CN105298125B - Hanging hang structure system and its construction method are held under one kind - Google Patents

Hanging hang structure system and its construction method are held under one kind Download PDF

Info

Publication number
CN105298125B
CN105298125B CN201510667541.4A CN201510667541A CN105298125B CN 105298125 B CN105298125 B CN 105298125B CN 201510667541 A CN201510667541 A CN 201510667541A CN 105298125 B CN105298125 B CN 105298125B
Authority
CN
China
Prior art keywords
transformational
section
force transferring
vertical
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510667541.4A
Other languages
Chinese (zh)
Other versions
CN105298125A (en
Inventor
周鹏华
邓伟华
周杰刚
周健
张锋
张一锋
武超
陈锴
王健
李健强
程康
蒲勇
黄挡玉
陈小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201510667541.4A priority Critical patent/CN105298125B/en
Publication of CN105298125A publication Critical patent/CN105298125A/en
Application granted granted Critical
Publication of CN105298125B publication Critical patent/CN105298125B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses holding upper hanging hang structure system and its construction method under one kind, including top reinforcement structure, the vertical force transferring structure in corner, after fill section, bottom transformational structure, middle vertical force transferring structure, hang system and lower support system in top, its construction method be work progress in first use transformational structure supporting system temporary support bottom transformational structure, and fill the interim tunable arrangement of section after rear dress section storey setting, after top reinforcement structure is formed, first unload and carry the interim tunable arrangement of section, more than section each layer concrete is filled after successively pouring again, finally unload transformational structure supporting system, so as to the upper structural system hung of forming part lower supporting part point.The present invention has broken the Traditional Thinking successively constructed from bottom to up, solves that big across converting system section is limited, Lack of support design challenges by the control of sequence of construction, in can be widely applied to need the structural system for setting long span transition structure.

Description

Hanging hang structure system and its construction method are held under one kind
Technical field
The present invention relates to a kind of structural system and its construction method, specifically hanging hang structure system and its construction are held under one kind Method.
Background technology
With continuing to develop for high-rise building, people are also more and more high-end to the building function demand of high-rise building Change, in order to show its high-endization, the hotel at the top of high-rise building often has large span, the visual field demand of large space, structure It is accomplished by disconnecting on the vertical primary structure post in part during design, and transformational structure is set, but the height of transformational structure is often received Architect limits, and in this case, relying solely on transformational structure and bear all of structural load in its top cannot meet, because This is accomplished by for the fractional load of superstructure being transferred directly to vertical applied force structure, so that mitigate the load of transformational structure, and Successively the conventional construction method of construction cannot realize design idea upwards.Accordingly, it would be desirable to design and construction tight structure, invention one New construction method is planted to realize this structure design intention.
The content of the invention
It is an object of the invention to provide upper hanging hang structure system and its construction method is held under one kind, to solve above-mentioned background skill The problem proposed in art.
To achieve the above object, the present invention provides following technical scheme:
Hanging hang structure system, including top reinforcement structure, the afterwards vertical force transferring structure in corner, dress section, bottom turn are held under one kind Structure, middle vertical force transferring structure, top hanging system and lower support system are changed, the vertical force transferring structure in centre is in bottom Head is received below transformational structure, the bottom transformational structure is not enough to bear all loads of superstructure, the lower support body Tie up in pressured state after structure is formed, the top is hung system and hangs state, the top in tension after structure is formed Top hanging system fractional load is transferred to the vertical force transferring structure in corner by reinforcement structure, and the bottom transformational structure is by bottom branch The system fractional load of holding is transferred to the vertical force transferring structure in corner.
As further scheme of the invention:The construction method of hanging hang structure system is held under a kind of, is comprised the following steps:
Step one, floor where substructure construction to bottom transformational structure and middle vertical force transferring structure have been constructed Cheng Hou, installs transformational structure supporting system, then installs bottom transformational structure, and bottom transformational structure carries out pre- according to calculating requirement Arch is set, and now the load of bottom transformational structure superstructure is directly transferred to middle vertical biography by transformational structure supporting system The vertical force transferring structure of power structure and corner;
Step 2, continue constructing structure to it is rear dress section where floor, and after the completion of fill the interim tunable arrangement of section installation, after The interim tunable arrangement of section is filled as interim force transferring structure, while there is provided discharge mechanism, its vertical adjustable value size is according to top Structural simulation is calculated and determined;
Step 3, continues constructing structure until all construction completions of top reinforcement structure, now dress section is hung as top afterwards Temporary connecting device between hanging body system and lower support system, and the vertical load that system is hung on top is transmitted, wherein on Portion's hanging system floor concrete is postponed pouring;
Step 4, unloads to rear dress section, that is, loosen its vertical constraint, and unloading should be same according to calculation simulation analysis classification Step is carried out, and now top hanging system is integrally moved down and forms hanging state;
Step 5, successively pour top hanging system floor concrete, after its vertical deformation stabilization after, after the completion of fill section end Gu, system vertical structure will be hung and weld to form entirety with supporting system vertical structure;
Step 6, the synchronous unloading transformational structure supporting system of classification, completes overall structure construction.
Compared with prior art, the beneficial effects of the invention are as follows:
First, this construction method is efficiently solved and is transferred directly to vertically part-structure load more than transformational structure Structure, so as to mitigate the technical barrier of transformational structure load.
Secondly, this construction method is a kind of approach for realizing that this design idea is both economical.
Again, the comparative maturity of the discharge mechanism discharging method employed in this construction method, work progress is easy to control System.
In the composite can be widely applied to need to set the structural system of long span transition structure.
Brief description of the drawings
Fig. 1 holds the structural representation of hanging hang structure system under being.
Fig. 2 holds the corresponding state diagram of step one in the construction method of hanging hang structure system under being.
Fig. 3 changes structural support system composition schematic diagram during hanging hang structure system is held under being.
Fig. 4 holds step 2 corresponding states figure in the construction method of hanging hang structure system under being.
Fig. 5 holds step 3 corresponding states figure in the construction method of hanging hang structure system under being.
Fig. 6 holds step 4 corresponding states figure in the construction method of hanging hang structure system under being.
Fig. 7 holds step 5 corresponding states figure in the construction method of hanging hang structure system under being.
Fig. 8 holds step 6 corresponding states figure in the construction method of hanging hang structure system under being.
In figure:1- tops reinforcement structure, the vertical force transferring structure in 2- corners, fill after 3- section, 4- bottoms transformational structure, Vertical force transferring structure, 6- tops hanging system, 6.1- hanging systems vertical structure, 6.2- hanging system horizontal junctions in the middle of 5- Structure, 7- lower supports system, 7.1- supporting systems vertical structure, 7.2- supporting systems horizontal structure, 8- transformational structure branch Section is filled after holding system, 8.1- transformational structure supporting systems force structure, 8.2- transformational structure supporting systems discharge mechanism, 9- Interim tunable arrangement.
Specific embodiment
The technical scheme of this patent is described in more detail with reference to specific embodiment.
Refer to Fig. 1-8, hold hanging hang structure system under one kind, including the vertical force transferring structure 2 of top reinforcement structure 1, corner, Dress section 3, bottom transformational structure 4, middle vertical force transferring structure 5, top hang system 6 and lower support system 7, the centre afterwards Vertical force transferring structure 5 receives head in bottom transformational structure below 4, the bottom transformational structure 4 is not enough to bear superstructure institute There is load, the lower support system 7 is in pressured state after structure is formed, and system 6 is hung after structure is formed in the top State is hung in tension, the top hanging fractional load of system 6 is transferred to the vertical force transferring structure in corner by the top reinforcement structure 1 2, the fractional load of lower support system 7 is transferred to the vertical force transferring structure 2 in corner by the bottom transformational structure 4.
The construction method of hanging hang structure system is held under a kind of, its step is as follows:
Step one, substructure construction to the place floor of bottom transformational structure 4 and middle vertical force transferring structure 5 have been constructed After the completion of, transformational structure supporting system 8 is installed, then bottom transformational structure 4 is installed, bottom transformational structure 4 is required according to calculating Carry out pre- arch to set, during now the load of the superstructure of bottom transformational structure 4 is directly transferred to by transformational structure supporting system 8 Between vertical force transferring structure 5 and the vertical force transferring structure 2 in corner;
Step 2, continue constructing structure to it is rear dress the place floor of section 3, and after the completion of fill the interim tunable arrangement 9 of section installation, The interim tunable arrangement 9 of section is filled afterwards as interim force transferring structure, while there is provided discharge mechanism, its vertical adjustable value size is according to upper Portion's structural simulation is calculated and determined;
Step 3, continuation constructing structure are until all construction completions of top reinforcement structure 1, now fill section 3 as top afterwards Temporary connecting device between hanging system 6 and lower support system 7, and the vertical load that system 6 is hung on top is transmitted, its Middle and upper part hanging system 6 floor concrete is postponed pouring;
Step 4, unloads to rear dress section 3, that is, loosen its vertical constraint, and unloading should be classified according to calculation simulation analysis Synchronously carry out, now top hanging system 6 is overall to be moved down and form hanging state;
Step 5, successively pour top hanging the floor concrete of system 6, after its vertical deformation stabilization after, after the completion of fill section 3 It is solid eventually, system vertical structure 6.1 will be hung and form overall with the welding of supporting system vertical structure 7.1;
Step 6, the synchronous unloading transformational structure supporting system 8 of classification, completes overall structure construction.
The better embodiment to this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, in the ken that one skilled in the relevant art possesses, can also be on the premise of this patent objective not be departed from Make a variety of changes.

Claims (2)

1. hold hanging hang structure system under one kind, including top reinforcement structure (1), the vertical force transferring structure in corner (2), afterwards dress section (3), System (6) and lower support system (7) are hung in bottom transformational structure (4), middle vertical force transferring structure (5), top, and its feature exists In the vertical force transferring structure in centre (5) receives head below in bottom transformational structure (4), and the bottom transformational structure (4) is not enough To bear all loads of superstructure, the lower support system (7) is in pressured state after structure is formed, the top hanging System (6) hangs state after structure is formed in tension, and system (6) part lotus is hung in top by the top reinforcement structure (1) Load is transferred to the vertical force transferring structure in corner (2), and the bottom transformational structure (4) transmits lower support system (7) fractional load To the vertical force transferring structure in corner (2).
2. it is a kind of it is as claimed in claim 1 under hold the construction method of hanging hang structure system, it is characterised in that including following step Suddenly:
Step one, floor where substructure construction to bottom transformational structure (4) and middle vertical force transferring structure (5) have been constructed After the completion of, transformational structure supporting system (8) is installed, bottom transformational structure (4) is then installed, bottom transformational structure (4) is according to meter Calculating requirement carries out pre- arch setting, and now the load of bottom transformational structure (4) superstructure directly passes through transformational structure supporting system (8) middle vertical force transferring structure (5) and the vertical force transferring structure in corner (2) are transferred to;
Step 2, continues floor where constructing structure to rear dress section (3), and after the completion of fill the installation of the interim tunable arrangement of section (9), The dress interim tunable arrangement of section (9) is used as interim force transferring structure afterwards, while there is provided discharge mechanism, its vertical adjustable value size according to Superstructure simulation is calculated and determined;
Step 3, continuation constructing structure are until top reinforcement structure (1) all construction completions, now fill section (3) as top afterwards Temporary connecting device between hanging system (6) and lower support system (7), and transmit the vertical of top hanging system (6) Load, its middle and upper part hanging system (6) floor concrete is postponed pouring;
Step 4, unloads to rear dress section (3), that is, loosen its vertical constraint, and unloading should be same according to calculation simulation analysis classification Step is carried out, and now top is hung system (6) and integrally moves down and form hanging state;
Step 5, successively pour top hanging system (6) floor concrete, after its vertical deformation stabilization after, after the completion of fill section (3) It is solid eventually, system vertical structure (6.1) will be hung and form overall with supporting system vertical structure (7.1) welding;
Step 6, synchronous unloading transformational structure supporting system (8) of classification, completes overall structure construction.
CN201510667541.4A 2015-10-16 2015-10-16 Hanging hang structure system and its construction method are held under one kind Active CN105298125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510667541.4A CN105298125B (en) 2015-10-16 2015-10-16 Hanging hang structure system and its construction method are held under one kind

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510667541.4A CN105298125B (en) 2015-10-16 2015-10-16 Hanging hang structure system and its construction method are held under one kind

Publications (2)

Publication Number Publication Date
CN105298125A CN105298125A (en) 2016-02-03
CN105298125B true CN105298125B (en) 2017-06-23

Family

ID=55195874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510667541.4A Active CN105298125B (en) 2015-10-16 2015-10-16 Hanging hang structure system and its construction method are held under one kind

Country Status (1)

Country Link
CN (1) CN105298125B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759909B (en) * 2016-12-15 2019-05-31 中建城市建设发展有限公司 Bearing structure system and its construction method are hung up under one kind

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3028436B2 (en) * 1992-06-16 2000-04-04 株式会社フジタ How to change the suspended load
JP3733511B2 (en) * 1999-07-16 2006-01-11 清水建設株式会社 Building construction method
CN1740473A (en) * 2005-09-13 2006-03-01 北京航空航天大学 Arched conversion beam for high-rise building
CN202017257U (en) * 2011-03-30 2011-10-26 广东南海国际建筑设计有限公司 Large-span transformational structure for high-rise building
CN103866979A (en) * 2014-02-27 2014-06-18 中天建设集团有限公司 Construction method for conversion layer unloading type formwork system

Also Published As

Publication number Publication date
CN105298125A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN203113553U (en) Prefabricated concrete frame-shear wall structure
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
CN103485283B (en) Hanging bracket supporting system of side-span cast-in-place section and implementation method thereof
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN106088330B (en) The connection structure and its construction method of assembling frame beam and frame column based on 3D printing
CN109024993A (en) A kind of assembly concrete frame wall filled with masonry structural system and its construction method
CN108560719A (en) The support installation method of super large span double-layer Bidirectional hanging rope structure
CN103244123A (en) High-dipping medium thick ore body mining method
CN207032601U (en) A kind of two-way close spelling laminated floor slab connecting joint structure
CN104847156A (en) Unit-assembly type communication tower
CN105298125B (en) Hanging hang structure system and its construction method are held under one kind
CN201942994U (en) Bridge bearing pad
CN104141358A (en) Mortar-free self-embedded masonry structure system and building comprising system
CN201554034U (en) Horizontal embedding support structure for post-pouring belt of top-down construction
CN206529892U (en) A kind of architectural structure system applied to high-level structure
CN105756380A (en) Construction method of multi-layer large-span assembled integral space steel grid box-type structure factory building
CN104775557B (en) A kind of large span assembled integral hollow sandwich panel ceiling for storied building
CN106013450A (en) Core tube skip-floor construction method
CN107191201A (en) Constructing middle partition wall in tunnel template and its constructing device
CN108797380A (en) Continuous girders by suspension grouting bracket suspends constructing device and construction method in midair
CN106988520A (en) Construction method and support system for high-rise overhung construction
CN207633583U (en) A kind of connection structure of prefabricated post and prefabricated partition wall
CN110359548A (en) A kind of steel truss suspension hybrid system and construction method
CN207659987U (en) Two prefabricated cabin assembly Pipe racks of superposed type
CN202787309U (en) Transformer foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant