CN108225642A - 一种悬臂平推架设过程安全监测方法 - Google Patents
一种悬臂平推架设过程安全监测方法 Download PDFInfo
- Publication number
- CN108225642A CN108225642A CN201711435852.3A CN201711435852A CN108225642A CN 108225642 A CN108225642 A CN 108225642A CN 201711435852 A CN201711435852 A CN 201711435852A CN 108225642 A CN108225642 A CN 108225642A
- Authority
- CN
- China
- Prior art keywords
- flat
- rolling
- pressure
- spanning
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
Abstract
本发明公开了一种悬臂平推架设过程安全监测方法,该方法在平滚的下方设置压力监测块,压力监测块通过信号线缆连接压力表,桥跨的重力通过平滚作用在压力监测块上,压力值通过压力表显示;首先将主桥和导梁组合的桥跨结构在平滚和摇滚组合的平推支撑结构上向前推进;观测位于桥跨下方的两组平滚上的压力表,若平滚压力逐步减小并接近于零,应即时调整桥跨结构,当桥跨跨过三组平滚后,如果远离推进端的最后一组平滚的压力逐步减小并接近于零,应即时调整桥跨结构或增加配重;采用该方法对架设过程进行监测时不需经验丰富的技术人员亦可清楚判断任一施工状态是否存在倾倒危险,大大减低了施工风险。
Description
技术领域
本发明涉及一种桥梁架设过程中的安全监测方法,特别涉及一种钢结构桥梁采用悬臂平推架设施工法架设过程中的安全监测方法。
背景技术
由于悬臂平推架设的施工方法架设迅速、安全可靠、不需要大的起重设备,工人稍加培训即可承担架设任务,因而许多钢结构桥梁均采用悬臂平推的架设方式,尤其是贝雷桥和钢桁架桥。悬臂平推架设需要在河流两岸预先布置好摇滚和平滚,将桥梁的大部分构件在我岸拼装好,然后利用人力或者机械牵引拖拉,将桥梁平稳推出,直达对岸摇滚后就位。但采用悬臂平推架设需特别注意保持桥梁的平衡,避免在推出过程中因前端悬空而发生倾倒的危险,同时还应保证各平滚受力安全。因而,一般采用该施工方法时,同时会在桥梁的正前端另拼几节导梁结构,待桥梁达到对岸摇滚后,再逐节拆除。但即使采用导梁结构,为了保证桥梁在悬臂平推过程中,不发生倾倒,常常需要额外的配重装备,该配重装备的数量及位置需通过计算在平推过程中不断更改,以便保证结构重心始终位于我岸摇滚之后,且需预留足够的平滚承载力安全余量。因而需要施工技术人员对桥梁及导梁结构有足够的了解,自身具有一定的职业能力,且需根据现场条件时刻调整配重设计,具有一定的技术难度,不方便即时控制施工状态。
发明内容
有鉴于此,本发明提供了一种悬臂平推架设过程安全监测方法,采用该方法对架设过程进行监测时不需经验丰富的技术人员亦可清楚判断任一施工状态是否存在倾倒危险,大大减低了施工风险。
一种悬臂平推架设过程安全监测方法,该方法在平滚的下方设置压力监测块,压力监测块通过信号线缆连接压力表,桥跨的重力通过平滚作用在压力监测块上,压力值通过压力表显示;实现监测的步骤如下:
第一步:将主桥和导梁组合的桥跨结构在平滚和摇滚组合的平推支撑结构上沿水平方向向前推进;
第二步:当桥跨仅跨过两组平滚的早期阶段,观测位于桥跨下方的两组平滚上的压力表,若平滚压力逐步减小并接近于零,说明桥跨有向远离该组平滚倾倒的趋势,应即时调整桥跨结构,即增加主桥的桥节以改变桥跨结构的重心;
第三步:当桥跨跨过三组平滚后,观测各平滚上压力表的压力值,如果远离推进端的最后一组平滚的压力逐步减小并接近于零,说明桥跨有向推进方向倾倒的趋势,应即时调整桥跨结构或增加配重;
第四步:当导梁到达对岸的摇滚后完成架设过程安全监测。
有益效果:
本发明的安全监测装置将桥梁悬臂平推架设过程中各平滚的受力通过压力监测系统的压力表明确的显示后,不需经验丰富的技术人员亦可清楚判断任一施工状态是否存在倾倒危险,大大减低了施工风险。同时,根据平滚的压力表显示的压力值,不需通过复杂的受力计算,即可适时增加或减少配重,或者调整配重的位置,极大提高了平推施工的效率。
附图说明
图1:桥梁结构悬臂平推架设示意图
图2:本发明平滚压力监测装置安装位置示意图
图3:本发明平滚压力监测装置安装位置侧视示意图
其中,1-主桥、2-导梁、3-平滚、4-摇滚、5-配重、6-压力表、7-压力监测块,
图1中G.C为桥跨重心位置,L为桥梁跨度,L1为平(摇)滚间距。
具体实施方式
下面结合附图并举实施例,对本发明进行详细描述。
本发明提供了一种悬臂平推架设过程安全监测方法,该方法应用于桥梁悬臂平推架设施工过程中。桥梁悬臂平推架设包括上部桥跨结构和下部平推支撑结构两大部分。上部桥跨体系包括若干节主桥1和若干节导梁2。下部平推支撑结构包括若干组平滚3、位于我岸桥台的一组摇滚4和对岸桥台的另一组摇滚4组成。平滚3和摇滚4支撑于桥跨结构之下,每组平滚和摇滚的数量由桥跨结构的榀数决定,一般桥跨结构为左右两榀,则每组平滚和摇滚亦为两件,分别支撑左右两榀桥跨。
如图2所示,压力监测装置安装于平滚上,由四个压力监测块7、信号线缆(图中未显示)和压力表6组成。压力监测装置可将压力监测块7所承受的压力转换为平滚所受压力,并将该压力通过信号线缆传递给压力表6,由压力表6明确显示。
在桥梁两端桥台上布设摇滚,在我岸桥台后方间隔一定距离(L1)布设平滚,并保证平滚、摇滚沿桥纵向轴心位于同一直线,且上表面标高一致,然后在平滚上拼装导梁及主桥,调整好后即可向前推进。当主桥1和导梁2组合的桥跨结构在平滚3和摇滚4组合的平推支撑结构上向前推进过程中,由于桥跨结构位置和结构的改变,导致结构重量和重心不断改变,因而支撑于下方的平滚3和摇滚4受力亦随之改变。
在平推架设开始时,由导梁2和主桥1组成的桥跨仅跨过两组平滚,观测位于桥跨下方的两组平滚3的压力表6,若某一组平滚3的压力表6显示值步减小并接近于零,说明桥跨有向远离该组平滚3倾倒的危险,应及时调整桥跨结构。
当桥跨结构跨过三组平滚3后,观测各平滚,尤其是远离推进端的最后一组平滚3的压力表6指示值,若指示值逐步减小并接近于零,说明桥跨有向推进方向倾倒的危险,应及时调整桥跨结构或增加配重。
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (1)
1.一种悬臂平推架设过程安全监测方法,其特征在于,该方法在平滚的下方设置压力监测块,压力监测块通过信号线缆连接压力表,桥跨的重力通过平滚作用在压力监测块上,压力值通过压力表显示;实现监测的步骤如下:
第一步:将主桥和导梁组合的桥跨结构在平滚和摇滚组合的平推支撑结构上沿水平方向向前推进;
第二步:当桥跨仅跨过两组平滚的早期阶段,观测位于桥跨下方的两组平滚上的压力表,若平滚压力逐步减小并接近于零,说明桥跨有向远离该组平滚倾倒的趋势,应即时调整桥跨结构,即增加主桥的桥节以改变桥跨结构的重心;
第三步:当桥跨跨过三组平滚后,观测各平滚上压力表的压力值,如果远离推进端的最后一组平滚的压力逐步减小并接近于零,说明桥跨有向推进方向倾倒的趋势,应即时调整桥跨结构或增加配重;
第四步:当导梁到达对岸的摇滚后完成架设过程安全监测。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711435852.3A CN108225642A (zh) | 2017-12-26 | 2017-12-26 | 一种悬臂平推架设过程安全监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711435852.3A CN108225642A (zh) | 2017-12-26 | 2017-12-26 | 一种悬臂平推架设过程安全监测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108225642A true CN108225642A (zh) | 2018-06-29 |
Family
ID=62648945
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711435852.3A Pending CN108225642A (zh) | 2017-12-26 | 2017-12-26 | 一种悬臂平推架设过程安全监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108225642A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653076A (zh) * | 2018-12-24 | 2019-04-19 | 四川港航建设工程有限公司 | 复合式防洪度汛闸首贝雷钢桥及施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB9411609D0 (en) * | 1994-06-09 | 1994-08-03 | Fitzpatrick Patrick A | A ground supported bridge, and a method of working on a roadway employing such a bridge |
CN101787678A (zh) * | 2010-02-08 | 2010-07-28 | 中铁一局集团有限公司 | 大跨度节段拼装造桥机及其拼装施工工艺 |
CN102561200A (zh) * | 2012-01-20 | 2012-07-11 | 中铁一局集团有限公司 | 架桥机过路基用推行装置及架桥机过路基方法 |
CN107503296A (zh) * | 2017-08-31 | 2017-12-22 | 中国十九冶集团有限公司 | 贝雷桥就位方法 |
-
2017
- 2017-12-26 CN CN201711435852.3A patent/CN108225642A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB9411609D0 (en) * | 1994-06-09 | 1994-08-03 | Fitzpatrick Patrick A | A ground supported bridge, and a method of working on a roadway employing such a bridge |
CN101787678A (zh) * | 2010-02-08 | 2010-07-28 | 中铁一局集团有限公司 | 大跨度节段拼装造桥机及其拼装施工工艺 |
CN102561200A (zh) * | 2012-01-20 | 2012-07-11 | 中铁一局集团有限公司 | 架桥机过路基用推行装置及架桥机过路基方法 |
CN107503296A (zh) * | 2017-08-31 | 2017-12-22 | 中国十九冶集团有限公司 | 贝雷桥就位方法 |
Non-Patent Citations (1)
Title |
---|
孙文俊: "《渡河桥梁装备设计与计算》", 31 March 2013 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109653076A (zh) * | 2018-12-24 | 2019-04-19 | 四川港航建设工程有限公司 | 复合式防洪度汛闸首贝雷钢桥及施工方法 |
CN109653076B (zh) * | 2018-12-24 | 2021-01-08 | 四川港航建设工程有限公司 | 复合式防洪度汛闸首贝雷钢桥及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101519864B (zh) | 一种箱型拱桥安装方法 | |
CN106087752B (zh) | 多跨提篮拱桥施工方法 | |
CN108374347A (zh) | 一种高速铁路大跨度提篮拱桥钢拱肋扣挂系统施工方法 | |
CN107201721A (zh) | 一种斜拉索安装施工方法 | |
CN202247688U (zh) | 一种上跨高速铁路防气动力防护棚架 | |
CN104480868B (zh) | 上跨运营铁路的公路桥拆梁方法 | |
CN104032678A (zh) | H型塔柱内力可调的临时横撑结构及其施工方法 | |
CN101284628B (zh) | 大吨位压力机架的吊装方法 | |
CN102704405B (zh) | 一种利用扣、锚索平衡额外水平力的方法 | |
CN100494576C (zh) | 箱式桥梁梁体维修工程箱外悬挂式脚手架的搭设方法 | |
CN108457207A (zh) | 利用架桥机纵连进行营业线多跨桥梁梁体拆除的方法 | |
CN204689430U (zh) | 竖井施工可移动式吊装装置 | |
CN105586832A (zh) | 悬挂式猫道面网安装系统 | |
CN106758862B (zh) | 格构式钢管塔架安、拆平台 | |
CN108225642A (zh) | 一种悬臂平推架设过程安全监测方法 | |
CN107761543A (zh) | 一种快速构建大跨度轻量化应急桥梁的装置和方法 | |
CN109208471A (zh) | 一种桥梁检修用吊篮施工平台 | |
CN206471750U (zh) | 一种跨越障碍物架线施工保护结构 | |
CN108625289A (zh) | 一种适用于悬索桥加劲梁的架设装置及架设方法 | |
CN206359894U (zh) | 一种水中裸岩地质组合式现浇箱梁支架系统 | |
CN205591115U (zh) | 悬挂式猫道面网安装系统 | |
CN209618724U (zh) | 一种动臂塔吊用自提升底部防护装置 | |
CN204823738U (zh) | 一种双梁电葫芦式起重机主梁矫正装置 | |
CN103849709A (zh) | 炼钢转炉的倾动系统的安装方法 | |
CN207109599U (zh) | 一种支架现浇混凝土连续梁的模板拆除及安装装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180629 |
|
WD01 | Invention patent application deemed withdrawn after publication |