CN208500119U - A kind of boom hoisting of A font cantilever crane - Google Patents

A kind of boom hoisting of A font cantilever crane Download PDF

Info

Publication number
CN208500119U
CN208500119U CN201820773275.2U CN201820773275U CN208500119U CN 208500119 U CN208500119 U CN 208500119U CN 201820773275 U CN201820773275 U CN 201820773275U CN 208500119 U CN208500119 U CN 208500119U
Authority
CN
China
Prior art keywords
cantilever crane
boom hoisting
font
pier
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820773275.2U
Other languages
Chinese (zh)
Inventor
罗晓宁
姚俊卿
张小芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Original Assignee
Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd filed Critical Tianhai Fusion Defense Equipment And Technology Ltd By Share Ltd
Priority to CN201820773275.2U priority Critical patent/CN208500119U/en
Application granted granted Critical
Publication of CN208500119U publication Critical patent/CN208500119U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a kind of boom hoisting of A font cantilever crane, the boom hoisting includes: two identical piers, the two piers are symmetricly set in deck in ship structure;Cantilever crane, the cantilever crane is arranged between two piers, and can be rotated on pier, and the cantilever crane is equipped with pulley structure;Two pitching oil cylinders, one end of one of pitching oil cylinder is rotatably arranged on one of pier, the other end can be rotatably set in the side of cantilever crane, one end of another pitching oil cylinder is rotatably arranged on another pier, and the other end can be rotatably set in the other side of cantilever crane;Wire rope lifting winch, the wire rope lifting winch are arranged in deck in ship structure, and the wirerope and pulley structure on the wire rope lifting winch are cooperatively connected.The utility model structure is simple, and installment work is convenient on ship, and specific lifting construction requirement can be realized with minimum manufacturing cost.

Description

A kind of boom hoisting of A font cantilever crane
Technical field
The utility model relates to a kind of special vessel lifting equipments, and in particular to a kind of boom hoisting of A font cantilever crane.
Background technique
In marine engineering, it is often necessary to lift detecting devices between ship deck under water or cargo, these equipment are general Outer dimension is close to cube shaped, and heavier-weight, and there are about tens of tons.Do not needed when lifting it is big hang height, first can be placed on On plate, but need that the farther away region of the disembarkation side of a ship can be hung onto, in order to avoid collide with hull.
Conventional method is that installation ship's crane is realized using crane ship or in deck in ship structure, due to this kind of work Belong to provisional, stage sex work, and generally to hang ability stronger for ship's crane, has revolute function, makees in such lifting It cannot actually play a role in industry activity, belong to extra performance, so above method cost is higher, especially installation lifting The scheme of machine can also be affected to the partial structurtes of original hull since crane pilum load is relatively concentrated, and reequip work It is more troublesome.
Utility model content
The utility model to solve the above-mentioned problems, so that providing a kind of can easily realize that the function of above-mentioned operation is wanted The boom hoisting for the A font cantilever crane asked.
In order to achieve the above objectives, the technical solution of the utility model is as follows:
A kind of boom hoisting of A font cantilever crane, the boom hoisting include:
Two identical piers, the two piers are symmetricly set in deck in ship structure;
Cantilever crane, the cantilever crane is arranged between two piers, and can be rotated on pier, the cantilever crane It is equipped with pulley structure;
One end of two pitching oil cylinders, one of pitching oil cylinder is rotatably arranged on one of pier, The other end can be rotatably set in the side of cantilever crane, and one end of another pitching oil cylinder is rotatably arranged on another structure bottom On seat, the other end can be rotatably set in the other side of cantilever crane;
Wire rope lifting winch, the wire rope lifting winch are arranged in deck in ship structure, the wire rope lifting winch On wirerope and pulley structure be cooperatively connected.
In a preferred embodiment of the utility model, the pier is directly welded at the gunnel position on deck Side.
In a preferred embodiment of the utility model, the cantilever crane is A font.
In a preferred embodiment of the utility model, the pier is equipped with the first hinge and the second hinge, Cantilever crane and the first hinge are cooperatively connected, and pitching oil cylinder and the second hinge are cooperatively connected.
In a preferred embodiment of the utility model, it is equipped with a short beam outstanding at left and right sides of cantilever crane rear, The short beam end is equipped with third hinge, and the third hinge and pitching oil cylinder are cooperatively connected.
In a preferred embodiment of the utility model, the pulley structure includes fixed pulley and leading block, described Fixed pulley is arranged in the top of cantilever crane, and the leading block is located at below fixed pulley, the wirerope on wire rope lifting winch according to It is secondary to be connect with leading block and fixed pulley.
In a preferred embodiment of the utility model, a crossbeam is equipped between two short beams.
The beneficial effects of the utility model are:
The utility model structure is simple, and installment work is convenient on ship, and specific lifting can be realized with minimum manufacturing cost Construction requirement.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 be the utility model face upward state when front view;
Fig. 2 be the utility model face upward state when top view;
Fig. 3 be the utility model face upward state when left view;
Front view when Fig. 4 is the utility model nutation state.
Specific embodiment
In order to be easy to understand the technical means, creative features, achievement of purpose, and effectiveness of the utility model, under Face combines and is specifically illustrating, and the utility model is further described.
Referring to Fig. 1 to Fig. 4, the boom hoisting of A font cantilever crane provided by the utility model comprising hoister winch 2, cantilever crane 4, two pitching oil cylinders 5 and two identical piers 6.
Two piers 6 are symmetricly set on 1 deck of hull, are directly anchored to 1 first of hull especially by welding manner Plate is close to gunnel position, in this way, since pier 6 can directly weld, nothing the original inside floor of positive hull 1 Aperture or reinforcement are needed, thus work very little is reequiped to hull 1.
In addition, being equipped with the first hinge and the second hinge on pier 6.
Cantilever crane 4 is arranged between two piers 6, and its two sides is cooperatively connected with the first hinge respectively, in this way Realizing cantilever crane can be rotated between two piers 6, to realize pitching movement.
Cantilever crane 4 is specially A font, so that stall space is opened with biggish in 4 lower part of cantilever crane, when cargo is hung on deck When upper, it can open in stall space being contained in boom 4 easily.
Pulley structure is equipped on cantilever crane 4, pulley structure is for being cooperatively connected with the wirerope 3 on hoister winch 2.
Pulley structure includes fixed pulley 45 and leading block 44, and fixed pulley 45 is arranged in the top of cantilever crane 4, and leading block Position 44 is in 45 lower section of fixed pulley, and wirerope 3 can successively be connect with leading block 44 and fixed pulley 45, by along 45 He of fixed pulley Leading block 44 slides, to realize lifting.
In addition, being equipped with a short beam 42 outstanding at left and right sides of 4 rear of cantilever crane, cut with scissors in 42 end of short beam equipped with third Point 43, third hinge 43 are used to be cooperatively connected with pitching oil cylinder 5.
Furthermore a crossbeam 46 is equipped between two short beams 42, a crossbeam 46 is for balancing two pitching oil cylinders 5 to respective The additional moment of hinge keeps stable structure.
Two pitching oil cylinders 5, one end of one of pitching oil cylinder 5 are rotatably arranged on one of pier 6 On the second hinge on, the other end can be rotatably set on one of third hinge 43 of cantilever crane 4, another pitching oil cylinder 5 one end is rotatably arranged on the second hinge on another pier 6, and the other end can be rotatably set in cantilever crane 4 A third hinge 43 on.
In this way, being arranged by above structure, when so that pitching oil cylinder 5 being stretched, cantilever crane 4 can be driven to carry out pitching fortune It is dynamic.
Hoister winch 2 is arranged on 1 deck of hull, wirerope 3 is equipped on hoister winch 2, in 3 front end of wirerope Equipped with suspension hook 31, leading block 44 and fixed pulley 45 are sequentially passed through by the wirerope 3 above it, cargo is risen to realize Liter and lowering operation.
Here is the specific work process of the application:
When pitching oil cylinder 5 is fully extended, cantilever crane 4 can be controlled just at upright state, cargo by hoister winch 2 System, directly from slinging above deck;
After being hung to certain altitude, control pitching oil cylinder 5 is retracted, then cantilever crane 4 starts to face upward under tilting forwards, until wait bow When facing upward oil cylinder 5 and being fully retracted, at this moment cantilever crane 4 is approximately in horizontality, and 4 upper end of cantilever crane can lean out ship side maximum distance, at this time Cargo decentralization can be carried out by hoister winch 2;
When cargo recycles, operated by above-mentioned opposite action.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (7)

1. a kind of boom hoisting of A font cantilever crane, which is characterized in that the boom hoisting includes:
Two identical piers, the two piers are symmetricly set in deck in ship structure;
Cantilever crane, the cantilever crane is arranged between two piers, and can be rotated on pier, sets on the cantilever crane There is pulley structure;
One end of two pitching oil cylinders, one of pitching oil cylinder is rotatably arranged on one of pier, another End can be rotatably set in the side of cantilever crane, and one end of another pitching oil cylinder is rotatably arranged on another pier On, the other end can be rotatably set in the other side of cantilever crane;
Wire rope lifting winch, the wire rope lifting winch is arranged in deck in ship structure, on the wire rope lifting winch Wirerope and pulley structure are cooperatively connected.
2. a kind of boom hoisting of A font cantilever crane according to claim 1, which is characterized in that the pier is direct The gunnel position side of welding above deck.
3. a kind of boom hoisting of A font cantilever crane according to claim 1, which is characterized in that the cantilever crane is A font.
4. a kind of boom hoisting of A font cantilever crane according to claim 1, which is characterized in that set on the pier There are the first hinge and the second hinge, cantilever crane and the first hinge are cooperatively connected, and pitching oil cylinder and the second hinge are cooperatively connected.
5. a kind of boom hoisting of A font cantilever crane according to claim 1, which is characterized in that at left and right sides of cantilever crane rear It is equipped with a short beam outstanding, the short beam end is equipped with third hinge, and the third hinge and pitching oil cylinder are cooperatively connected.
6. a kind of boom hoisting of A font cantilever crane according to claim 1, which is characterized in that the pulley structure includes The top of cantilever crane is arranged in fixed pulley and leading block, the fixed pulley, and the leading block is located at below fixed pulley, wirerope Wirerope on hoister winch is successively connect with leading block and fixed pulley.
7. a kind of boom hoisting of A font cantilever crane according to claim 5, which is characterized in that be equipped between two short beams One crossbeam.
CN201820773275.2U 2018-05-23 2018-05-23 A kind of boom hoisting of A font cantilever crane Active CN208500119U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820773275.2U CN208500119U (en) 2018-05-23 2018-05-23 A kind of boom hoisting of A font cantilever crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820773275.2U CN208500119U (en) 2018-05-23 2018-05-23 A kind of boom hoisting of A font cantilever crane

Publications (1)

Publication Number Publication Date
CN208500119U true CN208500119U (en) 2019-02-15

Family

ID=65293500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820773275.2U Active CN208500119U (en) 2018-05-23 2018-05-23 A kind of boom hoisting of A font cantilever crane

Country Status (1)

Country Link
CN (1) CN208500119U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661772A (en) * 2020-04-28 2020-09-15 武汉船用机械有限责任公司 Diving equipment drags hoisting accessory

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661772A (en) * 2020-04-28 2020-09-15 武汉船用机械有限责任公司 Diving equipment drags hoisting accessory

Similar Documents

Publication Publication Date Title
CN101337574B (en) Mounting method of large ship stern-door transmission system
CN101357736B (en) Method for hoisting and turning over large articles using frame crane
CN101492140B (en) Aluminum alloy catamaran whole-boat afloat process
CN109319041B (en) Method for turning over irregular U-shaped block of chemical tanker
CN201756173U (en) Water surface hoisting construction ship with buoyant boxes
CN107792303B (en) Semi-submersible type ocean hoisting platform and operation method thereof
CN102642601B (en) Movable full-rotation type hoisting catamaran
CN101417693A (en) Oceanography engineering module integral hoisting method
CN108163694A (en) A kind of body section hanging method with hatch coaming
US20150217838A1 (en) Method for lowering and hoisting of a load to or from an ocean floor
CN109811661A (en) A kind of Working mechanism set up for boat
CN208500119U (en) A kind of boom hoisting of A font cantilever crane
CN202169997U (en) Heavy lift vessel with door-shaped trusses
CN211281408U (en) A assistance-localization real-time frock that is used for different positions of engineering ship to fall mound
CN105947910B (en) The hoisting of FPSO crane superstructures
CN208882038U (en) Semi-submersible type loads and unloads ship
CN104943825A (en) Mechanical anti-sway method for marine weight lifting
CN112810759A (en) Large heavy workpiece transporting and lifting ship
CN207417081U (en) A kind of semi-submersible offshore lifting platform
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
CN201686393U (en) Derrick mast hoisting tool
CN109110050A (en) Semi-submersible type loads and unloads ship
CN105129632A (en) Grid-type steel sheet pile large cylinder main grid installation construction special-purpose crane ship
CN211004284U (en) Supporting arm type crane reinforcing structure
CN210971453U (en) Large heavy workpiece transporting and lifting ship

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant