CN108221876A - A kind of hydraulic engineering flood discharge antiseepage dam - Google Patents

A kind of hydraulic engineering flood discharge antiseepage dam Download PDF

Info

Publication number
CN108221876A
CN108221876A CN201810126620.8A CN201810126620A CN108221876A CN 108221876 A CN108221876 A CN 108221876A CN 201810126620 A CN201810126620 A CN 201810126620A CN 108221876 A CN108221876 A CN 108221876A
Authority
CN
China
Prior art keywords
layer
flood discharge
hydraulic engineering
observation
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810126620.8A
Other languages
Chinese (zh)
Other versions
CN108221876B (en
Inventor
吕桂兰
王艳芳
王凤云
柳小平
伍迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningxia Fengyun Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810126620.8A priority Critical patent/CN108221876B/en
Publication of CN108221876A publication Critical patent/CN108221876A/en
Application granted granted Critical
Publication of CN108221876B publication Critical patent/CN108221876B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Laminated Bodies (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of hydraulic engineering flood discharge antiseepage dam, including first layer supporting layer, second layer non cohesire soil layer, third layer corrosion-resistant coating, the 4th layer concrete structure sheaf, layer 5 membrane waterproofing and observation flood discharge hole;The present invention is by setting five-layer structure, second layer non cohesire soil layer especially therein, third layer corrosion-resistant coating and layer 5 membrane waterproofing, it can be good at playing the resistance to compression of dam, durable, anti-blend etch-proof effect, and between five layers by the special rattan after chemically treated into latticed through connection, each layer can be connected as to an entirety, to enhance the fastness of dam and stability;Setting observation flood discharge hole can timely observe the situation of sampling water, and automatic controlling gate flexibly can accurately carry out flood discharge, alleviate the pressure of dam, and then increase the service life of dam.

Description

A kind of hydraulic engineering flood discharge antiseepage dam
Technical field
The present invention relates to Water Resources Domain, more specifically to a kind of hydraulic engineering flood discharge antiseepage dam.
Background technology
Hydraulic engineering is the surface water and groundwater for controlling and allocating nature, reaches and removes the evil emerging sharp purpose and build Engineering.Also referred to as Hydraulic Projects.Water is human being's production and essential precious resources of living, but the state of its naturally occurring is simultaneously Not in full conformity with the needs of the mankind.Hydraulic engineering is only built, flow could be controlled, prevents flood, and carry out water It adjusts and distributes, to meet the needs of people's lives and production to water resource.Hydraulic engineering needs to build dam, dike, spillway, water Lock, channel, crosses the different types of hydraulic structure such as mortise, log chute, fish pass at water inlet, to realize its target.
Hydraulic engineering not only makes a difference to the economy of location and society by its construction task, and to rivers, Lake and natural appearance in the neighbourhood, ecological environment, natural landscape or even to regional climate, will all generate different degrees of Influence.It is this to influence both advantageous and disadvantageous, this influence must be fully estimated during planning and designing, give full play to hydraulic engineering Positive effect, eliminate its negative influence.
Dam is block rivers ditch water flow with raising of water level or the water retaining structure of adjusting flow.Reservoir can be formed, is lifted High water level, concentrates head at regulated flow, for flood control, water supply, irrigation, hydroelectric generation, improves shipping etc..
Traditional dam is mostly earth and rockfill dam or concrete dam, since dam body is washed away by flowing water, corrodes or mixed for a long time The reasons such as solidifying soil aging, can cause hypertonia, seepage discharge big and cause dam deformation, more serious to cause to have an accident.And After long-time service, since the variation washed away with geology of flow will appear the offset of two dam bodys in left and right.
Existing part dam structure is simple, and antiseepage, Corrosion Protection are poor;And when variation in water pressure is excessive cannot and When effectively observe with flood discharge depressurize, be easy to cause dam break.
Invention content
1st, the technical problem to be solved in the present invention
The purpose of the present invention is to provide a kind of hydraulic engineering flood discharge antiseepage dam manufacturing method, to solve in above-mentioned background technology The problem of proposition:
(1), existing part dam structure it is simple, antiseepage, Corrosion Protection are poor;
(2), existing part dam cannot timely and effectively be observed when variation in water pressure is excessive and flood discharge decompression, be easy to cause routed Dam.
2nd, technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of hydraulic engineering flood discharge antiseepage dam, including ontology, the ontology from being disposed with first layer inside outside Supporting layer, second layer non cohesire soil layer, third layer corrosion-resistant coating, the 4th layer concrete structure sheaf and layer 5 membrane waterproofing, institute The first layer supporting layer stated is fixedly connected by carrying the reinforcing bar of barb with second layer non cohesire soil layer side, the second layer Non cohesire soil layer opposite side is tightly connected by the adhesive of high intensity plus cement mixing and third layer corrosion-resistant coating side, institute The third layer corrosion-resistant coating opposite side stated is connect by cement and glue for tile mixing with the 4th layer concrete structure sheaf side, described 4th layer concrete structure sheaf opposite side is seamlessly connected with layer 5 membrane waterproofing by epoxy adhesive and pitch;Described is each Between layer by the special rattan after chemically treated into latticed through connection.
Epoxy adhesive is a kind of work being formulated by epoxy resin base-material, curing agent, diluent, accelerating agent and filler Journey adhesive, adhesive property is good, functionality is good, less expensive, technique for sticking are easy.Epoxy resin contains various polarity Group and active very big epoxy group, so the material with high surface activity has very strong bonding force(Such as cement), while ring The cohesive strength of oxygen solidfied material is also very big, so its glue-joint strength is very high;And a variety of media such as energy acid and alkali resistance, salt, solvent Corrosion.
This chemically treated rattan is first to be handled by timber reinforcing agent, then by corrosion inhibiter;Timber reinforcing agent is a kind of Wood bamboo rattan strain cracking is prevented, performance function is put forward, increases hardness strength, keeps the chemical extravasation of moisture content stabilization, closing With the chemical material of moisture-proof acid/alkali-corrosion-resistant, while high abrasion is also equipped with, height closing, high tenacity, the performances such as environmental protection;For rattan Can prevent afterwards sugar in rattan, albumen object it is mouldy, prevent rattan material from changing colour, height attachment high tenacity can make that rattan material is more robust, rattan article Structure is more firm.Corrosion inhibiter mainly includes phosphonic acids(Salt), phosphine carboxylic acid, coloured glaze base benzothiazole, benzotriazole, lignosulfonate etc. one Heterocyclic compound containing oxynitrides a bit can prevent rattan from corroding;After chemical treatment, there is Corrosion Protection, it can It persistently uses, and the hardness of its own and connectivity also increase many times.
Further, more right-angled intersection steel columns are provided in the 4th layer concrete structure sheaf;This steel column is embedded in ground downwards Under table, left and right is inserted within massif, can be enhanced the hardness and fastness of concrete, be improved the resistance to compression energy of dam Power.
Further, first layer supporting layer is brick mix structure layer, and every several reinforcing bars of traverse between two pieces of bricks, it is tough to increase its Property, it plays a supporting role.
Further, observation flood discharge hole is provided in ontology, the upper end in the observation flood discharge hole is provided with the steel of umbrella shape Plate is filled with soil between the observation flood discharge hole and steel plate.
Further, ontology is arc;It can play the role of disperseing pressure, the pressure of water is disperseed toward both sides massif; And arcuate structure can prevent waterproof membrane cracked, extend the service life of waterproof membrane, be more uniformly distributed the stress of each layer.
Further, observation flood discharge hole is provided with undulatory antidetonation resistance to compression piece between three-layer pipe road, goes out to be three layers round The mouth of a river is three groups, can play and alleviate the too urgent pressure of flow.
Further, rattan is by chemical specially treated, and rattan is into latticed whole through being connected as one by each layer Body.
Further, each layer of ontology is embedded in inside massif by expanding steel nail, and dam can be made to close two with massif and be One, it is integrally formed, resists the impact of hydraulic pressure and flow.
Further, observation flood discharge hole is provided with three-layer pipe structure, be followed successively by from inside to outside first layer pipe, second layer pipe and Third layer pipe, the first layer pipe is welded and fixed by antidetonation resistance to compression piece with second layer pipe to be connect, and the second layer pipe leads to Antidetonation resistance to compression piece is crossed to be welded to connect with third layer pipe;First layer pipe, second layer pipe and third layer pipe are made of special material, With hardness height and Corrosion Protection, antidetonation resistance to compression piece has certain elasticity, can play the role of resistance to compression antidetonation buffering.
3rd, the beneficial effects of the invention are as follows:
Compared with prior art, the beneficial effects of the invention are as follows:
(1)The present invention is by setting five-layer structure, second layer non cohesire soil layer especially therein, third layer corrosion-resistant coating and the 5th Layer membrane waterproofing, can be good at solving the problems, such as the resistance to compression of dam, it is durable, prevent blending it is etch-proof.
(2)The present invention can timely observe the situation of sampling water, and automatic by being provided with observation flood discharge pore structure Regulating gate flexibly can accurately carry out flood discharge, alleviate the pressure of dam.
Description of the drawings
Attached drawing is used to provide further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Example is applied together for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the internal structure schematic diagram of the present invention;
Fig. 3 is the observation flood discharge pore structure schematic diagram of the present invention;
The dam that Fig. 4 is the present invention is embedded in massif schematic diagram;
Fig. 5 is the vertical view of the present invention;
Fig. 6 is the observation flood discharge hole internal cross section structure diagram of the present invention.
Figure label explanation:
(1), first layer supporting layer;
(2), second layer non cohesire soil layer;
(3), third layer corrosion-resistant coating;
(4), concrete;
(5), membrane waterproofing;
(6), observation flood discharge hole;
(7), steel plate;
(8), dam ontology;
(9), massif;
(10), first layer pipe;
(11), second layer pipe;
(12), third layer pipe;
(13), antidetonation resistance to compression piece.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only the part of the embodiment invented, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment belongs to the range of the protection of the present invention.
Embodiment 1:Please refer to Fig.1-6, a kind of hydraulic engineering flood discharge antiseepage dam, including ontology 8, ontology 8 is from outside inside successively It is provided with first layer supporting layer 1, second layer non cohesire soil layer 2, third layer corrosion-resistant coating 3, the 4th layer concrete structure sheaf 4 and Five layers of membrane waterproofing 5, first layer supporting layer 1 are fixedly connected by carrying the reinforcing bar of barb with 2 side of second layer non cohesire soil layer, 2 opposite side of second layer non cohesire soil layer is close plus cement mixing and 3 side of third layer corrosion-resistant coating by the adhesive of high intensity Envelope connection, 3 opposite side of third layer corrosion-resistant coating are connect by cement and glue for tile mixing with 4 side of the 4th layer concrete structure sheaf, 4th layer concrete structure sheaf, 4 opposite side is seamlessly connected with layer 5 membrane waterproofing 5 by epoxy adhesive and pitch;Each layer it Between by the special rattan after chemically treated into latticed through connection.
More right-angled intersection steel columns are provided in 4th layer concrete structure sheaf 4.First layer supporting layer 1 is brick mix structure Layer.Observation flood discharge hole 6 is provided in ontology, the upper end in observation flood discharge hole 6 is provided with the steel plate 7 of umbrella shape, observation flood discharge hole 6 and steel Soil is filled between plate 7.Ontology 8 is arc.Flood discharge hole 6 is observed to be three layers round, three-layer pipe is provided with corrugated between road Antidetonation resistance to compression piece 13, water outlet be three groups.Become whole after connection into latticed by the reinforcing bar of high intensity between each layer Body.8 each layer of ontology is to be embedded in 9 inside of massif by expanding steel nail.Observation flood discharge hole 6 is provided with three-layer pipe structure, from interior First layer pipe 10, second layer pipe 11 and third layer pipe 12 are followed successively by outward, first layer pipe 10 passes through antidetonation resistance to compression piece 13 and second Layer pipe 11 is welded and fixed connection, and second layer pipe 11 is welded to connect by antidetonation resistance to compression piece 13 with third layer pipe 12.
Second layer non cohesire soil layer 2,
S1:Select the quartzite and basalt being of moderate size;This rocks is firm, fine and close, flexible;Quartzitic hardness is high, Close structure, water suction is relatively low, has fabulous heat-resisting quantity;Quartzite is widely distributed, facilitates exploitation, is easily worked, at low cost It is honest and clean.Basalt, hard wear resistant is anticorrosive, and high temperature resistance is good;The excellent pressure-proof and snap-resistent condition performance of basalt, and it is wear-resisting The reason of property is good, and water absorption rate is low, is also extraordinary construction material.
S2:Take the soil of neighbouring soft drying;It can reduce the collision friction between rock, the effect of compensator or trimmer pressure, together When soil also have keep the temperature bonding effect, quartzite and basalt can be made to be blended in one piece and become an entirety, promote it Function and effect.
S3:Make the wooden template of square cubic;The making of the template is in order to quartzite and basalt and soil Mixture, fixed compression moulding, convenient for piling up.
S4:Prepare appropriate sisal hemp;Sisal hemp is a kind of perennial tropical hard leaf fibre crop, sisal fiber have in itself compared with Good gloss, and natural resiliency is bigger, pulling force is also very strong, along with having preferable saline-alkali tolerant and frictional behaviour, therefore will Sisal hemp is blended in quartzite, basalt and soil, can increase its globality, will not be split easily, while can also make it Compressive effect greatly enhances.
S5:By rock, soil, sisal hemp and cement according to 6:3:1:1 ratio is adequately mixed.
S6:Suitable water is added again and adhesive stirs evenly;The viscosity of adhesive can be such that a variety of materials firmly polymerize Together.
S7:Then mixing material is pressed with square cubic wooden template;
S8:The material of compression moulding is finally subjected to a degree of drying;
When piling up, with cement Adherents junction between every piece, this layer is convenient and efficient also cost-saved, and has resistance to compression cushioning effect, It is unlikely to deform.The non cohesire soil layer can be with a degree of pressure shared first layer supporting layer and born simultaneously.It adds First layer supporting layer is fixedly connected by carrying the reinforcing bar of barb with second layer non cohesire soil layer side, and the two can be allowed to become one A coenosarc, while stress.
Embodiment 2:Please refer to Fig.1-6, a kind of hydraulic engineering flood discharge antiseepage dam, including ontology 8, ontology 8 is from outside inside successively It is provided with first layer supporting layer 1, second layer non cohesire soil layer 2, third layer corrosion-resistant coating 3, the 4th layer concrete structure sheaf 4 and Five layers of membrane waterproofing 5, first layer supporting layer 1 are fixedly connected by carrying the reinforcing bar of barb with 2 side of second layer non cohesire soil layer, 2 opposite side of second layer non cohesire soil layer is close plus cement mixing and 3 side of third layer corrosion-resistant coating by the adhesive of high intensity Envelope connection, 3 opposite side of third layer corrosion-resistant coating are connect by cement and glue for tile mixing with 4 side of the 4th layer concrete structure sheaf, 4th layer concrete structure sheaf, 4 opposite side is seamlessly connected with layer 5 membrane waterproofing 5 by epoxy adhesive and pitch.
Between each layer by the special rattan after chemically treated into latticed through connection.4th layer concrete structure sheaf More right-angled intersection steel columns are provided in 4.First layer supporting layer 1 is brick mix structure layer.Observation flood discharge hole 6 is provided in ontology, The upper end in observation flood discharge hole 6 is provided with the steel plate 7 of umbrella shape, and soil is filled between observation flood discharge hole 6 and steel plate 7.
Ontology 8 is arc.Flood discharge hole 6 is observed to be three layers round, undulatory antidetonation resistance to compression is provided between three-layer pipe road Piece 13, water outlet are three groups.It is integrally formed after connection into latticed by the reinforcing bar of high intensity between each layer.Ontology 8 is each Layer is to be embedded in 9 inside of massif by expanding steel nail.Observation flood discharge hole 6 is provided with three-layer pipe structure, is followed successively by from inside to outside First layer pipe 10, second layer pipe 11 and third layer pipe 12, first layer pipe 10 are welded by antidetonation resistance to compression piece 13 with second layer pipe 11 It is fixedly connected, second layer pipe 11 is welded to connect by antidetonation resistance to compression piece 13 with third layer pipe 12.
Third layer corrosion-resistant coating 3,
S1:Appropriate loess is taken, it is exposed to the sun, then be rolled into little particle under the sun;Loess can play antiseepage buffering pressure The effect of power, cost are extremely low.
S2:The weeds of some flexibles, such as straw are chosen, is dried;The miscellaneous of good toughness is mixed in clay mortar Grass, the plant fiber inside the weeds have tensile property, can increase the tensile strength of mixture.
S3:Take suitable earth grille;Earth grille is using glass fibre as material, using one Mesh material made of fixed weaving is protective glass fiber, improves whole performance, by special coating The earthwork composite material that treatment process forms, has very high non-deformability, and fracture elongation is less than 3%.The master of glass fibre Wanting composition is:Silica is inorganic material, the great stabilization of physicochemical property, and with intensity is big, modulus is high, and very high is wear-resisting Property and excellent to cold;Without long-term creep(As reinforcing material, has the energy of the resistance to deformation in the case of long duration load Power ensures that product being capable of long-term retention property);Thermal stability is good(At 1000 DEG C or more, this ensures the fusion temperature of glass fibre Glass Fibre Earth Grid bears in paving operation the stability of heat).
Coating processing is carried out by special post-treatment agent simultaneously, Glass Fibre Earth Grid can resist all kinds of physical abrasions and change It learns and corrodes, moreover it is possible to resist bioerosion and climate change, ensure that its performance is unaffected.
Increase since earth and stone material interlocks power in TGXG grid, the friction coefficient between them significantly increases, geotechnique The withdrawal resistance that grid is buried in the earth is significantly increased since the frictional engagement power between grid and the soil body is relatively strong, it is a kind of Good reinforcement material.TGXG light weight simultaneously is easy to scene and cuts and connect, can also be overlapped overlap joint, easy construction.Paving It can increase its stability in dykes and dams.
S4:Take a certain amount of slaked lime powder again, by its with roll after the uniform mix of loess;Slaked lime powder incorporation is loose Soil in, the mixing material that is obtained after mix, compacting and maintenance has certain intensity and water resistance;Pulverized limestone belongs to alkalinity And silica in clay, complicated chemical reaction being produced between alundum (Al2O3), the mixing after compacting has good Intensity, water resistance and globality.
S5:Weeds with the mixture of loess and slaked lime powder are stirred and are merged.
S6:A certain amount of aloe and the coptis is taken to shred and roll, is put into object mixed above, in the blade of aloe plumpness Containing abundant glue liquid, this glue liquid is also a kind of natural preservative, at the same aloe contain a large amount of amino acid, Vitamin, polysaccharide compound, various enzymes and minerals have bactericidal effect;The coptis is containing jamaicin, coptisine, the methyl coptis The alkaloids such as alkali, palmatine;Loess and the microorganism in weeds and the insect of similar white ants can be killed, prevents soil Matter is slack and undisciplined by its special hole, ensures that the layer tightly seals.
S7:Marine glue and clear water are further added in, is stirred evenly;The addition of marine glue can further enhance its waterproof effect Fruit.
S8:Freezing plastic is added again, increases fastness.
S9:Finally above mixture is placed in TGXG.
This layer has the etch-proof effect of antiseepage.
Embodiment 3:Please refer to Fig.1-6, a kind of hydraulic engineering flood discharge antiseepage dam, including ontology 8, ontology 8 is from outside inside successively It is provided with first layer supporting layer 1, second layer non cohesire soil layer 2, third layer corrosion-resistant coating 3, the 4th layer concrete structure sheaf 4 and Five layers of membrane waterproofing 5, first layer supporting layer 1 are fixedly connected by carrying the reinforcing bar of barb with 2 side of second layer non cohesire soil layer, 2 opposite side of second layer non cohesire soil layer is close plus cement mixing and 3 side of third layer corrosion-resistant coating by the adhesive of high intensity Envelope connection, 3 opposite side of third layer corrosion-resistant coating are connect by cement and glue for tile mixing with 4 side of the 4th layer concrete structure sheaf, 4th layer concrete structure sheaf, 4 opposite side is seamlessly connected with layer 5 membrane waterproofing 5 by epoxy adhesive and pitch;Each layer it Between by the special rattan after chemically treated into latticed through connection.
More right-angled intersection steel columns are provided in 4th layer concrete structure sheaf 4.First layer supporting layer 1 is brick mix structure Layer.Observation flood discharge hole 6 is provided in ontology, the upper end in observation flood discharge hole 6 is provided with the steel plate 7 of umbrella shape, observation flood discharge hole 6 and steel Soil is filled between plate 7.
Ontology 8 is arc.Flood discharge hole 6 is observed to be three layers round, undulatory antidetonation resistance to compression is provided between three-layer pipe road Piece 13, water outlet are three groups.It is integrally formed after connection into latticed by the reinforcing bar of high intensity between each layer.Ontology 8 is each Layer is to be embedded in 9 inside of massif by expanding steel nail.Observation flood discharge hole 6 is provided with three-layer pipe structure, is followed successively by from inside to outside First layer pipe 10, second layer pipe 11 and third layer pipe 12, first layer pipe 10 are welded by antidetonation resistance to compression piece 13 with second layer pipe 11 It is fixedly connected, second layer pipe 11 is welded to connect by antidetonation resistance to compression piece 13 with third layer pipe 12.
Layer 5 waterproof layer 5,
S1:1. selecting, viscosity is high, needle penetration is small, the high pitch low with paraffin content of softening point;2. with outer-penetrating agent modified pitch;3. it adopts With the larger mineral aggregate of grain size and gap grading;4. it is 1~1.2 to keep the ratio between miberal powder and pitch;5. in addition to upper layer, use is smaller In the asphalt optimum content of Marshall Test;6. the porosity of Marshall Test result concrete is not less than 4%;7. using higher Compactness.The high-temperature stability of asphalt can be improved.
Simultaneously using SBS modified pitch, the crack resistance at low-temperature of asphalt can be effectively increased;It was mixed and stirred in mixture Fiber is added in journey, fiber plays reinforced action;Warm-Mix Bitumen Mixture is produced using warm mixing process, warm-mixed asphalt, which reduces, to be mixed And temperature, it is that pitch degree of aging during mixing and stirring reduces, so as to improve working performance during its low temperature.
Above modified pitch has good caking property, plasticity, water-resistance, anti-corrosive properties, durability, high temperature resistance and resists Cryogenic property.
S2:Choose the non-woven fabrics of appropriate high quality;Non-woven fabrics using acrylic resin as main production raw material, have antibacterial, Anti- chemical agent:Polypropylene category inactivity substance, does not damage by worms, and the erosion there are liquid Endophytic bacteria and insects can be isolated, and resists Bacterium, caustic corrosion, finished product do not influence intensity due to erosion.
There is moistureproof and waterproof simultaneously, not mouldy, not mould moth, nontoxic nonirritant, heat preservation, retractility and cheap etc. special Point.
S3:Take polyurethanes anti-corrosive and waterproof paint;Nontoxic, tasteless, volatilization moisture content, belongs to environmentally friendly machine;Film is resistance to It is aqueous, alkali resistance is good, have higher breaking ductility, anti-uv-ray is strong, and service life is long, have well it is weather-proof, resistance to Ageing properties, bonding force is strong, no fire hazard.
S4:Suitable amylum adhesive is taken again;Amylum adhesive is water, uncooked amylum, ripe paste, caustic soda, borax and first The mixture of aldehyde, general ratio are:Water 80%;Starch 20%(Wherein uncooked amylum accounts for 85%, and ripe starch accounts for 15%);Caustic soda(Starch Total amount)2.4-2.8%;Borax(Starch total amount)2.7-3.2%, about 10 moles;Formaldehyde is micro.
Uncooked amylum will first pass through chemical treatment, and treated starch has good firmoviscosity and the fabulous property of water-bearing Energy.
S5:Asphaltum with high viscosity, non-woven fabrics, polyurethanes anti-corrosive and waterproof paint, amylum adhesive are pressed 4:3:1:1 ratio Hybrid process makes.
S6:Finally with acrylic fibers, viscose rayon through needle point method into felt, using graphite after oxidation processes and charing process Change and handle and manufactured carbonaceous felt, for high temperature resistant up to 3000 DEG C or more, coefficient of thermal expansion is less than (2 ~ 5) * 10-6/ DEG C, intensity It it is 3 times of aluminium alloy, weight is only the 1/5 of steel.By this applying material on the outside of the lower half of the waterproof layer.
This layer can more effectively play waterproof action, and increase the viscosity between the 4th layer concrete structure sheaf even It connects, enhances its sealing performance.The waterproof layer also has the effect kept the temperature simultaneously, to the 4th adjacent layer concrete structure sheaf and first Layer brick mix structure layer have the function of heat preservation, buffering hydraulic pressure, prevent in the case of high temperature or low temperature, concrete with The inside of brick mix structure layer is damaged and influences;And pressure that lower part is born will be bigger, and which also is able to help Adjacent two layers is helped to alleviate and resists born hydraulic pressure, ensure the complete of the dam and extends its time limit used.
Embodiment 4:Please refer to Fig.1-6, a kind of hydraulic engineering flood discharge antiseepage dam, including ontology 8, ontology 8 is from outside inside successively It is provided with first layer supporting layer 1, second layer non cohesire soil layer 2, third layer corrosion-resistant coating 3, the 4th layer concrete structure sheaf 4 and Five layers of membrane waterproofing 5, first layer supporting layer 1 are fixedly connected by carrying the reinforcing bar of barb with 2 side of second layer non cohesire soil layer, 2 opposite side of second layer non cohesire soil layer is close plus cement mixing and 3 side of third layer corrosion-resistant coating by the adhesive of high intensity Envelope connection, 3 opposite side of third layer corrosion-resistant coating are connect by cement and glue for tile mixing with 4 side of the 4th layer concrete structure sheaf, 4th layer concrete structure sheaf, 4 opposite side is seamlessly connected with layer 5 membrane waterproofing 5 by epoxy adhesive and pitch;Each layer it Between by the special rattan after chemically treated into latticed through connection.More are provided in 4th layer concrete structure sheaf 4 Right-angled intersection steel column.First layer supporting layer 1 is brick mix structure layer.
Observation flood discharge hole 6 is provided in ontology, the upper end in observation flood discharge hole 6 is provided with the steel plate 7 of umbrella shape, observation flood discharge hole Soil is filled between 6 and steel plate 7.Ontology 8 is arc.Flood discharge hole 6 is observed to be three layers round, three-layer pipe is provided with wave between road The antidetonation resistance to compression piece 13 of line shape, water outlet are three groups.
It is integrally formed after connection into latticed by the reinforcing bar of high intensity between each layer.8 each layer of ontology is by swollen Swollen steel nail is embedded in inside massif 9.Observation flood discharge hole 6 is provided with three-layer pipe structure, be followed successively by from inside to outside first layer pipe 10, Second layer pipe 11 and third layer pipe 12, first layer pipe 10 are welded and fixed with second layer pipe 11 by antidetonation resistance to compression piece 13 and connect, the Two layers of pipe 11 are welded to connect by antidetonation resistance to compression piece 13 with third layer pipe 12.
Flood discharge hole 6 is observed,
This hole is circle, and water inlet is one group, and water outlet is divided into three groups, and two pieces of high-strength steel sheets 7 are tiltedly placed in the top in this hole, use In the pressure that dispersion observation flood discharge hole 6 is born;It covers in and fills between steel plate 7 and observation flood discharge hole 6, there is the effect of compensator or trimmer pressure Fruit;The integral pressure balance that flood discharge hole 6 does not interfere with dam body is observed simultaneously.
The water inlet in observation flood discharge hole 6 is equipped with automatic controlling gate, closing gate when normal, can be used for observation and takes Sample after hydraulic pressure reaches certain value, can send out alarm, and automatic controlling gate will automatically open in advance, carry out flood discharge Alleviate the pressure of dam.
Observation flood discharge hole 6 is made itself of steel alloy;One or more of alloy members are appropriately added in carbon steel Element makes the institutional framework of steel change, plastic if intensity, hardness are big so as to which steel be made to have a variety of different properties Property, good toughness, it is wear-resisting, it is corrosion-resistant etc..Three-decker is contained in the hole, and antidetonation resistance to compression piece 3 is between three-layer pipe road, in ripple Shape has elasticity, it is therefore intended that damping is depressurized, protection observation flood discharge hole 6.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, it is any Those familiar with the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its improves Design is subject to equivalent substitution or change, should all cover within the scope of the present invention.

Claims (9)

1. a kind of hydraulic engineering flood discharge antiseepage dam, including ontology(8), it is characterised in that:The ontology(8)From outside inside according to It is secondary to be provided with first layer supporting layer(1), second layer non cohesire soil layer(2), third layer corrosion-resistant coating(3), the 4th layer concrete knot Structure layer(4)With layer 5 membrane waterproofing(5), the first layer supporting layer(1)Side is provided with the reinforcing bar of barb, and described One layer of supporting layer(1)Pass through reinforcing bar and second layer non cohesire soil layer(2)Side is fixedly connected, the second layer non cohesire soil layer (2)Opposite side is by the adhesive of high intensity plus cement mixing and third layer corrosion-resistant coating(3)Side is tightly connected, described Third layer corrosion-resistant coating(3)Opposite side is by cement and glue for tile mixing and the 4th layer concrete structure sheaf(4)Side connects, described The 4th layer concrete structure sheaf(4)Opposite side and layer 5 membrane waterproofing(5)It is seamlessly connected by epoxy adhesive and pitch; Between each layer by the special rattan after chemically treated into latticed through connection.
2. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 1, it is characterised in that:The 4th layer of coagulation Soil structure layer(4)In be provided with more right-angled intersection steel columns.
3. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 1, it is characterised in that:The first layer support Layer(1)For brick mix structure layer, contain reinforcing bar in the layer.
4. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 1, it is characterised in that:It is set in the ontology There is observation flood discharge hole(6), the observation flood discharge hole(6)Upper end be provided with the steel plate of umbrella shape(7), the observation flood discharge hole (6)With steel plate(7)Between be filled with soil.
5. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 1 or 2, it is characterised in that:The ontology(8) For arc.
6. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 4, it is characterised in that:The observation flood discharge hole (6)To be three layers round, pipeline is special steel alloy, and undulatory antidetonation resistance to compression piece is provided between three-layer pipe road(13), go out The mouth of a river is three groups.
7. a kind of hydraulic engineering flood discharge antiseepage dam according to one of claim 1-4, it is characterised in that:The rattan Be by chemical specially treated, rattan into it is latticed by each layer through being connected as an entirety;Handle the chemical composition of rattan Including timber reinforcing agent and corrosion inhibiter.
8. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 1, it is characterised in that:The ontology(8)Respectively Layer is to be embedded in massif by expanding steel nail(9)Internal.
9. a kind of hydraulic engineering flood discharge antiseepage dam according to claim 4, it is characterised in that:The observation flood discharge hole (6)Three-layer pipe structure is provided with, is followed successively by first layer pipe from inside to outside(10), second layer pipe(11)With third layer pipe(12), institute The first layer pipe stated(10)Pass through antidetonation resistance to compression piece(13)With second layer pipe(11)It is welded and fixed connection, the second layer pipe (11)Pass through antidetonation resistance to compression piece(13)With third layer pipe(12)It is welded to connect.
CN201810126620.8A 2018-02-08 2018-02-08 Hydraulic engineering flood discharge seepage prevention dam Active CN108221876B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810126620.8A CN108221876B (en) 2018-02-08 2018-02-08 Hydraulic engineering flood discharge seepage prevention dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810126620.8A CN108221876B (en) 2018-02-08 2018-02-08 Hydraulic engineering flood discharge seepage prevention dam

Publications (2)

Publication Number Publication Date
CN108221876A true CN108221876A (en) 2018-06-29
CN108221876B CN108221876B (en) 2021-04-27

Family

ID=62671003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810126620.8A Active CN108221876B (en) 2018-02-08 2018-02-08 Hydraulic engineering flood discharge seepage prevention dam

Country Status (1)

Country Link
CN (1) CN108221876B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396978A (en) * 2019-07-16 2019-11-01 淮安市水利规划服务中心 Improve the method that river ecological structure promotes urban rives water ecological environment
CN112609634A (en) * 2020-12-18 2021-04-06 沈士恺 Flood discharge seepage-proofing dam for hydraulic engineering
CN114753315A (en) * 2022-04-19 2022-07-15 中国葛洲坝集团第二工程有限公司 Construction method for replacing reinforcing steel bars with glass fiber reinforcements for dam panels

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1500720A1 (en) * 1987-12-21 1989-08-15 Le Otdel V Proekt Izyskatel Earth-fill dam
CN204385682U (en) * 2014-12-26 2015-06-10 李新旺 A kind of hydraulic engineering dyke seepage control water-stopping structure
CN105155477A (en) * 2015-10-10 2015-12-16 中国电建集团成都勘测设计研究院有限公司 High earth-rock dam slope protection structure and construction method thereof
CN205444124U (en) * 2015-12-26 2016-08-10 江南水利水电工程公司 Waterproof dam of cement piece formula
CN205857134U (en) * 2016-06-24 2017-01-04 中国电建集团华东勘测设计研究院有限公司 A kind of economical mud-rock flow blocking dam structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1500720A1 (en) * 1987-12-21 1989-08-15 Le Otdel V Proekt Izyskatel Earth-fill dam
CN204385682U (en) * 2014-12-26 2015-06-10 李新旺 A kind of hydraulic engineering dyke seepage control water-stopping structure
CN105155477A (en) * 2015-10-10 2015-12-16 中国电建集团成都勘测设计研究院有限公司 High earth-rock dam slope protection structure and construction method thereof
CN205444124U (en) * 2015-12-26 2016-08-10 江南水利水电工程公司 Waterproof dam of cement piece formula
CN205857134U (en) * 2016-06-24 2017-01-04 中国电建集团华东勘测设计研究院有限公司 A kind of economical mud-rock flow blocking dam structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110396978A (en) * 2019-07-16 2019-11-01 淮安市水利规划服务中心 Improve the method that river ecological structure promotes urban rives water ecological environment
CN112609634A (en) * 2020-12-18 2021-04-06 沈士恺 Flood discharge seepage-proofing dam for hydraulic engineering
CN114753315A (en) * 2022-04-19 2022-07-15 中国葛洲坝集团第二工程有限公司 Construction method for replacing reinforcing steel bars with glass fiber reinforcements for dam panels
CN114753315B (en) * 2022-04-19 2024-04-26 中国葛洲坝集团第二工程有限公司 Construction method for replacing reinforcing steel bars with glass fiber reinforced plastic bars for dam panels

Also Published As

Publication number Publication date
CN108221876B (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN102134841B (en) Method for jointly repairing submerged plants on underwater hard slope of river
CN103643656B (en) High rock-fill dam membrane anti-seepage body on deep coverage layer and construction method of high rock-fill dam membrane anti-seepage body
CN103866776B (en) A kind of building waste gabion wall ecological bank protecting method
CN106759291B (en) The construction method of artificial ecology islands and reefs construction
KR20220123696A (en) Restoration management method of coal waste-rock stockyard using coal-based solid waste
CN108221876A (en) A kind of hydraulic engineering flood discharge antiseepage dam
CN205530288U (en) Resist towards ecological blanket
CN201314039Y (en) Ecological recovering type bank protection structure in riverway beaches
CN107963838A (en) A kind of ecology spray anchor protective slope structure and method
CN105746125A (en) Method for road slope protection greening through straw grass blankets
CN110106826A (en) River bed microorganism grouting ecological anti-seepage system and its construction method
CN105970978B (en) Slope ecological restoration system and method
CN107724336A (en) A kind of construction method of " phytomicroorganism " coupled mode landscape ecological shore protection suitable for north city inland river
CN110106830A (en) One kind having hole mold-bagged concrete ecological bank protection structure and construction method
CN110366896A (en) Side slope vegetation ecological recovery method
CN204898694U (en) Living concrete member is planted to prefabricated chain formula
CN100507163C (en) Slope protection and greening method
CN1349024A (en) Plant/concrete block and its making process
CN202672119U (en) Flexible drainage channel for coal gangue mountain
CN108560499A (en) A kind of leakproof Treatment of Sludge water resources dam
CN102369834A (en) Aggregate bio-substrate concrete (BSC) and preparation and construction method thereof
CN212375804U (en) Slope protection with good protection effect
CN212835245U (en) Can protect cross bank protection of vegetation
CN114790751A (en) Fruit and mud composite ecological slope protection structure and construction method thereof
CN208328834U (en) Concrete facing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Dingli

Inventor after: Lv Guilan

Inventor after: Wang Yanfang

Inventor after: Wang Fengyun

Inventor after: Liu Xiaoping

Inventor after: Wu Di

Inventor before: Lv Guilan

Inventor before: Wang Yanfang

Inventor before: Wang Fengyun

Inventor before: Liu Xiaoping

Inventor before: Wu Di

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20210409

Address after: 750001 7-313, area a, Greenland 21 city, Xingqing District, Yinchuan City, Ningxia Hui Autonomous Region

Applicant after: Ningxia Fengyun Construction Engineering Co.,Ltd.

Address before: 272000 huicuiyuan, Jianshe North Road, Rencheng District, Jining City, Shandong Province

Applicant before: Lv Guilan

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant