CN108166772A - 关于柱包钢加固变截面柱节点的一种处理方法 - Google Patents
关于柱包钢加固变截面柱节点的一种处理方法 Download PDFInfo
- Publication number
- CN108166772A CN108166772A CN201711390088.2A CN201711390088A CN108166772A CN 108166772 A CN108166772 A CN 108166772A CN 201711390088 A CN201711390088 A CN 201711390088A CN 108166772 A CN108166772 A CN 108166772A
- Authority
- CN
- China
- Prior art keywords
- column
- steel
- node
- section
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
在加固改造的施工项目中,柱包角钢的加固方式为常用的方法,在施工时需要一条柱上下多层贯通包角钢。在施工过程中,会遇到柱子的截面变化的状况,如果在变截面的节点处理不好,会严重影响加固的整体受力效果。通过在柱截面变化处安装与角钢等同厚度的钢板,并埋植化学锚栓固定,加固层钢、角钢形成为一整体,增强节点处抗震效果。
Description
技术领域
房屋建筑加固领域。
背景技术
在加固改造的施工项目中,柱包角钢的加固方式为常用的方法,施工时需要一条柱上下多层贯通包角钢。在现在的高层建筑中随着楼层的升高,柱子的截面会变化,如果在变截面的节点处理不好,会严重影响加固的整体受力效果,使建筑物结构加固后达到应有的抗震效果。
本次发明主要是对当柱包钢结构加固遇到柱截面变化,节点处理的一种加固方式。可以使柱包钢的完整性,达到应有抗震效果。
发明内容
本次发明包含以下步骤。
步骤1根据施工图纸对施工现场进行柱位进行复核,柱加固节点进行复核,拆除柱装饰。将柱变截面处柱角楼板进行凿除并切断钢筋,凿毛并使凿除面平整。
步骤2将对柱节点表面进行打磨。
步骤3安装柱角钢、与角钢等厚钢板,安装锚栓固定,焊接连接。
步骤4注入灌浆料、养护。
步骤5恢复装饰层。
其中步骤1中还包含对柱装饰层进行拆除,包含砂浆批荡的拆除。
其中步骤1中还包含为使柱上下贯通,将主角楼板进行开洞,洞口沿柱角方向进行,在主梁节点停止,宽度10cm。大小柱变截面节点处以大柱边为基准线进行凿除楼板。
其中步骤1中还包含混凝土楼板凿除后剪断楼板钢筋,剪断钢筋时注意从靠住、梁侧进行剪断,然后扳弯,以便恢复楼板时使用。
其中步骤1中还包含混凝土楼板凿除完成后,对靠柱侧的凿除面进行修补,剔除松散的石块,对较深坑槽采用环氧砂浆修补平整,确保角钢安装时基面的平整度。
其中步骤2中还包含对柱变截面楼板面装饰进行凿除后,对包角钢的贴合面进行打磨。
其中步骤2中还包含在大小柱节点位的小柱柱角周围进行打磨,打磨宽度与大柱周边位置平齐,且包含梁面的打磨。
其中步骤3中还包含角钢安装时从下往上安装,先安装柱角角钢,采用化学锚栓固定,然后焊接缀板及柱节点为钢板安装。
其中步骤3中还包含依次安装界面较小柱的角钢及缀板。
其中步骤3中还包上下柱角钢与节点处钢板焊接连接。
其中步骤3中还包含在柱顶与梁交接处,缀板无法拉通时,通过在梁端部安装全包一段与缀板同宽同厚的钢板进行加强。
其中步骤3中还包含所有角钢及钢板直接与混凝土贴合的均采用花学锚栓固定,钢板与角钢间采用满焊焊接连接。
其中步骤4中还包含在灌注胶体前角钢、钢板必须焊接完成。
其中步骤4中还包含在楼板开凿洞口处剪断的钢筋扳回与包柱角钢焊接连接,焊接长度为钢筋直径的10d,钢筋长度不足时,可以另加钢筋连接。
其中步骤4中还包含注胶前先对角钢、缀板边缘进行封边,待胶体完全固化后,且养护24小时。
其中步骤4中还包含在注胶时,严格注意周边是否有漏胶的,如有及时采用肥皂泥堵死。
其中步骤4中还包含灌注满时,严禁立即撤除注浆设备,需稳压10分钟,再进行撤除注浆设备。
其中步骤4中还包含灌注完成后,养护72小时,养护期间禁止对结构较大有震动的施工,养护期满后,再次检查灌注区域内是否有空鼓的,如有,采用磁力钻钻孔补胶。检查是否空鼓采用小锤敲打的方式进行检查。
其中步骤5中还包含养护期满后,对钢板表面进行打磨,喷刷防护油漆,露在混凝土外的钢材表面还应涂刷防锈油漆。
本次发明的柱节点加固方法,可以增强节点受力,施工方便牢靠,有力增强结构的抗震效果。
附图说明
图1为原结构柱截面变化节点图。
图2为原结构柱截面变化处节点剖面图。
图3为柱包钢竖向图。
图4为柱包钢水平面剖面图。
具体实施方式
为更好的理解本次发明的柱包截面变化节点处理的阐述说明,结合图对节点施工方法进行详细说明。
根据现场情况,找出柱截面变化的节点,如图1所示。将截面较大柱1及截面较小柱2表面的装饰层进行拆除,包含表面砂浆批荡层。并对结构表面进行打磨处理,对柱表面不平整的进行修补,修补采用环氧砂浆或者结构修补胶胶进行修补。
如图2所示,在柱装饰面凿除后,凿除节点处楼板,形成楼板洞口5,凿除楼板洞口5以下层较大截面柱1边缘及结构梁4边为界线。凿除楼板时,将与柱及梁边修齐平整,并剔除松散的小块,且将钢筋从梁侧及柱侧进行剪断并弯起。
柱表面装饰拆除完成并打磨完成后,开始从下至上安装角钢及肋板。如图3所示,先进行柱四角角钢6的安装,采用化学锚栓8进行固定,锚栓的直径根据角钢的尺寸不同采用不同的直径,下层截面较大柱1角钢安装时,高度超出较大截面柱高1cm。
如图3所示,柱四角的角钢6安装固定以后,进行缀板7的安装,在柱节点处与梁交处,缀板不能水平通过,在梁端安装一块口字型箍板12,并焊接较短的缀板13,与角钢6和箍板12焊接连接,箍板采用化学锚栓6进行固定。
如图3所示,在节点处截面较小柱脚安装一块水平钢板9,环绕柱2一周,钢板宽等同与柱1宽减去柱2宽之差(如图4所示),钢板厚度同包柱角钢厚度,并采用化学锚栓8固定。
如图3所示,柱2脚钢板9与柱1四角角钢6进行焊接连接,完成后,对柱2进行角钢10的安装,并采用化学锚栓固定,然后焊接缀板11。安装的角钢10与钢板9焊接连接,使其上下不同截面柱的后加角钢连接为一个整体。
钢板和角钢安装焊接完成以后,恢复洞口5处的楼板钢筋,将钢筋与角钢或缀板进行焊接,钢筋焊接长度为钢筋直径的10d。
涉及所有的焊接工序完成后,对角钢6、角钢10和钢板9、钢板12、缀板7、缀板11、缀板13进行封边及注浆,使其与原结构紧密贴实。
最后恢复结构楼板,根据要求对钢材表面进行涂刷防腐防火涂料,并对结构表面装饰进行恢复。
此柱截面变化除节点处理方式施工方便快捷,后加固角钢形成一整体,通过填充注浆可以使后加钢材与原结构紧密结构形成整体受力,有效的增强节点受力状况。
Claims (3)
1.本发明为建筑加固改造柱钢包截面变化柱节点处理的一种方式,其特征在于对柱大小截面角钢通过钢板进行连接,在梁柱节点包钢加强节点的整体性。
2.如权利1所诉,柱大小截面包角钢时,通过安装固定在大柱顶的水平钢板焊接连接,柱顶钢板固定时采用化学锚栓进行固定,钢板厚度与角钢厚度相等。
3.如权利1所诉,柱顶部角钢缀板无法水平贯通时,在梁端处包一段口字型钢板,宽度同包角钢的缀板同宽同厚。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711390088.2A CN108166772B (zh) | 2017-12-21 | 2017-12-21 | 一种柱包钢加固变截面节点的加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711390088.2A CN108166772B (zh) | 2017-12-21 | 2017-12-21 | 一种柱包钢加固变截面节点的加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108166772A true CN108166772A (zh) | 2018-06-15 |
CN108166772B CN108166772B (zh) | 2021-02-26 |
Family
ID=62523303
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711390088.2A Active CN108166772B (zh) | 2017-12-21 | 2017-12-21 | 一种柱包钢加固变截面节点的加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108166772B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109991311A (zh) * | 2019-04-09 | 2019-07-09 | 中国十七冶集团有限公司 | 一种厂房柱加固方法及其焊缝检测装置 |
CN111706107A (zh) * | 2020-05-29 | 2020-09-25 | 中铁城市规划设计研究院有限公司 | 一种建筑中间框架柱变截面加固结构及其施工方法 |
CN111910945A (zh) * | 2020-07-31 | 2020-11-10 | 上海二十冶建设有限公司 | 用于历史建筑矩形变截面框架柱加固的施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201288377Y (zh) * | 2008-10-16 | 2009-08-12 | 中国建筑第六工程局有限公司 | 一种非植筋和焊接筋接长钢筋混凝土柱节点结构 |
KR101019425B1 (ko) * | 2008-09-26 | 2011-03-07 | 한국전력공사 | 압축좌굴내력 보강기구 및 이의 체결 방법 |
CN206487170U (zh) * | 2017-01-22 | 2017-09-12 | 西安西热锅炉环保工程有限公司 | 一种混凝土梁柱节点处新增钢构件的改造结构 |
-
2017
- 2017-12-21 CN CN201711390088.2A patent/CN108166772B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101019425B1 (ko) * | 2008-09-26 | 2011-03-07 | 한국전력공사 | 압축좌굴내력 보강기구 및 이의 체결 방법 |
CN201288377Y (zh) * | 2008-10-16 | 2009-08-12 | 中国建筑第六工程局有限公司 | 一种非植筋和焊接筋接长钢筋混凝土柱节点结构 |
CN206487170U (zh) * | 2017-01-22 | 2017-09-12 | 西安西热锅炉环保工程有限公司 | 一种混凝土梁柱节点处新增钢构件的改造结构 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109991311A (zh) * | 2019-04-09 | 2019-07-09 | 中国十七冶集团有限公司 | 一种厂房柱加固方法及其焊缝检测装置 |
CN109991311B (zh) * | 2019-04-09 | 2021-06-11 | 中国十七冶集团有限公司 | 一种厂房柱加固方法及其焊缝检测装置 |
CN111706107A (zh) * | 2020-05-29 | 2020-09-25 | 中铁城市规划设计研究院有限公司 | 一种建筑中间框架柱变截面加固结构及其施工方法 |
CN111910945A (zh) * | 2020-07-31 | 2020-11-10 | 上海二十冶建设有限公司 | 用于历史建筑矩形变截面框架柱加固的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108166772B (zh) | 2021-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102864737B (zh) | 门式刚架天桥结构及其施工方法 | |
CN108166772A (zh) | 关于柱包钢加固变截面柱节点的一种处理方法 | |
CN109457993A (zh) | 一种混凝土立柱修复加固方法 | |
KR101150392B1 (ko) | 내진 보강용 철골 구조물의 접합구조 및 접합공법 | |
CN109183807A (zh) | 可移动钢支撑及其施工方法 | |
CN107165435B (zh) | 一种有裂缝内墙的加固施工方法 | |
CN112727504A (zh) | 一种地铁隧道钢环内衬加固施工工艺 | |
CN109610470A (zh) | 一种采用三轴搅拌桩机的基坑支护施工方法 | |
JP2021115527A (ja) | 遮水側壁構造物、底版・側壁構造物及び遮水側壁構築方法 | |
CN105350559A (zh) | 一种适用于大型厂房的金刚砂结构地面的施工方法 | |
CN101250878A (zh) | 一种用无嵌固端桩锚结合锚板墙的深基坑支护方法 | |
CN113738145A (zh) | 建筑加固工程结构及其施工方法 | |
CN108755394B (zh) | 一种预应力筋加固桥梁异形墩柱的方法 | |
JP4137287B2 (ja) | 高耐久性構造埋設型枠工法 | |
CN103774563A (zh) | 一种刚架拱桥的加固方法 | |
CN100464020C (zh) | 连续配筋混凝土路面端部处理方法 | |
KR100375495B1 (ko) | 교각 기초 구조물의 세굴 보수공법 | |
CN113818352B (zh) | 一种软基高墩曲线现浇箱梁桥及其施工方法 | |
JP5680441B2 (ja) | 被覆防食パネル及び該被覆防食パネルを使用した護岸工事方法 | |
CN209082512U (zh) | 可移动钢支撑 | |
JP2012144869A (ja) | トンネル監視員通路の破損した縦壁のタイル壁の補修方法 | |
CN109098319A (zh) | 一种复核轻质条板墙施工方法 | |
JP3310949B2 (ja) | 建造物の空隙充填方法 | |
JPH07233620A (ja) | 床構造 | |
CN103643701A (zh) | 预制桩静载试验桩头处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Yan Zhigang Inventor after: Duan Zhanfei Inventor after: Liu Xianhua Inventor after: Liu Rongsong Inventor before: Yan Zhigang Inventor before: Duan Zhanfei Inventor before: Feng Heqing Inventor before: Liu Xianhua Inventor before: Liu Rongsong |
|
CB03 | Change of inventor or designer information |