CN108163694A - A kind of body section hanging method with hatch coaming - Google Patents

A kind of body section hanging method with hatch coaming Download PDF

Info

Publication number
CN108163694A
CN108163694A CN201711394947.5A CN201711394947A CN108163694A CN 108163694 A CN108163694 A CN 108163694A CN 201711394947 A CN201711394947 A CN 201711394947A CN 108163694 A CN108163694 A CN 108163694A
Authority
CN
China
Prior art keywords
hanging ring
steel wire
wire rope
body section
hook hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711394947.5A
Other languages
Chinese (zh)
Inventor
张津京
孙颖
甘建新
袁亚银
王晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201711394947.5A priority Critical patent/CN108163694A/en
Publication of CN108163694A publication Critical patent/CN108163694A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of body section hanging methods with hatch coaming, specifically include following steps:Stage installation main hook hanging ring and auxiliary hook hanging ring are found in group;First shackle on main hook hanging ring is installed, unloads to buckle first and fixes the first steel wire rope, the second steel wire rope is fixed on auxiliary hook hanging ring;It is vertical assembled in body section that deck group is found into other groups with hull;First steel wire rope and the second shackle on crane are connected;Lift body section;Remove the first shackle and the first steel wire rope.The present invention founds stage installation hanging ring in group, pushing tow operation is changed to plane operation, it does not need to that hanging ring can be installed using pushing tow auxiliary tool, considerably reduce hanging ring installation difficulty and installation quality, reduce task difficulty, the Fast Installation of hanging ring and steel wire rope is realized, a large amount of manpower and materials has been saved, has improved production efficiency.

Description

A kind of body section hanging method with hatch coaming
Technical field
The present invention relates to shipbuilding technical field, more particularly to a kind of body section hanging method with hatch coaming.
Background technology
During shipbuilding, when body section lifts, freeze in advance hanging ring and connecting steel wire ropes are needed.Due to hull Hatch closed structure is made of particulate metal material, therefore cannot freeze on hatch closed structure hanging ring or hatch closed structure Upper preloader can not install hanging ring, therefore the installation of hanging ring is cumbersome.
In hull work progress, hanging ring is installed after segmentation is completed, since hanging ring and steel wire rope are very heavy, It is generally necessary to more people are lifted hanging ring from bottom to top to be fixed on segmental structure by cucurbit tool with merging, this peace Dress method is extremely difficult, and task difficulty is big, and soldering angle is bad, it is difficult to ensure the welding quality of hanging ring, there are certain to apply Work hidden danger.Simultaneously because Quality of Steel Wire Rope is heavier, flexible very poor, steel wire rope, which is fixed on hanging ring, to be needed to expend larger people Power, segmental hoisting operating efficiency are very low.
Invention content
The purpose of the present invention is overcome the deficiencies in the prior art, design a kind of body section lifting side with hatch coaming Method.
In order to achieve the above objectives, the technical solution adopted in the present invention is:
A kind of body section hanging method with hatch coaming, specifically includes following steps:
The first step founds stage installation main hook hanging ring and auxiliary hook hanging ring in group;
Specifically, the deck upper surface normal state that group is stood on deck places at least one set of main hook hanging ring, and in outside plate upper surface, normal state is put Put at least one set of auxiliary hook hanging ring;Then, welding positioning is carried out to all main hook hanging rings and auxiliary hook hanging ring using flat fillet weld;
Second step fixes first shackle on each main hook hanging ring, unloads to buckle each first and fixes first steel wire Rope, the length of first steel wire rope are more than the height of hatch coaming;Second steel wire rope is fixed on each auxiliary hook hanging ring;
Third step stands the deck group and hull other groups are vertical carries out assembled, forms body section, the hatch coaming is located at ship The upside of body segmentation, main hook hanging ring are located at the lower section of hatch coaming, and main hook hanging ring gross deadweight is more than the weight of body section;
4th step fixes third steel wire rope on the suspension hook of crane, the second shackle is fixed in third steel wire rope lower end, by the first steel The free end of cord is fixed in the retaining ring of the second shackle;The free end of second steel wire rope is fixed on to the suspension hook of another crane On;
Two cranes of 5th step while startup, lift the body section;
After 6th step, body section lifting positioning, the first shackle and the first steel wire rope are removed, lifting is completed.
Preferably, the main hook hanging ring and auxiliary hook hanging ring are located at the both sides of body section center of gravity.
Preferably, when being lifted to the body section, the interlude of third steel wire rope is tightly attached to hatch envelope surface On plate.
Preferably, the safeload intensity of first shackle and the first steel wire rope should meet segmental hoisting design and want It asks.
Preferably, the main hook hanging ring is linear is uniformly distributed above deck, and auxiliary hook hanging ring is linear to be uniformly distributed On outside plate.
The positive beneficial effect of the present invention:The present invention founds stage installation hanging ring in group, and pushing tow operation is changed to plane makees Industry does not need to install hanging ring using pushing tow auxiliary tool, considerably reduces hanging ring installation difficulty and installation matter Amount, reduces task difficulty, realizes the Fast Installation of hanging ring and steel wire rope, saved a large amount of manpower and materials, improved life Produce efficiency.Simultaneously as carrying out plane operation, fillet welding in the vertical position when hanging ring is installed is changed to flat fillet weld, can reduce hanging ring welding Operation difficulty ensures the welding quality of hanging ring, improves construction safety stability.
Description of the drawings
Fig. 1 is the scheme of installation that deck group founds stage main hook hanging ring.
Fig. 2 is the hook throwing schematic diagram of the method for the present invention.
Fig. 3 is the lifting schematic diagram of the method for the present invention.
The concrete meaning of figure label is:1 is main hook block ring, and 2 be auxiliary hook hanging ring, and 3 be deck, and 4 be outside plate, and 5 be first Shackle, 6 be the first steel wire rope, and 7 be hatch coaming, and 8 be the second steel wire rope, and 9 be body section, and 10 be third steel wire rope, and 11 be the Two shackles.
Specific embodiment
Understand to make the object, technical solutions and advantages of the present invention clearer, it is specific below by what is shown in attached drawing Embodiment describes the present invention.However, it should be understood that these descriptions are merely illustrative, and it is not intended to limit the model of the present invention It encloses.In addition, in the following description, the description to known features and technology is omitted, to avoid unnecessarily obscuring the present invention's Concept.
The present embodiment will be described with reference to Fig. 1, and the body section hanging method of the invention with hatch coaming can meet hanging ring The requirement of the quick hook throwing of segmentation on the downside of segmentation can realize the Fast Installation of hanging ring and steel wire rope.
When being lifted to body section, the present invention specifically includes following steps:
The first step founds stage installation main hook hanging ring 1 and auxiliary hook hanging ring 2 in group;
Specifically, the 3 upper surface normal state of deck that group is stood on deck places at least one set of linearly distributed main hook hanging ring 1, main hook It hangs, 1 is uniformly distributed on the deck 3;In outside plate upper surface, normal state places at least one set of linearly distributed auxiliary hook hanging ring 2, auxiliary hook Hanging ring 2 is evenly distributed on outside plate 4.Main hook hanging ring 1 and auxiliary hook hanging ring 2 in group are installed in the stage of standing, greatly reduced Hanging ring installation difficulty and installation quality, reduce task difficulty, do not need to just place hanging ring by pushing tow auxiliary tool Above deck, meanwhile, pushing tow operation is changed to plane operation, a large amount of manpower and materials can be saved.
Then, welding positioning is carried out to all main hook hanging rings 1 and auxiliary hook hanging ring 2 using flat fillet weld.It is freezed using flat fillet weld Mode can reduce the difficulty of hanging ring welding operation, ensure welding quality, avoid causing construction safety due to poor welding quality Accident.
Second step fixes first shackle 5 on each main hook hanging ring 1, and one is fixed in each first shackle 5 One steel wire rope 6, the length of first steel wire rope 6 are more than the height of hatch coaming 7,5 and first steel wire rope 6 of the first shackle Safeload intensity should meet segmental hoisting design requirement.Second steel wire rope 8 is fixed on each auxiliary hook hanging ring 2.
Third walks, the deck group is stood to, composition body section assembled with the vertical progress of other groups of hull.In this process, It is assembled with the vertical progress of other groups together that hanging ring and steel wire rope follow deck group to stand, and can improve production efficiency.The hatch coaming 7 In the upside of body section 9, main hook hanging ring 1 is located at the lower section of hatch coaming 7, and 1 gross deadweight of main hook hanging ring is more than body section 9 Weight.
4th step fixes third steel wire rope 10 on the suspension hook of crane, and the second shackle is fixed in 10 lower end of third steel wire rope 11;The free end of second steel wire rope 8 is fixed on the suspension hook of another crane.
Two cranes of 5th step while startup, lift the body section 9, by the free end of the first steel wire rope 6 It is fixed in the retaining ring of the second shackle 11.In segmental hoisting operation, the first steel wire rope 6 and the second shackle 11 are fixed up, A large amount of manpower and materials can be reduced, because of all unusual weights of steel wire rope and shackle, steel wire rope it is flexible and very poor, if adopted With conventional method, need to move steel wire rope below hatch coaming to, steel wire rope is connected in hanging ring, more people is needed to match in this way Steel wire rope and hanging ring could be fixed up by merging by cucurbit suspender, expend larger manpower and materials, and efficiency is very low, this Invention can be good at solving this lifting problem, improve the lifting efficiency of segmentation.
When body section lifts, the interlude of third steel wire rope 10 is tightly attached on 7 panel of hatch coaming, and stress point is located at cabin Mouth encloses 7 top.And main hook hanging ring 1 and auxiliary hook hanging ring 2 are located at the both sides of segmentation center of gravity respectively, after main hook lifting, coordinate auxiliary hook Segmental structure can be made once to lift in place, do not need to be secondary and change hook, greatly improve lifting efficiency.
After 6th step, body section lifting positioning, the first shackle 5 and the first steel wire rope 6 are removed, lifting is completed.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, those of ordinary skills in the art should understand that;Still It can modify to the specific embodiment of the present invention or equivalent replacement is carried out to some technical characteristics;Without departing from this hair The spirit of bright technical solution should all cover in the claimed technical solution range of the present invention.

Claims (5)

1. a kind of body section hanging method with hatch coaming, which is characterized in that specifically include following steps:
The first step founds stage installation main hook hanging ring and auxiliary hook hanging ring in group;
Specifically, the deck upper surface normal state that group is stood on deck places at least one set of main hook hanging ring, and in outside plate upper surface, normal state is put Put at least one set of auxiliary hook hanging ring;Then, welding positioning is carried out to all main hook hanging rings and auxiliary hook hanging ring using flat fillet weld;
Second step fixes first shackle on each main hook hanging ring, unloads to buckle each first and fixes first steel wire Rope, the length of first steel wire rope are more than the height of hatch coaming;Second steel wire rope is fixed on each auxiliary hook hanging ring;
Third step stands the deck group and hull other groups are vertical carries out assembled, forms body section, the hatch coaming is located at ship The upside of body segmentation, main hook hanging ring are located at the lower section of hatch coaming, and main hook hanging ring gross deadweight is more than the weight of body section;
4th step fixes third steel wire rope on the suspension hook of crane, and the second shackle is fixed in third steel wire rope lower end;By the second steel The free end of cord is fixed on the suspension hook of another crane;
Two cranes of 5th step while startup, lift the body section, the free end of the first steel wire rope are fixed on In the retaining ring of second shackle;
After 6th step, body section lifting positioning, the first shackle and the first steel wire rope are removed, lifting is completed.
2. the body section hanging method according to claim 1 with hatch coaming, which is characterized in that the main hook hanging ring and Auxiliary hook hanging ring is located at the both sides of body section center of gravity.
3. the body section hanging method according to claim 1 with hatch coaming, which is characterized in that the body section When being lifted, the interlude of third steel wire rope is tightly attached on hatch coaming panel.
4. the body section hanging method according to claim 1 with hatch coaming, which is characterized in that first shackle and The safeload intensity of first steel wire rope should meet segmental hoisting design requirement.
5. the body section hanging method according to claim 1 with hatch coaming, which is characterized in that the main hook hanging ring is in Threadiness is uniformly distributed above deck, and auxiliary hook hanging ring is linear to be evenly distributed on outside plate.
CN201711394947.5A 2017-12-21 2017-12-21 A kind of body section hanging method with hatch coaming Pending CN108163694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711394947.5A CN108163694A (en) 2017-12-21 2017-12-21 A kind of body section hanging method with hatch coaming

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711394947.5A CN108163694A (en) 2017-12-21 2017-12-21 A kind of body section hanging method with hatch coaming

Publications (1)

Publication Number Publication Date
CN108163694A true CN108163694A (en) 2018-06-15

Family

ID=62523141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711394947.5A Pending CN108163694A (en) 2017-12-21 2017-12-21 A kind of body section hanging method with hatch coaming

Country Status (1)

Country Link
CN (1) CN108163694A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109264579A (en) * 2018-09-30 2019-01-25 广船国际有限公司 A kind of ship turn-over method and protecting tool set-up
CN109533191A (en) * 2018-10-23 2019-03-29 上海江南长兴造船有限责任公司 A kind of hanging method for two phase stainless steel chemical tanker transverse bulkhead medial section
CN110077520A (en) * 2019-04-30 2019-08-02 上海外高桥造船有限公司 Sectional turn-over main hook hanging horse arragement construction is built on a kind of bulk freighter
CN110171772A (en) * 2019-05-28 2019-08-27 沪东中华造船(集团)有限公司 A kind of method that shipbuilding quickly adjusts split fix in the process
CN111591879A (en) * 2020-05-28 2020-08-28 南通振华重型装备制造有限公司 Novel lifeboat static load test method
CN113928497A (en) * 2021-12-01 2022-01-14 沪东中华造船(集团)有限公司 Method for high-altitude dismantling of ship outer plate lifting ring and special tool

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102490863A (en) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 Overall lifting method for ship superstructure
CN103754747A (en) * 2014-02-11 2014-04-30 武汉理工大学 Arranging method for large-scale segmental hoisting secure lifting rope of ship body
CN104504201A (en) * 2014-12-22 2015-04-08 大连理工大学 Automatic design method for ship segmental hoisting scheme
CN105129622A (en) * 2015-06-24 2015-12-09 李泽华 Segmental hoisting process method
CN107010171A (en) * 2017-03-13 2017-08-04 沪东中华造船(集团)有限公司 A kind of method that block lifting is segmented for super-container vessel transverse bulkhead

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102490863A (en) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 Overall lifting method for ship superstructure
CN103754747A (en) * 2014-02-11 2014-04-30 武汉理工大学 Arranging method for large-scale segmental hoisting secure lifting rope of ship body
CN104504201A (en) * 2014-12-22 2015-04-08 大连理工大学 Automatic design method for ship segmental hoisting scheme
CN105129622A (en) * 2015-06-24 2015-12-09 李泽华 Segmental hoisting process method
CN107010171A (en) * 2017-03-13 2017-08-04 沪东中华造船(集团)有限公司 A kind of method that block lifting is segmented for super-container vessel transverse bulkhead

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109264579A (en) * 2018-09-30 2019-01-25 广船国际有限公司 A kind of ship turn-over method and protecting tool set-up
CN109533191A (en) * 2018-10-23 2019-03-29 上海江南长兴造船有限责任公司 A kind of hanging method for two phase stainless steel chemical tanker transverse bulkhead medial section
CN109533191B (en) * 2018-10-23 2020-09-25 上海江南长兴造船有限责任公司 Hoisting method for middle section of transverse bulkhead of duplex stainless steel chemical tanker
CN110077520A (en) * 2019-04-30 2019-08-02 上海外高桥造船有限公司 Sectional turn-over main hook hanging horse arragement construction is built on a kind of bulk freighter
CN110171772A (en) * 2019-05-28 2019-08-27 沪东中华造船(集团)有限公司 A kind of method that shipbuilding quickly adjusts split fix in the process
CN111591879A (en) * 2020-05-28 2020-08-28 南通振华重型装备制造有限公司 Novel lifeboat static load test method
CN111591879B (en) * 2020-05-28 2022-03-25 南通振华重型装备制造有限公司 Novel lifeboat static load test method
CN113928497A (en) * 2021-12-01 2022-01-14 沪东中华造船(集团)有限公司 Method for high-altitude dismantling of ship outer plate lifting ring and special tool
CN113928497B (en) * 2021-12-01 2023-12-08 沪东中华造船(集团)有限公司 Method and special tool for high-altitude dismantling of ship outer plate hanging ring

Similar Documents

Publication Publication Date Title
CN108163694A (en) A kind of body section hanging method with hatch coaming
CN101357736B (en) Method for hoisting and turning over large articles using frame crane
CN108455451B (en) A kind of 600 tons of gantry cranes hold the method for hanging installation superelevation flare tower
CN205932941U (en) A device for handling of precast box girder template
CN102019998A (en) Erection embarking method of upper and lower water side cabins
CN108190723A (en) A kind of hanging method with the segmentation of the topside of outside plate bulwark and hatch coaming
CN105799860A (en) Method for overturning C-shaped block of large-size ship
CN205045694U (en) Even deck of boat hoist of atress
CN204342257U (en) A kind of large-scale component turning device
CN201077714Y (en) Container lifting base angle lockhole special slings
CN201077715Y (en) Container lifting base angle lockhole sling with localization
CN105947910B (en) The hoisting of FPSO crane superstructures
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN204198229U (en) A kind ofly realize joining the lifting beam device hanging segmentation tread flaking
CN108163142B (en) Hoisting method of stern springboard
CN207774605U (en) A kind of unit module hoisting fixture for outfititem
CN106043623A (en) Mechanical automatic lifting slipway scaffold assembly
CN203699679U (en) Lifting appliance for lifting wire coil
CN201907631U (en) Rudder blade hoisting device
CN208500119U (en) A kind of boom hoisting of A font cantilever crane
CN201941944U (en) Integral building hoisting lug
CN208856786U (en) Hoisting tooling suitable for Turbo-charged Marine Boiler
CN106629376A (en) Angle-adjustable electromagnetic lifting appliance and adjusting method thereof
CN105129622A (en) Segmental hoisting process method
CN207645676U (en) Locomotive crane arm head pulley mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20190903