CN108032032A - A kind of horizontal asellate equipment group weldering installation device and method - Google Patents

A kind of horizontal asellate equipment group weldering installation device and method Download PDF

Info

Publication number
CN108032032A
CN108032032A CN201711347780.7A CN201711347780A CN108032032A CN 108032032 A CN108032032 A CN 108032032A CN 201711347780 A CN201711347780 A CN 201711347780A CN 108032032 A CN108032032 A CN 108032032A
Authority
CN
China
Prior art keywords
saddle
main supporting
supporting plate
plate
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711347780.7A
Other languages
Chinese (zh)
Inventor
江大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering Third Construction Co Ltd
Original Assignee
China National Chemical Engineering Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering Third Construction Co Ltd filed Critical China National Chemical Engineering Third Construction Co Ltd
Priority to CN201711347780.7A priority Critical patent/CN108032032A/en
Publication of CN108032032A publication Critical patent/CN108032032A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of horizontal asellate equipment group weldering installation device and method.A kind of horizontal asellate equipment group weldering installation equipment, including Template Saddle and jack, the Template Saddle includes bottom plate, main supporting plate, branch's fagging and top plate, the bottom plate is rectangle level board, main supporting plate bottom is level, main supporting plate is vertically arranged on bottom plate, main supporting plate length is identical with floor length, certain radian is equipped with the top of main supporting plate, top plate is equipped with certain radian, the radian of top plate is identical with the radian at the top of main supporting plate, the radian of top plate is identical with the radian on the outside of the storage tank pre-installed, top plate is arranged on main supporting plate, branch's fagging is several, several branch's faggings are arranged between bottom plate and top plate, it is in 90 degree between branch's fagging and main supporting plate, the jack is several, several jack are arranged under bottom plate.

Description

A kind of horizontal asellate equipment group weldering installation device and method
Technical field
The present invention relates to the installation equipment of preserving jar, more particularly to a kind of horizontal asellate equipment group weldering installation equipment and side Method.
Background technology
In chemical project, when installing inflammable and explosive storage tank, such as butadiene storage tank, in order to ensure safety and the coefficient of expansion It is required that considering the asellate support of storage tank the 5th during design and in concrete structure, concrete structure and storage after work to be installed Filling is enriched with sand between tank, it is entirely sealed within concrete structure.How to carry out group weldering in asellate condition and pacify Design requirement ensures its installation level and angle becomes a great problem in installation process.Existing solution method is to use Roller supporting carries out welding resistance and removes, although so solving the problems, such as welding resistance and setting angle, how to remove roller And ensure that storage tank integral installation is horizontal and angle is with regard to relatively difficult.
The content of the invention
It is an object of the invention to provide ensure its installation accuracy, do not influence design to its technical requirements, allow storage tank close Close the horizontal asellate equipment group weldering installation equipment influenced in space from external force.
Another object of the present invention is to provide a kind of horizontal asellate equipment group weldering installation method.
The above-mentioned purpose of the present invention is achieved through the following technical solutions:
A kind of horizontal asellate equipment group weldering installation equipment, including Template Saddle and jack, the Template Saddle include Bottom plate, main supporting plate, branch's fagging and top plate, the bottom plate are rectangle level board, and main supporting plate bottom is horizontal, main support Plate is vertically arranged on bottom plate, and main supporting plate length is identical with floor length, is equipped with certain radian at the top of main supporting plate, top plate is set There is certain radian, the radian of top plate is identical with the radian at the top of main supporting plate, on the outside of the radian of top plate and the storage tank of pre-installation Radian is identical, and top plate is arranged on main supporting plate, and branch's fagging is several, several branch's faggings be arranged on bottom plate and It it is in 90 degree between branch's fagging and main supporting plate, the jack is several, several jack are arranged between top plate Under bottom plate.
For the ease of installation, the main supporting plate is equipped with hole for hoist.
Preferably, the hole for hoist is two, and two holes for hoist are arranged on main supporting plate both ends.
A kind of horizontal asellate equipment group weldering installation method, its step are as follows:
(1) first, several above-mentioned Template Saddles are made, and several Template Saddles are successively set on bottom of storage tank Portion, and being sling several Template Saddles through hole for hoist with hoisting rope, then with several jack by each Template Saddle top Firmly;
(2) then, very heavy heights of roofs is adjusted, storage tank carries out a group weldering after reaching accurate setting angle and precision;
(3) after the completion of group weldering, permanent saddle is accumulated using cloth sandbag;
(4) Template Saddle and very heavy heights of roofs are repeatedly adjusted, allows storage tank stress to meet that storage tank is normally settled in permanent saddle Afterwards, the installation number of the cloth sandbag of permanent saddle is constantly adjusted, until permanent saddle height meets installation needs, can so be protected Demonstrate,prove permanent saddle not to be subjected to displacement, ensure the setting angle and precision of storage tank;
(5) after meeting installation needs with permanent saddle, Template Saddle and jack are removed, storage tank whole stress is in permanent saddle On seat;
(6) the integral-filled sand of engineering design requirements is finally pressed, by storage tank seal within whole concrete structural environment.
Beneficial effects of the present invention:The horizontal asellate equipment group weldering installation method, it is simple quick, it is existing not only according to construction Field condition simply solves tank battery weldering, technical requirements, and solves and how to remove a group weldering supporting item, ensures its installation essence Degree, does not influence design to its technical requirements, allow storage tank influences in confined space from external force;Template Saddle adds the group of jack Close, not only solve assembling precision needs, meet storage tank resistive weld techniques requirement, also removing supporting item for the later stage provides condition, Permanent saddle is adjusted for the later stage good operating condition is provided at the same time;Permanent saddle uses cloth sandbag, not only meets storage tank peace The required precision of dress, and mounting technique of the design to storage tank of having a full house, ensure that safety and expansion coefficient requirements, are sought from external force Support, be evenly arranged in sand drift, while can prevent electrostatic, it is ensured that safety;The horizontal asellate equipment welding resistance installation method, no The installation specification of dangerous medium reservoirs is address only, and adapts to more chemical project scene, with traditional method Compare, this method not only weldering of satisfaction group and adjustment needs, but also cost-effective in the construction process.
Brief description of the drawings
Attached drawing 1 installs the structure diagram of equipment for a kind of horizontal asellate equipment group weldering of the present invention;
Attached drawing 2 is the structure diagram of the Template Saddle of the present invention;
Label declaration:1- Template Saddles;101- bottom plates;102- main supporting plates;1021- holes for hoist;103- branches fagging; 104- top plates;2- jack;
Embodiment
For the technology contents that the present invention will be described in detail, realize target effect, be explained in detail below in conjunction with embodiment.
The present invention provides a kind of horizontal asellate equipment group weldering installation equipment, including Template Saddle 1 and jack 2, described Template Saddle 1 includes bottom plate 101, main supporting plate 102, branch's fagging 103 and top plate 104, and the bottom plate 101 is horizontal for rectangle Plate, 102 bottom of main supporting plate are level, and main supporting plate 102 is vertically arranged on bottom plate 101,102 length of main supporting plate and bottom plate 101 length are identical, and the top of main supporting plate 102 is equipped with certain radian, and top plate 104 is equipped with certain radian, the radian of top plate 104 and master The radian at the top of support plate 102 is identical, and the radian of top plate 104 is identical with the radian on the outside of the storage tank pre-installed, and top plate 104 is set On main supporting plate 102, branch's fagging 103 is several, several branch's faggings 103 are arranged on bottom plate 101 and top plate It it is in 90 degree between 104, between branch's fagging 103 and main supporting plate 102, the jack 2 is several, several jack 2 are arranged under bottom plate 101.
In the present embodiment, the main supporting plate 102 is equipped with hole for hoist 1021, and hole for hoist 1021 is two, two liftings Hole 1021 is arranged on 102 both ends of main supporting plate.
The present invention also provides a kind of horizontal asellate equipment group weldering installation method, its step are as follows:
(1) first, several above-mentioned Template Saddles 1 are made, and several Template Saddles 1 are successively set on bottom of storage tank Portion, and sling several Template Saddles 1 through hole for hoist 1021 with hoisting rope, then will be each interim with several jack 2 Saddle 1 is withstood;
(2) then, the height of jack 2 is adjusted, storage tank carries out a group weldering after reaching accurate setting angle and precision;
(3) after the completion of group weldering, permanent saddle is accumulated using cloth sandbag, in order to remove Template Saddle 1 and jack 2;
(4) Template Saddle 1 and the height of jack 2 are repeatedly adjusted, allows storage tank stress to meet that storage tank normally sinks in permanent saddle After drop, the installation number of the cloth sandbag of permanent saddle is constantly adjusted, until permanent saddle height meets installation needs, so can be with Ensure that permanent saddle is not subjected to displacement, ensure the setting angle and precision of storage tank;
(5) after meeting installation needs with permanent saddle, Template Saddle 1 and jack 2 are removed, storage tank whole stress is permanent On saddle;
(6) the integral-filled sand of engineering design requirements is finally pressed, by storage tank seal within whole concrete structural environment.
The horizontal asellate equipment group weldering installation method, it is simple quick, simply solved not only according to construction site condition Tank battery welds, technical requirements, and solves and how to remove a group weldering supporting item, ensures its installation accuracy, does not influence design to it Technical requirements, allow storage tank influences in confined space from external force;The combination of Template Saddle 1 plus jack 2, not only solves group Precision is needed, meets storage tank resistive weld techniques requirement, also removing supporting item for the later stage provides condition, while for later stage adjustment forever Long saddle provides good operating condition;Permanent saddle uses cloth sandbag, not only meets the required precision of storage tank installation, but also Mounting technique of the design of having a full house to storage tank, ensure that safety and expansion coefficient requirements, from external force nutrition, is evenly arranged in sand drift In, while can prevent electrostatic, it is ensured that safety;The horizontal asellate equipment welding resistance installation method, not only solves dangerous Jie The installation specification of matter storage tank, and more chemical project scene is adapted to, compared with traditional method, this method is not only full The weldering of foot group and adjustment need, and cost-effective in the construction process.
The foregoing is merely the embodiment of the present invention, is not intended to limit the scope of the invention, every to utilize this hair The equivalent transformation that bright specification and accompanying drawing content are made, is directly or indirectly used in other related technical areas, similarly It is included within the scope of the present invention.

Claims (4)

1. a kind of horizontal asellate equipment group weldering installation equipment, it is characterised in that described interim including Template Saddle and jack Saddle includes bottom plate, main supporting plate, branch's fagging and top plate, and the bottom plate is rectangle level board, and main supporting plate bottom is water Flat, main supporting plate is vertically arranged on bottom plate, and main supporting plate length is identical with floor length, and certain arc is equipped with the top of main supporting plate Degree, top plate are equipped with certain radian, and the radian of top plate is identical with the radian at the top of main supporting plate, the radian of top plate and the storage of pre-installation Radian on the outside of tank is identical, and top plate is arranged on main supporting plate, and branch's fagging is several, several branch's faggings are set Between the bottom panel and top panel, it is in 90 degree between branch's fagging and main supporting plate, the jack is several, several are very heavy Top is arranged under bottom plate.
2. horizontal asellate equipment group weldering installation equipment according to claim 1, it is characterised in that on the main supporting plate Equipped with hole for hoist.
3. horizontal asellate equipment group weldering installation equipment according to claim 2, it is characterised in that the hole for hoist is two A, two holes for hoist are arranged on main supporting plate both ends.
4. a kind of horizontal asellate equipment group weldering installation method, it is characterised in that its step is as follows:
(1) first, several above-mentioned Template Saddles are made, and several Template Saddles are successively set on tank bottom, and Several Template Saddles are sling through hole for hoist with hoisting rope, then are withstood each Template Saddle with several jack;
(2) then, very heavy heights of roofs is adjusted, storage tank carries out a group weldering after reaching accurate setting angle and precision;
(3) after the completion of group weldering, permanent saddle is accumulated using cloth sandbag;
(4) Template Saddle and very heavy heights of roofs are repeatedly adjusted, allows storage tank stress in permanent saddle, meets storage tank normally after sedimentation, The installation number of the cloth sandbag of permanent saddle is constantly adjusted, until permanent saddle height meets installation needs, can so be ensured Permanent saddle is not subjected to displacement, and ensures the setting angle and precision of storage tank;
(5) after meeting installation needs with permanent saddle, Template Saddle and jack are removed, storage tank whole stress is in permanent saddle On;
(6) the integral-filled sand of engineering design requirements is finally pressed, by storage tank seal within whole concrete structural environment.
CN201711347780.7A 2017-12-15 2017-12-15 A kind of horizontal asellate equipment group weldering installation device and method Pending CN108032032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711347780.7A CN108032032A (en) 2017-12-15 2017-12-15 A kind of horizontal asellate equipment group weldering installation device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711347780.7A CN108032032A (en) 2017-12-15 2017-12-15 A kind of horizontal asellate equipment group weldering installation device and method

Publications (1)

Publication Number Publication Date
CN108032032A true CN108032032A (en) 2018-05-15

Family

ID=62102757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711347780.7A Pending CN108032032A (en) 2017-12-15 2017-12-15 A kind of horizontal asellate equipment group weldering installation device and method

Country Status (1)

Country Link
CN (1) CN108032032A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108622564A (en) * 2018-05-22 2018-10-09 江西制氧机有限公司 A kind of tank container frame system
CN115959260A (en) * 2022-12-15 2023-04-14 招商局金陵鼎衡船舶(扬州)有限公司 Full-pressure type LPG transport ship cargo tank integrity hoisting construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3661624A (en) * 1967-12-11 1972-05-09 Price Co H C Method for coating tubular objects
CN202924167U (en) * 2012-12-13 2013-05-08 张永华 A novel steel storage tank provided with glass fiber and resin gluing protection shell layers and supports
CN103567690A (en) * 2013-11-14 2014-02-12 南京奥特电气股份有限公司 Assembly tool for accurately locating large-size storage tank
CN203679576U (en) * 2013-11-21 2014-07-02 付恒 Horizontal assembly welding adjustable saddle type bracket for cylindrical equipment
CN105364369A (en) * 2015-11-23 2016-03-02 中国重汽集团柳州运力专用汽车有限公司 Cement tank rollover welding tool
CN105382784A (en) * 2015-10-30 2016-03-09 莱芜钢铁集团有限公司 Tool for replacing base and roller way of metal mixer
CN107187760A (en) * 2017-06-23 2017-09-22 武汉冶钢结构有限责任公司 Sectional method of the earthing formula storage tank in sand bed

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3661624A (en) * 1967-12-11 1972-05-09 Price Co H C Method for coating tubular objects
CN202924167U (en) * 2012-12-13 2013-05-08 张永华 A novel steel storage tank provided with glass fiber and resin gluing protection shell layers and supports
CN103567690A (en) * 2013-11-14 2014-02-12 南京奥特电气股份有限公司 Assembly tool for accurately locating large-size storage tank
CN203679576U (en) * 2013-11-21 2014-07-02 付恒 Horizontal assembly welding adjustable saddle type bracket for cylindrical equipment
CN105382784A (en) * 2015-10-30 2016-03-09 莱芜钢铁集团有限公司 Tool for replacing base and roller way of metal mixer
CN105364369A (en) * 2015-11-23 2016-03-02 中国重汽集团柳州运力专用汽车有限公司 Cement tank rollover welding tool
CN107187760A (en) * 2017-06-23 2017-09-22 武汉冶钢结构有限责任公司 Sectional method of the earthing formula storage tank in sand bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108622564A (en) * 2018-05-22 2018-10-09 江西制氧机有限公司 A kind of tank container frame system
CN115959260A (en) * 2022-12-15 2023-04-14 招商局金陵鼎衡船舶(扬州)有限公司 Full-pressure type LPG transport ship cargo tank integrity hoisting construction process

Similar Documents

Publication Publication Date Title
CN108032032A (en) A kind of horizontal asellate equipment group weldering installation device and method
CN205661674U (en) Electric magnet positioning device that unmanned aerial vehicle descends on on -vehicle platform that rises and falls
CN105836150A (en) Electromagnet positioning device for landing of unmanned aerial vehicle on vehicle-mounted landing platform
CN104675179B (en) Jack up head tower installation hanger device and head tower construction method
CN105780666A (en) Climbing formwork wall-attaching device and climbing formwork
CN101435270B (en) High layer post subsection butt-joint operating method
CN205296802U (en) Well steel platform
CN104612166B (en) The combination supporting device of a kind of supporting hole wall and method for protecting support
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN104032944A (en) Suspension frame construction platform device
CN204185161U (en) The control system of construction machinery and equipment and mounting or dismounting of getting off for construction machinery and equipment
CN205857006U (en) Novel Bailey bracket
CN107250501A (en) Suspension holdfast
CN206571492U (en) Combined shaft shaft equipment is installed with special-shaped hanging scaffold
CN203247828U (en) Suspension beam placing device
CN107380052B (en) Lift truck carriage
KR102019917B1 (en) Apparatus for embedding pipe support
US20180370352A1 (en) Safety spill-proof fuel tank structure
CN203947455U (en) A kind of Deep Water Steel structure bridging constructional device
CN105084195B (en) Spud leg displacement method
CN206128611U (en) A positioning and clamping device for surmounting integrated construction platform in layer or die carrier
CN105569366B (en) A kind of falling proof device of building Jing Dong
CN104775608A (en) Integrated lifting platform attached device for special layer high position
CN204113339U (en) Evacuation platform for tunnel fixed support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515

RJ01 Rejection of invention patent application after publication