CN105799860A - Method for overturning C-shaped block of large-size ship - Google Patents

Method for overturning C-shaped block of large-size ship Download PDF

Info

Publication number
CN105799860A
CN105799860A CN201410840135.9A CN201410840135A CN105799860A CN 105799860 A CN105799860 A CN 105799860A CN 201410840135 A CN201410840135 A CN 201410840135A CN 105799860 A CN105799860 A CN 105799860A
Authority
CN
China
Prior art keywords
section
complete cross
dolly
type complete
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410840135.9A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Original Assignee
JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd filed Critical JIANGSU MODERN SHIPBUILDING TECHNOLOGY Ltd
Priority to CN201410840135.9A priority Critical patent/CN105799860A/en
Publication of CN105799860A publication Critical patent/CN105799860A/en
Pending legal-status Critical Current

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The invention discloses a method for overturning a C-shaped block of a large-size ship. When the weight of the C-shaped block exceeds the safety range of an upper trolley or a lower trolley of a gantry crane of an erection field for conducting independent craning but does not exceed the integral hoisting capacity of the gantry crane, by means of the method, the C-shaped overweight block can be overturned safely, thereby the fitting-out rate of the block is raised, the integrity of the block is improved, hoisting work generated during the erection period is reduced, the erection cycle and the whole construction cycle of the ship are obviously shortened, production efficiency is greatly improved, and quite considerable economic benefits and social benefits are achieved.

Description

A kind of turn-over method of large ship C type complete cross section
Technical field
The present invention relates to the turn-over method of a kind of large ship C type complete cross section, particularly to the hanging method of a kind of large ship cargo hold C type complete cross section, belong to shipbuilding technology field.
Background technology
Along with fitting-out integrity and the size of complete cross section, the weight of boats and ships complete cross section step up, the building technology of boats and ships complete cross section constantly strides forward towards the direction maximized, and has become as the development trend of shipbuilding industry.But, the maximization of complete cross section receives the impact from shipbuilding key element, in the restriction of the loop wheel machine elevating capacity being mainly reflected on dock (or building berth).Considering the safety coefficient of lifting, actual safe elevating capacity will be less.
Summary of the invention
On the basis of tradition processing, adopting General welding and the process equipment of shipyard, by existing parts being made the simple transformation in place, it is achieved that the semiautomatic welding welding of T profile parts, substantially increasing production efficiency.
The invention provides the turn-over method of a kind of large ship C type complete cross section, its weight being applied to work as C type complete cross section has been over closing up the safety range that on the straddle truck in place, dolly or lower dolly individually lift by crane, but during less than the integral hoisting ability of straddle truck.
The present invention is achieved by following steps:
1) apply a kind of tool part landing and standing up, this tool part is positioned when body section makes, is welded in Ship Structure;
2) C type complete cross section always organizes lift-launch with ship hull plate for basal plane, in the middle part of inner bottom plating, main deck, the correct position of main-deck stringer arrange C type complete cross section close up greatly hanger;
3) hanger being arranged in inner bottom plating place hangs lower dolly, is arranged in the hanger in the middle part of main deck and hangs up dolly, and C type complete cross section, to start hoisting and overturning, makes C type complete cross section rotate around landing turning tool part in the process, lands and should arrange necessary chock under turning tool;
4) paying close attention to the stressing conditions of dolly on straddle truck, bear the weight of a part of complete cross section owing to landing turning tool, the stress of upper dolly should control within safety range;
5) after upper dolly stressing conditions is stable, lower dolly breaks off relations, and the hanger being arranged in main-deck stringer place is hung lower dolly, and operation is stood up in the lifting continuing C type complete cross section, until C type complete cross section reaches the state closed up.
The complete cross section quantity of current boats and ships will directly affect overall the closing up the cycle of boats and ships with closing up to hang to count, and after complete cross section maximization, the lift-launch of boats and ships be closed up the shortening in cycle and serve obvious facilitation.Complete cross section divide process in, occur more than the complete cross section of safe elevating capacity unavoidably, how to balance complete cross section weight and quantity, become shipbuilding enterprise have to faced by difficult choice.The turn-over method of a kind of large ship C type complete cross section provided by the invention contributes to enterprise after complete cross section size, weight being increased, and remains able to realize the method that lifting is stood up.It possesses advantages below:
1) adopt and land turning tool part, so as to bear the weight standing up a part of complete cross section in process at C type complete cross section, decrease straddle truck load in complete cross section hoisting and overturning process, make lifting operation remain in the scope of security clearance and carry out;
2) turning tool that lands can be recycled, and is conducive to the raising of shipyard materials'use efficiency;
3) owing to the size of complete cross section and weight are bigger, more outfititem can in the installation of complete cross section stage, and the integrity of complete cross section accommodation outfitting is ensured to greatest extent;
4) the workload reach making to close up greatly, total group of stage and can complete more to close up welding job, closes up greatly the cycle provide strong support for shortening.
Accompanying drawing explanation
Fig. 1 large ship C type complete cross section stand up front schematic diagram.
The front hanger that stands up of Fig. 2 large ship C type complete cross section links up with schematic diagram.
Fig. 3 large ship C type complete cross section land roll schematic diagram.
Fig. 4 large ship C type complete cross section stand up rear schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described, the total segment length of C type 24.5 meters of the present embodiment, wide 8.1 meters, high about 25.6 meters, complete cross section weight about 695 tons, this complete cross section carries out turnover hoisting in dock, and the elevating capacity of two suspension hooks of dolly respectively 350 tons and 350 tons on straddle truck, the elevating capacity of the single suspension hook of lower dolly is 450 tons.The operation of standing up of this C type complete cross section carries out as follows:
1) in the cargo hold turn of the bilge sectional making process of composition C type complete cross section 1, by a kind of tool part 2 welding equipment of standing up of landing on the outside plate of the segmentation turn of the bilge, together carrying out total group with turn of the bilge segmentation;
2) C type complete cross section carries out total group with outside plate for basal plane in depressed place, total group terminate after, carry out lifting and strengthen the installation of supporting construction 3, remove associated construction equipment, and remove scaffold;
3) by steel wire rope, the hook of upper and lower for straddle truck dolly and complete cross section hanger are coupled together, wherein: the hanger 4 being arranged in inner bottom plating place hangs lower dolly, is arranged in the hanger 5 in the middle part of main deck and hangs up dolly;
4) tightening up along with the upper and lower car rope of straddle truck, C type complete cross section is to start hoisting and overturning;
5) chock 6 should be set under turning tool landing, make C type complete cross section rotate around landing turning tool part 2 in lifting process;
6) paying close attention to the stressing conditions of dolly on straddle truck, the stress of upper dolly should control within safety range;
7) after upper dolly stressing conditions is stable, lower dolly breaks off relations, and the hanger 7 being arranged in main-deck stringer place is hung lower dolly, and lower dolly continues to tighten up steel wire rope, until C type complete cross section reaches the state closed up.
In addition to the implementation, the present invention can also have other embodiments, all employings to be equal to replacement or the technical scheme of equivalent transformation formation, all falls within the protection domain of application claims.

Claims (1)

1. the turn-over method of a large ship C type complete cross section, it is characterized in that: described boats and ships divide in cargo area C type complete cross section, and the weight of this C type complete cross section has been over closing up the safety range that on the straddle truck in place, dolly or lower dolly individually lift by crane, but less than the integral hoisting ability of straddle truck, its turnover hoisting comprises the following steps:
1) apply a kind of tool part landing and standing up, this tool part is positioned when body section makes, is welded in Ship Structure;
2) C type complete cross section always organizes lift-launch with ship hull plate for basal plane, in the middle part of inner bottom plating, main deck, the correct position of main-deck stringer arrange C type complete cross section close up greatly hanger;
3) hanger being arranged in inner bottom plating place hangs lower dolly, is arranged in the hanger in the middle part of main deck and hangs up dolly, and C type complete cross section, to start hoisting and overturning, makes C type complete cross section rotate around landing turning tool part in the process, lands and should arrange necessary chock under turning tool;
4) paying close attention to the stressing conditions of dolly on straddle truck, bear the weight of a part of complete cross section owing to landing turning tool, the stress of upper dolly should control within safety range;
5) after upper dolly stressing conditions is stable, lower dolly breaks off relations, and the hanger being arranged in main-deck stringer place is hung lower dolly, and operation is stood up in the lifting continuing C type complete cross section, until C type complete cross section reaches the attitude closed up.
CN201410840135.9A 2014-12-30 2014-12-30 Method for overturning C-shaped block of large-size ship Pending CN105799860A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410840135.9A CN105799860A (en) 2014-12-30 2014-12-30 Method for overturning C-shaped block of large-size ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410840135.9A CN105799860A (en) 2014-12-30 2014-12-30 Method for overturning C-shaped block of large-size ship

Publications (1)

Publication Number Publication Date
CN105799860A true CN105799860A (en) 2016-07-27

Family

ID=56980079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410840135.9A Pending CN105799860A (en) 2014-12-30 2014-12-30 Method for overturning C-shaped block of large-size ship

Country Status (1)

Country Link
CN (1) CN105799860A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109319041A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A method of for chemical tanker, irregularly U-shaped block is turned over
CN109353449A (en) * 2018-10-29 2019-02-19 上海外高桥造船有限公司 Other plate turnover hoisting method
CN110304547A (en) * 2019-05-25 2019-10-08 招商局重工(江苏)有限公司 A kind of turn-over method of cruise segmentation
CN111017843A (en) * 2019-11-15 2020-04-17 沪东中华造船(集团)有限公司 Turning-over hoisting method for rudder horn subsection
CN111559473A (en) * 2020-04-24 2020-08-21 上海外高桥造船有限公司 Hoisting method for bow main section of bulk carrier
CN112811312A (en) * 2021-03-30 2021-05-18 广州文冲船厂有限责任公司 Segmented turning-over method for air guide sleeve

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6050093A (en) * 1983-08-31 1985-03-19 Nippon Kokan Kk <Nkk> Turning over of structure
CN102069893A (en) * 2009-11-24 2011-05-25 江苏新世纪造船有限公司 Segment rolling process of large deck
CN202400253U (en) * 2011-12-19 2012-08-29 大连中远船务工程有限公司 Hanging horse hole structure for segmented hoisting and turning over of ship
CN102963498A (en) * 2012-12-07 2013-03-13 广州中船黄埔造船有限公司 Body section turn-over auxiliary tool
KR20140025734A (en) * 2012-08-22 2014-03-05 주식회사 현대미포조선 Turnover of the block construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6050093A (en) * 1983-08-31 1985-03-19 Nippon Kokan Kk <Nkk> Turning over of structure
CN102069893A (en) * 2009-11-24 2011-05-25 江苏新世纪造船有限公司 Segment rolling process of large deck
CN202400253U (en) * 2011-12-19 2012-08-29 大连中远船务工程有限公司 Hanging horse hole structure for segmented hoisting and turning over of ship
KR20140025734A (en) * 2012-08-22 2014-03-05 주식회사 현대미포조선 Turnover of the block construction
CN102963498A (en) * 2012-12-07 2013-03-13 广州中船黄埔造船有限公司 Body section turn-over auxiliary tool

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109319041A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A method of for chemical tanker, irregularly U-shaped block is turned over
CN109353449A (en) * 2018-10-29 2019-02-19 上海外高桥造船有限公司 Other plate turnover hoisting method
CN110304547A (en) * 2019-05-25 2019-10-08 招商局重工(江苏)有限公司 A kind of turn-over method of cruise segmentation
CN111017843A (en) * 2019-11-15 2020-04-17 沪东中华造船(集团)有限公司 Turning-over hoisting method for rudder horn subsection
CN111017843B (en) * 2019-11-15 2021-11-02 沪东中华造船(集团)有限公司 Turning-over hoisting method for rudder horn subsection
CN111559473A (en) * 2020-04-24 2020-08-21 上海外高桥造船有限公司 Hoisting method for bow main section of bulk carrier
CN112811312A (en) * 2021-03-30 2021-05-18 广州文冲船厂有限责任公司 Segmented turning-over method for air guide sleeve
CN112811312B (en) * 2021-03-30 2023-10-03 广州文冲船厂有限责任公司 Subsection turning method for air guide sleeve

Similar Documents

Publication Publication Date Title
CN105799860A (en) Method for overturning C-shaped block of large-size ship
CN101357736B (en) Method for hoisting and turning over large articles using frame crane
CN108163694A (en) A kind of body section hanging method with hatch coaming
CN204727441U (en) A kind of hoisting crane self-locking sling
CN204775859U (en) A support device for crane wire rope wire rope handling
CN204778459U (en) Double small car container bank bridge
CN201077714Y (en) Container lifting base angle lockhole special slings
CN201077715Y (en) Container lifting base angle lockhole sling with localization
CN205034962U (en) Rotatory double hook of large -tonnage lorry crane
CN205151520U (en) Large -scale ring rolling spare hoist
CN103640674A (en) Multipurpose lifeboat crane
CN204198229U (en) A kind ofly realize joining the lifting beam device hanging segmentation tread flaking
CN108163142B (en) Hoisting method of stern springboard
CN110329908A (en) A kind of heavy lift carrier master hangs connection and hangs test method
CN102328739A (en) Erection-free combined scaffold device for ship
CN210418892U (en) Hoisting tool for steel pipe for ship
CN105129622A (en) Segmental hoisting process method
CN207158599U (en) A kind of suspender of three 40 chi empty vans capable of hoisting
CN202687757U (en) Special hanger for combination of gantry cranes
CN201914830U (en) Rope separator of tower hoist
CN201236104Y (en) Special slings for loading and unloading heavy steel tube
CN205151525U (en) Two board lifting hook
CN102897672A (en) Full-rotation tugboat vertical lifting device and entire boat lifting launching method
CN205023715U (en) A pier loading and unloading multipurpose thick stick
CN216426465U (en) Auxiliary turning-over hanging beam main body device for hatch cover

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160727

WD01 Invention patent application deemed withdrawn after publication