CN108005116A - Assembled cast-in-place concrete structure non-dismantling formwork piping lane - Google Patents

Assembled cast-in-place concrete structure non-dismantling formwork piping lane Download PDF

Info

Publication number
CN108005116A
CN108005116A CN201711343269.XA CN201711343269A CN108005116A CN 108005116 A CN108005116 A CN 108005116A CN 201711343269 A CN201711343269 A CN 201711343269A CN 108005116 A CN108005116 A CN 108005116A
Authority
CN
China
Prior art keywords
dismantling formwork
piping lane
prefabricated
place concrete
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711343269.XA
Other languages
Chinese (zh)
Inventor
林国海
翟洪远
林宣佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Hongsheng House Energy Saving System R&D Center
Original Assignee
Harbin Hongsheng House Energy Saving System R&D Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Hongsheng House Energy Saving System R&D Center filed Critical Harbin Hongsheng House Energy Saving System R&D Center
Priority to CN201711343269.XA priority Critical patent/CN108005116A/en
Publication of CN108005116A publication Critical patent/CN108005116A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The present invention is to provide assembled cast-in-place concrete structure non-dismantling formwork piping lane.Including cast-in-place concrete bottom plate, two prefabricated non-dismantling formwork system wallboards and prefabricated exempt to tear floorboard open, reserve wall anchor bar in the both sides of cast-in-place concrete bottom plate, prefabricated non-dismantling formwork system wallboard includes metal truss and the non-dismantling formwork installed in metal truss both sides, it is prefabricated to exempt to tear the bar-mat reinforcement that floorboard includes bottom surface non-dismantling formwork and is laid on the non-dismantling formwork of bottom surface open, two prefabricated non-dismantling formwork system wallboard vertical runs are in the both sides of cast-in-place concrete bottom plate, it is prefabricated to exempt to tear the top that floorboard is laid in two prefabricated non-dismantling formwork system wallboards open, there is casting concrete load bearing wall in gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard, it is prefabricated exempt to tear open have casting concrete top layer on floorboard.The agent structure of the piping lane of the present invention on construction ground complete by the outer form by batch production, is assembled at the construction field (site), improves the speed of application of piping lane, reduce difficulty of construction.

Description

Assembled cast-in-place concrete structure non-dismantling formwork piping lane
Technical field
The present invention relates to a kind of underground pipe gallery, specifically a kind of assembled underground pipe gallery.
Background technology
Underground pipe gallery is to be built in structures and affiliated facility that Urban Underground is used to accommodate all kinds of municipal engineering pipelines.
Underground pipe gallery is divided into main line piping lane, branch line piping lane and cable piping lane etc. according to species.Which kind of underground pipe gallery applied using Work mode depends on cost and the feasibility implemented, and main line piping lane is because section is big, slots from the big generally use of great, quantities Method, cast-in-place form of construction work.Using fluting method construction, it is impossible to adapt to push pipe demand.Rainy day, northern area winter can not construct. The construction operation time is grown, situ wet operation heavy workload, needs longer concrete curing Enhanced time.Limited by building-site condition System, long time period, and the concrete impermeability made easily locally is oozed not as the concrete made in factory Easily there is construction crack, contain body sidewall entire crack etc. in leakage, culvert pipe.
Rubber water-proof band connection is used between the box culvert segmentation of field fabrication, the drawback is that anti-uneven settlement of foundation ability Difference, interface easily occur dislocation up and down and deformation, cause waterstop by drawing crack;Cast-in-place construction need to stay branch modular space, and earth volume increases, It is also big to surrounding enviroment destructive power, it is unfavorable for the protection of ecological environment.
The content of the invention
It is an object of the invention to provide a kind of construction efficiency that can improve underground pipe gallery, the quality of underground pipe gallery is lifted Assembled cast-in-place concrete structure non-dismantling formwork piping lane.
The object of the present invention is achieved like this:Including cast-in-place concrete bottom plate, two prefabricated non-dismantling formwork system wallboards Exempt to tear floorboard open with prefabricated, wall anchor bar, the prefabricated non-dismantling formwork system are reserved in the both sides of the cast-in-place concrete bottom plate System wallboard includes metal truss and the non-dismantling formwork installed in metal truss both sides, metal truss laying reinforcing bar, described prefabricated to exempt from Tearing floorboard open includes bottom surface non-dismantling formwork and the bar-mat reinforcement being laid on the non-dismantling formwork of bottom surface, two prefabricated non-dismantling formwork system walls Plate vertical runs in the both sides of cast-in-place concrete bottom plate, it is prefabricated exempt to tear floorboard open be laid in two prefabricated non-dismantling formwork system wallboards Top, have casting concrete load bearing wall in the gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard, it is prefabricated to exempt to tear open There is casting concrete top layer on floorboard.
The present invention can also include:
1st, the wall anchor bar is N-shaped.
2nd, the reinforcing bar in the metal truss in prefabricated non-dismantling formwork system wallboard and the wall anchor in cast-in-place concrete bottom plate Gu reinforcing bar is connected.
3rd, the height of the non-dismantling formwork on the inside of prefabricated non-dismantling formwork system wallboard is less than non-dismantling formwork on the outside of metal truss Highly, the prefabricated bar-mat reinforcement for exempting to tear open floorboard stretches out the edge of bottom surface non-dismantling formwork and is connected with the reinforcing bar in metal truss.
4th, the reinforcing bar in metal truss is vertical with metal truss.
5th, the length direction of piping lane is segmental structure, is connected between two sections by flexible connection rubber sealing.
6th, there is the division wall that piping lane is divided into different functional areas in piping lane.
Underground pipe gallery is designed to assembling with pouring the form being combined by the present invention, and the agent structure of piping lane is on construction ground Completed outside by the form of batch production, assembled at the construction field (site), improve the speed of application of underground pipe gallery, reduce construction Difficulty.Some engineerings can not make concrete floor basis, before piping lane is installed, behind can earth backing, resume traffic.There is water Under the conditions of can also construct, be not required to precipitation.
The bell and spigot of the present invention is flexibly connected using cushion rubber, and the preferable antidetonation resist displacement of energy, solves rigid interface sealing The problem of by longitudinal tensioning, antidetonation resist displacement is impacted, and annex anti-corrosive durability is poor, and waterproof safeguard is few.
The main efficacy results of the present invention are embodied in:
1. relative to traditional construction mode, reduce the usage amount of plank sheathing, flitch supporting etc., reduce the comsumption of natural resources, Reduce cost.
2. the prefabricated non-dismantling formwork system of batch production, improves speed of application and construction precision.
3. continuous cast-in-place construction, integral waterproofing good airproof performance.
Brief description of the drawings
Fig. 1 is the assembling stereogram of the present invention(Do not include concrete).
Fig. 2 is the schematic diagram of cast-in-place concrete bottom plate.
Fig. 3 is the schematic diagram of prefabricated non-dismantling formwork system wallboard.
Fig. 4 is the prefabricated schematic diagram for exempting to tear floorboard open.
Fig. 5 is the front view of Fig. 1.
Fig. 6 is the assembling stereogram of the present invention(Including concrete).
Fig. 7 is the schematic diagram of second of embodiment of the present invention.
Embodiment
Illustrate below in conjunction with the accompanying drawings for a more detailed description to the present invention.
With reference to Fig. 1, the first embodiment of the invention includes 1, two prefabricated non-dismantling formwork system of cast-in-place concrete bottom plate System wallboard 2,3 and prefabricated exempt to tear floorboard 4 open.
With reference to Fig. 2, cast-in-place concrete bottom plate specifically includes bottom reinforcement bars 1-1, casting concrete layer 1-2 and positioned at both sides Reserved wall anchor bar 1-3, wall anchor bar is preferably N-shaped.
With reference to Fig. 3, prefabricated non-dismantling formwork system wallboard specifically include be made of shaped steel 2-3, reinforcing bar 2-4 metal truss, Non-dismantling formwork 2-2 on the outside of the metal truss and non-dismantling formwork 2-1 on the inside of metal truss.Non-dismantling formwork passes through Screw is fixed on metal truss, and the reinforcing bar in metal truss can also use in-site installation.Reinforcing bar and gold in metal truss It is vertical to belong to truss.
With reference to Fig. 4, it is prefabricated exempt to tear floorboard open specifically include bottom surface non-dismantling formwork 4-1, be laid on the non-dismantling formwork of bottom surface Bar-mat reinforcement 4-2 and reinforced bar support seat 4-3, and two sides has two layers of reinforcing bar.
Two prefabricated non-dismantling formwork system wallboard vertical runs are prefabricated to exempt to tear floorboard open in the both sides of cast-in-place concrete bottom plate It is laid in the top of two prefabricated non-dismantling formwork system wallboards.After on-site hoisting combination, in prefabricated non-dismantling formwork system wallboard Non-dismantling formwork between gap in have casting concrete load bearing wall, it is prefabricated exempt to tear open have casting concrete top layer on floorboard, And concrete top layer is the low domatic in middle high both sides.
The reinforcing bar in metal truss in prefabricated non-dismantling formwork system wallboard is anchored with the wall in cast-in-place concrete bottom plate Reinforcing bar is connected.
The height of non-dismantling formwork on the inside of prefabricated non-dismantling formwork system wallboard is less than the height of non-dismantling formwork on the outside of metal truss Degree, the prefabricated both sides for exempting to tear the bar-mat reinforcement stretching bottom surface non-dismantling formwork of floorboard open, bar-mat reinforcement are connected with metal truss.
The length direction of piping lane is segmental structure, is connected between two sections by flexible connection rubber sealing.
With reference to Fig. 7, second of embodiment of the invention is on the basis of the first embodiment, is set in piping lane Piping lane is divided into the division wall 5 of different functional areas.

Claims (10)

1. a kind of assembled cast-in-place concrete structure non-dismantling formwork piping lane, it is characterized in that:Including cast-in-place concrete bottom plate, two it is pre- Non-dismantling formwork system wallboard processed and it is prefabricated exempt to tear floorboard open, wall anchor bar is reserved in the both sides of the cast-in-place concrete bottom plate, The prefabricated non-dismantling formwork system wallboard includes metal truss and the non-dismantling formwork installed in metal truss both sides, metal truss cloth If reinforcing bar, the prefabricated bar-mat reinforcement for exempting to tear open floorboard and including bottom surface non-dismantling formwork and being laid on the non-dismantling formwork of bottom surface, two Prefabricated non-dismantling formwork system wallboard vertical runs in the both sides of cast-in-place concrete bottom plate, it is prefabricated exempt to tear open floorboard be laid in two it is pre- The top of non-dismantling formwork system wallboard processed, pours coagulation in the gap between the non-dismantling formwork of prefabricated non-dismantling formwork system wallboard Native load bearing wall, it is prefabricated exempt to tear open have casting concrete top layer on floorboard.
2. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:The wall anchor Gu reinforcing bar is N-shaped.
3. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:It is prefabricated to exempt from form removal The reinforcing bar in metal truss in plate system wallboard is connected with the wall anchor bar in cast-in-place concrete bottom plate.
4. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1, it is characterized in that:It is prefabricated to exempt from form removal The height of non-dismantling formwork on the inside of plate system wallboard is less than the height of non-dismantling formwork on the outside of metal truss, prefabricated to exempt to tear floorboard open Bar-mat reinforcement stretches out the edge of bottom surface non-dismantling formwork and is connected with the reinforcing bar in metal truss.
5. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: Reinforcing bar in metal truss is vertical with metal truss.
6. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: The length direction of piping lane is segmental structure, is connected between two sections by flexible connection rubber sealing.
7. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 5, it is characterized in that:The length of piping lane Direction is segmental structure, is connected between two sections by flexible connection rubber sealing.
8. the assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 1-4 any one, it is characterized in that: There is the division wall that piping lane is divided into different functional areas in piping lane.
9. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 5, it is characterized in that:Have in piping lane by Piping lane is divided into the division wall of different functional areas.
10. assembled cast-in-place concrete structure non-dismantling formwork piping lane according to claim 6, it is characterized in that:Have in piping lane Piping lane is divided into the division wall of different functional areas.
CN201711343269.XA 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane Pending CN108005116A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711343269.XA CN108005116A (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711343269.XA CN108005116A (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Publications (1)

Publication Number Publication Date
CN108005116A true CN108005116A (en) 2018-05-08

Family

ID=62059193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711343269.XA Pending CN108005116A (en) 2017-12-15 2017-12-15 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Country Status (1)

Country Link
CN (1) CN108005116A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576480A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Construction process for trench disassembly-free formwork
CN114351754A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery bottom T-shaped joint and construction method thereof
CN114351755A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery top L-shaped joint and construction method thereof
CN114607140A (en) * 2022-03-14 2022-06-10 中铁三局集团有限公司 Concrete structure free of formwork construction and construction method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204163108U (en) * 2014-10-11 2015-02-18 上海市政工程设计研究总院(集团)有限公司 A kind of can the assembled pipe gallery of stretch-draw in body
CN105625470A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembled prefabricated comprehensive pipe gallery
CN105649108A (en) * 2015-12-24 2016-06-08 中交上海三航科学研究院有限公司 Control method for cracks in side wall of pipe gallery box type tunnel
CN105839667A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN106049536A (en) * 2016-08-01 2016-10-26 安徽三建工程有限公司 Splitting method for assembled integral type waterproof comprehensive pipe rack
CN106245674A (en) * 2016-08-01 2016-12-21 中建五局第三建设有限公司 Hollow wallboard mixes prefabricated assembled pipe gallery and construction method thereof
CN106592631A (en) * 2017-01-12 2017-04-26 建华建材(江苏)有限公司 Precast assembling type underground comprehensive pipe gallery and construction method
CN107188518A (en) * 2017-06-19 2017-09-22 山西金辰绿环建筑技术有限公司 A kind of fireproof non-dismantling formwork
CN207714371U (en) * 2017-12-15 2018-08-10 哈尔滨鸿盛房屋节能体系研发中心 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204163108U (en) * 2014-10-11 2015-02-18 上海市政工程设计研究总院(集团)有限公司 A kind of can the assembled pipe gallery of stretch-draw in body
CN105649108A (en) * 2015-12-24 2016-06-08 中交上海三航科学研究院有限公司 Control method for cracks in side wall of pipe gallery box type tunnel
CN105625470A (en) * 2016-03-13 2016-06-01 青岛润国生态科技发展有限公司 Assembled prefabricated comprehensive pipe gallery
CN105839667A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Construction and manufacturing process of total-prefabricated superimposed assembly type underground pipe gallery
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process
CN106049536A (en) * 2016-08-01 2016-10-26 安徽三建工程有限公司 Splitting method for assembled integral type waterproof comprehensive pipe rack
CN106245674A (en) * 2016-08-01 2016-12-21 中建五局第三建设有限公司 Hollow wallboard mixes prefabricated assembled pipe gallery and construction method thereof
CN106592631A (en) * 2017-01-12 2017-04-26 建华建材(江苏)有限公司 Precast assembling type underground comprehensive pipe gallery and construction method
CN107188518A (en) * 2017-06-19 2017-09-22 山西金辰绿环建筑技术有限公司 A kind of fireproof non-dismantling formwork
CN207714371U (en) * 2017-12-15 2018-08-10 哈尔滨鸿盛房屋节能体系研发中心 Assembled cast-in-place concrete structure non-dismantling formwork piping lane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576480A (en) * 2020-04-20 2020-08-25 中铁建工集团有限公司 Construction process for trench disassembly-free formwork
CN114351754A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery bottom T-shaped joint and construction method thereof
CN114351755A (en) * 2021-12-22 2022-04-15 北京工业大学 Combined shell pipe gallery top L-shaped joint and construction method thereof
CN114607140A (en) * 2022-03-14 2022-06-10 中铁三局集团有限公司 Concrete structure free of formwork construction and construction method

Similar Documents

Publication Publication Date Title
CN101298782B (en) Method and system for basement engineering water proof and water drain
CN108005116A (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN110878700B (en) Tunnel waterproof structure and construction method thereof
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN204753627U (en) Prefabricated comprehensive piping lane
CN111997088A (en) Groove type prefabricated assembly type cable duct bank and working well installation and construction method
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN207714371U (en) Assembled cast-in-place concrete structure non-dismantling formwork piping lane
CN112012763B (en) Construction method of double-layer primary support multi-arch tunnel structure
CN112900294A (en) Lining structure for box culvert repair and construction method thereof
CN113187487B (en) Construction method of double-layer full-section frozen underground excavation station structure of subway
CN110056071A (en) A kind of municipal administration storm sewer assembling module and construction method
CN113186977B (en) Reverse-order construction method for underground comprehensive pipe gallery
CN216077128U (en) Subway double-layer full-section freezing underground excavation transfer station structure
CN115012451A (en) Underground structure induced joint
CN210163936U (en) Pile culvert integrally-assembled steel bone concrete comprehensive pipe gallery
CN101603299B (en) Broken line type dam joint structure and construction method thereof
CN204570725U (en) Assemble superimposed monolithic pipe trench and prefabricated units thereof
CN207211187U (en) Outer wall of underground structure HCMW engineering method composite walls
LU504723B1 (en) Anchoring structure of landfill liner cushion layer using rice husk ash concrete
CN201433386Y (en) Broken-line type dam joint structure
CN213928447U (en) Corrugated steel drainage ditch structure
CN212337307U (en) Arch cover structure of tunnel lower-penetrating river channel
CN214833311U (en) Assembled drainage pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination