CN108180943A - A kind of greening park maintenance system - Google Patents

A kind of greening park maintenance system Download PDF

Info

Publication number
CN108180943A
CN108180943A CN201810013225.9A CN201810013225A CN108180943A CN 108180943 A CN108180943 A CN 108180943A CN 201810013225 A CN201810013225 A CN 201810013225A CN 108180943 A CN108180943 A CN 108180943A
Authority
CN
China
Prior art keywords
gardens
administrative center
module
monitoring module
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810013225.9A
Other languages
Chinese (zh)
Inventor
秦雷健
茅春刚
王春雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Henglv Construction Engineering Co Ltd
Original Assignee
Jiangsu Henglv Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Henglv Construction Engineering Co Ltd filed Critical Jiangsu Henglv Construction Engineering Co Ltd
Priority to CN201810013225.9A priority Critical patent/CN108180943A/en
Publication of CN108180943A publication Critical patent/CN108180943A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/16Control of watering
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/16Control of watering
    • A01G25/167Control by humidity of the soil itself or of devices simulating soil or of the atmosphere; Soil humidity sensors

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental Sciences (AREA)
  • Soil Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing And Monitoring For Control Systems (AREA)

Abstract

The present invention relates to a kind of greening park maintenance systems, it is related to afforestation field, it is fed back to solve to be monitored the maintenance situation for afforesting gardens and carry out timely processing to the situation of appearance, technical points include the environment monitoring module, exception monitoring module, feedback module and the administrative center that are set in gardens;The environment monitoring module is monitored, and monitoring result is committed to administrative center the environment in gardens by multiple sensors;The exception monitoring module is monitored the abnormal conditions in gardens by sensor and data acquisition device, and abnormal conditions are committed to administrative center;The feedback module is connected with administrative center, it receives the instruction that administrative center sends out and is fed back, the administrative center is connected with environment monitoring module, exception monitoring module and feedback module, environment monitoring module and exception monitoring module are transmitted the data come and analyzed and processed, and send out instruction to feedback module according to result by the administrative center.

Description

A kind of greening park maintenance system
Technical field
The present invention relates to afforestation field, more particularly to a kind of greening park maintenance system.
Background technology
With the development of society, demand of the people to afforestation is also increasing, the area of the afforestation in city Also constantly expanding, as the saying goes, " three points plant, seven points support ", maintenance work does not carry out the gardens that can build the very big cost of flower Landscape cannot be kept well, and grassland degeneration, tree death occurs quickly in some, weedy.Therefore the maintenance of afforestation The scientific maintenance management of scientific standardization is carried out, higher requirement is proposed to the staff for afforesting gardens.
Publication No. is that the Chinese patent of CN107145084A discloses a kind of afforestation maintenance control system, including ring Border factors check sensor, controller, power supply unit, server.It is directly read by controller and is distributed in environment space and presets The environmental information of the envirment factor sensor acquisition of position is simultaneously uploaded to server, and server end staff can pass through It reminds, takes appropriate measures, power supply unit carries out collection of energy, very environmental protection using solar-energy photo-voltaic cell so that pipe Reason personnel can accurately learn the physiological status of green plants, preferably to be conserved.
But the technical solution is only monitored the situation in gardens by envirment factor sensor, passes through sensor Information feedback only up to the effect for reminding staff, fail to carry out effective intelligent feedback for situation about monitoring And processing, therefore, intelligence degree when which uses is high not enough.
Invention content
The technical purpose of the present invention is to provide a kind of greening park maintenance system, can be effectively to the environment in gardens It is monitored, and effective intelligent feedback processing is carried out according to the situation of monitoring.
The present invention above-mentioned technical purpose technical scheme is that:
It is a kind of greening park maintenance system, including be set in gardens environment monitoring module, exception monitoring module, feedback module and Administrative center;The environment monitoring module is monitored the environment in gardens by the sensor of multiple and different functions, and will Monitoring result is committed to administrative center;The exception monitoring module is by sensor and data acquisition device to the exception in gardens Situation is monitored, and abnormal conditions are committed to administrative center;The feedback module is connected with administrative center, receives in management Instruction that the heart is sent out simultaneously is fed back;The administrative center is connected with environment monitoring module, exception monitoring module and feedback module, Environment monitoring module and exception monitoring module are transmitted the data come and analyzed and processed by the administrative center, and according to result to Feedback module sends out instruction.
By using above-mentioned technical proposal, gardens are internally provided with environment monitoring module and the environment inside gardens are supervised It surveys, and the result obtained will be monitored in time to administrative center's feedback, the number sent by administrative center according to environment monitoring module It is believed that breath is targetedly handled;Exception monitoring module is effectively monitored for the abnormal conditions inside gardens, and will The result that monitoring obtains is sent to administrative center, is fed back by administrative center according to the result that exception monitoring module is known;Instead Feedback module can rapidly feed back the instruction that administrative center sends, and ensure effective realization of instruction, pass through environmental monitoring Module, exception monitoring module, feedback module and the cooperation of administrative center operating, can effectively realize to the situation inside gardens It is monitored and is targetedly handled in time according to the situation that monitoring obtains, ensure effectively transport inside gardens It changes a job work.
Further, the environment monitoring module includes the temperature sensor, humidity sensor and the soda acid that are set in soil Sensor is spent, the temperature sensor, humidity sensor and acidity-basicity sensor are uniformly arranged in gardens.
By using above-mentioned technical proposal, environment monitoring module includes temperature sensor, humidity sensor in being set on suddenly Device and acidity-basicity sensor, and multiple sensors are uniformly arranged in inside gardens, therefore, environment monitoring module can be effectively right Soil air inside gardens etc. carries out comprehensive monitoring, and the information that sensor is known is transferred to administrative center, by pipe Reason center is directed to the information passed over and is analyzed and judged, so as to guarantee the growing state tool to the plant inside gardens There are certain understanding and monitoring, ensure that the plant in gardens can obtain preferable growing environment.
Further, the feedback module includes the spray equipment poured to the plant in gardens and to staff The communication unit given notice.
By using above-mentioned technical proposal, feedback module includes spray equipment and communication unit, and spray equipment can be in ring After the relatively low situation of humidity that border monitoring modular measures, timely plant is poured, meanwhile, spray equipment and environmental monitoring The position of the distribution of module is close, therefore, after the relatively low situation of humidity that environment monitoring module measures, is sent to administrative center In information, the not only location information of the data with humidity, also data measured, therefore, spray equipment is when being poured, root The amount of spray is determined according to the humidity sent, determines which spray equipment unlatching carries out spray work according to position, specific aim is more By force;Communication unit is then that feedback module sends out information according to the information that administrative center sends to staff on duty, so as to right Gardens scene carries out effective feedback processing.
Further, water tank is additionally provided in gardens, the water tank is connect with external water supply network, and the water tank is also connected with storage Water unit.
By using above-mentioned technical proposal, water source is provided for spray equipment equipped with water tank, ensures have during spray equipment operation Sufficient water is poured, and water tank is connect with external water supply network and water storage unit, when spray equipment needs water supply, first by Water storage unit provides water source, after the water in water storage unit is finished, then by external water supply network to water tank water delivery to spray equipment It supplies water for spray equipment, ensures that spray equipment can be operated effectively.
Further, the water storage unit is set under earth's surface, and the water storage unit includes the rainwater water storage mould of block pattern row pattern Block, the rainwater water storage module are coated with waterproof cloth, water-level gauge are equipped in the water storage unit.
By using above-mentioned technical proposal, water storage module includes the rainwater water storage module of block pattern row pattern, and rainwater water storage The outside of module is enclosed with waterproof cloth, and therefore, the water of accumulation can be got up by rainwater water storage module collection;Meanwhile in water storage unit Portion is additionally provided with water-level gauge, the height of water level of the water in rainwater water storage module can be monitored, and by water level information constantly Be sent at administrative center, so as to timely make feedback for the height situation of the water level in water storage unit, ensure to spraying The coherent progress of the water supply of shower device.
Further, the exception monitoring module includes smoke sensor device, spray equipment monitoring modular and video acquisition mould Block;After the smoke sensor device collects the information of smog, to administrative center's feedback information;The spray equipment monitoring modular pair The water for flowing through spray equipment is monitored, excessive and when spray equipment can not spray in spray equipment breakage water, to management Center sends out instruction;The video acquisition module includes the multiple cameras set in gardens, and the camera will be in gardens Vision signal be transferred to administrative center.
By using above-mentioned technical proposal, exception monitoring module includes smoke sensor device, spray equipment monitoring modular and regards Frequency acquisition module, smoke sensor device can be monitored the smog inside gardens, someone's smoking or generation fire behavior in gardens Smoke sensor device can be perceived timely afterwards, and the position of generation is sent to administrative center, from administrative center into feedback The heart sends out instruction and is handled;Spray equipment monitoring modular can be monitored the water for flowing through spray equipment, be filled in spray When the water put is more than or less than preset range, spray equipment monitoring modular can send out information to administrative center, by anti- Feedback module quickly makes instruction for the information sent, and the situation of appearance is handled;Video acquisition module is included in garden The multiple cameras set in woods can carry out 360 ° of monitoring without dead angle to gardens inside, ensure the video letter in gardens Breath can quickly and accurately reach administrative center.
Further, after typing has attendance information, the communication unit to receive management center instruction in the communication unit Instruction is sent out to staff on duty according to attendance information.
By using above-mentioned technical proposal, by the attendance information typing to communication unit of the staff in gardens, therefore, There are the information and contact method of staff on duty, after feedback module sends instruction, communication unit primitive root in communication unit Instruction is sent out to staff on duty at the first time according to the content of instruction, it is enabled to be directed to environment monitoring module and exception monitoring mould The information at the gardens scene that block obtains quickly is fed back, and ensures that communication unit notifies the validity of staff, is ensured anti- Feedback module timely can efficiently be fed back.
Further, photovoltaic cell is further included, the photovoltaic cell is set in gardens and powers to outdoor power equipment.
By using above-mentioned technical proposal, photovoltaic cell is additionally provided in gardens, is set from photovoltaic cell to outdoor electric power It is standby that electric power is provided, since gardens internal area is larger and illumination is sufficient, set in gardens photovoltaic cell can obtain compared with More electric power, the sustainable power equipment in gardens provide cleaning stable electric power.
In conclusion the invention has the advantages that:
1st, the situation in gardens is effectively monitored by environment monitoring module, exception monitoring module, and according to reaching pipe The information at reason center is handled, and processing structure is transferred to feedback module and is timely and effectively handled;
2nd, water source is provided for spray equipment by way of water storage unit and external electrical network cooperation, ensures efficiently using for water;
3rd, supply of electric power of the setting photovoltaic cell to provide efficient stable in gardens.
Description of the drawings
Fig. 1 is a kind of flow diagram for afforesting park maintenance system in the present embodiment;
Fig. 2 is the overall structure diagram of water storage unit in the present embodiment.
In figure, 1, administrative center;2nd, environment monitoring module;21st, temperature sensor;22nd, humidity sensor;23rd, acid-base value Sensor;3rd, feedback module;31st, spray equipment;311st, water tank;312nd, water storage unit;3121st, rainwater water storage module;3122nd, prevent Water cloth;3123rd, water-level gauge;3124th, inspection shaft;3125th, suction pump;313rd, water supply network;32nd, communication unit;4th, exception monitoring mould Block;41st, smoke sensor device;42nd, spray equipment monitoring modular;43rd, video acquisition module;5th, photovoltaic cell.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
Embodiment:
A kind of greening park maintenance system, with reference to Fig. 1, including environment monitoring module 2, exception monitoring module 4, feedback module 3 and Administrative center 1, administrative center 1 handle the data information that environment monitoring module 2 and exception monitoring module 4 obtain, and right The structure of acquisition is analyzed, and the result for analyzing acquisition is reached feedback module 3 later, by feedback module 3 to the information of acquisition Processing feedback is carried out, completes the intelligentized management of entire greening park maintenance system.
With reference to Fig. 1, environment monitoring module 2 includes the temperature sensor 21, humidity sensor 22 and the acid that are set in soil Alkalinity sensor 23, each sensor are uniformly arranged in gardens, to temperature, humidity and the acid-base value of soil in entire gardens into Row measures, and constantly transmit the data that measure to administrative center 1, administrative center 1 is by the data of acquisition and preset data phase Than if beyond preset range(Such as the humidity of the soil measured is too low), then the result of data comparison is transferred to feedback Module 3 is handled and is fed back according to the situation that the result measures environment monitoring module 2 by feedback module 3.
With reference to Fig. 1, feedback module 3 includes the spray equipment 31 poured to the plant in gardens and is sent out to staff The communication unit 32 put up a notice after feedback module 3 receives the instruction that administrative center 1 sends out, is fed back according to the content of instruction, If humidity is too low, the instruction sprayed is needed, then the spray equipment 31 in feedback module 3 can be poured to plant, be sprayed Device 31 is set to similar position with humidity sensor 22, therefore, is had according to the instruction of the humidity sensor 22 at the position Targetedly the humidity condition at this is fed back, avoids humidity at one relatively low, the whole audience pours the situation of spray, effective to protect The rational utilization of resource has been demonstrate,proved, while has prevented the waste of water;If other are instructed, staff is needed to rush for live place Reason, then instruction is sent out to staff by communication unit 32, be directed to ensure that the instruction that sends out of communication unit 32 has more Property, can achieve the effect that feed back rapidly, in communication unit 32 typing have the attendance information of staff, therefore, communication unit Member 32 can effectively send instructions to individual when sending out instruction to staff according to the situation on duty of staff, Ensure effective reception and registration of instruction, so as to quickly be carried out to the situation that staff is needed to be handled occurred in gardens Effective processing.
Effectively to be monitored to the abnormal conditions in greening gardens, with reference to Fig. 1, exception monitoring is additionally provided in gardens Module 4, exception monitoring module 4 include smoke sensor device 41, spray equipment monitoring modular 42 and video acquisition module 43, and smog passes Sensor 41 after can occurring smog to gardens inside finds and the place for smog occur is sent to administrative center 1 in time, by pipe Reason center 1 handles information, is handled, therefore the personnel in gardens can be taken out according to the actual conditions at scene by feedback module 3 Cigarette and the fire condition being likely to occur are monitored, especially winter dry weather when, smoke sensor device 41 can be timely to garden Smog in woods perceives and feedback notification is to the processing of staff's progress first time, ensures the safety in gardens;Spray dress It puts monitoring modular 42 to be monitored the working condition of spray equipment 31, ensures that it can be rapidly and efficiently run, this reality It applies in example, spray equipment monitoring modular 42 mainly monitors the flow of the water flowed through of spray equipment 31, when the value for flowing through flow is big When preset value, it may be possible to which somewhere is revealed, and caused water suddenly rises, when flowing through flow less than preset value Wait, it may be possible to insufficient water or situations such as block, spray equipment monitoring modular 42 can at the first time to administrative center 1 instead Information is sent to feedback module 3 by feedback after the reception of administrative center 1, and feedback module 3 sends out letter by communication unit 32 to staff Breath, you can timely handled the situation of appearance by staff on duty;Video acquisition module 43 includes being set on gardens Interior multiple cameras, for camera to realizing 360 ° of monitoring without dead angle in gardens, staff can be right in administrative center 1 The situation at gardens scene has comprehensive control, ensures timely to handle the abnormal conditions of appearance.
Effectively to be supplied water to spray equipment 31, referring to FIG. 1 and FIG. 2, water tank 311 is equipped in gardens to spray dress 31 to be put to supply water, spray equipment 31 is connected with external water supply network 313, meanwhile, there is water storage unit 312 inside gardens to garden Water inside woods is kept, and provides clear water for water tank 311, and water-level gauge 3123, and water-level gauge are equipped in water storage unit 312 3123 information is sent at administrative center 1, when water-level gauge 3123 show water level it is enough, can to spray equipment 31 effectively carry out During water supply, spray equipment 31 is supplied water by the water storage in water storage unit 312, when water-level gauge 3123 shows water level deficiency, management Center 1 switches over immediately, is supplied water by external water supply network 313, ensures the duration that spray equipment 31 works, Bu Huisui The water for water storage unit 312 reduces and stops.
Referring to FIG. 1 and FIG. 2, water storage unit 312 is set on the lower section of earth's surface, by the rainwater water storage module of multiple block pattern row patterns 3121 stack, and are wrapped with waterproof cloth 3122 in neatly packed rainwater water storage module 3121, waterproof cloth 3122 can be by rain Water under water water storage module 3121 accumulates is kept, when supplying water to spray equipment 31, by suction pump 3125 by water storage list It is transported at spray equipment 31 after water extraction in member 312;Meanwhile the inspection shaft for stretching into bottom is additionally provided on water storage unit 312 3124, it can ensure that water storage unit 312 can be high to timely being handled after going wrong inside water storage unit 312 Imitate stable operation.
With reference to Fig. 1, photovoltaic cell 5 is additionally provided with inside gardens, photovoltaic cell 5 is set on bright and clear position, is in gardens The power equipment in portion is powered, such as various sensors, suction pump 3125, spray equipment 31 etc., illumination foot, area in gardens Greatly, it is suitble to place more solar panels, the electricity of clean clean green can be effectively provided the power equipment in gardens Power is supplied.
Operation principle:
After this curing system is started to work, by environment monitoring module 2, exception monitoring module 4 to inside gardens temperature, soil Inside humidity, the acid-base value of soil, the smoke condition in air, the working condition of the spray equipment 31 under working condition and gardens Video image etc. be monitored, can have comprehensive monitoring to the situation inside gardens, and the data transfer obtained will be monitored To administrative center 1, the data information transmitted is handled by administrative center 1, and by treated, information forms instruction, sends It to feedback module 3, is handled by feedback module 3 according to the instruction sent, ensures that the maintenance work inside gardens can be smooth Development.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of no creative contribution after this specification is read, but as long as at this It is all protected in the right of invention by Patent Law.

Claims (8)

1. a kind of greening park maintenance system, it is characterised in that:Environment monitoring module (2), exception including being set in gardens are supervised Survey module (4), feedback module (3) and administrative center (1);
The environment monitoring module (2) is monitored the environment in gardens by the sensor of multiple and different functions, and will prison It surveys result and is committed to administrative center (1);
The exception monitoring module (4) is monitored the abnormal conditions in gardens by sensor and data acquisition device, and Abnormal conditions are committed to administrative center (1);
The feedback module (3) is connected with administrative center (1), receives the instruction that administrative center (1) sends out and is fed back;
The administrative center (1) is connected with environment monitoring module (2), exception monitoring module (4) and feedback module (3),
Environment monitoring module (2) and exception monitoring module (4) are transmitted the data come and carried out at analysis by the administrative center (1) Reason, and instruction is sent out to feedback module (3) according to result.
2. a kind of greening park maintenance system according to claim 1, it is characterised in that:The environment monitoring module (2) Including the temperature sensor (21), humidity sensor (22) and acidity-basicity sensor (23) being set in gardens in soil.
3. a kind of greening park maintenance system according to claim 1, it is characterised in that:The feedback module (3) includes The spray equipment (31) poured to the plant in gardens and the communication unit given notice to staff(32).
4. a kind of greening park maintenance system according to claim 3, it is characterised in that:Water tank is additionally provided in gardens (311), the water tank (311) connect with external water supply network (313), and the water tank (311) is also connected with water storage unit (312).
5. a kind of greening park maintenance system according to claim 4, it is characterised in that:The water storage unit (312) sets Under earth's surface, rainwater water storage module (3121) of the water storage unit (312) including block pattern row pattern, the rainwater water storage module (3121) waterproof cloth (3122) is coated with, water-level gauge (3123) is equipped in the water storage unit (312).
6. a kind of greening park maintenance system according to claim 1, it is characterised in that:The exception monitoring module (4) Including smoke sensor device (41), spray equipment monitoring modular(42)And video acquisition module (43);
After the smoke sensor device (41) collects the information of smog, to administrative center (1) feedback information;
The spray equipment monitoring modular(42)The water for flowing through spray equipment (31) is monitored, it is broken in spray equipment (31) Damage, water are excessive and when spray equipment (31) can not spray, to administrative center (1) feedback information;
The video acquisition module (43) includes multiple cameras for being set in gardens, and the camera is by the video in gardens Signal is transferred to administrative center (1).
7. a kind of greening park maintenance system according to claim 3, it is characterised in that:The communication unit(32)Interior record Entering has attendance information, the communication unit(32)Receive after administrative center (1) instruction according to attendance information to work people on duty Member sends out instruction.
8. a kind of greening park maintenance system according to claim 1, it is characterised in that:Further include photovoltaic cell (5), institute Photovoltaic cell (5) is stated in gardens and is powered to outdoor power equipment.
CN201810013225.9A 2018-01-06 2018-01-06 A kind of greening park maintenance system Pending CN108180943A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810013225.9A CN108180943A (en) 2018-01-06 2018-01-06 A kind of greening park maintenance system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810013225.9A CN108180943A (en) 2018-01-06 2018-01-06 A kind of greening park maintenance system

Publications (1)

Publication Number Publication Date
CN108180943A true CN108180943A (en) 2018-06-19

Family

ID=62550063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810013225.9A Pending CN108180943A (en) 2018-01-06 2018-01-06 A kind of greening park maintenance system

Country Status (1)

Country Link
CN (1) CN108180943A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108665192A (en) * 2018-07-02 2018-10-16 深圳市诺信连接科技有限责任公司 A kind of roadside greening management platform and method
CN109105220A (en) * 2018-08-29 2019-01-01 温州博旺联科建筑工程有限公司 A kind of park maintenance system
CN109141532A (en) * 2018-09-30 2019-01-04 安徽艺林环境工程有限公司 A kind of road afforestation curing system
CN109174499A (en) * 2018-08-30 2019-01-11 深圳春沐源控股有限公司 Spray control method and spray control system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203675787U (en) * 2014-01-04 2014-07-02 沧州临港金太阳绿色农业有限公司 Intelligent water-saving garden irrigation device
CN105869062A (en) * 2016-04-08 2016-08-17 浪潮电子信息产业股份有限公司 Garden maintenance method and system based on cloud calculation
CN106292372A (en) * 2016-09-21 2017-01-04 安徽瀚景观规划设计院有限公司 A kind of urban afforestation based on Internet of Things management system
CN106652411A (en) * 2016-12-19 2017-05-10 南京科控奇智能科技有限公司 Courtyard greening auto-control system
CN106888941A (en) * 2017-02-16 2017-06-27 郑州云海信息技术有限公司 A kind of urban green belts water saving automatic irrigation system and method based on cloud computing
CN107094492A (en) * 2017-06-30 2017-08-29 合肥虎俊装饰工程有限公司 A kind of garden management system based on Internet of Things
CN107179734A (en) * 2017-06-30 2017-09-19 合肥虎俊装饰工程有限公司 A kind of afforestation curing system based on wireless telecommunications
CN206532122U (en) * 2016-12-21 2017-09-29 司哲 One kind is based on Internet of Things plant long-distance intelligent curing system
CN107251751A (en) * 2017-07-14 2017-10-17 安阳工学院 Garden ecological three-dimensional greening system for urban buildings

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203675787U (en) * 2014-01-04 2014-07-02 沧州临港金太阳绿色农业有限公司 Intelligent water-saving garden irrigation device
CN105869062A (en) * 2016-04-08 2016-08-17 浪潮电子信息产业股份有限公司 Garden maintenance method and system based on cloud calculation
CN106292372A (en) * 2016-09-21 2017-01-04 安徽瀚景观规划设计院有限公司 A kind of urban afforestation based on Internet of Things management system
CN106652411A (en) * 2016-12-19 2017-05-10 南京科控奇智能科技有限公司 Courtyard greening auto-control system
CN206532122U (en) * 2016-12-21 2017-09-29 司哲 One kind is based on Internet of Things plant long-distance intelligent curing system
CN106888941A (en) * 2017-02-16 2017-06-27 郑州云海信息技术有限公司 A kind of urban green belts water saving automatic irrigation system and method based on cloud computing
CN107094492A (en) * 2017-06-30 2017-08-29 合肥虎俊装饰工程有限公司 A kind of garden management system based on Internet of Things
CN107179734A (en) * 2017-06-30 2017-09-19 合肥虎俊装饰工程有限公司 A kind of afforestation curing system based on wireless telecommunications
CN107251751A (en) * 2017-07-14 2017-10-17 安阳工学院 Garden ecological three-dimensional greening system for urban buildings

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108665192A (en) * 2018-07-02 2018-10-16 深圳市诺信连接科技有限责任公司 A kind of roadside greening management platform and method
CN109105220A (en) * 2018-08-29 2019-01-01 温州博旺联科建筑工程有限公司 A kind of park maintenance system
CN109174499A (en) * 2018-08-30 2019-01-11 深圳春沐源控股有限公司 Spray control method and spray control system
CN109141532A (en) * 2018-09-30 2019-01-04 安徽艺林环境工程有限公司 A kind of road afforestation curing system

Similar Documents

Publication Publication Date Title
CN108180943A (en) A kind of greening park maintenance system
KR20200079762A (en) Automatic cleaning apparatus of solar panel array and cleaning method thereof
CN105610900A (en) Embedded Internet of things gateway-based agricultural greenhouse indoor environment monitoring system
CN206820788U (en) A kind of plant factor plant growing way record and plantation suggesting system for wearing
KR101021182B1 (en) System and method for monitering green house and for managing growth of plants in green house using renewable energy
CN214719212U (en) Photovoltaic inspection cleaning robot based on image recognition
CN206221178U (en) Fan monitoring system
CN107786846A (en) A kind of water resource remote monitoring device suitable for field
CN107505865A (en) Intelligent city green area irrigation management system
CN112136667B (en) Intelligent sprinkling irrigation method and system based on edge machine learning
CN109984105A (en) A kind of intelligent monitoring system of Landscape Construction
CN106538293A (en) A kind of photovoltaic solar intelligent management booth
CN107728526A (en) A kind of greenhouse-environment intelligent monitor system based on NB IoT honeycomb technology of Internet of things
CN107018205A (en) A kind of network intelligence fire fighting hydraulic pressure table control system and its control method
CN110040244A (en) Inner wall of stack image collecting device and method based on unmanned plane suspension platform
CN108958201A (en) park maintenance device and park maintenance method
KR101402487B1 (en) Plant factory system
CN107070371B (en) Wind light mutual complementing power generation monitoring system based on mobile Internet
CN111034702A (en) Intelligent power grid operation obstacle avoidance system and method
CN105210695A (en) A kind of intelligent green house of vegetables long distance control system
CN107046392B (en) Wind and solar hybrid generating system
CN107211845A (en) A kind of gardening Intelligent drip irrigation system
CN209463013U (en) A kind of agricultural greenhouse monitoring system
CN208298047U (en) Intelligent plant maintenance monitors system
TWI678145B (en) A moveable green mushroom cultivation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180619

RJ01 Rejection of invention patent application after publication