CN107165435B - 一种有裂缝内墙的加固施工方法 - Google Patents
一种有裂缝内墙的加固施工方法 Download PDFInfo
- Publication number
- CN107165435B CN107165435B CN201710556045.0A CN201710556045A CN107165435B CN 107165435 B CN107165435 B CN 107165435B CN 201710556045 A CN201710556045 A CN 201710556045A CN 107165435 B CN107165435 B CN 107165435B
- Authority
- CN
- China
- Prior art keywords
- wall
- pressure
- steel plate
- interior wall
- concrete girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0222—Replacing or adding wall ties
Abstract
本发明公开了一种有裂缝内墙的加固施工方法,其特征是(1)在楼板上支设钢支撑;(2)剥离内墙表面的粉刷砂浆;(3)形成第一道混凝土小梁和第二道混凝土小梁;(4)在外墙钻设预留孔;(5)在构造柱箍筋上面焊接垫钢筋,再在垫钢筋上面焊接承压钢板,锚板焊接在承压钢板外表面;(6)预应力筋经锚板固定在承压钢板,然后进行预应力筋张拉;(7)墙体表面挂设钢筋网;(8)用压力喷枪喷涂细石混凝土;(9)涂刷水泥砂浆进行找平。
Description
技术领域
本发明涉及一种有裂缝内墙的加固施工方法,适用于建筑领域。
背景技术
建筑物内墙在使用过程中会出现裂缝,分析原因可能如下:一、上部结构荷载超过建筑物内墙的承载能力;二、建筑物内墙与外墙的拉结筋未放或不到位;三、建筑物内墙在温度应力或沉降应力的影响。在上述情况下建筑物内墙会出现八字裂缝,尤其在建筑物内墙和外墙的交接处容易出现竖向裂缝,甚至会使外墙产生外闪倾向。无论是出于安全性能还是使用功能考虑,都要进行加固,但是目前传统的加固方法是挂设钢筋网,力学性能改善不大,所以加固效果不佳。
发明内容
本发明是提供一种有裂缝内墙的加固施工方法,解决传统加固方法力学加固效果不好的问题。
本发明在内墙中间设置两道混凝土小梁,第一道混凝土小梁设置在离楼板四分之三层高部位,第二道混凝土小梁设置在离楼板四分之一层高部位。混凝土小梁高度为200mm,宽度比内墙宽度大60~80mm,混凝土小梁外凸于内墙宽度大60~80mm,混凝土小梁外凸部位中间设置固定孔,固定孔深度为70~90mm,固定孔直径为16~18mm,固定孔插入固定筋,固定筋直径为12~14mm,固定筋沿着水平方向的间距为50~70mm。在离楼层顶部30~60cm处内墙表面设置预应力筋,预应力筋直径为18~22mm,预应力筋穿过外墙的预留孔,预留孔直径为22~25mm,构造柱局部凿除露出箍筋,箍筋焊接垫钢筋,垫钢筋直径与构造柱保护层厚度相同,垫钢筋焊接承压钢板,承压钢板厚度为20~30mm,垫钢筋设置目的是为了使承压钢板内侧面与外墙的砖外表面相同,承压钢板延伸至外墙的砖外表面,锚板焊接在承压钢板外表面,承压钢板的设置可以有效地防止锚板部位的砖在张拉时局部承压破坏。预应力筋张拉完毕后用固定筋固定形成折线形状。墙体表面挂设钢筋网,钢筋网间距为250mm,钢筋网所采用的钢筋直径为6~8mm,钢筋网通过铆钉固定在墙体的灰缝中,钢筋网外面设置细石混凝土,细石混凝土厚度为15~25mm,细石混凝土外面设置水泥砂浆。
施工步骤包括:
(1)在楼板上支设钢支撑,将作用在内墙的荷载完全卸掉。
(2)剥离内墙表面的粉刷砂浆。
(3)在离楼层顶部1/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第一道混凝土小梁;在离楼层顶部3/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第二道混凝土小梁。
(4)在外墙钻设预留孔,以利于预应力筋穿过外墙固定于锚板。
(5)构造柱局部凿除露出箍筋,剥离放置锚板部位外墙的粉刷,在构造柱箍筋上面焊接垫钢筋,再在垫钢筋上面焊接承压钢板,承压钢板延伸至外墙的砖外表面,锚板焊接在承压钢板外表面。
(6)预应力筋穿过外墙预留孔,预应力筋和外墙预留孔之间的空隙采用高强环氧树脂填塞。预应力筋经锚板固定在承压钢板,然后进行预应力筋张拉,预应力筋张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。预应力筋张拉为竖向张拉,预应力筋张拉完毕后用固定筋固定,预应力筋与固定筋进行焊接,固定筋穿入混凝土小梁的固定孔,固定筋和混凝土小梁的固定孔之间的空隙采用高强环氧树脂填塞。
(7)墙体表面挂设钢筋网,钢筋网通过铆钉固定在墙体的灰缝中。
(8)挂设钢筋网完毕后用压力喷枪喷涂细石混凝土,细石混凝土粗骨料粒径采用15mm以内,粒径小于10mm的比例要大于70%。
(9)涂刷水泥砂浆进行找平。
本发明力学性能好,操作安全可靠。
附图说明
图1有裂缝内墙的加固结构示意图。
附图标志:1、第一道混凝土小梁,2、第二道混凝土小梁,3、预应力筋,4、锚板,5、固定筋,6、承压钢板,7、构造柱,8、楼板。
具体实施方式
以下结合附图对本实施例进行详细描述。
本实施例在内墙中间设置两道混凝土小梁,第一道混凝土小梁1设置在离楼板8四分之三层高部位,第二道混凝土小梁2设置在离楼板8四分之一层高部位。混凝土小梁高度为200mm,宽度比内墙宽度大60~80mm,混凝土小梁外凸于内墙宽度大60~80mm,混凝土小梁外凸部位中间设置固定孔,固定孔深度为70~90mm,固定孔直径为16~18mm,固定孔插入固定筋5,固定筋5直径为12~14mm,固定筋5沿着水平方向的间距为50~70mm。在离楼层顶部30~60cm处内墙表面设置预应力筋3,预应力筋3直径为18~22mm,预应力筋3穿过外墙的预留孔,预留孔直径为22~25mm,构造柱7局部凿除露出箍筋,箍筋焊接垫钢筋,垫钢筋直径与构造柱7保护层厚度相同,垫钢筋焊接承压钢板6,承压钢板6厚度为20~30mm,承压钢板6延伸至外墙的砖外表面,锚板4焊接在承压钢板6外表面。预应力筋3张拉完毕后用固定筋5固定形成折线形状。墙体表面挂设钢筋网,钢筋网间距为250mm,钢筋网所采用的钢筋直径为6~8mm,钢筋网通过铆钉固定在墙体的灰缝中,钢筋网外面设置细石混凝土,细石混凝土厚度为15~25mm,细石混凝土外面设置水泥砂浆。
施工步骤包括:
(1)在楼板8上支设钢支撑,将作用在内墙的荷载完全卸掉。
(2)剥离内墙表面的粉刷砂浆。
(3)在离楼层顶部1/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第一道混凝土小梁1;在离楼层顶部3/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第二道混凝土小梁2。
(4)在外墙钻设预留孔。
(5)构造柱7局部凿除露出箍筋,剥离放置锚板4部位外墙的粉刷,在构造柱7箍筋上面焊接垫钢筋,再在垫钢筋上面焊接承压钢板6,承压钢板6延伸至外墙的砖外表面,锚板4焊接在承压钢板6外表面。
(6)预应力筋3穿过外墙预留孔,预应力筋3和外墙预留孔之间的空隙采用高强环氧树脂填塞。预应力筋3经锚板4固定在承压钢板6,然后进行预应力筋3张拉,预应力筋3张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15。预应力筋3张拉为竖向张拉,预应力筋3张拉完毕后用固定筋5固定,预应力筋3与固定筋5进行焊接,固定筋5穿入混凝土小梁的固定孔,固定筋5和混凝土小梁的固定孔之间的空隙采用高强环氧树脂填塞。
(7)墙体表面挂设钢筋网,钢筋网通过铆钉固定在墙体的灰缝中。
(8)挂设钢筋网完毕后用压力喷枪喷涂细石混凝土,细石混凝土粗骨料粒径采用15mm以内,粒径小于10mm的比例要大于70%。
(9)涂刷水泥砂浆进行找平。
Claims (3)
1.一种有裂缝内墙的加固施工方法,其特征是在内墙中间设置两道混凝土小梁,第一道混凝土小梁设置在离楼板四分之三层高部位,第二道混凝土小梁设置在离楼板四分之一层高部位;混凝土小梁外凸于内墙,外凸宽度为60~80mm,混凝土小梁外凸部位中间设置固定孔,固定孔插入固定筋,固定筋直径为12~14mm,固定筋沿着水平方向的间距为50~70mm;在离楼层顶部30~60cm处内墙表面设置预应力筋,预应力筋直径为18~22mm,预应力筋穿过外墙的预留孔,预留孔直径为22~25mm,构造柱局部凿除露出箍筋,箍筋焊接垫钢筋,垫钢筋直径与构造柱保护层厚度相同,垫钢筋焊接承压钢板,承压钢板延伸至外墙的砖外表面,锚板焊接在承压钢板外表面;预应力筋张拉完毕后用固定筋固定形成折线形状;墙体表面挂设钢筋网,钢筋网通过铆钉固定在墙体的灰缝中,钢筋网外面设置细石混凝土,细石混凝土厚度为15~25mm,细石混凝土外面设置水泥砂浆;
施工步骤包括:
(1)在楼板上支设钢支撑,将作用在内墙的荷载完全卸掉;
(2)剥离内墙表面的粉刷砂浆;
(3)在离楼层顶部1/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第一道混凝土小梁;在离楼层顶部3/4层高部位内墙部位凿除砖形成凹槽,将绑扎好的钢筋和箍筋放入凹槽,浇筑混凝土,形成第二道混凝土小梁;
(4)在外墙钻设预留孔;
(5)构造柱局部凿除露出箍筋,剥离放置锚板部位外墙的粉刷,在构造柱箍筋上面焊接垫钢筋,再在垫钢筋上面焊接承压钢板,承压钢板延伸至外墙的砖外表面,锚板焊接在承压钢板外表面;
(6)预应力筋穿过外墙预留孔,预应力筋和外墙预留孔之间的空隙采用高强环氧树脂填塞;预应力筋经锚板固定在承压钢板,然后进行预应力筋张拉,预应力筋张拉采用杠杆式夹紧工具,杠杆式夹紧工具的阻力臂与动力臂的比值为0.05~0.15;预应力筋张拉为竖向张拉,预应力筋张拉完毕后用固定筋固定,预应力筋与固定筋进行焊接,固定筋穿入混凝土小梁的固定孔,固定筋和混凝土小梁的固定孔之间的空隙采用高强环氧树脂填塞;
(7)墙体表面挂设钢筋网,钢筋网通过铆钉固定在墙体的灰缝中;
(8)挂设钢筋网完毕后用压力喷枪喷涂细石混凝土,细石混凝土粗骨料粒径采用15mm以内,粒径小于10mm的比例要大于70%;
(9)涂刷水泥砂浆进行找平。
2.根据权利要求1所述的有裂缝内墙的加固施工方法,其特征是固定孔深度为70~90mm,固定孔直径为16~18mm。
3.根据权利要求1所述的有裂缝内墙的加固施工方法,其特征是钢筋网间距为250mm,钢筋网所采用的钢筋直径为6~8mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710556045.0A CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710556045.0A CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
CN201610127849.4A CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610127849.4A Division CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107165435A CN107165435A (zh) | 2017-09-15 |
CN107165435B true CN107165435B (zh) | 2019-05-03 |
Family
ID=55984642
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610127849.4A Expired - Fee Related CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
CN201710556045.0A Active CN107165435B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固施工方法 |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610127849.4A Expired - Fee Related CN105604344B (zh) | 2016-02-28 | 2016-02-28 | 一种有裂缝内墙的加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105604344B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592839A (zh) * | 2017-03-03 | 2017-04-26 | 沈阳建筑大学 | 一种横张体外预应力压型钢板组合楼板 |
CN107327157B (zh) * | 2017-09-04 | 2023-12-15 | 安徽津达建材股份有限公司 | 混凝土楼板加固结构 |
CN108360839A (zh) * | 2018-03-26 | 2018-08-03 | 桂林理工大学 | 一种旧墙加固系统及其施工方法 |
CN110593597A (zh) * | 2019-08-26 | 2019-12-20 | 广东建宇建筑科技有限公司 | 一种修补墙体裂缝的方法 |
CN112359889B (zh) * | 2020-10-19 | 2022-01-28 | 中国建筑第二工程局有限公司 | 一种基础底板加固逆作施工方法 |
CN113417222B (zh) * | 2021-08-02 | 2022-07-29 | 杨伟涛 | 一种道路桥梁裂缝处理装置 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100316276B1 (ko) * | 1999-01-28 | 2001-12-12 | 원종균 | 벽체보수방법 |
US20090260312A1 (en) * | 2006-05-24 | 2009-10-22 | Yan Sup Lee | Fix Holder, Steel Wire, Bricks, and Bricks Walls Reinforcement Method Thereby |
CN201011136Y (zh) * | 2007-03-16 | 2008-01-23 | 中国建筑科学研究院 | 钢铰线、聚合物砂浆复合加固结构 |
CN201531124U (zh) * | 2009-09-24 | 2010-07-21 | 马人乐 | 分级体外预应力加固砌体结构 |
CN103089021A (zh) * | 2011-11-08 | 2013-05-08 | 上海美创建筑加固工程有限公司 | 砌体结构抗震加固圈梁制造方法 |
CN103075022B (zh) * | 2012-11-09 | 2016-02-03 | 河南省建设集团有限公司 | 一种既有建筑砌体增加暗梁结构及其施工方法 |
CN103835521A (zh) * | 2012-11-20 | 2014-06-04 | 贵阳铝镁设计研究院有限公司 | 一种砖墙的加固方法及结构 |
CN103243804B (zh) * | 2013-05-23 | 2015-04-15 | 东北石油大学 | 预应力薄壁型钢—混凝土组合框架及其施工方法 |
CN103352581B (zh) * | 2013-07-09 | 2015-12-09 | 北京筑福国际工程技术有限责任公司 | 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法 |
CN103469939B (zh) * | 2013-09-24 | 2015-09-09 | 中国建筑第二工程局有限公司 | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 |
CN103758362B (zh) * | 2014-01-06 | 2016-05-04 | 北京筑福国际工程技术有限责任公司 | 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法 |
CN103883022B (zh) * | 2014-03-20 | 2016-04-27 | 中国建筑第二工程局有限公司 | 围护结构内外墙抗震与隔音抗裂一体化构造的施工方法 |
CN103967127B (zh) * | 2014-05-23 | 2016-06-01 | 东北石油大学 | 内置芯柱的异强组合柱组合梁框架及其施工方法 |
-
2016
- 2016-02-28 CN CN201610127849.4A patent/CN105604344B/zh not_active Expired - Fee Related
- 2016-02-28 CN CN201710556045.0A patent/CN107165435B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN107165435A (zh) | 2017-09-15 |
CN105604344A (zh) | 2016-05-25 |
CN105604344B (zh) | 2018-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107165435B (zh) | 一种有裂缝内墙的加固施工方法 | |
CN108412125A (zh) | 一种劲性混凝土组合结构框架梁柱施工工法 | |
CN104818991A (zh) | 一种浅埋偏压残坡积土隧道的施工方法 | |
CN106498950B (zh) | 锚头置于桩身的深基坑桩锚支护体系的实施方法 | |
CN109706846B (zh) | 用于斜坡地基的高、窄桥盖梁穿心钢棒施工方法 | |
CN103510540B (zh) | 浆砌片石挡土墙加固施工方法及其结构 | |
CN109457993A (zh) | 一种混凝土立柱修复加固方法 | |
CN106150060B (zh) | 基于装配式连墙件外墙脚手架体系的施工方法 | |
CN103758358A (zh) | 钢板角钢组合构造柱和粘锚钢板砌体加固结构及施工方法 | |
CN103194949B (zh) | 一种斜向预应力水泥混凝土路面裂缝修补结构及修补方法 | |
CN109611102A (zh) | 一种冷开挖下穿立交桥施工方法 | |
CN103306493B (zh) | 建筑物结构的加固方法 | |
CN103498425A (zh) | 一种全拆装组合式多功能托架支承结构及其施工方法 | |
CN103215953A (zh) | 超大超深地下室工程中抗浮锚杆的施工方法 | |
CN113605771B (zh) | 一种预应力装配式框架结构体系 | |
CN105926470A (zh) | 高架桥梁改造方法 | |
JP5064245B2 (ja) | Pc梁と鋼製梁との接合方法 | |
CN108316290A (zh) | 无承台的一柱一桩结构及其施工方法 | |
CN104988884A (zh) | 一种用于面板堆石坝的脱空变形监测装置及安装方法 | |
CN106120793A (zh) | 一种倾斜预应力管桩的纠偏方法及结构 | |
CN114215090A (zh) | 一种封闭空间内筏板与压桩的施工方法 | |
CN106401615A (zh) | 公路隧道初衬钢拱架与预应力锚杆一体化支护结构及施工工艺 | |
CN104675138B (zh) | 一种用于隔声降噪改造的板式阳台加固方法 | |
CN205975615U (zh) | 一种倾斜预应力管桩的纠偏结构 | |
JP3582971B2 (ja) | コンクリート構造物の補強施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201204 Address after: 224000 Dajian neighborhood committee, Haitong Town, Sheyang County, Yancheng City, Jiangsu Province Patentee after: Sheyang Tonghai Village Construction Development Co., Ltd Address before: 325000, Jingshan Hill, Zhejiang, Wenzhou, group 11, Room 302 Patentee before: Ye Xiangzhu |
|
TR01 | Transfer of patent right |