CN108221508A - A kind of integrated form single track beam end pre-embedded device - Google Patents

A kind of integrated form single track beam end pre-embedded device Download PDF

Info

Publication number
CN108221508A
CN108221508A CN201810232858.9A CN201810232858A CN108221508A CN 108221508 A CN108221508 A CN 108221508A CN 201810232858 A CN201810232858 A CN 201810232858A CN 108221508 A CN108221508 A CN 108221508A
Authority
CN
China
Prior art keywords
backing plate
fitting
holder top
anchor backing
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810232858.9A
Other languages
Chinese (zh)
Other versions
CN108221508B (en
Inventor
夏玉龙
邱廷琦
刘海亮
刘成
杜传知
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xinzhu Transportation Technology Co ltd
Original Assignee
Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Xinzhu Road and Bridge Machinery Co Ltd filed Critical Chengdu Xinzhu Road and Bridge Machinery Co Ltd
Priority to CN201810232858.9A priority Critical patent/CN108221508B/en
Publication of CN108221508A publication Critical patent/CN108221508A/en
Application granted granted Critical
Publication of CN108221508B publication Critical patent/CN108221508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B25/00Tracks for special kinds of railways
    • E01B25/08Tracks for mono-rails with centre of gravity of vehicle above the load-bearing rail

Abstract

The invention discloses a kind of integrated form single track beam end pre-embedded devices, including track girder, bearing, anchor backing plate, holder top embedded board, telescopic device built-in fitting, anchorage and corrugated pipe connector are installed on the anchor backing plate, holder top cast-in fixing bolt is set on the holder top embedded board, the anchor backing plate is fixedly connected with holder top embedded board.Anchor backing plate is fixedly connected after collection is integrated by above-mentioned technical proposal with holder top embedded board, the active force of original anchor backing plate and holder top cast-in fixing bolt peptizaiton in concrete fine strain of millet end can be become an entirety to load, it allows being more uniformly stressed of concrete fine strain of millet end, is more not readily susceptible to damage;During fabrication, required template is less, arrangement get up it is more convenient time saving, construction quality is easier to be guaranteed;Former holder top cast-in fixing bolt in need can be shortened, so as to increase the space of deformed bar arrangement.

Description

A kind of integrated form single track beam end pre-embedded device
Technical field
The present invention relates to a kind of integrated form single track beam end pre-embedded devices, for track girder fine strain of millet end, belong to rail traffic skill Art field.
Background technology
Country is greatly developing urban track traffic at present, and wherein straddle-type monorail is may widely apply in the future one Kind form, but domestic straddle-type monorail is applied also seldom at present, and only Chongqing was established in 2000 or so Introduced from Japan technologies Several straddle-type monorail circuits, existing straddle-type monorail use PC track girders.
Structure shown in Fig. 1 is tradition PC track girder fine strains of millet end built-in fitting schematic diagram, and the cross section of such PC track girders is general No more than 900mm(It is wide)×1500mm(It is high), the pre-buried bearing embedded board in corresponding beam-ends above its bearing 1 of PC track girders 2 And cast-in fixing bolt 3, steady wheel castellated plates built-in fitting 4, prestressed anchor anchor backing plate 5, directive wheel castellated plates built-in fitting 6, walking Form of gear tooth plate built-in fitting 7.Due to wanting this pre-buried many built-in fitting, space is at full stretch.This structure design can bring one Series of problems:Beam-ends attachment to be mounted is more during precast beam, and model sheetinstallat position is complicated, the bulk between each built-in fitting It should not control, construction time and the bad guarantee of construction quality;And concrete is when anchorage tensioning, shrinkage and creep, vehicle pass through Under Fatigue Load, the concrete stressing conditions between built-in fitting are poor, are susceptible to destruction;Existing PC tracks beam span Generally only 18~22m, pier, the pier stud for building needs are relatively more, when town road is laid out, across the ability of town road Also it is weaker.
Therefore, patent of the present invention carries out comprehensive analysis by the bearing, prestressed anchor, telescopic device to PC track girders, It proposes a kind of integrated solution of beam-ends built-in fitting, can effectively solve problem above, and can be carried for external prestressing For anchorage point, so as to improve the span of PC track girders, engineering construction period and cost are reduced, improves the cross-line energy of PC track girders Power.
Invention content
The goal of the invention of the present invention is:In view of the above problems, it is pre-buried to provide a kind of integrated form single track beam end Device.
The technical solution adopted by the present invention is such:
A kind of integrated form single track beam end pre-embedded device including track girder, bearing, anchor backing plate, holder top embedded board, is stretched Device built-in fitting, installation anchorage and corrugated pipe connector on the anchor backing plate set holder top on the holder top embedded board Cast-in fixing bolt, the anchor backing plate are fixedly connected with holder top embedded board.
Anchor backing plate is fixedly connected after collection is integrated by above-mentioned technical proposal with holder top embedded board, can will be original The active force of anchor backing plate and holder top cast-in fixing bolt peptizaiton in concrete fine strain of millet end becomes an entirety to load, and allows mixed Being more uniformly stressed for solidifying soil fine strain of millet end, is more not readily susceptible to damage;During fabrication, required template is less, and arrangement is got up more Convenient and time-saving, construction quality is easier to be guaranteed;Former holder top cast-in fixing bolt in need can be shortened, it is pre- so as to increase The space of stress steel bar arrangement.
Preferably, the telescopic device built-in fitting is fixedly connected with anchor backing plate and holder top embedded board.Further It is preferred that the telescopic device built-in fitting includes traveling wheel walking surface built-in fitting, directive wheel walking surface built-in fitting and steady wheel walking Face built-in fitting, the traveling wheel walking surface built-in fitting are fixedly connected with anchor backing plate top, the directive wheel walking surface built-in fitting Anchor backing plate top both sides are fixedly connected on, the steady wheel walking surface built-in fitting is fixedly connected on anchor backing plate lower part both sides. Telescopic device built-in fitting is also integrated together, it can be to avoid each component of telescopic device built-in fitting and anchor backing plate, holder top Interference between cast-in fixing bolt in this way integrates three original individually separated pre-buried structures, in prefabrication of beam, just It only needs to carry out one-time positioning and pre-buried, the relative position between three pre-buried structures can accurately be ensured, be shortened prefabricated The manufacturing cycle of beam improves the prefabricated precision of beam body.
Preferably, the holder top embedded board bottom sets external anchor point.Further preferably, the external anchoring Point is combined together or is provided separately with bearing.The external anchor point of setting can bear for installing external prestressing anchorage Pressure and moment of flexure further improve the bearing capacity of track girder and cross-line ability, so as to further increase track girder Span reduces the pier stud quantity of entire circuit, reducings the construction costs.
Description of the drawings
Fig. 1 is traditional PC track girder beam-ends built-in fitting schematic diagrames.
Fig. 2 is the structure that holder top embedded board is combined with anchor backing plate in the embodiment of the present invention 1.
Fig. 3 is that holder top embedded board in the embodiment of the present invention 2, anchor backing plate, telescopic device built-in fitting are combined(Nothing External anchor point)Schematic diagram.
Fig. 4 is that holder top embedded board in the embodiment of the present invention 3, anchor backing plate, telescopic device built-in fitting are combined(Have External anchor point)Schematic diagram.
Fig. 5 is that external anchor point is detached with bearing in the embodiment of the present invention 3(Right half part)Or it organically combines(Left side Point)Schematic diagram.
Fig. 6 is the dimensional structure diagram of the embodiment of the present invention 2.
Fig. 7 is the internal structure schematic diagram of the embodiment of the present invention 3.
It is marked in Fig. 1:1 is bearing, and 2 be PC track girders, and 3 be the pre-buried version of bearing and cast-in fixing bolt, and 4 be steady wheel castellated plates Built-in fitting, 5 be prestressed anchor anchor backing plate, and 6 be directive wheel castellated plates built-in fitting, and 7 be traveling wheel castellated plates built-in fitting;
It is marked in Fig. 2-6:1 is track girder, and 2 be reinforcing bar, and 3 be bridge pier, and 4 be bearing, and 5 be anchorage, and 6 be anchor backing plate, and 7 be bearing Top cast-in fixing bolt, 8 be holder top embedded board, and 9 be telescopic device built-in fitting, and 10 be corrugated pipe connector, and 11 be external anchoring Point, 91 be traveling wheel walking surface built-in fitting, and 92 be directive wheel walking surface built-in fitting, and 93 be steady wheel walking surface built-in fitting.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in detail.
Embodiment 1:
As shown in Fig. 2, a kind of integrated form single track beam end pre-embedded device, bearing 4 including track girder 1, on bridge pier 3, Anchor backing plate 6, holder top embedded board 8, telescopic device built-in fitting 9, installation anchorage 5 and bellows connect on the anchor backing plate 6 First 10, for connecting reinforcing bar 2, set holder top cast-in fixing bolt 7, the anchor backing plate 6 and branch on the holder top embedded board 8 Seat top embedded board 8 is fixedly connected.
In the present embodiment, telescopic device built-in fitting 9 can be identical with traditional telescopic device built-in fitting.
Embodiment 2:
As shown in Fig. 3,6, a kind of integrated form single track beam end pre-embedded device, including track girder 1, the bearing on bridge pier 3 4th, anchor backing plate 6, holder top embedded board 8, telescopic device built-in fitting 9, installation anchorage 5 and bellows on the anchor backing plate 6 Connector 10 sets holder top cast-in fixing bolt 7 for connecting reinforcing bar 2 on the holder top embedded board 8, the anchor backing plate 6 with Holder top embedded board 8 is fixedly connected.
The telescopic device built-in fitting 9 is fixedly connected with anchor backing plate 6 and holder top embedded board 8.The telescopic device Built-in fitting 9 includes traveling wheel walking surface built-in fitting 91, directive wheel walking surface built-in fitting 92 and steady wheel walking surface built-in fitting 93, institute It states traveling wheel walking surface built-in fitting 91 to be fixedly connected with 6 top of anchor backing plate, the directive wheel walking surface built-in fitting 92, which is fixed, to be connected 6 top both sides of anchor backing plate are connected on, the steady wheel walking surface built-in fitting 93 is fixedly connected on 6 lower part both sides of anchor backing plate.
Embodiment 3:
As shown in fig. 7, a kind of integrated form single track beam end pre-embedded device, bearing 4 including track girder 1, on bridge pier 3, Anchor backing plate 6, holder top embedded board 8, telescopic device built-in fitting 9, installation anchorage 5 and bellows connect on the anchor backing plate 6 First 10, for connecting reinforcing bar 2, set holder top cast-in fixing bolt 7, the anchor backing plate 6 and branch on the holder top embedded board 8 Seat top embedded board 8 is fixedly connected.8 bottom of holder top embedded board sets external anchor point 11, the external anchor point 11 are combined together or are provided separately with bearing 4, as shown in Figure 4,5.
The telescopic device built-in fitting 9 is fixedly connected with anchor backing plate 6 and holder top embedded board 8.The telescopic device Built-in fitting 9 includes traveling wheel walking surface built-in fitting 91, directive wheel walking surface built-in fitting 92 and steady wheel walking surface built-in fitting 93, institute It states traveling wheel walking surface built-in fitting 91 to be fixedly connected with 6 top of anchor backing plate, the directive wheel walking surface built-in fitting 92, which is fixed, to be connected 6 top both sides of anchor backing plate are connected on, the steady wheel walking surface built-in fitting 93 is fixedly connected on 6 lower part both sides of anchor backing plate.

Claims (5)

1. a kind of integrated form single track beam end pre-embedded device, including track girder(1), bearing(4), anchor backing plate(6), holder top Embedded board(8), telescopic device built-in fitting(9), the anchor backing plate(6)Upper installation anchorage(5)And corrugated pipe connector(10), it is described Holder top embedded board(8)On set holder top cast-in fixing bolt(7), it is characterised in that:The anchor backing plate(6)With holder top Embedded board(8)It is fixedly connected.
2. a kind of integrated form single track beam end pre-embedded device according to claim 1, it is characterised in that:The telescopic device Built-in fitting(9)With anchor backing plate(6)With holder top embedded board(8)It is fixedly connected.
3. a kind of integrated form single track beam end pre-embedded device according to claim 2, it is characterised in that:The telescopic device Built-in fitting(9)Including traveling wheel walking surface built-in fitting(91), directive wheel walking surface built-in fitting(92)It is pre-buried with steady wheel walking surface Part(93), the traveling wheel walking surface built-in fitting(91)With anchor backing plate(6)Top is fixedly connected, and the directive wheel walking surface is pre- Embedded part(92)It is fixedly connected on anchor backing plate(6)Top both sides, the steady wheel walking surface built-in fitting(93)It is fixedly connected on anchor Lower bolster(6)Lower part both sides.
4. a kind of integrated form single track beam end pre-embedded device according to claim 1 or 2, it is characterised in that:The bearing Top embedded board(8)Bottom sets external anchor point(11).
5. a kind of integrated form single track beam end pre-embedded device according to claim 4, it is characterised in that:The external anchoring Point(11)With bearing(4)It is combined together or is provided separately.
CN201810232858.9A 2018-03-21 2018-03-21 Integrated monorail beam end pre-buried device Active CN108221508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810232858.9A CN108221508B (en) 2018-03-21 2018-03-21 Integrated monorail beam end pre-buried device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810232858.9A CN108221508B (en) 2018-03-21 2018-03-21 Integrated monorail beam end pre-buried device

Publications (2)

Publication Number Publication Date
CN108221508A true CN108221508A (en) 2018-06-29
CN108221508B CN108221508B (en) 2023-08-04

Family

ID=62658865

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810232858.9A Active CN108221508B (en) 2018-03-21 2018-03-21 Integrated monorail beam end pre-buried device

Country Status (1)

Country Link
CN (1) CN108221508B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1335429A (en) * 2001-09-07 2002-02-13 上海磁悬浮交通发展有限公司 Track structure of high-speed track traffic
JP2002212903A (en) * 2001-01-17 2002-07-31 Hitachi Ltd Straddle monorail track girder and its installation method
CN201144367Y (en) * 2007-12-29 2008-11-05 中铁二院工程集团有限责任公司 Track girder
WO2011005049A2 (en) * 2009-07-10 2011-01-13 No Yun Keun Pre-stressed reinforced concrete girder and a method of constructing therewith
CN103485279A (en) * 2013-10-08 2014-01-01 北京交通大学 Wet joint for straddle type monorail traffic
CN104711905A (en) * 2013-12-13 2015-06-17 中铁工程设计咨询集团有限公司 Ice and snow melting device for PC rail beam, paving method and PC rail beam
CN104727441A (en) * 2015-03-31 2015-06-24 武汉理工大学 Prestress assembled concrete beam column joint structure and construction method thereof
CN104746395A (en) * 2013-12-30 2015-07-01 中铁工程设计咨询集团有限公司 PC track beam and manufacturing method thereof
CN105178163A (en) * 2015-09-10 2015-12-23 重庆市轨道交通设计研究院有限责任公司 Novel continuous beam type rail
CN107419655A (en) * 2017-09-15 2017-12-01 成都市新筑路桥机械股份有限公司 A kind of straddle-seat type single traffic rail beam girder falling retractor device
CN207987635U (en) * 2018-03-21 2018-10-19 成都市新筑路桥机械股份有限公司 A kind of integrated form single track beam end pre-embedded device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002212903A (en) * 2001-01-17 2002-07-31 Hitachi Ltd Straddle monorail track girder and its installation method
CN1335429A (en) * 2001-09-07 2002-02-13 上海磁悬浮交通发展有限公司 Track structure of high-speed track traffic
CN201144367Y (en) * 2007-12-29 2008-11-05 中铁二院工程集团有限责任公司 Track girder
WO2011005049A2 (en) * 2009-07-10 2011-01-13 No Yun Keun Pre-stressed reinforced concrete girder and a method of constructing therewith
CN103485279A (en) * 2013-10-08 2014-01-01 北京交通大学 Wet joint for straddle type monorail traffic
CN104711905A (en) * 2013-12-13 2015-06-17 中铁工程设计咨询集团有限公司 Ice and snow melting device for PC rail beam, paving method and PC rail beam
CN104746395A (en) * 2013-12-30 2015-07-01 中铁工程设计咨询集团有限公司 PC track beam and manufacturing method thereof
CN104727441A (en) * 2015-03-31 2015-06-24 武汉理工大学 Prestress assembled concrete beam column joint structure and construction method thereof
CN105178163A (en) * 2015-09-10 2015-12-23 重庆市轨道交通设计研究院有限责任公司 Novel continuous beam type rail
CN107419655A (en) * 2017-09-15 2017-12-01 成都市新筑路桥机械股份有限公司 A kind of straddle-seat type single traffic rail beam girder falling retractor device
CN207987635U (en) * 2018-03-21 2018-10-19 成都市新筑路桥机械股份有限公司 A kind of integrated form single track beam end pre-embedded device

Also Published As

Publication number Publication date
CN108221508B (en) 2023-08-04

Similar Documents

Publication Publication Date Title
US8266751B2 (en) Method to compress prefabricated deck units by tensioning supporting girders
CN202482709U (en) Prefabricated floating slab ballast bed
CN103590322A (en) Shear force connecting part, combination beam comprising same and construction method of combination beam
KR100742206B1 (en) Steel-concrete composite rahmen bridge and construction method thereof
CN203603029U (en) Shearing force connecting piece and composite beam with same
CN109457597B (en) Flat plate type modular prefabricated hollow pier splicing structure and manufacturing method thereof
CN109610315A (en) The dry joint connecting structure of prefabrication and assembly construction floorings and implementation method
CN112941975B (en) Combined track slab, prefabricated slab track system and installation and construction method thereof
CN113652966B (en) Construction method of full-prefabricated assembly type concrete beam type bridge structure system
CN107100065A (en) A kind of compound section steel box girder and its method of construction for high-speed railway
CN105484151A (en) Structure for enhancing connection among prefabricated concrete segments and construction method thereof
CN108914715B (en) Assembly type ballastless track structure for vibration reduction zone and assembly method
US7357084B2 (en) Guideway structure for high-speed track- bound transportation
CN103306168A (en) Prefabricated floating slab track bed and construction method thereof
CN111455865A (en) Temporary pre-stressed anchoring device for assembling precast concrete segment box girder
CN207987635U (en) A kind of integrated form single track beam end pre-embedded device
JP2967876B1 (en) Method of forming concrete slab and method of constructing upper road suspension bridge
CN211340366U (en) Continuous combined beam bridge
CN108221508A (en) A kind of integrated form single track beam end pre-embedded device
CN113565004A (en) Jack type corrugated steel web prestress composite beam
CN202577061U (en) Prefabricated floating slab
CN110886185A (en) Box girder with anchoring device and box girder bridge
KR100696646B1 (en) External prestressing method of ps concrete composite girder bridge by tendon anchored/supported to prefabricated cross beam
CN211735010U (en) Assembled earthing corrugated steel plate-prestressed concrete combination arched bridge
CN113403943A (en) Guardrail roadbed integrated configuration for bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230116

Address after: 611400 No. 799, hope road, Wujin street, Xinjin District, Chengdu, Sichuan (Industrial Park)

Applicant after: Chengdu Xinzhu Transportation Technology Co.,Ltd.

Address before: 611430 Xinjin Industrial Park, Sichuan, Chengdu

Applicant before: CHENGDU XINZHU ROAD & BRIDGE MACHINERY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant