位于两直线段围堰之间的圆弧段围堰为中间部分围堰;The two closed circular cofferdams and the arc section cofferdam between the two straight section cofferdams are the middle section cofferdams;

将围堰整体下放到承台设计位置进行水平限位;Lower the cofferdam as a whole to the design position of the cap for horizontal limit;

再对第一承台区和第二承台区进行承台施工;Carry out platform cap construction on the first platform area and the second platform area;

对第三承台区进行承台施工。Carry out platform cap construction for the third platform cap area.

在上述技术方案的基础上,其中,第一承台区和第二承台区的具体施工步骤如下,On the basis of the above-mentioned technical scheme, wherein, the specific construction steps of the first platform area and the second platform area are as follows,

1)浇筑圆形承台的封底砼、再进行圆形承台抽水;1) Pouring the bottom cover concrete of the circular cap, and then pumping the circular cap;

2)绑扎圆形承台钢筋;2) Bundle the steel bars of the circular cap;

3)浇筑圆形承台的承台砼,预留圆形承台与第三承台区之间的钢筋接头和湿接缝;3) Pouring the cap concrete of the circular cap, reserving the steel bar joints and wet joints between the circular cap and the third cap area;

4)待圆形承台区的承台砼达到强度要求后,对除中间部分围堰外的部分圆形围堰与圆形承台之间的区域空隙进行砼填充。4) After the cap concrete in the circular cap area meets the strength requirements, fill the gap between the circular cofferdam and the circular cap except for the middle part of the cofferdam with concrete.

在上述技术方案的基础上,第三承台区的施工步骤如下,On the basis of the above technical scheme, the construction steps of the third platform area are as follows:

1)浇筑中央系梁承台的封底砼,再进行中央系梁承台抽水;1) Pouring the bottom concrete of the central beam cap, and then pumping the central beam cap;

2)割除中央系梁承台底以上的中间部分围堰;2) Cut off the middle cofferdam above the bottom of the central girder cap;

3)绑扎中央系梁承台钢筋,浇筑中央系梁承台的承台砼。3) Bind the steel bars of the central beam cap, and pour the concrete of the central beam cap.

在上述技术方案的基础上,所述圆形围堰由若干块弧形钢围堰单元件焊接而成。On the basis of the above technical solution, the circular cofferdam is welded by several arc-shaped steel cofferdam units.

与现有技术相比,本发明的优点在于:Compared with the prior art, the present invention has the advantages of:

本发明的哑铃型承台的施工方法,将两侧的圆形围堰进行封闭,与直线段围堰搭接形成三个承台的工作区域,承台施工充分利用了两侧圆形围堰在径向载荷下仅承受轴向力的特点,成功避免了空腔哑铃两端双圆形围堰在圆直交叉点处处理复杂的问题,结构整体性更好,受力更为合理;中间部分圆形围堰可以直接充当直线段围堰的内支撑;采用三个独立施工区域分别施工,降低了哑铃型承台施工难度,无需再系梁区增设临时辅助桩;减少了临时辅助桩和内支撑的投入,使得深水基础施工更为安全经济可靠。The construction method of the dumbbell-shaped caps of the present invention closes the circular cofferdams on both sides, and overlaps with the straight section cofferdams to form three working areas of the caps, and the construction of the caps makes full use of the circular cofferdams on both sides Under the radial load, it only bears the axial force, which successfully avoids the complicated problem of dealing with the double circular cofferdams at both ends of the cavity dumbbell at the intersection of the circles and straights. The structural integrity is better and the force is more reasonable; the middle Part of the circular cofferdam can directly serve as the inner support of the straight section cofferdam; three independent construction areas are used for construction, which reduces the construction difficulty of the dumbbell-shaped cap and does not need to add temporary auxiliary piles in the tie beam area; reduces the number of temporary auxiliary piles and The investment of internal support makes the deep water foundation construction safer, more economical and more reliable.

附图说明Description of drawings

图1为本发明中围堰平面示意图。Fig. 1 is a schematic plan view of a cofferdam in the present invention.

图2为本发明的浇筑区域划分示意图。Fig. 2 is a schematic diagram of pouring area division in the present invention.

图3为本发明中割除中间部分围堰后的围堰示意图。Fig. 3 is a schematic diagram of the cofferdam after the middle part of the cofferdam is cut off in the present invention.

图4为本发明的侧视图。Figure 4 is a side view of the present invention.

图中:1-圆形围堰,2-直线段围堰,3-圆形承台,4-中央系梁承台,5-湿接缝,6-中间部分围堰,7-空隙,8-第一承台区,9-第二承台区,10-第三承台区。In the figure: 1-circular cofferdam, 2-straight section cofferdam, 3-circular cap, 4-central beam cap, 5-wet joint, 6-middle part cofferdam, 7-gap, 8-th The first platform area, 9-the second platform area, and 10-the third platform area.

具体实施方式detailed description

以下结合附图及实施例对本发明作进一步详细说明。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments.

参见图1至4所示,本发明实施例提供一种哑铃型承台的施工方法,包括以下步骤:Referring to Figures 1 to 4, an embodiment of the present invention provides a construction method for a dumbbell-shaped platform, including the following steps:

步骤1,根据哑铃型承台的尺寸拼装双壁钢围堰,Step 1, assemble the double-wall steel cofferdam according to the size of the dumbbell-shaped cap,

其中围堰包括:The cofferdams include:

两封闭圆形围堰1,圆形围堰1由24块弧形钢围堰单元件焊接而成,其包括第一圆形围堰和第二圆形围堰,第一圆形围堰设第一承台区8,第二圆形围堰设第二承台区9;Two closed circular cofferdams 1, the circular cofferdam 1 is welded by 24 arc-shaped steel cofferdam units, which includes the first circular cofferdam and the second circular cofferdam, the first circular cofferdam is set The first platform area 8, the second circular cofferdam is provided with the second platform area 9;

位于两圆形围堰中间的两直线段围堰2的两端分别连接第一圆形围堰和第二圆形围堰,且两所述直线段围堰之间设第三承台区10;The two ends of the two straight-line cofferdams 2 located in the middle of the two circular cofferdams are respectively connected to the first circular cofferdam and the second circular cofferdam, and a third platform area 10 is set between the two straight-line cofferdams. ;

两封闭圆形围堰位于两直线段围堰之间的圆弧段围堰为中间部分围堰;The two closed circular cofferdams and the arc section cofferdam between the two straight section cofferdams are the middle section cofferdams;

步骤2,将围堰整体下放到承台设计位置进行水平限位;Step 2, lower the cofferdam as a whole to the design position of the cap for horizontal limit;

步骤3,施工两侧第一承台区8和第二承台区9内的圆形承台3,Step 3, constructing the circular caps 3 in the first caps area 8 and the second caps area 9 on both sides,

1)浇筑圆形承台3范围内的封底砼,封底砼使圆形围堰和位于圆形围堰1内的钻孔桩整体固定,将圆形围堰1的重量转至钻孔桩承受,对圆形承台3进行抽水;1) Pouring the bottom-sealing concrete within the scope of the circular cofferdam 3, the bottom-sealing concrete fixes the circular cofferdam and the bored piles in the circular cofferdam 1 as a whole, and transfers the weight of the circular cofferdam 1 to the bored piles to bear , pumping water to the circular cap 3;

2)绑扎圆形承台3钢筋;2) Binding the steel bars of the circular bearing platform 3;

3)浇筑圆形承台3的承台砼,预留圆形承台3与第三承台区10之间的钢筋接头和湿接缝5;3) Pouring the cap concrete of the circular cap 3, reserving the steel bar joint and the wet joint 5 between the circular cap 3 and the third cap area 10;

4)待圆形承台3的承台砼达到强度要求后,对除中间部分围堰6外的圆形围堰1与圆形承台3之间的区域空隙进行砼填充,使得圆形承台3参与抵抗水压;4) After the cap concrete of the circular cap 3 reaches the strength requirement, fill the gap between the circular cofferdam 1 and the circular cap 3 except the middle part cofferdam 6 with concrete, so that the circular cap Platform 3 participates in resisting water pressure;

步骤4,施工第三承台区10,Step 4, construction of the third platform area 10,

1)浇筑中央系梁承台4的封底砼,由于中央部分围堰6的侧板与圆形承台3范围内的封底砼形成整体,其与直线段围堰2一同为中央系梁承台4的封底砼提供约束,减小封底砼跨度,然后对第中央系梁承台4进行抽水;1) Pouring the back cover concrete of the central beam cap 4, since the side plate of the central cofferdam 6 and the back cover concrete within the circular cap 3 form a whole, it and the straight section cofferdam 2 are the back cover concrete of the central beam cap 4 Provide constraints, reduce the concrete span of the bottom cover, and then pump water to the first central beam cap 4;

2)割除中央系梁承台4底以上的中间部分围堰6;2) Cut off the cofferdam 6 in the middle part above the bottom of the central beam cap 4;

3)绑扎中央系梁承台4钢筋,浇筑中央系梁承台4的承台砼,承台基础施工完成。3) Bind the steel bars of the central tie beam cap 4, pour the cap concrete of the central tie beam cap 4, and the cap foundation construction is completed.

本发明不局限于上述实施方式,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本发明的保护范围之内。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。The present invention is not limited to the above-mentioned embodiments. For those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications are also considered protection of the present invention. within range. The content not described in detail in this specification belongs to the prior art known to those skilled in the art.

Claims (3)

1. a kind of construction method of dumbbell shape cushion cap, it is characterised in that comprise the following steps:
Double-Wall Steel Boxed Cofferdam is set up in the periphery of dumbbell shape cap design of pile position, wherein cofferdam includes:
Two closed circle cofferdam, which includes the first circular cofferdam and the second circular cofferdam, and first circular cofferdam sets first and holds Platform area, second circular cofferdam set the second cushion cap area;
The two ends in the two straightway cofferdam in the middle of two circular cofferdams connect the first circular cofferdam and the second circular cofferdam respectively, And described in two, between straightway cofferdam, set the 3rd cushion cap area;
It is mid portion cofferdam that two closed circle cofferdam are located at the arc section cofferdam between two straightway cofferdam;
Cofferdam is integrally transferred to cap design of pile position carries out Horizontal limiting;
Bearing platform construction is carried out to the first cushion cap area and the second cushion cap area again;
Bearing platform construction is carried out to the 3rd cushion cap area;
Wherein, the Specific construction step in the first cushion cap area and the second cushion cap area is as follows,
1) the back cover concrete of circular cushion cap is poured, circular cushion cap is carried out again and is drawn water;
2) colligation circle cushion cap reinforcing bar;
3) the cushion cap concrete of circular cushion cap is poured, the splice between circle cushion cap and the 3rd cushion cap area and wet seam is reserved;
4) after the cushion cap concrete in circular cushion cap area reaches intensity requirement, to the part circular cofferdam in addition to mid portion cofferdam and circle Region space between shape cushion cap carries out concrete filling.
2. a kind of construction method of dumbbell shape cushion cap as claimed in claim 1, it is characterised in that:The construction step in the 3rd cushion cap area It is rapid as follows,
1) the back cover concrete of central binder cushion cap is poured, then carries out central binder cushion cap and drawn water;
2) cut off mid portion cofferdam more than central binder cushion cap bottom;
3) colligation central authorities binder cushion cap reinforcing bar, pours the cushion cap concrete of central binder cushion cap.
3. a kind of construction method of dumbbell shape cushion cap as claimed in claim 1, it is characterised in that:The circular cofferdam is by some Block arc steel cofferdam unit piece is welded.
CN201510916182.1A 2015-12-10 2015-12-10 Construction method of dumbbell-shaped bearing platform Active CN105544382B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510916182.1A CN105544382B (en) 2015-12-10 2015-12-10 Construction method of dumbbell-shaped bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510916182.1A CN105544382B (en) 2015-12-10 2015-12-10 Construction method of dumbbell-shaped bearing platform

Publications (2)

Publication Number Publication Date
CN105544382A CN105544382A (en) 2016-05-04
CN105544382B true CN105544382B (en) 2017-03-22

Family

ID=55823914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510916182.1A Active CN105544382B (en) 2015-12-10 2015-12-10 Construction method of dumbbell-shaped bearing platform

Country Status (1)

Country Link
CN (1) CN105544382B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999206B (en) * 2018-07-02 2020-07-21 中铁大桥勘测设计院集团有限公司 Construction method of bridge bearing platform
CN109137960A (en) * 2018-09-04 2019-01-04 中铁大桥局集团有限公司 A kind of construction method of the dumbbell shape cushion cap suitable for land
CN109137945A (en) * 2018-10-26 2019-01-04 四川公路桥梁建设集团有限公司 Cofferdam suitable for waist-shaped pier bearing platform and construction method thereof
CN110485443A (en) * 2019-06-03 2019-11-22 四川公路桥梁建设集团有限公司 8-shaped Double-Wall Steel Boxed Cofferdam and construction manipulation process
CN111088809B (en) * 2019-12-26 2024-06-14 中交武汉港湾工程设计研究院有限公司 Water stop cofferdam structure for construction of underwater lower beam and construction method
CN114164763A (en) * 2021-11-10 2022-03-11 中交第四航务工程局有限公司 Construction method of bridge pier column system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474571Y (en) * 2001-04-24 2002-01-30 路桥集团第一公路工程局 Suspending steel jacket box used for tie beam construction of two column bridge pier under water
KR20100113739A (en) * 2009-04-14 2010-10-22 삼성물산 주식회사 Template and costruction method for cofferdam using the same
CN203034468U (en) * 2012-12-27 2013-07-03 中铁港航局集团有限公司 Novel cofferdam for deep water foundation construction
JP2013224578A (en) * 2013-06-04 2013-10-31 Penta Ocean Construction Co Ltd Reinforcing method of underwater structure and temporary coffering structure
CN203701113U (en) * 2013-12-31 2014-07-09 广州市市政集团有限公司 Combined dual-wall steel cofferdam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2474571Y (en) * 2001-04-24 2002-01-30 路桥集团第一公路工程局 Suspending steel jacket box used for tie beam construction of two column bridge pier under water
KR20100113739A (en) * 2009-04-14 2010-10-22 삼성물산 주식회사 Template and costruction method for cofferdam using the same
CN203034468U (en) * 2012-12-27 2013-07-03 中铁港航局集团有限公司 Novel cofferdam for deep water foundation construction
JP2013224578A (en) * 2013-06-04 2013-10-31 Penta Ocean Construction Co Ltd Reinforcing method of underwater structure and temporary coffering structure
CN203701113U (en) * 2013-12-31 2014-07-09 广州市市政集团有限公司 Combined dual-wall steel cofferdam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
南京长江第四大桥北塔基础施工技术;叶庆旱;《施工技术》;20110125(第2期);第41-44、47页 *

Also Published As

Publication number Publication date
CN105544382A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN104884794B (en) floating structure
CN105544382A (en) Construction method of dumbbell-shaped bearing platform
CN105544581B (en) A kind of construction method of dumbbell shape cushion cap
CN206034408U (en) A back pitching pile formula jacket structure for marine booster station
CN109267473B (en) Wet joint component for connecting bearing platform and prefabricated bridge pier body
CN105926427B (en) Pier beam transition connecting construction
CN213233111U (en) Concrete filled steel tube pier connecting structure with PBL (Poly-p-phenylene benzobisoxazole) shear keys
CN104805857B (en) One detachably recycles bottomless steel jacket box and construction method thereof
CN106869032B (en) Bridge bearing platform beam tying construction method
CN111719409A (en) A steel cap beam and concrete bridge pier connection structure
CN108643219B (en) A prefabricated transmission line bolt static pressure micro pile foundation and its construction method
CN203222733U (en) Pier column type pile foundation collar beam steel hanging box cofferdam
CN106065564A (en) A kind of seamless bridge of steel-concrete combined structure monoblock type
CN102979042B (en) Bridge pier connecting device for bridge lifting process and construction method for bridge pier connecting device
CN113833005B (en) Steel-solid waste concrete combined bearing platform with composite structure and construction method thereof
CN207436045U (en) A kind of prefabricated hollow steel pipe pile
CN204456160U (en) A kind of bridge prefabrication cushion cap
CN108824211A (en) A kind of bridge pier foundation in construction duration method in the river of bridge
CN108643213A (en) construction method of underwater bearing platform construction structure
CN216947817U (en) Transition connection system of bent cap and pier
CN111733691A (en) A connection structure and method of prefabricated column and pile foundation
CN218712148U (en) A outsourcing UHPC steel pipe connector for assembled concrete pier
CN202247929U (en) Plug-shaped bearing platform structure
CN206800434U (en) A kind of bridge pile foundation composite reinforcing structure
CN214574092U (en) Concrete prefabricated back cover structure for caps in tide water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhao Xiaojing

Inventor after: Pan Dongfa

Inventor after: Zhang Chunxin

Inventor after: Chen Zhiren

Inventor after: Mao Weiqi

Inventor after: Tu Manming

Inventor after: Wu Fangming

Inventor after: Ma Tao

Inventor after: Zhang Ruizhi

Inventor before: Zhao Xiaojing

Inventor before: Pan Dongfa

Inventor before: Chen Zhiren

Inventor before: Mao Weiqi

Inventor before: Tu Manming

Inventor before: Wu Fangming

Inventor before: Ma Tao

Inventor before: Zhang Ruizhi

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant